Specifications_FINAL-_1987_Wing.pdf
PDF 784 KB Posted
- Attached to
- Replace Air Handling Unit Federal contract opportunity
- Solicitation number
- 1232SD18B0006
About this file
1232SD18B0006 - SPECIFICATIONS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawings.pdf | ||
| SOLICITATION_PACKAGE_-_SOLICITATION__1232SD18B0006.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
REPLACE AIR HANDLING UNIT
(1987 WING)
NATIONAL SEDIMENTATION LABORATORY
OXFORD, MISSISSIPPI
Prepared For:
U.S. DEPARTMENT OF AGRICULTURE
Agricultural Research Service
Prepared By:
THE JOHNSON-McADAMS FIRM, P.A.
Greenwood, Mississippi
March 28, 2018
TABLE OF CONTENTS Page 1
USDA-ARS
TITLE: REPLACE AIR HANDLING UNIT (1987 WING)
USDA, ARS, NATIONAL SEDIMENTATION LABORATORY
OXFORD, MISSISSIPPI
TABLE OF CONTENTS
Section Number Paragraph Title
DIVISION 01 GENERAL REQUIREMENTS
01 00 01 Warranty of Construction 01 00 11 General Paragraphs 01 00 21 Contractor Quality Control 01 33 00 Submittal Procedures 01 50 00 Project Closeout 01 78 23 Operation and Maintenance Data
DIVISION 02 EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 07 92 00 Joint Sealants
DIVISION 09 FINISHES
09 90 00 Paints and Coatings
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems 23 03 00 Basic Mechanical Materials and Methods 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 Thermal Insulation for Mechanical Systems 23 09 00 Instrumentation and Control for HVAC 23 73 13 Modular Indoor Central-Station Air Handling Units
-- End of Table of Contents --
REPLACE AIR HANDLING UNIT (1987 WING), OXFORD, MS 1037M
SECTION 01 00 01 Page 1
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
PART 1 GENERAL
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage described in paragraph 1.1.1 above within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all subcontractors', manufacturers', and suppliers' warranties expressed or implied, respecting any work and materials shall, at the direction of the Government, be enforced by the Contractor for the benefit of the Government. In such case, if the Contractor's warranty under paragraph 1.1.1 above has expired, any suit directed by the Government to enforce a subcontractor's, manufacturer's, or supplier's warranty shall be at the expense of the Government. The Contractor shall obtain any warranties which the subcontractors, manufacturers, or suppliers would give in normal commercial practice. If so directed by the Contracting Officer, the Contractor shall require any such warranties to be executed in writing to the Government.
SECTION 01 00 01 Page 2
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with respect to latent defects, gross mistake, or fraud.
-- End of Section --
SECTION 01 00 11 Page 1
SECTION 01 00 11
GENERAL PARAGRAPHS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be Done
The work to be done consists of furnishing all labor, materials, and equipment and performing all work in strict accordance with these specifications for the replacement of the air handling unit (AHU-2) and condensing unit serving office/administration areas of the 1987 Wing, National Sedimentation Laboratory, USDA, ARS, in Oxford, Mississippi.
1.1.2 Location
The site of work contemplated by this specification is at Building 1, 1987 Wing, National Sedimentation Laboratory in Oxford, Mississippi.
1.1.3 Principal Features of Work:
A. Demolition of existing air handling unit, condensing unit and controls.
B. Installation of new air handling unit, condensing unit and controls.
C. Electrical modifications for HVAC upgrades.
Note: The above general outline of principal features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor and materials required by the plans and specifications. The term "provide" as used in the specifications and on the plans means to furnish and install the work indicated.
1.2 SITE VISIT
A site visit and inspection tour will be held at Building 1, USDA, ARS at Oxford, Mississippi. All potential bidders will be notified of the exact time and date and are strongly urged to attend the site visit. Inspection may only be made at this time, unless prior written approval is obtained to inspect at another date and time.
Contact:
U.S. Department of Agriculture, ARS, National Sedimentation Laboratory
Attn: Ms. Cathy W. Sabbatini 598 McElroy Oxford, Mississippi 38655-1157
(662) 232-2909
SECTION 01 00 11 Page 2
1.3 COORDINATION OF WORK
1.3.1 Work space and space available for storing materials shall be subject to the approval of the Contracting Officer. Do not store materials and equipment in other than assigned areas.
1.3.2 Execute work so as to interfere as little as possible with normal functioning of the facility, including operations of utility services and any existing equipment, and with work being done by others.
1.3.3 Minimize interference of construction activities with the flow of traffic by keeping roads, walks and entrances to grounds, to parking areas and to occupied areas of buildings clear of construction materials, debris, construction equipment and vehicles except where noted on plans or in specifications. Provide unobstructed access to areas required to remain in operation.
