127EAX22R0021 SF30 Amendment 002 RFI.pdf
PDF 286 KB Posted
- Attached to
- Construction: Tonto NF Boulder Rec Vegetation Removal Federal contract opportunity
- Solicitation number
- 127EAX21R0021
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 127EAX22R0021 SF30 Amendment 001.pdf | ||
| 127EAX22R0021 Boulder Reed Removal Rev1.pdf | ||
| Exhibit 2 TNF Industrial Fire Precautions Plan.pdf | ||
| Exhibit 1 - 2022 General Decision Number AZ20220017 Heavy Maricopa 02-25.pdf | ||
| Exhibit 3 Boulder Reeds Removal Project Maps.pdf | ||
| 127EAX22R0021 Boulder Reed Removal.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AMENDMENT N0. 2 07/26/2022
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA-FS SOUTHWESTERN REGION 3 PPS-FPO
333 BROADWAY SE
ALBUQUERQUE, NM 87102
USDA-FS SOUTHWESTERN REGION 3 PPS-FPO
PO BOX 640
30 S. CHIRICAHUA DRIVE
SPRINGERVILLE, AZ 85938
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
127EAX22R0021
9B. DATED (SEE ITEM 11)
6/21/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
127EAX22R0021 Answers to questions received 7/26/2022 (see next page).
I. The Closing Date for proposals remains August 11, 2022, 1600 Pacific Daylight Time. Last day to submit questions shall be July 29, 2022, Noon (PDT).
II. All other terms and conditions remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
WARREN ABBOTT, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
07/26/2022 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
127EAX22R0021
Amendment 002 – Page 2 of 2
Question 1: How far into the water shall the contractor remove the existing reeds, or shall all work be just on the beach?
Answer: All reeds and other vegetation, except trees, shall be removed from the shoreline out in the water to the end of the vegetation. Maximum distance from shore to end of veg is approximately 65 feet. Past contractors have made “mats” that look like giant pallets to allow equipment to move out over water to reach the farthest vegetation.
Question 2: Can the contractor shut down access to work zones to prevent pedestrian traffic near equipment? Can the contractor shut down access to the parking lots?
Answer: The site can be closed while the work is being done between November 1st and March 1st. The reason is that the outside this time frame, a closure would impact fee revenue and over congest the other sites and parking along the highway.
Question 3: What is the overall estimated area to be cleared?
Answer: The swimming area is approximately 0.14 acres; the keyhole area is approximately
0.24 acres.