Descripition_of_Work.DOCX
DOCX document 19 KB Posted
- Attached to
- Pavement Project on Mark Twain National Forest Federal contract opportunity
- Solicitation number
- 1264S519Q0001
About this file
This document outlines expectations related to this project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Map_1_Site_Location.docx | DOCX document | |
| Wage_Determination_Pavement_Project.pdf | ||
| ConstructionRFQ_MTNF_Pavement_Project.pdf | ||
| Map_2_Parking_Lot.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pavement Preservation Project Children’s Forest / Blue Hole Trail Head
Statement of Work: Chip seal Children’s Forest Trail and Blue Hole Trail Head Parking Area.
Description of Work
Install temporary traffic control devices
Layout parking area and establish construction limits
Layout trail area and establish construction limits
Mobilize equipment
Clean, prepare and patch potholes as necessary
Clean and prepare 1650 square yards of trail head parking area for chip seal placement
Clean and prepare 1575 square yards of walking trail for chip seal placement
Apply chip seal oil of 578 gallons to trail head parking area for chip seal placement
Place 1650 square yards of chip seal aggregate to trail head parking area
Apply chip seal oil of 552 gallons to walking trail for chip seal placement
Place 1575 square yards of chip seal aggregate to walking trail
Paint 7 standard parking lines of 30 feet long and a 4 inch width for parking areas
Paint 1 disabled parking lines of 30 feet long and a 4 inch width for parking areas
Install 10 wheel stops
Demobilize equipment
Remove temporary traffic control devices
Notes:
· Clean and prepare all surfaces removing loose material to ensure proper bonding between existing and new material.
File details come from the government source that posted it.