12445022Q0043_Attachment_2_SOW.docx

DOCX document 56 KB Posted

Attached to
Auburn HVAC Maintenance Federal contract opportunity
Solicitation number
12445022Q0043
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Auburn HVAC Maintenance, newest first.
File Type Posted
Combined Synopsis Sol_12445022Q0043.pdf PDF
12445022Q0043_Attachment_3_WageDetermination_2015-4589_Rev19.pdf PDF
Attachment_1_Auburn_HVAC_Maintenance_Pricing_Abstract_10Aug22.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement Of Work Auburn HVAC Maintenance August 16, 2022

Project George W. Andrews Forestry Sciences Laboratory HVAC Preventative Maintenance (PM) Service

General Information

1.0 Scope of Work

Contractor shall provide all labor, materials, and equipment to perform preventative maintenance services to the heating, ventilation, and air conditioning (HVAC) system at the Forestry Sciences Laboratory facility located at 521 DeVall Drive, Auburn University, AL, 38649. All services shall be performed per the general guidelines of the Manufacturer’s Operations & Maintenance (O&M) manual for each specific make and model of equipment.

The scope of this contract does not include service calls for system diagnostics or repairs. Contract scope is only for scheduled Preventative Maintenance (PM) visits.

The government reserves the right to pursue all available options for the acquisition of any necessary repair work.

2.0 Background

The George W. Andrews Forestry Sciences Laboratory, located in Auburn, AL, was built in the mid 1970’s. The facility consists of 6 buildings encompassing approximately 30,000 sq. ft. The approximately 24,000 S.F. main laboratory building interior is conditioned by three air cooled condensing units (AC) and air handler units (AHU) ranging from 20 to 50 ton capacity. Heating is provided by electric duct heaters (EDH). The system is controlled by a direct digital control program. Table 1 contains the list of equipment covered by this contract.

Table 1: George W. Andrews HVAC Preventative Maintenance (PM) Service equipment list.

Quantity
Equipment
Manufacturer
Model
Size
Location
1
AHU - 1
Trane
CSAA017UA
15 HP
Front Mechanical Room
1
AC - 1
Trane
TTA24044DAB
20 Ton
Front Mechanical Room Roof
1
AHU – 2
Trane
MCCB017UAOAOUA
15 HP
Rear Mechanical Room
1
AC – 2
Trane
TTA24044CAB
20 Ton
Rear Mechanical Room Roof
1
AHU – 3
Trane
MCCB03OUAOAOUA
25 HP
Rear Mechanical Room
1
AC - 3
Trane
RAUJC504B
50 Ton
Rear Mechanical Room Roof
14
EDH 1-14

Throughout facility

Table 2: George W. Andrews HVAC Preventative Maintenance (PM) Service list of filters. Contractor shall verify all filter quantities and sizes.

Unit
Quantity
Changes/Yr
Size
Type
AHU - 1
8
4
16x20x2
Pre-filters, Pleated
AHU - 1
4
4
16x25x2
Pre-filters, Pleated
AHU - 1
8
1
24x24x12
Box, Perm Filter Frame
AHU - 2
8
4
16x20x2
Pre-filters, Pleated
AHU - 2
4
4
16x25x2
Pre-filters, Pleated
AHU - 2
8
1
24x24x12
Box, Perm Filter Frame
AHU - 3
12
4
20x20x2
Pre-filters, Pleated
AHU - 3
4
4
20x25x2
Pre-filters, Pleated
AHU - 3
12
1
24x24x12
Box, Perm Filter Frame

Contractor Requirements

3.0 Technical Requirements / Tasks

Contractor shall perform the tasks listed in Table 3.

Table 3: George W. Andrews HVAC Preventative Maintenance (PM) Service required tasks.

Task
Frequency
1
Clean condenser coils
Annually (Spring)
2
Check condenser operation, performance, refrigerant levels
Semi-annually (Spring and Fall)
3
Change all AHU belts, check belt alignment, clean drains and drain pains
Semi-annually (Spring and Fall)
4
Install new pre-filters in all Air Handling Units (3 total Air Handling Units)*
Quarterly
5
Install new primary (box) filters (3 total Air Handling Units) *
Annually (Fall)
6
Document all services and provide copy to COR
Quarterly
7
Test and Inspect Electric Duct Heaters (EDH)
Annually (Fall)
*
See Table 2 for list of filters. Contractor shall verify all quantities and sizes.

NOTE: The first preventative maintenance service conducted after award of the base year contract shall meet the requirements of an annual preventative maintenance service in order to establish a comprehensive baseline for the condition of the equipment.

3.1 Identification of Needed Repairs

Contractor shall notify the Contracting Officer Representative (COR) if any component or function of the HVAC system is found to be inoperable or defective during the preventative maintenance checks and services. Contractor shall not make any repairs outside the scope of this contract without approval of the Contracting Officer (CO).

4.0 Government Furnished

Building Access It shall be the Contractor's responsibility, through the COR, to coordinate access to buildings and facilities and arrange for them to be opened and closed. Work shall be preformed during normal business hours (8:00 am to 4:30 pm) Monday – Friday.

The contractor will ensure all Federal, USDA, and Forest Service safety protocols are followed when performing work onsite. This includes following USDA’s COVID-19 Workplace Safety Plan guidance https://www.usda.gov/sites/default/files/documents/usda-covid-19-workplace-safety-plan.pdf for measures related to COVID-19 and all similar safety issues that may occur during this contract. These requirements will be flowed down to all teaming partners (subcontractors, joint venture partners, or independent contractors) performing on-site work during the course of this contract.

5.0 Deliverables

After each maintenance visit, the contractor will provide a written Preventative Maintenance Service Report.

5.1 Records and Reports

The Contractor shall develop and maintain Preventative Maintenance Service Reports for each preventive maintenance service visit, which shall include:

· Summary remarks on the general condition of the equipment,

· Details regarding any recommended future maintenance or repair activities other than upcoming scheduled maintenance

· Copies of completed checklists for each piece of equipment included in the preventative maintenance service.

Preventative Maintenance Service Reports shall be submitted along with monthly invoices.

6.0 Travel

NA

7.0 Contractor’s Key Personnel

Contractor shall provide licensed/certified HVAC technicians for the performance of this contract.

8.0 Security Requirements

NA

9.0 Data Rights

NA

10.0 Section 508 – Electronic and Information Technology Standards

NA

11.0 Point of Contact

The point of contact (POC) and COR for this contract will be Jason Thompson (jason.d.thompson@usda.gov , Office: 334-826-8700, Ext. 137, Cell: 828-715-7974).

12.0 Safety

The contractor shall perform all work in a safe manner and shall comply with applicable local, state and federal (OSHA) standards.

13.0 Standards

All work shall meet the standards specified herein and shall be accomplished in conformance with approved and accepted standards of the industry; equipment manufacturers; all applicable activity, local, state, and federal standards; and all applicable building and safety codes. All work shall comply with ASHRAE (American Society of Heating, Refrigerating and Air-Conditioning Engineers, NEC (National Electrical Compliance) in accordance with manufacturer’s recommendations, OSHA and other applicable laws, federal & state regulations, and agency directives and guidance.

image1.png