File Type Posted
A00003.pdf PDF
A00002.docx DOCX document
A00002.pdf PDF
A00001.pdf PDF
Building 401MB Existing Upper and Lower Roof Drawings.pdf PDF
12619720b0002.docx DOCX document
SOW - 401MB Elastomeric Roof Coating.docx DOCX document
12619720B0002 1442.pdf PDF
wages.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITW POLYMERS SEALANTS NORTH AMERICA, INC.

111 S. Nursery Road. Irving, TX 75060 Tel: 972-438-9111 Fax: 972-554-3939 www.itwsealants.com

9/3/2019

H.E.R.

FABRIC-LESS FLASHING GRADE

POLYURETHANE ROOF SEALANT

TECHNICAL DATA SHEET

PRODUCT DESCRIPTION:

ERsystems® H.E.R. is a flashing grade single component moisture-cure polyurethane roof sealant. H.E.R. is a tough, seamless elastomeric roofing membrane that has excellent adhesion to a wide variety of substrates.

TYPICAL PROPERTIES:

Property Typical Value

Percent Solid: 80% Viscosity: 120,000-160,000 cps Ultimate Elongation:

ASTM D412 400%

Ultimate Tensile Strength:

ASTM D412 300-350 psi

Permeability:

ASTM E96 1.2 perms (at 30 dry mils.)

Weight/Gallon 7.4 lbs.

VOC Content 186.9 g/l EPA Method 24 Shore A Hardness:

ASTM D2240 40

Low Temp Flexibility:

ASTM D412 Pass at -60° F

Flash Point T.C.C. 109.9° F (43.3° C) Resistance to Weathering:

ASTM D822 Excellent

Chemical Resistance Excellent ** The shelf life for an unopened container stored at temperatures between 60°F (15.6°C) and 95°F (35°C) is 12 months from date of manufacture. Store out of direct sunlight in a cool, well-ventilated area.

Avoid storing container directly on the floor or against an outside wall

TYPICAL USES:

Uses include waterproofing metal roof seams and fasteners and flashing around roof penetrations where roof movement causes cracking and moisture penetration. H.E.R. has also found extensive use in sealing metal gutters. H.E.R. will also seal polyurethane foam, wood and concrete.

PACKAGING:

Packaging is standard in 10.1 oz. cartridges, 20 oz. sausages, 1 gallon, 2.5 gallon and 5 gallon pails.

PACKAGING:

Standard color available is aluminum gray.

APPLICATION EQUIPMENT:

H.E.R. can be applied by brush, roller and may be pumped by conventional airless spray equipment.

Brush or Roller: Recommended for flashing. Use a coarse, short bristle brush.

Airless Spray Equipment: H.E.R. can be pumped with the following equipment, and extruded into place on the metal roof. The pump must be capable of producing a material output of 2 gallons per minute at 3,000 psi. Ability to pump H.E.R. is typically related to the inlet plumbing to the pump.

An unrestricted 1 1/2" inlet works well. To reduce the pressure required at the pump 3/4" high pressure hoses perform best. To extrude the H.E.R., the gun is either removed or fitted with a wand without a tip and potentially with a flanged end to deliver a bead ¾ to 1" wide.

APPLICATION:

Over Metal:

H.E.R. can be pumped with the following equipment, and extruded into place on the metal roof. The pump must be capable of producing a material output of 2 gallons per minute at 3,000 psi. Ability to pump H.E.R. is typically related to the inlet plumbing to the pump. An unrestricted 1 1/2" inlet works well. To reduce the pressure required at the pump 3/4" high pressure hoses perform best. To extrude the H.E.R., the gun is either removed or fitted with a wand without a tip and potentially with a flanged end to deliver a bead ¾ to 1" wide.

H.E.R. may be used to seal around all roof penetrations, skylights, gutters, valleys, etc. Brush 60 mils of the sealer in a stripe 3" to 4" wide in each dimension around the penetration. If gaps exist or excessive roof movement is noted around penetrations, seams or fasteners the H.E.R.

may be reinforced with Polyester fabric embedded into the coating.

Two coats of H.E.R. may be required in some areas to achieve the 60 mils film thickness.

Metal surface must be dry and free of frost or dew. Best application will be achieved when H.E.R. is at least 60° F (15.6°C) and the surface to which it is applied is 40° F (4.45°C) or higher and rising in temperature.

