127EAU22Q0038_Statement_of_Work.pdf
PDF 302 KB Posted
- Attached to
- Fort Valley Forest Restoration Federal contract opportunity
- Solicitation number
- 127EAU22Q0038
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_127EAU22Q0038.pdf | ||
| Exhibit1_Detailed_Info_Sheet_2022_FVEF.pdf | ||
| Sol_127EAU22Q0038 _Schedule_of_Items.pdf | ||
| Exhibit2_FVEF-2022ContractMap.pdf | ||
| Exhibit3_Excerpts_FSH_2409-17.pdf | ||
| Exhibit4_Planting_Inspection_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Forest Service Solicitation 127EAU22Q0039 Chris Wissen christopher.wissen@usda.gov
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Fort Valley Experimental Forest Planting
C.1 - INTRODUCTION
C.1.1 Background
The Flagstaff Ranger District of the Coconino National Forest has a need of tree planting services to restore and reforest lands burned after wildfire. The purpose of this contract is to secure tree planting services in a manner that insures tree survival and growth. Tree survival and growth is dependent on the initial health of the tree seedlings, the manner in which trees are handled and planted, environmental conditions such as soil moisture and weather, and animal damage to the seedlings. The services secured with this contract will focus on the need to provide appropriate tree handling and planting techniques during a period when environmental conditions are most favorable to insure tree survival. Approximately 26 different seed lots are to be planted in this project. The 137-acre planting unit will be delineated into internal subdivisions for each set of seed lots.
C.1.2 Scope of Contract
The solicitation is for tree planting services on the Flagstaff Ranger District of the Coconino National Forest. The Forest expects to plant 41,100 seedlings on approximately 137 acres. These quantities may vary by +/- 20% depending on the number of seedlings delivered, and plant ability of the project area. The Contractor shall furnish all labor, equipment, quality control inspections, supervision, transportation, seedling transport, supplies (except those designated as Government furnished), and incidentals to perform all work necessary on the areas specified in the contract. The contract includes tree handling and planting and installation of tree shelters to provide the seedlings with the greatest chance of survival.
There are about 26 different seed lots being planted; the contractor must work closely with the COR and Forest Service representative to ensure seed lots are planted within the appropriate subdivision. All aspects of the work program shall be performed in an organized, systematic manner to assure services shall be performed over the entire unit.
Safety Alert: Contractor needs to be aware that there are standing dead trees at all planting sites that have the risk of falling at any time. These snags and burned trees are present in all planting units and have the risk of blowdown or falling debris, especially during windy conditions.
C.1.2.1 This contract is a performance based, firm-fixed price contract.
C.1.2.2 The performance period will begin approximately July 25, 2022. This date is weather and site dependent.
C.1.3 Description, Location and Access.
Items 1.1 was burned in a wildfire in 2000. There are only a few snags and burned trees present in these planting units and the potential exists for blowdown or falling debris, especially in windy conditions. Most of the acreage is plantable. Units may have 40-80 percent grass/forb cover with less than 5% brush.
Percent slope for the item average 5%. Elevation ranges from 7,500 feet to 7,700 feet above sea level. Contractor and planting workers shall use proper safety precautions regarding safety hazards attributed to dead standing trees and other site hazards throughout the planting area. See Exhibit 1 for additional information on bid items.
The soil is of volcanic origin. Rock cobble is present throughout the project area. Most of the area is plantable, there is competing vegetation, very large/heavy logs, or other factors present.
C.1.3.1 Access Routes
Access to the Planting Site: from Flagstaff, West on I-40 to Bellemont interchange exit, left (West) on frontage to FR 171, to East on FR 222A to planting site. Or from Flagstaff, North on US-180, to West on FR 222, to West on FR 222A, to planting site. The site can be access by regular vehicles without high clearance. However, during times of excessive rain, rutting can occur on the roads. The COR/Inspector may restrict off-road travel (including non-designated roads) when vehicles are likely to create resource damage (as determined by the COR/Inspector).
There will be no resources damaged during tree planting operations.
Seedlings will be delivered by FS to planting site. Seedlings will be in boxes which contain approximately 250-300 seedlings (approximately 11,900 Seedlings total).
The contractor must have appropriate vehicles, trailers and equipment that will be able to transport, store and protect seedlings. Past contracts have planted 5,000+ seedlings per day which translates into about 16-20 boxes.
Boxes are around 2ft x 2ft x 3ft in size.
The contractor is responsible for proper protection during transportation and care once the seedlings are stored at each unit. The Contractor will provide reflective shade tarps for use at the planting sites. The project is in old fire scar. These sites will have flagged boundaries.
The contractor is responsible to pick up tree shelters from the Mormon Lake Work Center: 4373 Lake Mary Road, Flagstaff, AZ. It is up to the contractor to determine when and how many tree shelters to pick up for smooth continuous operation.
C.1.3.2 Access: Refer to Government-furnished services in Section C.3 and Contractor Requirements in Section C4.1.1 for additional information.
The planting periods starts about mid-July to the end of August 2022.
SECTION C2 – DEFINITIONS
Acceptable established tree: An existing conifer of seedling and/or sapling size that is of good form, color, free of damage, has 50% or greater crown ratio, and is the species and size specified in the Detailed Information Chart, Exhibit 1.
