IRSC Appendix C.docx
DOCX document 68 KB Posted
- Attached to
- West Schubarth Stewardship (IRSC) Federal contract opportunity
- Solicitation number
- 12363N21Q0002
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains an appendix and federal contract opportunity related to road maintenance and forest management services. The appendix provides specifications for road surfacing, blading, drainage excavation, and definitions of related terms to maintain roads under a stewardship contract. The federal contract opportunity is a pre-solicitation notice for a commercial services contract located in Colorado's Pike National Forest to conduct thinning, fuels reduction, and timber removal across 552 acres. Services include minor road construction and maintenance. The pre-solicitation period is from February 24 to March 11, 2021, with the solicitation period from March 11 to April 8, 2021 and award anticipated thereafter. The Department of Agriculture Forest Service is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| West Schubarth Vicinity.pdf | ||
| IRSC Appendix A.docx | DOCX document | |
| West Schubarth CAM.pdf | ||
| Wage Determination_12363N21Q0002.pdf | ||
| IRSC Appendix B.doc | DOC document | |
| Sol_12363N21Q0002 West Schubarth.docx | DOCX document | |
| West Schubarth Vicinity_Draft.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
T-SPECIFICATIONS
| T-SPEC NUMBER |
| SPECIFICATION TITLE |
| PAGE |
| T-800 |
| Definitions |
| 2-4 |
| T-803 |
| Surfacing Blading |
| 5 |
| T-814 |
| Drainage Excavation |
| 6 |
PRE-HAUL (optional)
Termini
Applicable Road Maintenance Specifications
| Road |
| From |
| To |
| Miles |
| T-800 |
| T-803 |
| T-814 |
| NFSR 307 |
| JCT w/the Forest Boundary |
| JCT with NFSR 307.A |
| 1.6 |
| · |
| O |
O
| NFSR 307.A |
| JCT NFSR 307 |
| Northern Project Area Boundary |
| 1.7 |
| · |
| O |
O
POST-HAUL
Termini
Applicable Road Maintenance Specifications
| Road |
| From |
| To |
| Miles |
| T-800 |
| T-803 |
| T-814 |
| NFSR 307 |
| JCT w/the Forest Boundary |
| JCT with NFSR 307.A |
| 1.6 |
| · |
| C |
| C |
| NFSR 307.A |
| JCT NFSR 307 |
| Northern Project Area Boundary |
| 1.7 |
| · |
| C |
C
C = Contractor Performance Item O = Optional Performance Item NFSR = National Forest System Road JCT = Junction
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used, the intent and meaning shall be interpreted as follows:
800-1.1—Agreement—Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2—Annual Road Maintenance Plan—A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3—Base Course—Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4—Berm—Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.
800-1.5—Borrow—Select Material taken from designated borrow sites.
800-1.6—Clearing Limits—The limits of clearing as designated on the ground or on the drawings.
800-1.7—Crown, Inslope, and Outslope—The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.8—Culverts—A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.9—Drainage Dip—A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.10—Drainage Structures—Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, culverts and the like.
800-1.11—Dust Abatement Plan—A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.12—Lead-off Ditches—A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.13 —Material—Any substances specified for use in the performance of the work.
800-1.14—Pre-haul Maintenance—Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Contractor's use, provided Contractor's operations do not damage improvements in Section H.21 of the contract/solicitation or National Forest resources and hauling can be done safely. This work will be shown in the above Road Maintenance Requirements.
West Schubarth IRSC
Pre-haul Maintenance work the Contractor elects to perform will be in compliance with the Road Maintenance T-Specifications.
Pike and San Isabel NFs APPENDIX C Pikes Peak RD T-800-1 800-1.15—Right-of-Way—A general term denoting:
(1) The privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or
(2) Land, appurtenances thereto, or interest therein, usually in a strip, acquired for public or private passageway.
800-1.16—Roadbed—The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.
