This document is Amendment 0003 to Solicitation 12445524B0008 for the HIF Pointe Aux Chenes FR 3105 Bridge Replacement project. The amendment provides responses to four questions raised about the solicitation:

  1. A wave equation analysis is not required if a dynamic formula is specified to determine the nominal driven pile capacity.
  2. The Quality Control Manager role can be performed by the superintendent as long as they have the experience and ability to adequately fulfill both roles.
  3. The contractor is responsible for performing the dynamic load testing using the FHWA Modified Gates Dynamic Formula.
  4. Test piles are not required for this contract.

The solicitation is being issued by the USDA Forest Service for a firm-fixed price contract to replace a bridge on the Point Aux Chenes Creek in Mackinac County, Michigan. Quotes must be submitted electronically by the specified deadline.

View the file

Other files for this federal contract opportunity

Other files attached to HIF Pointe Aux Chenes FR 3105 Bridge Replacement, newest first.
File Type Posted
Att. 2 Pointe Aux Chenes - Supplemental Specs 240624.docx DOCX document
Amendment 0002 240624.pdf PDF
Amendment 0001 240614.pdf PDF
12445524B0008 240614.pdf PDF
Att. 1 Pointe Aux Chenes - Plans 240430.pdf PDF
Att. 2 Pointe Aux Chenes - Supplemental Specs 240430.pdf PDF
Att. 4 Permit WRP034448-Pointe Aux Chenes Creek Bridge 240430.pdf PDF
12445524B0008 240529.pdf PDF
Att. 3 Wage Determination MI20240001 240524.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12445524B0008 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309-2449

STE 876S

1720 PEACHTREE ST NW

USDA-FS CSA EAST 13

06/26/20240003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/30/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ERIN M. GARCIA

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

HIF Pointe Aux Chenes FR 3105 Bridge Replacement

Amendment 0003 provides questions and answers to four (4) questions raised about the Solicitation.

Question 1 - Is the contractor required to perform a wave equation analysis? Answer 1 - Per the FP-14, a wave equation analysis report is not required if the use of a dynamic formula is specified to determine the nominal driven pile capacity.

Question 2 - Can one onsite person perform dual roles of superintendent and QCM? Answer 2 -

I don't see any reason why the QC Manager can't be performed by the superintendent, as long Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12445524B0008/0003 as they have the experience and ability to perform both rolls adequately.

Question 3 - Who is responsible to perform dynamic load testing? Answer 3 - The contractor is responsible to perform the dynamic load testing using the FHWA Modified Gates Dynamic

Formula.

Question 4 - Are test piles required and if so, how many? Answer 4 - Test piles are not required for this contract.

Quotes must be submitted electronically to Kevin

Brown at kevin.brown2@usda.gov. Reference

Solicitation #12445524B0008 in the email subject line.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .