893117_statement_of_work.pdf

PDF 38 MB Posted

Attached to
GWCC Childcare Replace Sinks and Cabinetry Federal contract opportunity
Solicitation number
12314218R0017
Issued by
Department of Agriculture Office of Procurement and Property Management

About this file

statement of work

View the file

Other files for this federal contract opportunity

Other files attached to GWCC Childcare Replace Sinks and Cabinetry, newest first.
File Type Posted
SF_1449_(2_2012).pdf PDF
wage_determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: GWCC Childcare Center Cabinet and Sink Replacement

Statement of Work

The contractor shall provide all personnel, equipment, tools, materials, and supervision necessary to repair/replace/service cabinets. The base cabinets, overhead cabinets and countertops are to be removed and replaced with new. Sinks in the cabinets are to be removed and replaced with new. (#1 Overhead Cabinets 36 ½” x 83 ½” x 25” and Bottom Cabinets with Sink 22 ¼” x 83 ½” x 25”, #2 Overhead Cabinets 30” x 53 ½” x 12”, 18” x 32” x 12”, 18 ½” x 36” x 12” and Bottom Cabinets, with Sink 85” x 36 1/2” x 25”,#3 Overhead Cabinets 30” x 61” x 12” and Bottom Cabinets with sink 32” x 61” x 25”, #4 Overhead Cabinets 30” x 94 5/8” x 25” and Bottom Cabinets with sink 22” x 94, 5/8” x 25”, #5 Overhead Cabinets 30” x 94 1/8” x 12” and Bottom Cabinets with sink 22” x 94 1/8” x 25”, #6 Cabinet with sink 30 ¾” x 36” x 25”.) Prep, patch and paint the Childcare Center to match what is existing. Clean work areas upon completion of work.

• Remove and replace base cabinets, countertops and wall cabinets with new.

• Remove and replace existing sinks with new.

• Provide new piping and fittings associated with reconnecting the sinks.

• Prep, patch and paint walls to match existing.

• The attached PDF drawing document list the corresponding number and location of the cabinets and sinks that are to be replaced.

• Put systems back in service and test for proper operation.

• All work shall be conducted during weekend hours.

• The contract will be a firm fixed price.

• Kick off meetings will be held 10 days after award.

• Invoice procedures – vendor must submit all their invoices through IPP – and courtesy copy (via email) to COR. “The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury. All invoices are to be submitted via the electronic Invoice Processing Platform.

This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.

• The contractor shall repair or replace any damage to the existing conditions caused by his actions. Repair and replacement of damaged conditions shall match the integrity of the adjacent area.

• Contractor shall ensure final project meets current Guidelines, FAR regulations and current appropriate codes, standards, and regulations relative the United States Department of Agriculture.

• Contractor shall immediately notify USDA safety personnel of all accidents/incidents involving employee use of and/or damage/injury to facilities, equipment, or personnel.

• Contractor shall adhere to all OSHA standards.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm

• Contractor shall comply with all federal, state, and local environmental laws, and USDA policies and regulations to include but not limited to Resource Conservation and Recovery Act (RCRA), Safe Water Drinking Act (SWDA), the Clean Air Act (CAA), and Federal Facilities Compliance Act

(FFCA).

• The use, handling, storage, and disposal of all toxic, hazardous, special or radiological wastes/materials shall be IAW all local, state, federal, and USDA environmental regulations and procedures.

026001

CLD

847.05

028006

CLO

553.33

CLD

79.16

CLD

71.28

029014

TTO

CLD

85.75

CLD

71.68

029010

CRH

FDS

117.05

028037

CLD

589.06

028017

TTO

02B03t

HUT

028040

CLD

Im.SO

Chino.Simmons Callout #5 Overhead Cabinet and Bottom Cabinet with sink

Chino.Simmons Callout #1 Overhead Cabinet and Bottom Cabinet with sink

Chino.Simmons Callout #4 Overhead Cabinet and Bottom Cabinet with sink

Chino.Simmons Callout #2Overhead Cabinet and Bottom Cabinet with sink

Chino.Simmons Callout #6 Sink

Chino.Simmons Callout #3Overhead Cabinet and Bottom Cabinet with sink

GWCC Childcare Center Cabinet and Sink Replacement
GWCC Childcare Center Cabinet and Sink Replacement
Unit Costs
GWCC Childcare Center2
IMG_0697
IMG_0698
IMG_0699
IMG_1285
IMG_1286
IMG_1287
IMG_1288
IMG_1289
IMG_1290
IMG_1291
IMG_1292
IMG_1293
IMG_1294
IMG_1295
IMG_1296
IMG_1297
IMG_1298
IMG_1299
IMG_1300
IMG_1301
IMG_1302
IMG_1303
IMG_1304
IMG_1305
IMG_1306
IMG_1307
IMG_1308
IMG_1309
IMG_1310
IMG_1311

File details come from the government source that posted it.