After the initial cure (approximately 12 - 24 hours at 75°F (23.9°C) and 45% R.H.) is complete, all seams should be inspected for continuity of the coating membrane. H.E.R.

may then be finish coated with Acrylic 1000 Plus, Polyurethane 300 urethane system or another approved finish. Weather related conditions such as frost, dew, mist, condensation, humidity, and temperature must be taken into consideration prior to coating. Temperature should be http://www.itwsealants.com/

ITW POLYMERS SEALANTS NORTH AMERICA, INC.

111 S. Nursery Road. Irving, TX 75060 Tel: 972-438-9111 Fax: 972-554-3939 www.itwsealants.com

9/3/2019 above 40°F (4.45°C), more than 5°F above the dew point and rising, for best application results.

Do not apply over Silicone coatings or silicone caulks. Do not apply over fresh asphalt coatings, coal tar coatings or plastic roof cement.

Over Other Substrates:

H.E.R. may be used for sealing substrates such as polyurethane foam, concrete, plywood, aged BUR, aged Modified Bitumen single-ply, etc. H.E.R. is typically used to seal cracks, penetrations and other points where a high solids tough coating is required.

TEMPERATURE CONSTRAINTS:

Cold temperatures influence viscosity and pumping/handling characteristics of H.E.R.. Heat increases and cold decreases the flow of H.E.R.. When temperatures fall below 60°F (15.6°C), H.E.R. can best be applied after storage at 70°F for a minimum of 48 hours prior to usage. For ease of application, material temperature should be 60° F (15.6°C) minimum. If H.E.R. is to be pumped at temperatures below 60°F (15.6°C) insulated or heated hoses may be required. For additional cold weather application techniques and information, consult ITWPSNA. The service temperature range is -65°F (-53.9°C) to 180°F (82.2°C). The substrate temperature range for application is 40°F (4.45°C) – 120° F (48.9°C).

LIMITATION:

H.E.R. cures by reacting with air moisture. Partially used containers should not be left open and exposed to the air. Curing in the once opened container can be slowed by placing plastic wrap directly over the surface of the coating and tightly resealing the container. If a cured film has formed on the top of the product it should be carefully cut away prior to mixing the remainder of the product in the container. The surface film formation does not affect the performance of the remaining product.

CLEAN UP:

Upon completion of the application all tools, hoses, and equipment must be cleaned with acetone.

CAUTION!!!

H.E.R. contains a polyurethane resin and an aromatic solvent blend. If swallowed, do not induce vomiting. If splashed in eyes, flush with clean water for a minimum of 15 minutes. In either case, call physician immediately. If splashed on skin, wash thoroughly with soap and water. Avoid breathing vapors and spray mists. Use only with adequate ventilation. Proper eye protection and protective clothing for the skin should be worn.

May produce severe dermatitis and bronchial spasms. Keep away from heat, sparks and open flames. Close container after use.

Keep out of reach of children. For professional use only.

The flow of material through pump and system could create static electricity. When pumping flammable materials, all equipment must be properly grounded to prevent static discharge and sparking, which could cause fire or explosions. Use only conductive or grounded air and material hoses, and be sure that you compressor and pump are properly grounded per manufacturer's recommendations. Do not cut or weld on or near empty containers.

PRIOR TO USE OF THIS MATERIAL,

READ ALL APPROPRIATE SAFETY DATA SHEETS

EXCLUSION OF WARRANTIES:

