Attachment 1 Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Road Reconstruction FSR 177 & 182, newest first.
File Type Posted
scan0002.pdf PDF
SF30_Amend_2.pdf PDF
SF30.pdf PDF
Attachment_2_A_Spot_Repair_Detail.pdf PDF
Site_Vist_brief_sign_in.pdf PDF
Attachment_2_B_FM_Basemap_GeoPDF_20170207.pdf PDF
R0043.pdf PDF
ATTACHMENT_3_DOL.pdf PDF
Attachment_4_Experience_Questionnaire.docx DOCX document
Attachment_2_Statement_of_Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 12467018R0043

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

FM ERFO PROJECT 8

Francis Marion Ranger District Francis Marion and Sumter National Forests

B- 1 - SCHEDULE OF ITEMS

FSR 177 NEW HOPE ROAD RECONSTRUCTION (SCFMS 177)

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

FMS 201

Road Heavy Brushing

Mile

2.68

25102

Placed riprap, class III, with 8 oz. filter fabric, nonwoven

TN

30109

Aggregate surface course, Type FLBC, compaction method A

TN

30326

Road Reconditioning

Mile

2.68

60201

36” Reinforced Concrete Pipe

FT

62501

Seeding and Mulching, Dry method

AC

0.1

63301

Stop Sign System

EA

63312

Culvert Marker Posts

EA

SUB-TOTAL

· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Repair of washed out areas is incidental to pay item 30326.

B- 1 – SCHEDULE OF ITEMS (continued)

FSR 182 BENNETT BRANCH ROAD (SCFMS 182)

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

FMS 201

Road Heavy Brushing

Mile

2.50

20404

Unclassified borrow, compaction method D, finishing method A

CY

20701

Geotextile Material, Type 3A (Stabilization)

SY

30101

Aggregate base course, Type Commercial #4 Slag, compaction method A

TN

30109

Aggregate surface course, Type FLBC, compaction method A

TN

30326

Road Reconditioning

Mile

2.50

24” Reinforced Concrete Pipe

FT

36” Reinforced Concrete Pipe

FT

62501

Seeding and Mulching, Dry method

AC

0.1

63312

Culvert Marker Posts

EA

SUB-TOTAL

GRAND TOTAL

· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Repair of washed out areas is incidental to pay item 30326.