Acceptable Service: A job performed to the standard and within the acceptable quality level. The Contractor must do the specific job, and meet the standard, and meet the acceptable quality level before one can say that performance is acceptable for payment.
Acceptable Quality Level (AQL): The maximum allowable deviation from perfect performance that may occur before the Government will invoke payment deduction. An AQL does not allow a contractor knowingly to offer defective service, but limits reduced payment to circumstances in which defective performance results in a measurable reduction in the value of services rendered.
Access Point: The point identified for access to planting areas.
Animal Damage Control: Methods for protecting the seedlings from animal damage, particularly big game. May include tree protection shelters.
Artificial Shade: Materials not found on the planting site used to shade the trees
Best Value: One criterion used for selecting a service contractor for award, based on comparison of the service price offered, with the quality of service offered.
Calendar Days: Every day shown on the calendar, Sundays and holidays included.
Clean water and buckets: Water and buckets used for tree dipping that are free of contaminants that could injure the trees. Water is initially suitable for human consumption.
Clearing: Removal of surface debris around the planting hole to avoid debris from falling into the hole. Debris includes duff, litter, rotten or charred wood, moss, loose rock, ashes, snow, and surface frost.
Contracting Officer (CO): A Government employee with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contract Time: See Period of Performance.
Container plug: Seedling grown in a receptacle containing soil and nutrients. When the container seedlings are extracted from the receptacle, the soil stays intact around the roots. The soil and roots together are referred to as the container plug; the soil is the container media.
Contracting Officer’s Representative (COR). A Government person appointed by the contracting officer (CO) to help the CO with the contract administration and surveillance. The duties and responsibilities of a COR are defined in the letter of designation by the CO.
Delivery Point: The point identified for delivery of trees and other supplies. If there are multiple points of delivery of various items, it will be so noted.
Defective Service. A unit of service that contains one or more defects, or nonconformance with specified requirements.
Drip line: The line extending vertically from the exterior edge of a tree’s live crown to the ground.
Foreign material (in the planting hole): Large rocks, sticks, litter, or similar material not part of the surrounding soil substrate that is in the planting hole after the tree is planted.
Ground line of tree before planting: The original ground line of the tree before planting is the soil surface level in the nursery beds or in the container receptacle. It is between the cotyledon scar and the rot collar.
Inbox temperature: The temperature near the center of the box of trees measured with a probe thermometer or similar instrument. This is the temperature of the seedlings while in the shipping box.
Lateral roots: The horizontal roots extending from the main vertical (tap) root.
Microsite: A plantable spot favorable to seedling survival and growth. Examples of favorable microsites are stumps, down logs, large slash, snags, and standing cull trees that provide protection from sun, wind, animals, and other damaging agents.
Moist soil (in the planting hole): The soil in the planting hole is considered “moist” if it is similar in moisture to the undisturbed soil next to the planting hole at similar depth.
Period of Performance (also Performance Period or Contract Time): The number of calendar days allowed in the contract for completion of the contract work. Includes all days of the week including weekends and holidays.
Plantable spot: An area where a tree can be planted in accordance with all specifications in the contract. In the Planting Inspection method, a plantable spot is also any area where the contractor has planted a tree.
Protection: Natural and artificial materials that act as an obstacle protecting the tree from animal or other injurious agents. The protection material and effort required by the planter to protect the tree varies depending on the site conditions of each unit.
Quality Assurance: Those actions taken by the Government to assess the Contractor’s results to determine that they meet contract requirements. The methods for quality assurance are described in the Quality Assurance Surveillance Plan (QASP).
Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance surveillance. The document contains specific methods the Government will use to perform surveillance of the contractor.
Quality Control. Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS. The methods for inspecting for quality control are described in the Contractor’s Quality Control Plan (QCP).
Planting Inspection: The standard planting inspection procedure as described in Forest Service Handbook, R3 Supplement 2409.17 (effective 5/31/2002), 2.82 part 2 (refer to Section C.5.1 for internet access) and provided in Exhibit 3.
Residual Tree: Live trees remaining in the unit after the harvest or fire activity.
Root Length: The length of root measured from the original ground line to the end of the main vertical tap root.
Satisfactorily Planted Tree: A tree that is planted in accordance with C.4.4.1.
Scalping: The removal of live vegetation, including roots, to reduce competition from existing vegetation and to expose mineral soil. The diameter of the scalp and the maximum depth of the scalp are specified in the Detailed Information Chart, Exhibit 1.
Shade: Natural and artificial materials that protect the trees from the sun’s heat and wind. The type of shade material and effort required by the planter to shade the tree varies depending on the site conditions of each unit.
Stationary Material: Natural material used to shade or protect the tree that is not movable by the planter. Natural stationary material includes items such as stumps, logs, dead brush, rocks, or terrain features used to provide the required protection to the tree. Stationary material generally offers the most shade and protection for seedlings from the sun and animal trampling.
Seedling Protection Tube: A mesh or solid plastic or plastic-like material formed into a tube that is placed over a seedling to provide protection from animal browse or desiccation. It may be secured with a stick to the ground, or have staking legs attached to the base. Assembly may be required.
Top Height: The length from the original ground line to the top of the terminal leader; does not include needles extending above the leader.
Transportable Shade: Natural material such as wood debris that can be moved to the planting spot to shade the tree from the sun.