AS TO THE HEREIN DESCRIBED MATERIALS, ITW POLYMERS SEALANTS

NORTH AMERICA, INC. MAKES NO WARRANTIES WHETHER EXPRESSED

OR IMPLIED, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY

OR MECHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. SINCE

THE USE OF THE HEREIN DESCRIBED MATERIALS INVOLVES MANY

VARIABLES IN METHODS OF APPLICATION, HANDLING AND/OR USE, THE

USER IN ACCEPTING AND USING THESE MATERIALS ASSUMES ALL

RESPONSIBILITY FOR THE END RESULT. THE PURCHASE OF THIS ITW

POLYMERS SEALANTS NORTH AMERICA, INC. PRODUCT IS SUBJECT TO

THE TERMS AND CONDITIONS AF AN “AS IS” SALE, AND IF THE PRODUCT

IS PROVED TO BE DEFECTIVE, THE EXCLUSIVE REMEDY, AT ITW

POLYMERS SEALANTS NORTH AMERICA, INC.’S OPTION, SHALL BE TO

REPLACE THE DEFECTIVE ITW POLYMERS SEALANTS NORTH AMERICA,

INC. PRODUCT. ITW POLYMERS SEALANTS NORTH AMERICA, INC. SHALL

NOT OTHERWISE BE LIABLE FOR LOSS OF DAMAGES, WHETHER DIRECT,

INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL, REGARDLESS OF

THE LEGAL THEORY ASSERTED, INCLUDING NEGLIGENCE, WARRANTY OR

STRICT LIABILITY.

Complete technical information is available from ITW Polymers Sealants North America, Inc.

SECTION 07625

DOWNSPOUTS

400381-0 07625-1

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Prefabricated galvanized steel downspouts, complete with required connecting pieces and anchorages.

1.02 SUBMITTALS

A. Submit shop drawings clearly indicating general construction, configurations, jointing methods and locations, fastening methods and locations, and installation details.

B. See Section 01330 for additional requirements concerning submittals.

PART 2 PRODUCTS

2.01 MATERIALS AND COMPONENTS

A. Downspouts: Minimum 26-gauge steel with minimum 1.25 ounces per square foot galvanized coating, conforming to requirements of ASTM A527.

B. Prefinished to match roof panels.

C. Anchorage Devices: Type recommended by manufacturer and acceptable to the Architect/Engineer.

2.02 FABRICATION

A. Form downspouts of profiles and sizes indicated on drawings and as required to properly collect and remove water. Fabricate complete with required connection pieces.

PART 3 EXECUTION

3.01 INSTALLATION

A. Join lengths with formed seams sealed watertight. Flash and seal gutters from metal building.

END OF SECTION 07625

SECTION 05311

STEEL ROOF DECK

05311-1

FOR REFERENCE ONLY

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Steel roof deck and accessories.

B. Supplementary framing for unscheduled openings.

1.02 REFERENCES

A. AISI - Specification for the Design of Cold-Formed Steel Structural Members.

B. ASTM A36 - Structural Steel.

C. ASTM A611 - Steel, Cold-Rolled Sheet, Carbon, Structural.

D. ASTM A653 - 94.

E. AWS D1.1 - Structural Welding Code.

F. SDI - Design Manual for Composite Decks, Form Decks, Roof Decks.

1.03 SUBMITTALS

A. Submit shop drawings in accordance with Section 01330.

B. Shop Drawings: Indicate deck plan, support locations, projections, openings and reinforcement, pertinent details, and accessories.

C. Product Data: Provide deck profile characteristics and dimensions, structural properties and finishes.

D. Indicate locations, lengths, and marking of deck units to correspond with sequence and procedure to be used for erecting and fastening.

E. Indicate welding procedure for fastening deck and accessories. Include information to erector concerning suggested burn-off rates, welder settings, welding rod sizes and types for thicknesses to be welded. Indicate welds with AWS Standard Welding Symbols.

F. Indicate screwing procedure for fastening deck and accessories. Include information on screw type, size, material, finish, and allowable load capacities.

1.04 DELIVERY, STORAGE AND HANDLING

A. Metal decking shall be stored above the ground upon platform skids or other supports. Material shall be kept free from dirt, grease and other foreign matter, and shall be protected from the elements, splashing mud, spilled concrete, slushed mortar and other deleterious materials. Items which are corroded, bent, dented, sprung, or otherwise damaged will not be accepted.

05311-2

FOR REFERENCE ONLY

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Acceptable Manufacturers: Member of the Steel Deck Institute.

2.02 MATERIALS

A. Sheet Steel: ASTM A611, Grade C, D, or E.

B. Touch-up primer: Touch up primer shall be rust inhibitive paint suitable for application of sprayed-on fireproofing.

C. Welding Materials: AWS D1.1.

D. Supplementary Steel Framing: ASTM A36.

2.03 ACCESSORIES

A. Standard sump pans at roof drains.

B. Screws: Standard #12 self-drilling type with drill point, drill flute and pilot section. Buildex Type 12 - 14 x 3/4" HWH TEKS/1 or an approved substitute. (All screws shall be provided by the deck erector).