1.3.4 The Contractor shall complete all work within 120 consecutive calendar days after Notice to Proceed. Within 14 calendar days after Contract Award, the Contractor shall provide the Government with a detailed schedule of dates on which the Contractor plans to accomplish the work. In addition, the Contractor shall notify the Contracting Officer 20 days in advance of starting work. A planned work schedule shall be submitted to the Contracting Officer for approval. The schedule shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations. This schedule shall be updated monthly and submitted to the Contracting Officer for approval.
The entire building will be available to the contractor except for the addition on the east side of the building. The contractor shall be required to provide a work sequence schedule that allows USDA research in the addition to be unaffected by demolition, or construction work. The work sequence schedule shall detail the sequence and type of work, scheduled outages, and temporary heating requirements. The work sequence schedule shall be approved by the contracting officer prior to the start of any work in the building.
1.3.5 The Contractor shall be completely responsible for providing all equipment and labor required to provide temporary heating service and equipment. The Contractor may elect to utilize the permanent heating system for temporary heat. This may be allowed if the building is enclosed and after the heating system has been tested and is ready to operate and providing the Contractor complies with all provisions stated elsewhere in the Contract Documents. If the permanent heating system cannot be utilized or if work requires a shutdown of the existing system the Contractor shall make arrangements to comply with this requirement at no additional cost. The Contractor shall furnish and pay the costs of any materials and equipment which are not part of the permanent heating system and which may be required to operate the permanent heating system on a temporary basis. Unit heaters, if used, shall be of the smokeless type and be installed and operated in such a way that no materials
SECTION 01 00 11 Page 3 inside the building will be damaged.
1.3.6 The Contractor shall take all measures and provide all material necessary for protecting existing equipment, property, and ongoing operations in affected areas of construction against dust, noise and debris.
1.3.7 Power sources for the Contractor's operations will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of the Government's facilities. Water sources will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of any building. The Contractor is responsible for extending utility sources to his work locations. Such extensions shall be removed after work is completed, to the satisfaction of the Contracting Officer.
1.3.8 All references in the specifications to the Contracting Officer and
Contracting Officer's Representative shall constitute referrals initially to the Contracting Officer's Representative.
1.3.9 Contractor shall provide sanitary facilities for use by his employees and the employees of his subcontractors working on job site.
1.4 DRAWINGS
1.4.1 All dimensions shown of existing work and all dimensions required for work that is to be connected with existing work shall be verified by the Contractor by actual field measurements. Any work at variance with that specified or shown on the drawings, shall not be performed by the Contractor until the Contractor has received approval in writing from the Contracting Officer.
1.5 MATERIAL SAFETY DATA SHEETS (MSDS)
Material Safety Data Sheets must be submitted to the Contracting Officer prior to the commencement of any work with any substance that may be considered hazardous.
1.6 UTILITIES OR STRUCTURAL ITEMS CONFLICTING WITH PROPOSED
CONSTRUCTION
In the event the Contractor finds an area where existing utilities or structural items conflict with proposed construction, the Contracting Officer shall be notified immediately. The Contractor shall then propose a method of solving the problem.
Work shall not resume in the problem area until the Contractor has received written approval from the Contracting Officer. There shall be no additional cost to the Government.
1.7 ACCEPTANCE OF WORK
SECTION 01 00 11 Page 4
1.7.1 Final inspection will not be made until the contract work is completed. The Contractor shall notify in writing the Contracting Officer fifteen working days prior to the date on which the work will be ready for final inspection.
1.7.2 Final inspection and acceptance of the work shown by the drawings and specifications forming a part of this contract shall not be binding or conclusive on the Government if it shall be shown that (1) the Contractor has willfully or through collusion with persons or firms engaged in the performance of the contract supplied inferior materials, equipment, or workmanship, or (2) the Contractor has otherwise departed from the terms of the contract.
1.8 TEMPORARY COOLING
Provide temporary cooling systems for the duration of the work to be performed.
Refer to the contract drawings for additional requirements.
SECTION 01 00 21 Page 1
SECTION 01 00 21
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 GENERAL
This section covers the quality control inspection, sampling, and testing of all materials, services, and workmanship required to be performed by the contract drawings, specifications, and other contract requirements. The Contractor shall perform all quality control inspection, sampling, and testing required by this contract and shall review and certify that each submittal is correct and in strict conformance with the contract drawings and specifications for all shop drawings and lists of materials, fixtures, and equipment. All work performed under this contract shall be in strict accordance procedures and requirements detailed on the plans and specifications.
1.1.1 Certificate of Compliance
Upon completion of the contract work and prior to final acceptance, the Contractor shall submit to the Contracting Officer a certificate of compliance which states that all materials, equipment, design, and workmanship incorporated in the work are in strict compliance with contract drawings and specifications except for approved deviations.