Tree Shelters: Plan on having two different types of tree shelters on site due to the current market. One- or two-piece structure of opaque/diffuse plastic with minimal ventilation and the structure will be attached to ground with at least two sturdy attachment points. (e.g., two wooden stakes zip-tied to tube, or metal tines integrated into the tube, or other system). They will stand 15”-24” in height, cylindrical in shape, and have a 3-5” top diameter.
Or. Pre-assembled with three wire staking legs attached to the base which allow 8” of soil penetration for stability.
The shelter will be manufactured of solid polymer material with no mesh, and sufficiently rigid to allow the shelter to be pushed into workable soil without the use of driving tools. The shelter shall be conical in shape, approximately 18 inches in height, with the base being approximately 7 inches in diameter and tapering to approximately 4 inches at the open top. The shelter shall be made of translucent materials and include design features that allow the shelter to photo-degrade over a period of 5-7 years and separate or fracture and, in the event the shelter is never removed, not constrict the developing seedling which it protects as it matures into a tree.
Trees in Possession of the Contractor: The time after trees have been issued to the Contractor. During this time, the Contractor is responsible for all aspects of tree care and accountable for tree quantities.
Unplantable Spot: An area where a tree cannot be planted satisfactorily, and no tree has been planted. An allowance is given in the standard R-3 Planting Inspection for unplantable spots within the plot.
• In hoe planting, a spot is considered unplantable if a suitable spot for planting a tree cannot be found after three attempts of throwing the hoe, and if the hole cannot be opened at the spot with five swings or less.
• In auger planting, a spot is considered unplantable if a suitable spot cannot be found after three attempts at clearing or scalping to find a plantable spot, and then after three attempts to open the hole in the spot with auger fail.
Unsatisfactory Planted Tree: A planted tree which fails to meet one or more of the specifications of a satisfactorily planted tree (see C4.4.1). Refer to definitions for planting violations described by R-3 Planting Inspection. Refer to planting violations as described in FSH 2409.17, 2.82 provided in Exhibit 5, Reference E.2.2.
Spacing: Use 12-foot x 12 foot spacing on planted sections. At this spacing an average of 300 trees per acre should be planted correctly on each acre planted. When unplantable acres are encountered in the unit, an average of 300 trees per acre should occur across the entire unit by utilizing closer spacing in plantable areas. Contractor will consult with COR or FS representative to determine where to shift trees to be planted. Only planted sections will be inspected using the Planting and Inspection Sheet (Exhibit 3), while unplanted sections will be inspected visually for their plantable, size, and number. Clarifications for such units will be covered thoroughly in the prework meeting.
Wasted Material: Material provided to the Contractor to conduct a task such as installing tree shelters that are lost, dropped, or damaged by the Contractor, or which are installed on trees not in accordance with the requirements of the contract.
Wasted Tree: A tree which is lost, damaged, destroyed or handled contrary to the standards for care of trees.
Planted trees that exceed the maximum number of trees in the R-3 Planting Inspection plot procedure are also considered wasted trees.
C.3 – GOVERNMENT FURNISHED PROPERTY and SERVICES
The Government will provide the following items of Government property and services to the Contractor for use in in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.
The property and services that will be provided by the Government are as follows:
Item Description Where, When, How
3.1 Detailed Information Chart Chart with unit specifics Provided in Solicitation, also provided in Exhibit 1.
3.2 Project Maps Maps (2) of planting units with
access roads, access point(s) identified
Provided in solicitation, also provided in Exhibit 2A-2B
3.3 Access Roads The Government will provide
access to the access point(s). The Government will initially clear down trees from the access roads.
Access roads are accessible by two-wheel drive vehicle equipped for mountain driving.
At least one Forest Service Road to access each unit.
3.4 Trees- planting stock Container Grown Trees: Length of
container plug will range from 5 to 8 inches. Top heights range from 4 to 14 inches. At least 90% of the trees will meet these specifications.
Provided on written order with sufficient advanced notice.
Delivered to delivery point
3.5 Electronic files of all unit
boundaries
Files for use in newer Garmin GPS units (format for other GPS and .kml files for viewing in Google Earth may be available), NAD 83 Zone 13N
Will load GPS files onto Contractor’s GPS after pre-work. Kml files upon request delivered electronically.
3.6 Planting Inspection Sheet Form R3-2470-9. Quantity
necessary to inspect the contract.
[OR one copy provided, to be duplicated by contractor]
Provided at Pre-work meeting.
Sample provided in Exhibit 3.
3.7. Campsite, if requested. See Section C.4.3.1.1 and Section H Permit issued by District within 5 working days of advanced request.
3.8. USFS Silvicultural Practices
Handbook, FSH 2409.17
Southwest Regional Issuances of Reforestation Handbook – Regional Supplement Sections cited in this contract.
Available at the following weblink:
http://www.fs.fed.us/cgi-bin/directives/get_dirs/fsh?2409.17
3.9 Tree Shelters The Government will provide a mix
of new and used tree shelters.
Shelters will be picked up by contractor from the Mormon Lake Work Center. Some shelters may be delivered by FS but not all.
C.4 – CONTRACTOR WORK REQUIREMENTS and STANDARDS
C4.1. General.