2.04 FABRICATION

A. Fabricate metal decking in accordance with the Steel Deck Institute, to accommodate maximum working stress of 22,400 psi and maximum span deflection of 1/240.

B. Design thickness and profile of deck materials shall meet SDI Specifications. Deck shall be 1-1/2

in. deep, wide rib gage as indicated on Drawings.

C. Provide deck units in as long a length as possible. Deck shall span a minimum of two or more supports without disruption.

D. Cut deck to length before shipping.

E. Sump pans shall be of single piece galvanized sheet steel, 14 gage, with 1 1/2 deep recess.

F. Deck shall be prime paint with rust inhibitive paint suitable for application of sprayed on fire proofing.

05311-3

FOR REFERENCE ONLY

PART 3 EXECUTION

3.01 INSPECTION

A. Prior to installation of metal deck, verify that the steel framework has been plumbed, aligned, and completed and temporary shoring, where required, has been installed.

3.02 PREPARATION

A. Clean steel surfaces, to which materials are to be welded, of all paint, ice, water, oil, dirt, rust, and other deleterious materials detrimental to welding.

3.03 INSTALLATION

A. Erect metal decking in accordance with SDI Design Manual for Composite Decks, Form Decks, and Roof Decks. Perform welding to AWS D1.1.

B. Bear deck on steel supports with 2 in. minimum bearing. Align and level on supports.

C. Make end laps over continuous supports.

D. Bear deck on masonry, concrete or wood support surfaces 4 inch minimum. Align and level on supports.

E. Secure the metal roof deck to support framework as follows:

1. Secure to supporting members with 5/8" diameter fusion welds spaced at 6 inches on-center at end laps and along perimeter members, and 12 inches on-center at intermediate supports. Screws or powder actuated fasteners are not permitted.

2. Fasten sidelaps between adjacent deck units with two (2) self-drilling screws equally spaced between each supporting member or at 24" on center maximum.

3. Provide supplementary framing, minimum size L3 x 3 x 1/4, at all openings greater than 1 foot and at locations where several smaller openings are grouped together. Verify requirement with Architect/Engineer.

F. Install six-inch minimum wide sheet steel cover plates, of same thickness as deck where deck changes direction. Spot weld in place 12 in. o.c. maximum.

G. Immediately after welding deck in place, touch-up welds, burned areas, and surface coating damage with touch-up paint.