The certificates of compliance shall be signed and dated by both the manufacturer’s representative and the Contractor. Based upon this certificate of compliance and other contract requirements, the Contractor shall be responsible for correcting at his expense any defects, omissions, and deviations (other than those previously approved) which are detected during the contract period or during the one year warranty period as defined in SECTION 01 00 01, WARRANTY OF
CONSTRUCTION.
1.2 INSPECTION
The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
1.3 REVIEW AND APPROVAL OF SHOP DRAWINGS, SUBMITTALS,
MATERIALS, FIXTURES, AND EQUIPMENT
1.3.1 Prior to submission to the Government for approval, the Contractor shall review and certify that all shop drawings, submittals, lists of materials, fixtures, and equipment as called for under the various headings of these specifications are correct and in strict compliance with the contract drawings and specifications. These drawings, submittals and lists shall be accurate, complete, and adequately detailed.
The top copy of data comprising each item listed on the transmittal form shall be
SECTION 01 00 21 Page 2 identified as having received the quality control inspector's approval by being so stamped, signed and dated. Approval of shop drawings, submittals, materials, fixtures, and equipment by the Contracting Officer will not relieve the Contractor of the responsibility for any errors which may exist and the Contractor shall be responsible for the satisfactory construction of all work. All samples of materials submitted as required by these specifications shall be properly identified and labeled for ready identification, and upon being approved, stored at the site of the work for jobsite use until all work has been accepted by the Contracting Officer. The Contractor shall provide four (4) sets of all shop drawings.
1.3.2 All proposed deviations required by the Contractor shall be noted in the "Remarks" column of the Form. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the shop drawing. The Government reserves the right to rescind inadvertent approval of shop drawings containing unnoted deviations.
1.4 DAILY RECORDS
The Contractor shall maintain a daily record of quality control measures performed for each shift of Contractor or Subcontractor operations on an appropriate format.
These records shall provide factual evidence that continuous quality control inspections have been performed, including but not limited to the following: job progress, problems encountered; problems resolved; type and number of inspections; results of inspections or tests including all computations; nature of defects; causes for rejection; safety violations; proposed remedial action; and corrective action taken. These records shall cover both conforming and defective items and shall include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. The Contractor shall maintain a current record of all inspections and shall furnish to the Contracting Officer on a daily basis, legible copies of all inspection records for his permanent retention.
The daily records of inspections shall cover all work placement subsequent to the previous report, and shall be verified by the Contractor's designated representative.
1.5 RECURRING DEFICIENCIES
If recurring deficiencies in an item or items being inspected by the Contractor indicate that the inspection system is not providing adequate quality control, the Contractor shall take such corrective measures as deemed necessary by the Contracting Officer.
1.6 CONFLICTS
In the event of a difference of opinion between the Contractor and the Contracting Officer, the Contracting Officer shall govern.
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. SHOP DRAWINGS
The Contractor shall furnish the Contracting Officer six copies with such promptness as to cause no delay in this work or the work of any other contractors, one sepia copy of the shop drawings as required for the various subheadings for the Contracting Officer's approval. Shop drawings of any other subcontractor should be reviewed and approved by each subcontractor where their contract work comes in contact with or interferes with that of another subcontractor.
1.1 The Contracting Officer's approval, however, shall not relieve the
Contractor from responsibility for errors in shop drawings. Shop drawings are the instruments of the Contractor, not the Contracting Officer; the Drawings and Specifications shall always be final.
2. SAMPLES
Within and not later than thirty (30) days from the date of the General Contract, the General Contractor shall have secured and submitted to the Contracting Officer for his consideration, two samples of each kind and grade of materials and finish as noted under the various headings of the specifications. These samples shall be finished completely and shall accurately represent the work as it is proposed to be installed. The Contracting Officer will give immediate consideration to such samples and shall notify the General Contractor within ten (10) days after receipt of either approval or rejection. If such samples are rejected, the General Contractor shall, without delay, submit corrected samples for approval, and shall continue to do so until such approval is given the Contracting Officer. All approvals will be given by the Contracting Officer to the General Contractor in writing.
2.1 It shall be the Contractor's responsibility to obtain materials at such time as to cause no delay to the project. No allowance for additional time nor substitution of approved materials will be allowed for Contractor's negligence in late ordering of materials.
3. PRODUCT DATA
Submit six copies of preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer’s descriptive literature, catalog data, and other data to illustrate portion of work.
4. O & M MANUALS
O & M Manuals shall be submitted in accordance with Section 01 78 23 OPERATION
SECTION 01 33 00 Page 2
AND MAINTENANCE DATA.
5. GOVERNMENT ACTIONS POSSIBLE
Submittals will be returned to the Contractor with one of the following notations:
a. Submittals marked “approved” or “approved as submitted” authorize
Contractor to proceed with work covered.
b. Submittals marked “approved as noted” or “approval except as noted;
resubmission not required” authorize Contractor to proceed with work as noted provided the Contractor takes no exception to the notations.
c. Submittals marked “revise and resubmit” or “disapproved” indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
6. SUBMITTAL REGISTER
Contractor shall submit items as required.
