Attachment_1_Schedule_of_Items.docx

DOCX document 21 KB Posted

Attached to
Road REconstruction 166A and 162 Federal contract opportunity
Solicitation number
12467018R0040
Issued by
Department of Agriculture Forest Service R8-Southern Region

About this file

Attachment 1 Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Road REconstruction 166A and 162, newest first.
File Type Posted
scan0001.pdf PDF
SF30_Amned_2.pdf PDF
Attachment_2_A_Spot_Repair_Detail.pdf PDF
Site_Vist_brief_sign_in.pdf PDF
SF30.pdf PDF
Attachment_2_B_FM_Basemap_GeoPDF_20170207.pdf PDF
Attachment_2_Statement_of_Work.pdf PDF
ATTACHMENT_3_DOL.pdf PDF
Attachment_4_Experience_Questionnaire.docx DOCX document
R0040.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 12467018R0040

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

FM ERFO PROJECT 7

Francis Marion Ranger District Francis Marion and Sumter National Forests

B- 1 - SCHEDULE OF ITEMS

FSR 166A CONIFER A ROAD RECONSTRUCTION (SCFMS 166A)

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

FMS 201

Road Heavy Brushing

Mile

1.4

20404

Unclassified borrow, compaction method D, finishing method A

CY

20701

Geotextile Material, Type 3A (Stabilization)

SY

25102

Placed riprap, class III, with 8 oz. filter fabric, nonwoven

TN

30101

Aggregate base course, Type Commercial #4 Slag, compaction method A

TN

30109

Aggregate surface course, Type FLBC, compaction method A

TN

30326

Road Reconditioning

Mile

1.4

60201

24” Reinforced Concrete Pipe

FT

62501

Seeding and Mulching, Dry method

AC

0.1

63301

Stop Sign System

EA

63312

Culvert Marker Posts

EA

SUB-TOTAL

· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Repair of washed out areas is incidental to pay item 30326.

B- 1 – SCHEDULE OF ITEMS (continued)

FSR 162 HORSE ISLAND ROAD RECONSTRUCTION (SCFMS 162)

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

FMS 201

Road Heavy Brushing

Mile

5.33

20404

Unclassified borrow, compaction method D, finishing method A

CY

20701

Geotextile Material, Type 3A (Stabilization)

SY

30101

Aggregate base course, Type Commercial #4 Slag, compaction method A

TN

30109

Aggregate surface course, Type FLBC, compaction method A

TN

30326

Road Reconditioning

Mile

5.33

60201

18” Reinforced Concrete Pipe

FT

62501

Seeding and Mulching, Dry method

AC

0.2

63308

Reset/Replumb Roadside Signs

EA

63312

Culvert Marker Posts

EA

SUB-TOTAL

GRAND TOTAL

· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.

· Repair of washed out areas is incidental to pay item 30326.

File details come from the government source that posted it.