C4.1.1 Road Access. The Contractor may use system roads and service roads that run through the project areas for access with motorized vehicles such as cars, trucks, or other mechanized equipment to perform work during normal operating seasons. The COR will approve the use, and conditions of use, of any road not shown on the project or unit map. Cross country travel will be approved with the use of low impact vehicle such as an ATV or
UTV.
C4.1.2 Cultural and Historic Sites. All cultural and historic sites will be protected. Most sites will be protected by complete avoidance by mechanized equipment. No tree planting (auger hole drilling) will occur within protected http://www.fs.fed.us/cgi-bin/directives/get_dirs/fsh?2409.17 http://www.fs.fed.us/cgi-bin/directives/get_dirs/fsh?2409.17 sites. Designated site boundaries will be identified and flagged (white flagging) by the Forest Service prior to operations.
C4.1.3 Tree Transport within Unit. The Contractor may transport trees from the access point to portions of the unit at the Contractor’s discretion consistent with any restrictions on motorized or other vehicle type specified in the contract/task order and with COR approval.
C4.1.4 Walk-in Units. The unit cannot be accessed from open forest roads. The Contractor shall transport trees to the unit using the method of his/her choice consistent with any restrictions on motorized or other vehicle type specified in the contract/task order and with COR approval.
C4.1.5 Tree Orders and Delivery. The Contractor shall order in advance of desired delivery according to agreement with COR.
C4.1.5.1 Returned Trees. The Contractor shall plant all trees ordered and delivered to the planting unit within 24 hours of delivery unless otherwise approved by the COR. Trees shall not be returned to the Government for cooler storage unless approved by the COR. When the COR determines that conditions are unsuitable for planting, the Contractor shall return all unplanted trees to the delivery point with no penalty for delay in planting the delivered trees.
C4.1.6 Return Government Equipment. The Contractor shall return unused Government supplies, unplanted trees, all packaging materials, and wrapping materials to the delivery point daily.
C4.2 Tree Handling and Care
C.4.2.1 The Contractor shall be responsible for the care of trees from the delivery point and throughout the time that the trees are in possession of the Contractor to assure they are properly cared for and not damaged or exposed to damaging conditions consistent with FSH2409.17, 2.53 parts 6 and 7, provided in Exhibit 5 Reference.
C.4.2.2 Trees not properly cared for may be considered wasted trees.
C.4.2.3 To prevent crushing and damage, at all times while the trees are in the possession of the Contractor, tree boxes shall not be stacked greater than 4 boxes high.
C.4.2.4 Contractor shall not alter the trees (includes no root or top pruning).
C.4.2.5 Contractor shall take precautions to keep roots moist during the planting operation.
C.4.2.6 The Contractor shall be aware of environmental hazards which affect tree survival; he/she shall alter crew work schedules and tree handling practices to allow planting whenever possible. Environmental hazards are described in FSH 2409.17, 2.53 part 8 and 2.82 part 1c. (2) and provided in Exhibit 4.
C.4.2.7 The Contractor shall maintain the internal box temperature of tree boxes that are in possession of the Contractor at or below 40 degrees Fahrenheit.
C.4.4 Tree Planting
C.4.4.1 Satisfactorily Planted Tree. Trees shall be planted satisfactorily both above and below ground as defined in FSH 2409.17, 2.67. Trees shall be planted in moist soil, free of foreign debris, and in a hole deep enough to accommodate the fully extended tree roots, and shall meet all requirements of the contract. The open-hole method shall be used as described in FSH 2409.17, 2.63, and provided in Exhibit 4.
C.4.4.2 Clearing and Scalping. Each planting spot shall be free of surface debris and competing vegetation consistent with FSH 2409.17, 2.62, parts 1 and 2. The minimum clearing and scalping distances and the maximum clearing and scalping depths are stated in the Detained Information Chart, Exhibit 1. After the tree has been planted, surface material must be pushed back over the cleared surface to serve as mulch. The distance may differ from those stated in FSH 2409.17, 2.62.
C.4.4.3 Shade. Trees shall be planted in the best microsite available to mitigate problems associated with hot, dry aspects, consistent with FSH 2409.17, 2.61, parts 2 and 3a, and unit specific shade requirements as identified in Detailed Information Chart, Exhibit 1 and Shade Requirements, Exhibit 1A. 2. Stationary material first, then plant in open. A tree shall be planted next to stationary material when it is available. When stationary material is not available, tree may be planted in the open.
Each tree shall be as close to the shade material as possible or within a distance that is less than ½ the height of the shade. Planting adjacent to the shade shall not impede the ability to install the tree shelter.
C.4.4.3.1 When shade is required, each tree shall be shaded at the ground level from the afternoon sun (approximately 2-4 pm), except on east-facing slopes when the tree shall be shaded from the morning sun.
C.4.4.4 When seedling protection shelters are required, shelters should be installed vertically (+/- 15 degrees) with the base of the shelter flush with the ground. Shelters shall be installed so as not to damage the tree, including skinning the bark, breaking the leader, damaging roots, or needle stripping. The terminal bud of the seedling must be unattached to the shelter. The shelters must be installed during the same day the trees are planted.