M A
T E
R
IA
L A
PP
R
O V
A L
S U
B M
IT
T
L
T
O
U
SD
A A
R S
C C
A
E
C
R
FR
M
C on tr ac to r)
PR
JE
C T
N U
M B
E
PR
JE
C
T T
IT
L
E
C O
N T
R A
C T
N U
M B
E
(T o be c om pl et ed b y th e
C on tr ac to r)
G ov er nm en t U se
O nl y
SU
B M
IT
T
N
U M
B E
R
PR
E
V
IO
U S
SU
B
M
IT
T A
L N
U M
B
(o nl y if ite m s l ist ed w er e su bm itt ed p re vi ou sl y)
A ec om m en da tio n C
O om m en da tio n
C on tr ac tin g
O ff ic er pp ro va l/D is ap pr ov al in e o.
Sp ifi ca tio n
Se ct
Pa ra N o.
D ra w o.
D es cr ip tio n of
M at er ia l (I nc lu de ty pe , m od el
, m fg
PP
IS
A
P S ee om m en ts on ev se
A P m ev
A P m ev
If a n ite m is d is ap pr ov ed , a r es ub m itt al is d ue w ith in ca le nd ar d ay s o f t he
C on tr ac tin g
O ff ic er
’s si gn at ur e be lo w
C on tr ac to r
(K tr
A tr ac tin g
O ff ic
Y
PE
o r
PR
IN
T N
A M
E
T
IT
PE
o r
PR
IN
T N
A M
E
T
IT
PE
o r
PR
IN
T N
A M
E
T
IT
PE
o r
PR
IN
T N
A M
E
T
IT
SI
G
N A
T U
R E
SI
G N
A T
U R
E
SI
G
N A
T U
R E
SI
G N
A T
U R
E
D A
T E
D
A T
E
D A
T E
D
A T
E
B y co m pl et in g th is fo rm
, t he a bo ve si gn ed c on tra ct or c er tif ie s t ha t t he m at er ia l c om pl ie s w ith a ll sp ec ifi ca tio ns o f t he su bj ec t co nt ra ct
D A
T E
R E
C E
IV
E
D F
R O
M K
T R
D
A T
E R
E C
E
IV
E D
F R
O M
A
E
D A
T E
R E
C E
IV
E
D F
R O
M C
O T
R
PF
O
IL
F or m
JU
N
8)
N
TR
A C
SU
BM
IT
TA
M
M E
N T
S In st ru ct io ns
En te r t he in iti al s o f t he in di vi du al m ak in g th e co m m en t, th e
Li ne
N um be r o f t he it em fo r w hi ch th e co m m en t i s b ei ng m ad e, a nd th e co m m t.
PF
IL
F or m
JU
N
8)
R ev er
SECTION 01 50 00 Page 1
SECTION 01 50 00
PROJECT CLOSEOUT
PART 1 GENERAL
1.1 AS-BUILT DRAWINGS
At the completion of the project, the Contracting Officer will furnish the Contractor, free of charge, one set of drawings on which the Contractor will indicate all variations in locations, construction, equipment, etc. from that shown on the original Drawings.
They shall also indicate the exact location, size, etc. of the following:
a. Mechanical work
1.2 SUBSTANTIAL COMPLETION AND COMPLETION OF PUNCH LIST
CORRECTIONS
Set date and notify Contracting Officer as to time construction will be ready for preliminary punch list and, upon completion of that list, set time and date for inspection of punch list corrections. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Contracting Officer on the basis of an inspection, determines that the Work or designated portion thereof is sufficiently complete, in accordance with the Contract Documents, so that the Owner or separate contractors can occupy or utilize the Work or designated portion thereof for the use for which it is intended, he will prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time within which the Contractor shall complete the items listed therein or attached thereto. Warranties required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.
The Certificate of Substantial Completion shall be submitted to the Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate.
1.3 FINAL INSPECTION
The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. If the project is complete, in the opinion of the Contracting Officer, the Contracting Officer shall issue a certificate as set forth hereinafter. Minor unfinished items of work may be excluded from the certificate. The Contracting Officer and Contractor shall mutually agree on a date for the completion of these items of work.
SECTION 01 50 00 Page 2
Should the Contractor fail to complete the work within the agreed time, the Owner shall have the option of having the unfinished work completed.
1.4 RELEASE OF LIENS AND CERTIFICATION ALL BILLS ARE PAID
The Contractor, before final acceptance is given by the Contracting Officer, shall furnish for himself and all sub-contractors, in triplicate, duly certified by a notary, a full release of liens, damages, and a guarantee that all materials and labor are paid in accordance with the Contractual Documents.
