Amend_001_Continuation_Pages.pdf

PDF 342 KB Posted

Attached to
Inyo Craters Hazard Tree Felling Federal contract opportunity
Solicitation number
127EAS22Q0025
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Inyo Craters Hazard Tree Felling, newest first.
File Type Posted
Amend_002_Continuation_Pages.pdf PDF
SF30_Amend_002.pdf PDF
SF30_Amend_001.pdf PDF
001_127EAS22Q0025.pdf PDF
011_Map5_FY22_InyoCratersHT_P3west_Aerial.pdf PDF
002_SCHEDULE OF ITEMS REV1 (1).docx DOCX document
006_Photos_Current_Condition.pdf PDF
009_Map3_FY22_InyoCratersHT_Priorities_Aerial (1).pdf PDF
003_Wage Determination.pdf PDF
004_FirePlan (1).doc DOC document
005_Evaluation Factors Questionnaire.doc DOC document
007_Map1_FY22_InyoCratersHT_Overview_FULL.pdf PDF
008_Map2_FY22_InyoCratersHT_Priorities_TOPO (1).pdf PDF
010_Map4_FY22_InyoCratersHT_P3east_Aerial.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION

STANDARD FORM 30

CONTINUATION SHEET

SOLICITATION NUMBER

127EAS22Q0025

PAGE OF PAGES

2 3

SEE BELOW FOR QUESTIONS AND GOVERNMENT RESPONSES.

Question: The word “removal” is used twice in the description of work on Page 6 of the solicitation. Does this mean that the trees need to be felled, or do they need to be removed from any of the units?

Government Response: The trees should be left inside the unit where they lay once felled, unless they were felled into a parking area, across a trail, or across a road. Then they should be ‘bucked off the road’ and moved a couple feet off the parking area, trail, or road so that cars can park, people can walk, and cars can pass on the road.

Question: The Solicitation’s Licenses and Insurance section states on Page 8 that the subject contract requires a Form WH510 registration. Is this correct?

Government Response: No, the form number on Page 8 is the result of a typographical error. The correct form number is WH530.

Question: What is the COR’s availability for a site visit Friday, May 20; Saturday, May 21, or Sunday, May 22?

Government Response: The COR is available for a site visit during that time frame. Contractor must confirm the COR’s availability prior to site visit. The COR’s preference is for May 20th at 9:30 AM at the following location:

Mammoth Lakes Welcome Center (in the Parking Lot)

2510 Main Street (aka 2510 Hwy 203)

Mammoth Lakes, CA 93546

The COR is available by phone at (760) 924-5550 or (908) 591-5618.

Question: What degree of cleanup is required for the site?

Government Response: Government refers Contractor to Section C.7-2-1.4 – Cut Material – Trees which are cut will be lopped and scattered so that the bole and all cut material are lying flat on the ground to eliminate any potential risk of rolling. All spring poles created by the operation will be mitigated and low stumped. All cut material and/or activity generated debris will be removed from parking areas, trails, and roads and hauled/dragged back into the unit.

AMENDMENT OF SOLICITATION

STANDARD FORM 30

CONTINUATION SHEET

SOLICITATION NUMBER

127EAS22Q0025

PAGE OF PAGES

3 3

SEE BELOW FOR QUESTIONS AND GOVERNMENT RESPONSES.

Question: Do all branches stay on site (i.e. lop and scatter)?

Government Response: Yes, please see Section C.7-2-1.4 of the Solicitation, quoted above.

Question: What should be done with treetops that are too small for the mill?

Government Response: Nothing is going to the mill. All material is to be left onsite. Please see Section C.7-2-

1.4 of the Solicitation, quoted above.