C4.4.5 Spacing. Trees shall be planted to achieve the average spacing specified in the Detailed Information Chart, Exhibit 1, typically 12x12 spacing on fully plantable sections. It is expected that irregular distribution and will result as planters avoid acceptable established trees, rock or shallow soils, and seek planting spots in the best microsites and soil conditions. For individual trees, the spacing may be varied as much as 25 percent in any direction to attain the best plantable spot. The number of trees planted shall not be materially changed by the method of selecting planting spots.
C4.4.6 Acceptable Established Trees. A tree shall not be planted in direct competition with an acceptable established tree. Refer to the Detailed Information Chart, Exhibit 1 for species and size of acceptable trees. Do not plant a tree closer than 75% of the established spacing to an acceptable established tree.
C4.4.7 Residual Trees. Trees shall not be planted within the immediate influence of established larger trees in the unit. Do not plant within the dripline of a live residual tree that is a conifer with at least 25% live crown.
C4.4.8 Trees Not Meeting Specifications. The Contractor is not obligated to plant trees that do not meet the specifications in C.3.4, and they shall be returned to the Government. If trees not meeting specifications are planted, they shall be planted satisfactorily.
C.4.4.9 Quality Control. Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS. The Contractor shall prepare a Quality Control Plan as described in Section E.
The Contractor shall inspect the work in accordance with the accepted Quality Control Plan.
C.4.4.10 The Contractor shall prepare a work plan and schedule that demonstrates that work will be completed within the performance period described in Section F. The Contractor shall provide a general plan with the technical proposal. A supplementary plan and schedule shall be provided after contract award, but at least 5 days before start work.
The Contractor shall update the work plan as work is in progress to account for changes; and the updated work plan may be accepted by the Contracting Officer.
C.4.4.11 Camping and Worksite Conditions. The Contractor shall prepare a Camping and/or Worksite Plan and operate in a manner that will protect the environmental resources and the public facilities. The conditions will be consistent with the requirements of Section H, Section I.
C.4.4.12 Communications. The Contractor shall keep the Contracting Officer advised as to where the Contractor can be reached prior to start of Contract Time. Further, the Contractor shall maintain contact with the Contracting Officer during periods of work suspension to reduce any delay in resuming planting and to determine the best suitable time and conditions to resume planting.
C.4.4.13 On-site Representative. The Contractor’s on-site representative shall be fully conversant and literate in the English language and shall be in the work area whenever work is in progress. Refer to F.3 Superintendence by the Contractor. The Contractor’s Inspector shall also be conversant and literate in the English language.
C.4.4.14 Crew Safety. The Contractor shall consider and address crew safety and provide a Safety Plan consistent with FAR 52.236.13 Accident Prevention Alt. I, recognizing that all subitems may be in areas of snags and fire burned trees.
C.4.4.15 Special Restrictions. Do not move large rocks or logs. Do not plant trees on roads, hiking trails, or animal trails.
C.4.5 Shelter Installation
C.4.5.1. When seedling protection shelters are required, shelters should be installed vertically (+/- 15 degrees) with the base of the shelter flush with the ground. Shelters shall be installed so as not to damage the tree, including skinning the bark, breaking the leader, damaging roots, or needle stripping. The terminal bud of the seedling must be unattached to the shelter. The shelters shall be installed during the same day the trees are planted.
C.4.5.2. Shelters shall be installed concurrently with the planting to protect trees from the afternoon sun and wind. Installation shall be consistent with directions in Section J, Exhibit 6.
C.4.5.3. Shelters shall be installed so as not to damage the tree including skinning the bark, breaking the leader, damaging rots, or excessive bud stripping.
C.4.5.4. Tree Shelters shall be pre-assembled with three wire staking legs attached to the base which allow 8” of soil penetration for stability. The shelter will be manufactured of solid polymer material with no mesh, and sufficiently rigid to allow the shelter to be pushed into workable soil without the use of driving tools. The shelter shall be conical in shape, approximately 18 inches in height, with the base being approximately 7 inches in diameter and tapering to approximately 4 inches at the open top. The shelter shall be made of translucent materials and include design features that allow the shelter to photo-degrade over a period of 5-7 years and separate or fracture and, in the event the shelter is never removed, not constrict the developing seedling which it protects as it matures into a tree. (Example: https://www.treesentry.com/ ).
C.5 STANDARDS
C5.3.4. Spacing. For individual trees, the spacing may be varied as much as 25 percent in any direction to attain the best plantable spot. The number of trees planted shall not be materially changed by the method of selecting planting spots. Juniper and Oak are not counted in the spacing. Where Variable-Group spacing is used, only planted sections will be inspected using the Planting and Inspection Sheet (Exhibit 3), while unplanted sections will be inspected visually for their placement, size, and number. At least half of the total unit acreage must be planted unless approved otherwise in writing by the COR.
https://www.treesentry.com/
C.5.1. Mandatory Standard. The following sections from the Forest Service Handbook, R3-Supplement 2409.17- 2002-1 (effective 4/29/2002), Chapter 2 – Reforestation, are mandatory for execution of this contract.
Sections: 2.53 parts 6-8, 2.61, 2.62 parts 1 and 2, 2.63, 2.66, 2.67, and 2.82 parts 1.c and 2.
