AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

05/06/2020

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 67T0 7. ADMINISTERED BY (If other than Item 6) CODE

BLACK HILLS NATIONAL FOREST

1019 N FIFTH ST

CUSTER SD 57730-8214

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

1267T020Q0021 x 9B. DATED (SEE ITEM 11)

04/20/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide questions and answers presented in response to the solicitation.

Please see the amendment attachment for all 6 questions/answers.

Solicitation closing extended to 5/11/2020.

Period of Performance: 06/01/2020 to 08/31/2020

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

BARBARA K. DARLING

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
The purpose of this amendment is to provide questions and answers presented in response to the solicitation.

The purpose of this amendment is to provide questions and answers presented in response to the solicitation.

Question 1: on page 13 section C.11 states if two successive test fail to meet contract requirement, all material represented by the samples shall be rejected”. Will samples be averaged at the end of the project as most counties do to determine a pass or fail? And what is the effect on the contract if one test fails but a successive yes passes?

Answer 1: If the successive test passes the material will be accepted.

Question 2: if after two successive test, material that is stock piled by a tall stacking conveyor belt is rejected, how would one separated it from the conical pile to reject or remove it?

Answer 2: As far as we know there is no way to separate the failed material from the stockpile.

Section C-11 states (in part):

“… If any test fails to meet the contract requirements, the Contracting Officer's Representative shall be notified immediately, and immediate re-sampling and testing shall be performed. If two successive tests fail to meet contract requirements, all of the material represented by the samples shall be rejected.”

It is incumbent on the contractor, once a failing test occurs, to immediately contact the COR and seek guidance about how to prevent any substantial stockpile of aggregate from being rejected, while re-sampling and testing are performed.

Question 3: is use of a stacking conveyor allowed or must the stock pile be pushed up with a dozer or equivalent?

Answer 3: A Stacking Conveyor is the preferred method of stockpiling the material. Ensure that there is not a high drop height as this will cause segregation. Do not push up the piles with a bulldozer.

Question 4: on page 16 under biobased product utilization, will bio diesel fuel be considered an eligible product and because it is occasionally unavailable here in western SD, what problems may that cause if it was list to be used but unavailable when needed?

Answer 4: Biobased diesel fuel is considered an eligible product, but will not cause problems if it is unavailable. The related section reads that the products will be used”, …to the maximum extent possible without jeopardizing the intended end use.” So, if the fuel is not readily available, then an alternative product can be used.

Question 5: Relative to the plasticity index requirement minimum of 4 in the aggregate specification, has the clay to be borrowed from Forest Service sites been tested to determine the PI of the raw clay? Given the clay quality after combining it with the crushed rock, can the minimum or better be achieved? Clay quality varies dramatically throughout the hills and I worry that it might be impossible to fulfill the contract. I have encountered this situation before and I really don’t want to have it happen again.

Answer 5: Redbird Quarry has historically met PI with onsite clay material. We have other quarries that we have had to import clay in order to meet PI requirements, but Redbird has always met Spec requirements with onsite clay sources.

Question 6: on page 32, I am not aware of any particular South Dakota license for crusher operators however we are trained and annually recertified for MSHA. Other than truck drivers holding a valid license as required is there something else that you are requesting?

Answer 6: The valid operator’s license will cover all requirements.