1.5 GUARANTEE
The Contractor, before final acceptance by the Contracting Officer, shall furnish the
Owner, in triplicate, a written notarized guarantee. All Contractors shall guarantee their work for a period of one year from the date of Substantial Completion as stated by the Contracting Officer. Neither the final Certificate for Payment, nor any provision in the Contract Documents shall relieve the contractors of their responsibility for negligence or defective materials or workmanship within the extent and period covered by law; and upon written notice he shall remedy any defects due thereto, and pay all expenses for any damages to other work resulting therefrom. Emergency defective workmanship and defective materials within the year's guarantee shall be corrected within a few days after receipt of a written order from the Contracting Officer. Any items that are not considered of an emergency nature by the Contracting Officer may be corrected prior to the expiration of the Guarantee period.
1.5.1 The wording for the Guarantee shall be as follows:
"We hereby guarantee all work performed by us on the above captioned project to be free from defective materials and workmanship for a period of one year, or for such longer period of time as may be called for in the Contractual Documents for such portions of the work."
1.6 OTHER FINAL DOCUMENTS
Deliver to the Owner, through the Contracting Officer, all required bonds, warranties, individual guarantees, etc. that are required by the various following sections of these specifications.
1.7 ACCEPTANCE
Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and excepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the
SECTION 01 50 00 Page 3
Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.
SECTION 01 78 23 Page 1
SECTION 01 78 23
OPERATION AND MAINTENANCE DATA
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E 1971 (2005) Stewardship for the Cleaning of Commercial and Institutional Buildings
1.2 SUBMISSION OF OPERATION AND MAINTENANCE DATA
Submit Operation and Maintenance (O&M) Data/Manuals which are specifically applicable to this contract and a complete and concise depiction of the provided equipment or product. Organize and present information in sufficient detail to clearly explain O&M requirements at the system, equipment, component, and subassembly level. Include an index preceding each submittal. Submit in accordance with this section and Section 01 33 00, "SUBMITTAL PROCEDURES."
1.2.1 Quantity
Submit three sets of the supplier/manufacturers' O&M information specified herein for the components, assemblies, subassemblies, attachments, and accessories. The items for which O&M Data/Manuals are required are listed in the technical sections which specifies those particular items.
1.2.2 Package Quality
Documents must be fully legible. Poor quality copies and material with hole punches obliterating the text or drawings will not be accepted.
1.2.3 Package Content
Data package content shall be as shown in the paragraph titled "Schedule of Operation and Maintenance Data Packages." For each product, system, or component piece of equipment requiring submission of O&M Data, submit the Data Package specified in the individual technical section.
SECTION 01 78 23 Page 2
1.2.4 Delivery
Submit O&M Data Manuals to the Contracting Officer for review and acceptance;
submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
a. In the event the Contractor fails to deliver O&M Data/Manuals within the time limits set forth above, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data/Manuals are associated.
1.2.5 Changes to Submittals
Manufacturer-originated changes or revisions to submitted data shall be furnished by the Contractor if a component of an item is so affected subsequent to acceptance of the O&M Data. Changes, additions, or revisions required by the Contracting Officer for final acceptance of submitted data, shall be submitted by the Contractor within 30 calendar days of the notification of this change requirement.
1.3 TYPES OF INFORMATION REQUIRED IN O&M DATA PACKAGES
1.3.1 Operating Instructions
Include specific instructions, procedures, and illustrations for the following phases of operation:
1.3.1.1 Safety Precautions
List personnel hazards and equipment or product safety precautions for all operating conditions.
1.3.1.2 Operator Prestart
Include procedures required to set up and prepare each system for use.
1.3.1.3 Startup, Shutdown, and Postshutdown Procedures
Provide narrative description for each operating procedure including control sequence for each.
1.3.1.4 Normal Operations
Provide narrative description of normal operating procedures. Include control diagrams with data to explain operation and control of systems and specific equipment.
SECTION 01 78 23 Page 3
1.3.1.5 Emergency Operations
Include Emergency Procedures for equipment malfunctions to permit a short period of continued operation or to shut down the equipment to prevent further damage to systems and equipment. Include Emergency Shutdown Instructions for fire, explosion, spills, or other foreseeable contingencies. Provide guidance and procedures for emergency operation of all utility systems including required valve positions, valve locations and zones or portions of systems controlled.
1.3.1.6 Environmental Conditions
Include a list of environmental conditions (temperature, humidity, and other relevant data) which are best suited for each product or piece of equipment and describe conditions under which equipment should not be allowed to run.
1.3.2 Preventive Maintenance
Include the following information for preventive and scheduled maintenance to minimize corrective maintenance and repair.
1.3.2.1 Lubrication Data
Include preventative maintenance lubrication data, in addition to instructions for lubrication provided under paragraph titled "Operator Service Requirements":
a. A table showing recommended lubricants for specific temperature ranges and applications.
b. Charts with a schematic diagram of the equipment showing lubrication points, recommended types and grades of lubricants, and capacities.
c. A Lubrication Schedule showing service interval frequency.
