Attachment_1_Schedule_of_Items.docx

DOCX document 19 KB Posted

Attached to
Road Reconstruction FSR 135 / 173 Federal contract opportunity
Solicitation number
12467018R0064
Issued by
Department of Agriculture Forest Service R8-Southern Region

About this file

Attachment 1 Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Road Reconstruction FSR 135 / 173, newest first.
File Type Posted
Attachment_4_Experience_Questionnaire.docx DOCX document
Attachment_2_Specifications.pdf PDF
ATTACHMENT_3_DOL.pdf PDF
r0064.docx DOCX document
Attachment_2_C_Edits_to_Specifications.docx DOCX document
Attachment_2_A_Spot_Repair_Detail.pdf PDF
Attachment_2_B_FM_Basemap_GeoPDF_20170207.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

FM ERFO PROJECT 1

Francis Marion Ranger District Francis Marion and Sumter National Forests

B- 1 - SCHEDULE OF ITEMS

FSR 135 LITCHFIELD ROAD RECONSTRUCTION (SCFMS 135-1.0)

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

FMS 201

Road Heavy Brushing

Mile

2.76

20701

Geotextile Material, Type 3A (Stabilization)

SY

20801

Structure Excavation

CY

20803

Structure Backfill, compaction method B

CY

25102

Placed riprap, class III, with 8 oz. filter fabric, nonwoven

TN

30109

Aggregate surface course, Type FLBC, compaction method A

TN

30326

Road Reconditioning

Mile

2.76

60201

18” Reinforced Concrete Pipe

FT

60201

24” Reinforced Concrete Pipe

FT

62501

Seeding and Mulching, Dry method

AC

0.2

63306

Hazard Marker Signs & Posts

EA

63312

Culvert Marker Posts

EA

SUB-TOTAL

· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Repair of washed out areas is incidental to pay item 30326.

B- 1 – SCHEDULE OF ITEMS (continued)

FSR 173 HARLESTON DAM ROAD (SCFMS 173-1.2)

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

FMS 201

Road Heavy Brushing

Mile

2.75

20404

Unclassified borrow, compaction method D, finishing method A

CY

20701

Geotextile Material, Type 3A (Stabilization)

SY

20801

Structure Excavation

CY

20803

Structure Backfill, compaction method B

CY

25102

Placed riprap, class III, with 8 oz. filter fabric, nonwoven

TN

30101

Aggregate base course, Type Commercial #4 Slag, compaction method A

TN

30109

Aggregate surface course, Type FLBC, compaction method A

TN

30326

Road Reconditioning

Mile

2.75

62501

Seeding and Mulching, Dry method

AC

0.2

63306

Hazard Marker Signs & Posts

EA

SUB-TOTAL

GRAND TOTAL

· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Repair of washed out areas is incidental to pay item 30326.