800-1.17—Road Maintenance Requirements—A table which shows applicable road maintenance specifications to be performed by Contractor on specific roads.
800-1.18—Roadside—A general term denoting the area adjoining the outer edge of the Roadway.
800-1.19—Roadway—The portion of a road within the limits of excavation and embankment.
800-1.20—Shoulder—That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.21—Slide—A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated ravelling.
800-1.22—Slough—Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.23—Slump—A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.24—Special Project Specifications—Specifications which detail conditions and requirements peculiar to the individual project.
800-1.25—Subgrade—Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.26—Surface Course—The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.27—Surface Treatment Plan—A table which lists the roads and surface treatments to be applied.
800-1.28—Traveled Way—That portion of Roadway, excluding Shoulders, used for the movement of vehicles.
800-1.29—Turnouts—That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.30—Water Source—A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.31—Waterbar—A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway. A Waterbar is not designed to be traversable by logging trucks.
Pike and San Isabel NFs APPENDIX C Pikes Peak RD T-800-2
ILLUSTRATION OF ROAD STRUCTURE TERMS
Pike and San Isabel NFs APPENDIX C Pikes Peak RD T-800-3
SPECIFICATION T-803 SURFACE BLADING
DESCRIPTION:
1.1—Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes returning the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder; repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.
REQUIREMENTS:
3.1—Surface blading shall be performed before (if awarded), and after Contractor's use as often as necessary to facilitate traffic and proper drainage.
3.2—The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.
3.3—Water, taken from Water Sources designated on Contract Area Map, shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.
3.4—On native surfaced roads, Material generated from backslope sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads this Material shall not be blended with Surface or Base Course Material unless agreed otherwise.
3.5—Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.
Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.
3.6—Drainage Dips and Lead-off Ditches shall be cleaned to reasonably blend with existing line, grade, and cross-section.
3.7—Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.
3.8 —Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way. Unless otherwise designated by the Forest Service, the oversized Material shall be disposed of by sidecasting. Sidecasting into streams, lakes, or water courses will not be permitted.
3.9—Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.
3.10—Material resulting from work under this specification, plus any other accumulated debris, shall be removed from bridge decks and the deck drains opened. This includes existing debris under pre haul maintenance (if aw Pike and San Isabel NFs APPENDIX C Pikes Peak RD T-803
SPECIFICATION T-814 DRAINAGE EXCAVATION
DESCRIPTION:
1.1—This work shall consist of excavation and shaping of roadway drainage structures to drain freely including rolling dips, grade dips, roadway ditches, lead-off ditches, and catch basins.
Any clearing or grubbing necessary to accomplish the drainage excavation is consicidered incidental to the pay item.
REQUIRMENTS:
3.1—Cleaning and Grubbing. All trees, stumps, roots, and other protruding vegetative material shall be cleared from drainage. Trees shall be cut into lengths not to exceed 5 feet and all limbs removed. Logs, slash, and stumps shall be scattered outside the drainage or as directed by the Forest Service.
3.2—Excavation. Drainage structures shall be excavated and shaped to a depth and width to provide drainage in conformity with the line grades and cross sections as shown on the Illustration of Road Structure Terms drawing (page 4) at locations designated on the ground.
Hand work may be necessary to obtain a smooth surface and uniforn cross section.
Lead-off ditches shall be provided for a distance necessary to drain unless otherwise approved by the Forest Service. roadside ditches shall be free draining.
Material removed if suitable, shall be blended into the existing native road surface or shoulders. Unsuitable material shall be spread evenly and not heaped against existing vegetation.
Large rocks encountered during during excavation of drainage structures that inerfere with the lines and grades of the structure shall be removed, when practical and placed so that they will not roll or obstruct the use and maintenance of the roadway or moved to locations approved by the Forest Service.
MEASUREMENT:
1.1—Drainage dip and catch basin measurement will be the number of each item completed and accepted.
Roadside ditches and lead-off ditches will be measured by linear measurement, horizontally along the centerline of the ditch.