H. Install sump pans at drain locations with screws or welding to roof deck at 6" o.c. all around perimeter.

05311-4

FOR REFERENCE ONLY

3.04 PROTECTION

A. Do not use deck units for storage or working platforms until permanently secured in position.

B. Assure that construction loads do not exceed carrying capacity of deck.

END OF SECTION 05311

ERSystems-HER-Roof Sealant
Original Downspout Specifications
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Prefabricated galvanized steel downspouts, complete with required connecting pieces and anchorages.
1.02 SUBMITTALS
A. Submit shop drawings clearly indicating general construction, configurations, jointing methods and locations, fastening methods and locations, and installation details.
B. See Section 01330 for additional requirements concerning submittals.
PART 2 PRODUCTS
2.01 MATERIALS AND COMPONENTS
A. Downspouts: Minimum 26-gauge steel with minimum 1.25 ounces per square foot galvanized coating, conforming to requirements of ASTM A527.
B. Prefinished to match roof panels.
C. Anchorage Devices: Type recommended by manufacturer and acceptable to the Architect/Engineer.
2.02 FABRICATION
A. Form downspouts of profiles and sizes indicated on drawings and as required to properly collect and remove water. Fabricate complete with required connection pieces.
PART 3 EXECUTION
3.01 INSTALLATION
A. Join lengths with formed seams sealed watertight. Flash and seal gutters from metal building.
Original Steel Roof Specifications
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Steel roof deck and accessories.
B. Supplementary framing for unscheduled openings.
1.02 REFERENCES
A. AISI - Specification for the Design of Cold-Formed Steel Structural Members.
B. ASTM A36 - Structural Steel.
C. ASTM A611 - Steel, Cold-Rolled Sheet, Carbon, Structural.
D. ASTM A653 - 94.
E. AWS D1.1 - Structural Welding Code.
F. SDI - Design Manual for Composite Decks, Form Decks, Roof Decks.
1.03 SUBMITTALS
A. Submit shop drawings in accordance with Section 01330.
B. Shop Drawings: Indicate deck plan, support locations, projections, openings and reinforcement, pertinent details, and accessories.
C. Product Data: Provide deck profile characteristics and dimensions, structural properties and finishes.
D. Indicate locations, lengths, and marking of deck units to correspond with sequence and procedure to be used for erecting and fastening.
E. Indicate welding procedure for fastening deck and accessories. Include information to erector concerning suggested burn-off rates, welder settings, welding rod sizes and types for thicknesses to be welded. Indicate welds with AWS Standard Welding...
F. Indicate screwing procedure for fastening deck and accessories. Include information on screw type, size, material, finish, and allowable load capacities.
1.04 DELIVERY, STORAGE AND HANDLING
A. Metal decking shall be stored above the ground upon platform skids or other supports. Material shall be kept free from dirt, grease and other foreign matter, and shall be protected from the elements, splashing mud, spilled concrete, slushed mortar...
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Acceptable Manufacturers: Member of the Steel Deck Institute.
2.02 MATERIALS
A. Sheet Steel: ASTM A611, Grade C, D, or E.
B. Touch-up primer: Touch up primer shall be rust inhibitive paint suitable for application of sprayed-on fireproofing.
C. Welding Materials: AWS D1.1.
D. Supplementary Steel Framing: ASTM A36.
2.03 ACCESSORIES
A. Standard sump pans at roof drains.
B. Screws: Standard #12 self-drilling type with drill point, drill flute and pilot section. Buildex Type 12 - 14 x 3/4" HWH TEKS/1 or an approved substitute. (All screws shall be provided by the deck erector).
2.04 FABRICATION
A. Fabricate metal decking in accordance with the Steel Deck Institute, to accommodate maximum working stress of 22,400 psi and maximum span deflection of 1/240.
B. Design thickness and profile of deck materials shall meet SDI Specifications. Deck shall be 1-1/2 in. deep, wide rib gage as indicated on Drawings.
C. Provide deck units in as long a length as possible. Deck shall span a minimum of two or more supports without disruption.
D. Cut deck to length before shipping.
E. Sump pans shall be of single piece galvanized sheet steel, 14 gage, with 1 1/2 deep recess.
F. Deck shall be prime paint with rust inhibitive paint suitable for application of sprayed on fire proofing.
PART 3 EXECUTION
3.01 INSPECTION
A. Prior to installation of metal deck, verify that the steel framework has been plumbed, aligned, and completed and temporary shoring, where required, has been installed.
3.02 PREPARATION
A. Clean steel surfaces, to which materials are to be welded, of all paint, ice, water, oil, dirt, rust, and other deleterious materials detrimental to welding.
3.03 INSTALLATION
A. Erect metal decking in accordance with SDI Design Manual for Composite Decks, Form Decks, and Roof Decks. Perform welding to AWS D1.1.
B. Bear deck on steel supports with 2 in. minimum bearing. Align and level on supports.
C. Make end laps over continuous supports.
D. Bear deck on masonry, concrete or wood support surfaces 4 inch minimum. Align and level on supports.
E. Secure the metal roof deck to support framework as follows:
1. Secure to supporting members with 5/8" diameter fusion welds spaced at 6 inches on-center at end laps and along perimeter members, and 12 inches on-center at intermediate supports. Screws or powder actuated fasteners are not permitted.
2. Fasten sidelaps between adjacent deck units with two (2) self-drilling screws equally spaced between each supporting member or at 24" on center maximum.
3. Provide supplementary framing, minimum size L3 x 3 x 1/4, at all openings greater than 1 foot and at locations where several smaller openings are grouped together. Verify requirement with Architect/Engineer.
F. Install six-inch minimum wide sheet steel cover plates, of same thickness as deck where deck changes direction. Spot weld in place 12 in. o.c. maximum.
G. Immediately after welding deck in place, touch-up welds, burned areas, and surface coating damage with touch-up paint.
H. Install sump pans at drain locations with screws or welding to roof deck at 6" o.c. all around perimeter.
3.04 PROTECTION
A. Do not use deck units for storage or working platforms until permanently secured in position.
B. Assure that construction loads do not exceed carrying capacity of deck.