Attachment_1_Schedule_of_Items.docx
DOCX document 21 KB Posted
- Attached to
- Road REconstruction 166A and 162 Federal contract opportunity
- Solicitation number
- 12467018R0040
About this file
Attachment 1 Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| scan0001.pdf | ||
| SF30_Amned_2.pdf | ||
| Attachment_2_A_Spot_Repair_Detail.pdf | ||
| Site_Vist_brief_sign_in.pdf | ||
| SF30.pdf | ||
| Attachment_2_B_FM_Basemap_GeoPDF_20170207.pdf | ||
| Attachment_2_Statement_of_Work.pdf | ||
| ATTACHMENT_3_DOL.pdf | ||
| Attachment_4_Experience_Questionnaire.docx | DOCX document | |
| R0040.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 12467018R0040
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
FM ERFO PROJECT 7
Francis Marion Ranger District Francis Marion and Sumter National Forests
B- 1 - SCHEDULE OF ITEMS
FSR 166A CONIFER A ROAD RECONSTRUCTION (SCFMS 166A)
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
FMS 201
Road Heavy Brushing
Mile
1.4
20404
Unclassified borrow, compaction method D, finishing method A
CY
20701
Geotextile Material, Type 3A (Stabilization)
SY
25102
Placed riprap, class III, with 8 oz. filter fabric, nonwoven
TN
30101
Aggregate base course, Type Commercial #4 Slag, compaction method A
TN
30109
Aggregate surface course, Type FLBC, compaction method A
TN
30326
Road Reconditioning
Mile
1.4
60201
24” Reinforced Concrete Pipe
FT
62501
Seeding and Mulching, Dry method
AC
0.1
63301
Stop Sign System
EA
63312
Culvert Marker Posts
EA
SUB-TOTAL
· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.
· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.
· Repair of washed out areas is incidental to pay item 30326.
B- 1 – SCHEDULE OF ITEMS (continued)
FSR 162 HORSE ISLAND ROAD RECONSTRUCTION (SCFMS 162)
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
FMS 201
Road Heavy Brushing
Mile
5.33
20404
Unclassified borrow, compaction method D, finishing method A
CY
20701
Geotextile Material, Type 3A (Stabilization)
SY
30101
Aggregate base course, Type Commercial #4 Slag, compaction method A
TN
30109
Aggregate surface course, Type FLBC, compaction method A
TN
30326
Road Reconditioning
Mile
5.33
60201
18” Reinforced Concrete Pipe
FT
62501
Seeding and Mulching, Dry method
AC
0.2
63308
Reset/Replumb Roadside Signs
EA
63312
Culvert Marker Posts
EA
SUB-TOTAL
GRAND TOTAL
· Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.
· Demolition is considered an indirect cost of this contract and will not be compensated as a separate work item.
· Repair of washed out areas is incidental to pay item 30326.
File details come from the government source that posted it.