Sections mandatory for contract execution are provided as guidelines; the complete handbook is available at:
http://www.fs.fed.us/im/directives/field/r3/fsh/2409.17/2409.17_2.01_2.5.doc http://www.fs.fed.us/im/directives/field/r3/fsh/2409.17/2409.17_2.6_2.9.doc
C.5.2. Non-Mandatory Standard. The following references do not supersede direction given in C.5.1 or requirements set forth in this contract, but provide background and supporting information that may be useful to a prospective offeror.
C.5.2.1. The Forest Service Handbook, R3-Supplement 2409.17-2002-1 (effective 5/31/2002), Chapter 2 – Reforestation exclusive of the sections listed in C.5.1. The handbook is available at the website specified in C.5.1.
C.5.2.2. Tree handling and planting procedures that are acceptable are like those generally accepted for planting seedlings in forested conditions. There are several references describing the care and planting procedures. One reference is Reforestation Practices in Southwestern Oregon and Northern California (eds. Stephen D. Hobbs, Steven D. Tesch, Peyton W. Owston, Ronald E. Steward, John C. Tappeiner II, Gail E. Wells), Oregon State University Corvallis, Oregon. Specifically refer to Chapter 14, Seedling Handling and Planting by Robin Rose, pp. 330, 334-343.
http://www.fs.fed.us/im/directives/field/r3/fsh/2409.17/2409.17_2.01_2.5.doc http://www.fs.fed.us/im/directives/field/r3/fsh/2409.17/2409.17_2.6_2.9.doc
C.6 PERFORMANCE REQUIREMENTS SUMMARY (PRS)
The following describes the major items in the contract with the consequences for meeting or not meeting the performance standard for the work described. Items below are included here as described.
Work Statement
Performance Standard Government Method of Assessment
Consequences for Meeting or not Meeting Performance Standard
C.4.2 Tree Handling and Care
-Contractor shall be responsible for care of the trees throughout the time that trees are in the Contractor’s possession to assure they are not damaged or exposed to damaging conditions consistent with FSH 2409.17, 2.54 parts 4 through 7.
-Trees not properly cared for may be considered wasted trees.
-Contractor shall not alter tree seedlings (includes no root or top pruning) -Contractor shall take precautions to keep roots moist during the planting operation.
-Contractor shall be aware of environmental hazards which affect tree survival.
-Contractor shall alter crew work schedules and tree handling practices to allow planting whenever possible
COR and Inspector will monitor operations and conduct random samples.
-The Contractor’s care and handling of trees will affect the performance assessment as either a positive or negative incentive.
-If contractor does not meet the standard and/or take corrective action, the Government may collect damages (Section G.4), and provide adverse performance assessment.
C.4.3 Tree Planting
-Planting quality meets or exceeds performance standard of 90% quality -Trees shall be planted in the best microsite available to mitigate problems associated with hot, dry aspects, consistent with FSH 2409.17, 2.61.
-A tree shall not be planted in a manner that directly competes with an acceptable established tree (see definition C.2) or another planted tree.
COR or inspector will conduct periodic inspections consisting of plots consistent with R-3 Planting Inspection (FSH 2409.17, 2.82, part 2).
-The Contractor’s care and handling of trees will affect the performance assessment as either a positive or negative incentive.
-If Contractor achieves 90% planting quality or greater, full unit price is paid G.3.2.1.
If Contractor does not achieve at least 90% quality, is as per Section G.3. May result in adverse performance assessment.
C.4.4 Shelter installation
- Shelters should be installed vertically (+/- 15 degrees) with the base of the shelter flush with the ground. Shelters shall be installed so as not to damage the tree, including skinning the bark, breaking the leader, damaging roots, or needle stripping. The terminal bud of the seedling must
COR or inspector shall perform visual inspection.
Must pass government inspection of shelter installation with 90% or greater for full payment.
If Contractor does not meet 90% quality or greater, reduced payment shall be made in accordance with Section G.
be unattached to the shelter. The shelters shall be installed during the same day the trees are planted.
May result in adverse performance assessment.
C.4.3.9 Quality Control
-Contractor maintains good quality control on all aspects of operation including tree handling, preparation and planting. Actions not consistent with contract specifications are corrected as per the Quality Control Plan.
COR or inspector randomly sample and observe operations
-The quality of Quality Control provided by the Contractor will be reflected in the performance assessment as either a positive or negative incentive.
-If the Contractor fails to meet standards, work may be suspended or the Contractor put in Default for failure to take corrective action immediately and result in adverse performance assessment.
-Contractor’s plot inspections are +/- 5% of Government’s quality.
Inspection completed to meet timeframes. Inspection records are complete and accurate.
COR or inspector randomly sample and observe Contractor inspections. Reviews Contractor inspection sheets daily
-The ability of the Contractor to meet the standard will be reflected in the performance assessment as either a positive or negative incentive.
-When Contractor’s plot inspections meet standards, no deduction.
-If quality does not meet standard, deduction (Section G.3 & G.4) and/or damages will be assessed.
Work Plan and Schedule
Work meets schedule as per the accepted Work Plan.
COR and Inspector conduct periodic monitoring.
-The Contractor’s ability to maintain the work schedule and complete work on schedule will be reflected in the performance assessment as either a positive or negative incentive.
Work not completed on schedule is subject to Default and may result in assessment of actual costs.
E.1. CONTRACTOR QUALITY CONTROL
E.1.1. Quality Control Plan. The Contractor shall provide a Quality Control Plan (QCP) with the technical proposal.