1.3.2.2 Preventive Maintenance Plan and Schedule
Include manufacturer's schedule for routine preventive maintenance, inspections, tests and adjustments required to ensure proper and economical operation and to minimize corrective maintenance and repair. Provide manufacturer's projection of preventive maintenance work-hours on a daily, weekly, monthly, and annual basis including craft requirements by type of craft. For periodic calibrations, provide manufacturer's specified frequency and procedures for each separate operation.
1.3.2.3 Cleaning Recommendations
Provide environmentally preferable cleaning recommendation in accordance with
ASTM E 1971.
SECTION 01 78 23 Page 4
1.3.3 Corrective Maintenance (Repair)
Include manufacturer's recommendations on procedures and instructions for correcting problems and making repairs.
1.3.3.1 Troubleshooting Guides and Diagnostic Techniques
Include step-by-step procedures to promptly isolate the cause of typical malfunctions.
Describe clearly why the checkout is performed and what conditions are to be sought. Identify tests or inspections and test equipment required to determine whether parts and equipment may be reused or require replacement.
1.3.3.2 Wiring Diagrams and Control Diagrams
Wiring diagrams and control diagrams shall be point-to-point drawings of wiring and control circuits including factory-field interfaces. Provide a complete and accurate depiction of the actual job specific wiring and control work. On diagrams, number electrical and electronic wiring and pneumatic control tubing and the terminals for each type, identically to actual installation numbering.
1.3.3.3 Maintenance and Repair Procedures
Include instructions and list tools required to restore product or equipment to proper condition or operating standards.
1.3.3.4 Removal and Replacement Instructions
Include step-by-step procedures and list required tools and supplies for removal, replacement, disassembly, and assembly of components, assemblies, subassemblies, accessories, and attachments. Provide tolerances, dimensions, settings and adjustments required. Instructions shall include a combination of text and illustrations.
1.3.3.5 Spare Parts and Supply Lists
Include lists of spare parts and supplies required for maintenance and repair to ensure continued service or operation without unreasonable delays. Special consideration is required for facilities at remote locations. List spare parts and supplies that have a long lead time to obtain.
1.3.4 Appendices
Provide information required below and information not specified in the preceding paragraphs but pertinent to the maintenance or operation of the product or equipment. Include the following:
SECTION 01 78 23 Page 5
1.3.4.1 Product Submittal Data
Provide a copy of all Product Data submittals required in the applicable technical sections.
1.3.4.2 O&M Submittal Data
Provide a copy of all Operation and Maintenance Data submittals required in the applicable technical sections.
1.3.4.3 Parts Identification
Provide identification and coverage for all parts of each component, assembly, subassembly, and accessory of the end items subject to replacement. Include special hardware requirements, such as requirement to use high-strength bolts and nuts. Identify parts by make, model, serial number, and source of supply to allow reordering without further identification. Provide clear and legible illustrations, drawings, and exploded views to enable easy identification of the items. When illustrations omit the part numbers and description, both the illustrations and separate listing shall show the index, reference, or key number which will cross-reference the illustrated part to the listed part. Parts shown in the listings shall be grouped by components, assemblies, and subassemblies. Parts data may cover more than one model or series of equipment. components, assemblies, subassemblies, attachments, or accessories, such as a master parts catalog, in accordance with the manufacturer's standard commercial practice.
1.3.4.4 Warranty Information
List and explain the various warranties and include the servicing and technical precautions prescribed by the manufacturers or contract documents to keep warranties in force. Include warranty information for primary components such as the compressor of air conditioning system.
1.3.4.5 Personnel Training Requirements
Provide information available from the manufacturers to use in training designated personnel to operate and maintain the equipment and systems properly.
1.3.4.6 Testing Equipment and Special Tool Information
Include information on test equipment required to perform specified tests and on special tools needed for the operation, maintenance, and repair of components.
1.3.4.7 Contractor Information
SECTION 01 78 23 Page 6
Provide a list that includes the name, address, and telephone number of the General Contractor and each subcontractor installing the product or equipment. Include local representatives and service organizations most convenient to the project site.
Provide the name, address, and telephone number of the product or equipment manufacturers.
1.3 SCHEDULE OF OPERATION AND MAINTENANCE DATA PACKAGES
Furnish the O&M Data Packages specified in individual technical sections. The required information for each O&M Data Package is as follows:
1.3.1 Data Package 1
Not used.
