Descripition_of_Work.DOCX

DOCX document 19 KB Posted

Attached to
Pavement Project on Mark Twain National Forest Federal contract opportunity
Solicitation number
1264S519Q0001
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

This document outlines expectations related to this project.

View the file

Other files for this federal contract opportunity

Other files attached to Pavement Project on Mark Twain National Forest, newest first.
File Type Posted
Map_1_Site_Location.docx DOCX document
Wage_Determination_Pavement_Project.pdf PDF
ConstructionRFQ_MTNF_Pavement_Project.pdf PDF
Map_2_Parking_Lot.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pavement Preservation Project Children’s Forest / Blue Hole Trail Head

Statement of Work: Chip seal Children’s Forest Trail and Blue Hole Trail Head Parking Area.

Description of Work

Install temporary traffic control devices

Layout parking area and establish construction limits

Layout trail area and establish construction limits

Mobilize equipment

Clean, prepare and patch potholes as necessary

Clean and prepare 1650 square yards of trail head parking area for chip seal placement

Clean and prepare 1575 square yards of walking trail for chip seal placement

Apply chip seal oil of 578 gallons to trail head parking area for chip seal placement

Place 1650 square yards of chip seal aggregate to trail head parking area

Apply chip seal oil of 552 gallons to walking trail for chip seal placement

Place 1575 square yards of chip seal aggregate to walking trail

Paint 7 standard parking lines of 30 feet long and a 4 inch width for parking areas

Paint 1 disabled parking lines of 30 feet long and a 4 inch width for parking areas

Install 10 wheel stops

Demobilize equipment

Remove temporary traffic control devices

Notes:

· Clean and prepare all surfaces removing loose material to ensure proper bonding between existing and new material.

File details come from the government source that posted it.