The Contractor shall supplement the QCP within 5 days of contract award based on items awarded to the Contractor and Government comments.
The general Quality Control plan must demonstrate how the Contractor will assure quality meets the requirements and specifications of the contract. It shall specify how quality will be monitored to assure the performance standards are met; the supervision of crew and work; and the personnel that will be performing the quality control. Quality control includes the monitoring of quality while work is in progress and an unbiased sample of planting, artificial shade, and protection shelters for determining actual quality percentage. The Contractor shall have at least one experienced, fluent in English, inspector whose duties do not include supervision or planting duties
E.2. GOVERNMENT INSPECTION / QUALITY ASSURANCE SURVEILLANCE PLAN
The objective of this plan is to provide a quality surveillance plan for tree planting performed on the Coconino National Forest. This plan provides a basis for the Contracting Officers Representative to evaluate the quality of the Contractor’s performance. The oversight provided for in the contract and in this plan will help ensure that quality levels reach the required levels of performance.
E.2.2. Plot Inspections- Tree Planting. The Contractor shall maintain a plot system that provides an unbiased sample of planting quality, and which represents the entire area planted. The plot system shall be consistent with the Planting Inspection Methods, specified in FSH 2409.17, 2.82, part 2, provided. The Contractor shall sample at least 1-percent of the planted area, with a minimum of 5 plots per unit.
The Government may observe or re-examine the Contractor’s plots at any time. Tree Shelter installation shall be included in the inspection of planting.
E.2.2.1. The Contractor shall mark and identify each inspection plot on the ground.
E.2.2.2. The Contractor shall provide written inspection data by unit using the Planting Inspection Sheet (R3-2470- 9), Exhibit 3, and shall provide a sketch map of the unit with plot locations. The Contractor may also provide a GPS waypoint file of the plot location. Planting inspection sheets and maps shall be provided to the Government by 8 a.m. the day after inspection or end of workday and shall be signed and dated by the person who conducted the inspection, certifying that the inspection records are complete and accurate.
E.2.2.3. The planting quality percent shall be based on the following calculation (reference columns of Planting Inspection Sheet):
No. of Satisfactory Trees Above Ground (Column 9)
X
No. of Satisfactory Trees Below Ground (Column 11)
X 100 = Quality % Actual No. Of Plantable Spots on which Trees should have been Planted (Col. 5)
No. of Trees Dug (Column 10)
All computations will be carried out to at least thousandths (.000) and the final percentage of planting quality as calculated above will be rounded to the nearest whole percent.
E.2.2.4. Plot inspection shall include a tally of trees that are in excess to the maximum allowable to be planted and noted in Column 8 of Inspection Sheet. These trees are considered wasted trees. To ensure that trees are distributed throughout the unit fairly consistently, wasted trees shall be tallied by plot. The Government will use the sum of all wasted trees on plots to determine the damages assessment, Section G.4.
E.2.3. Acceptance. The Contractor’s Quality Control inspections for planting shall be within five percent of the Government quality assurance to be considered acceptable.
E.2.3.1 The Contractor’s quality control will be deemed unacceptable when the Contractor fails to provide planting quality within 5 percent of the Government’s quality assurance results at the completion of a unit. When the Contractor’s quality control is unacceptable, payment for the unit will be based on results of the Government’s quality assurance (G.3.1).
If the Government’s results are objectionable to the Contractor, the Contractor may request a re-examination in writing within 5 calendar days after receipt of the Government’s quality assurance inspection results. The request shall include documentation that supports that the probability of error exists. The Government’s re-examination will consist of a 1-percent sample utilizing the same inspection method as the original examination, but new plots will be selected with different plot centers than the plots previously inspected by the Government. If the results of the re-examination are within 5-percent of the Contractor’s submitted quality control results, the Contractor’s results will be considered acceptable and used for pay. If the results of the re-examination exceed 5-percent of the Contractor’s submitted quality results, the Government’s re-examination results will be used for the basis of pay and the Contractor will be assessed costs incurred by the Government that are directly related to the performance of such service.
F. 1 DELIVERIES
F.1.1. Contract Performance Time and Required Rate of Progress
Tree survival and growth is dependent upon proper soil and weather conditions at the time of planting and these conditions only prevail for a limited length of time. It is therefore imperative that work be started promptly after conditions for planting become suitable. The Contractor shall maintain progress at a rate that will assure completion within the performance period. The minimum acceptable rate of progress will be calculated by dividing the total unit of work for each Item by performance time specified. In the event the Contractor is delayed and falls more than 2 calendar days behind the progress rate required above, the Contractor’s right to proceed is subject to immediate termination for default. See FAR 52.249.8, Default, Section I, for additional information.
F.1.2. Contract Time (See Period of Performance definition).
The Contractor shall start work promptly after receipt of a Notice to Proceed. The Contractor shall maintain progress at a rate that will assure completion within the stated contract time. The contract time will generally not exceed a required rate of progress exceeding that determined from the accepted work plan. If more than one area is available for planting, the Government may prescribe the planting sequence.