1.3.2 Data Package 2
a. Safety precautions
b. Normal operations
c. Environmental conditions
d. Lubrication data
e. Preventive maintenance plan and schedule
f. Cleaning recommendations
g. Maintenance and repair procedures
h. Removal and replacement instructions
i. Spare parts and supply list
j. Parts identification
k. Warranty information
l. Contractor information
1.3.3 Data Package 3
a. Safety precautions
b. Operator prestart
SECTION 01 78 23 Page 7
c. Start-up, shutdown, and post shutdown procedures
d. Normal operations
e. Emergency operations
f. Environmental conditions
g. Lubrication data
h. Preventive maintenance plan and schedule
i. Cleaning recommendations
j. Troubleshooting guides and diagnostic techniques
k. Wiring diagrams and control diagrams
l. Maintenance and repair procedures
m. Removal and replacement instructions
n. Spare parts and supply list
o. Product submittal data
p. O&M submittal data
q. Parts identification
r. Testing equipment and special tool information
s. Warranty information
t. Testing and performance data
u. Contractor information
PART 2 PRODUCTS
SECTION 01 78 23 Page 8
PART 3 EXECUTION
SECTION 02 41 00 Page 1
SECTION 02 41 00
DEMOLITION
The publications are referred to in the text by the basic designation only.
CODE OF FEDERAL REGULATIONS (CFR)
40 CFR 61-SUBPART M National Emission Standard for Asbestos
1.2 GENERAL REQUIREMENTS
Do not begin demolition until authorization is received from the Contracting Officer.
Remove rubbish and debris from the project site; do not allow accumulations inside or outside the building. Store materials that cannot be removed daily in areas specified by the Contracting Officer.
1.3 SUBMITTALS
Submit the following in accordance with Section 01 33 00, "Submittals."
1.3.1 Statements
a. Demolition plan
1.3.1.1 Required Data
Demolition plan shall include procedures for coordination with other work in progress, a disconnection schedule of utility services, and a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
1.4 REGULATORY AND SAFETY REQUIREMENTS
Comply with federal, state, and local hauling and disposal regulations.
1.4.1 Notifications
Furnish timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61-SUBPART M. Notify the State's environmental protection agency and the Contracting Officer in writing 10 days prior to the commencement of work in accordance with 40 CFR 61-SUBPART M.
SECTION 02 41 00 Page 2
1.5 DUST AND DEBRIS CONTROL
Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.
1.6 PROTECTION
1.6.1 Traffic Control Signs
Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Notify the Contracting Officer prior to beginning such work.
1.6.2 Existing Work
Protect existing work which is to remain in place, be reused, or remain the property of the Government. Repair items which are to remain and which are damaged during performance of the work to their original condition, or replace with new. Provide new supports and reinforcement for existing construction weakened by demolition or removal work. Repairs, reinforcement, or structural replacement must have Contracting Officer approval.
1.6.3 Trees
Conform to Section 01 57 50, "Temporary Environmental Controls," for protection of natural resources.
1.6.4 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities.
1.7 BURNING
Burning will not be permitted.
SECTION 02 41 00 Page 3
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
Remove existing structures as indicated.
3.1.2 Utilities and Related Equipment
Remove existing utilities, as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. If utility lines are encountered that are not shown on drawings, contact the Contracting Officer for further instructions.
3.1.3 Paving and Slabs
Remove sawcut concrete and asphaltic concrete paving and slabs as indicated.
Provide neat sawcuts at limits of pavement removal, 2 inches deep, minimum.
3.1.4 Concrete
Saw concrete along straight lines to a depth of not less than 2 inches. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face.
Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.
3.1.5 Masonry
Sawcut and remove masonry so as to prevent damage to surfaces to remain and to facilitate the installation of new work.
3.1.6 Patching
Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work.
Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall be as specified and indicated, and shall include:
a. Holes and depressions left as a result of removals in existing masonry walls to remain shall be completely filled with an approved masonry patching material, applied in accordance with the manufacturer’s printed instructions.
SECTION 02 41 00 Page 4
3.1.7 Air Conditioning Equipment
Remove air conditioning equipment without releasing chlorofluorocarbon refrigerants to the atmosphere in accordance with the Clean Air Act Amendment of 1990.
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
All materials and equipment removed, and not reused, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition and removal procedures, and authorization by the Contracting Officer to begin demolition. The Government will not be responsible for the condition or loss of, or damage to, such property after notice to proceed. Materials and equipment shall not be viewed by prospective purchasers or sold on the site.
3.2.2 Disposal of Chlorofluorocarbon Refrigerants
Capture and either dispose of or recycle chlorofluorocarbon refrigerants in accordance with the Clean Air Act Amendment of 1990.
3.3 CLEANUP
3.3.1 Debris and Rubbish
Remove and transport debris and rubbish in a manner that will prevent spillage on pavements, streets or adjacent areas. Clean up spillage from pavements, streets and adjacent areas.