The Forest Service will issue a Notice to Proceed as soon as weather and ground conditions are favorable for planting and survival of the trees on one or more of the areas. Contract time will start whichever is sooner: (1) on the date specified on the Notice to Proceed, if the notice is hand-delivered; Or (2) on the third day after the post office has issued a Notice of Certified Mail to the Contractor; Or (3) when planting commences, whichever is sooner. Failure of the Contractor to pick-up Certified Mail will not be considered excusable.
F.2.3. Unsuitable Conditions.
Whenever it is determined that environmental or physical conditions become unsuitable for tree survival, or when extreme weather conditions create the potential for blowdown, the Contractor shall move to another area identified by the Contractor and agreed to by the Contracting Officer, or take other mitigating actions to improve the situation agreed to by the Contracting Officer. When there is no acceptable mitigating practice and no other area is available, the Contracting Officer shall suspend work and stop the contract time. When conditions are again suitable, the Contracting Officer will issue a verbal Resume Work Order and confirm that order in writing. The count of contract time will resume on the day indicated by the Contracting Officer. If the Contractor cannot be reached at the phone number provided or the Contractor fails to contact the Contracting Officer, (per Section C.4.3.12, H.2.5.10) a written Resume Work Order will be mailed and count of contract time will resume on the date specified in the order.
F.2.4 Work Completed after the Performance Period.
Whenever the Contractor fails to complete the work within the performance period, and is allowed to work beyond that period, the Contractor will be assessed the actual damages. Items to be included in the actual damage include, but are not limited to: wages of the COR and Government Inspector(s) for quality assurance after the performance period, cost of vehicles, meals and lodging that are incurred while administering the contract after the performance period.
G.1. METHOD OF CALCULATING PAYMENT
G.1.1. The Contractor’s Quality Control For each completed unit, the Contractor’s quality control inspection percentage for tree planting will be compared to the Government’s assessment results. If the results of the inspection differ by 5 percent or less, the Contractor’s inspection will be considered acceptable and the quality percentage (90 percent or higher) will be used as the basis for payment. When the inspection results differ by more than 5 percent, the Government’s inspection percentage will be used as the basis for payment as per E.2.
G.1.2. Tree Planting - Payment Calculation If the work quality is determined to be 90 percent or higher, based on the Contractor’s quality control inspection plot(s) and verified by the Government’s assessment, payment will be made at 100 percent of unit price.
Payment Example: With a unit price of $200 and a unit size of 60 acres, the bid price would be $12,000. If the Contractor’s planting quality was 90 percent, payment would be $12,000.
Planting Quality less than 90 percent but at least 80 percent or greater. Whenever inspection determines planting quality is 80 percent and above but below 90 percent, the work will be accepted at a rate reduction of 2 percent for each 1 percent the quality of work is below 90 percent.
Where quality falls below 80 percent, no payment will be made for the work.
Payment Example: With a unit price of $200 and a unit size of 60 acres, the bid price would be $12,000. If the Contractor’s planting quality was 85 percent, payment would be $200 x (100 – 15) x 60 acres = $10,200.
Planting Quality below 80 percent: Whenever the planting quality is below 80 percent, based on the Contractor’s quality control (G.1.1) inspection percentage, the quality of planting will be considered insufficient and unacceptable. No payment for work performed will be made.
G.2.1. Rework.
G.2.1.1. Any unit, that is planted at less than the performance standard of 90 percent and at least 80 percent, the Government may (i) accept the work at a reduced price, or (ii) require the area to be reworked at no additional expense to the Government.
G.2.1.2. The Government will permit the Contractor to rework an area only if planting stock or other material is available and/or the existing deficiencies can be corrected.
G.2.1.3. Any Government quality assurance assessment needed due to the Contractor reworking an area, either at the Contractor’s request or because of unacceptable work, will be at the Contractor’s expense. The Contractor may be assessed actual damages which may include but is not limited to wages of the COR and Government Inspector(s) for quality assurance incurred due to the rework, cost of vehicles, meals and lodging that are incurred while administering the contract during the rework.
G.2.1.4. The Government shall document unacceptable work quality in the performance assessment.
G.3. DAMAGES
G.3.1. Damages for below 80% Planting Quality. It is agreed that when the quality of planting is below 80 percent, the Government is damaged, and replanting will likely be necessary. Therefore, if the Contractor fails to plant any unit within a sub-item at a level of 80 percent or higher planting quality, the Government may terminate this contract in whole or in part under the Default Clause (FAR 52.249-8).
G.3.1.1. The Contractor shall not be charged with damages when the quality of planting arises out of causes beyond the control and without the fault or negligence of the Contractor as defined in the Default Clause (FAR 52.249-8).
G.3.2. Wasted Trees. When the Contractor wastes trees, the Government is considered damaged. Damages will be charged based on the following clauses.
G.3.2.1. Wasted Trees in Inspection Plot: The sum total of the wasted trees on each of the inspection plots will be used to determine the wasted trees in the unit. The inspection plots, either the Contractor’s or the Government’s, that are being used for the calculation of payment shall be used to calculate wasted trees. The Damage Charge for trees wasted will be based on this plot calculation:
Damage Charge for Trees Wasted Based on Plot Calculation
No. of Wasted Trees On Plots
X Reciprocal of the Plot
Size X Acres in Pay
Unit X Charge
Rate per Tree
= Wasted Tree Charge No. of Plots Taken
G.3.2.2. When wasted trees are found that are not part of the inspection plot being used for payment, and they are not…