SECTION 07 84 00 Page 1
SECTION 07 84 00
FIRESTOPPING
ASTM E119 (2012a) Standard Test Methods for Fire Tests of
Building Construction and Materials
ASTM E1399 (1997; R 2009) Cyclic Movement and Measuring the Minimum and Maximum Joint Widths of Architectural Joint Systems
ASTM E1966 (2007; R 2011) Fire-Resistive Joint Systems
ASTM E814 (2011a) Standard Test Method for Fire Tests of
Through-Penetration Fire Stops
ASTM E84 (2013a) Standard Test Method for Surface Burning Characteristics of Building Materials
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
FM AS 4991 (2001) Approval of Firestop Contractors
UNDERWRITERS LABORATORIES (UL)
UL 1479 (2003; Reprint Oct 2012) Fire Tests of Through- Penetration Firestops
UL 2079 (2004; Reprint Dec 2012) Tests for Fire Resistance of Building Joint Systems
UL 723 (2008; Reprint Aug 2013) Test for Surface Burning Characteristics of Building Materials
SECTION 07 84 00 Page 2
UL Fire Resistance (2012) Fire Resistance Directory
1.2 SYSTEM DESCRIPTION
1.2.1 General
Furnish and install tested and listed firestopping systems, combination of materials, or devices to form an effective barrier against the spread of flame, smoke and gases, and maintain the integrity of fire resistance rated walls, partitions, floors, and ceiling-floor assemblies, including through-penetrations and construction joints and gaps.
a. Through-penetrations include the annular space around pipes, tubes, conduit, wires, cables and vents.
b. Construction joints include those used to accommodate expansion, contraction, wind, or seismic movement; firestopping material shall not interfere with the required movement of the joint.
c. Gaps requiring firestopping include gaps between the top of the fire-rated walls and the roof or floor deck above and at the intersection of shaft assemblies and adjoining fire resistance rated assemblies.
1.2.2 Sequencing
Coordinate the specified work with other trades. Apply firestopping materials, at penetrations of pipes and ducts, prior to insulating, unless insulation meets requirements specified for firestopping. Apply firestopping materials. at building joints and construction gaps, prior to completion of enclosing walls or assemblies. Cast-in-place firestop devices shall be located and installed in place before concrete placement. Pipe, conduit or cable bundles shall be installed through cast-in-place device after concrete placement but before area is concealed or made inaccessible.
Firestop material shall be inspected and approved prior to final completion and enclosing of any assemblies that may conceal installed firestop.
1.2.3 Submittals Requirements
a. Submit certificates attesting that firestopping material complies with the specified requirements. For all intumescent firestop materials used in through penetration systems, manufacturer shall provide certification of compliance with UL 1479.
b. Submit documentation of training and experience for Installer.
c. Submit inspection report stating that firestopping work has been inspected and found to be applied according to the manufacturer's recommendations and the specified requirements.
SECTION 07 84 00 Page 3
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Firestopping Materials; G
SD-06 Test Reports
Inspection; G
SD-07 Certificates
Firestopping Materials Installer Qualifications; G
1.4 QUALITY ASSURANCE
1.4.1 Installer
Engage an experienced Installer who is:
a. FM Research approved in accordance with FM AS 4991, operating as a UL Certified Firestop Contractor, or
b. Certified, licensed, or otherwise qualified by the firestopping manufacturer as having the necessary staff, training, and a minimum of 3 years experience in the installation of manufacturer's products in accordance with specified requirements.
A manufacturer's willingness to sell its firestopping products to the Contractor or to an installer engaged by the Contractor does not in itself confer installer qualifications on the buyer. The Installer shall have been trained by a direct representative of the manufacturer (not distributor or agent) in the proper selection and installation procedures. The installer shall obtain from the manufacturer written certification of training, and retain proof of certification for duration of firestop installation.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver materials in the original unopened packages or containers showing name of the manufacturer and the brand name. Store materials off the ground, protected from damage and exposure to elements and temperatures in accordance with manufacturer requirements. Remove damaged or deteriorated materials from the site. Use materials within their indicated shelf life.
SECTION 07 84 00 Page 4
2.1 FIRESTOPPING MATERIALS
Provide firestopping materials, supplied from a single domestic manufacturer, consisting of commercially manufactured, asbestos-free, nontoxic products FM APP GUIDE approved, or UL listed, for use with applicable construction and penetrating items, complying with the following minimum requirements:
2.1.1 Fire Hazard Classification
Material shall have a flame spread of 25 or less, and a smoke developed rating of 50 or less, when tested in accordance with ASTM E84 or UL 723. Material shall be an approved firestopping material as listed in UL Fire Resistance or by a nationally recognized testing laboratory.
2.1.2 Toxicity
Material shall be nontoxic and carcinogen free to humans at all stages of application or during fire conditions and shall not contain hazardous chemicals or require harmful chemicals to clean material or equipment. Firestop material must be free from Ethylene Glycol, PCB, MEK, or other types of hazardous chemicals.
2.1.3 Fire Resistance Rating
Firestop systems shall be UL Fire Resistance listed or FM APP GUIDE approved with "F" rating at least equal to fire-rating of fire wall or floor in which penetrated openings are to be protected.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.