893117_statement_of_work.pdf
PDF 38 MB Posted
- Attached to
- GWCC Childcare Replace Sinks and Cabinetry Federal contract opportunity
- Solicitation number
- 12314218R0017
About this file
statement of work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_1449_(2_2012).pdf | ||
| wage_determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: GWCC Childcare Center Cabinet and Sink Replacement
Statement of Work
The contractor shall provide all personnel, equipment, tools, materials, and supervision necessary to repair/replace/service cabinets. The base cabinets, overhead cabinets and countertops are to be removed and replaced with new. Sinks in the cabinets are to be removed and replaced with new. (#1 Overhead Cabinets 36 ½” x 83 ½” x 25” and Bottom Cabinets with Sink 22 ¼” x 83 ½” x 25”, #2 Overhead Cabinets 30” x 53 ½” x 12”, 18” x 32” x 12”, 18 ½” x 36” x 12” and Bottom Cabinets, with Sink 85” x 36 1/2” x 25”,#3 Overhead Cabinets 30” x 61” x 12” and Bottom Cabinets with sink 32” x 61” x 25”, #4 Overhead Cabinets 30” x 94 5/8” x 25” and Bottom Cabinets with sink 22” x 94, 5/8” x 25”, #5 Overhead Cabinets 30” x 94 1/8” x 12” and Bottom Cabinets with sink 22” x 94 1/8” x 25”, #6 Cabinet with sink 30 ¾” x 36” x 25”.) Prep, patch and paint the Childcare Center to match what is existing. Clean work areas upon completion of work.
• Remove and replace base cabinets, countertops and wall cabinets with new.
• Remove and replace existing sinks with new.
• Provide new piping and fittings associated with reconnecting the sinks.
• Prep, patch and paint walls to match existing.
• The attached PDF drawing document list the corresponding number and location of the cabinets and sinks that are to be replaced.
• Put systems back in service and test for proper operation.
• All work shall be conducted during weekend hours.
• The contract will be a firm fixed price.
• Kick off meetings will be held 10 days after award.
• Invoice procedures – vendor must submit all their invoices through IPP – and courtesy copy (via email) to COR. “The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury. All invoices are to be submitted via the electronic Invoice Processing Platform.
This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
• The contractor shall repair or replace any damage to the existing conditions caused by his actions. Repair and replacement of damaged conditions shall match the integrity of the adjacent area.
• Contractor shall ensure final project meets current Guidelines, FAR regulations and current appropriate codes, standards, and regulations relative the United States Department of Agriculture.
• Contractor shall immediately notify USDA safety personnel of all accidents/incidents involving employee use of and/or damage/injury to facilities, equipment, or personnel.
• Contractor shall adhere to all OSHA standards.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
• Contractor shall comply with all federal, state, and local environmental laws, and USDA policies and regulations to include but not limited to Resource Conservation and Recovery Act (RCRA), Safe Water Drinking Act (SWDA), the Clean Air Act (CAA), and Federal Facilities Compliance Act
(FFCA).
• The use, handling, storage, and disposal of all toxic, hazardous, special or radiological wastes/materials shall be IAW all local, state, federal, and USDA environmental regulations and procedures.
026001
CLD
847.05
028006
CLO
553.33
CLD
79.16
CLD
71.28
029014
TTO
CLD
85.75
CLD
71.68
029010
CRH
FDS
117.05
028037
CLD
589.06
028017
TTO
02B03t
HUT
028040
CLD
Im.SO
Chino.Simmons Callout #5 Overhead Cabinet and Bottom Cabinet with sink
Chino.Simmons Callout #1 Overhead Cabinet and Bottom Cabinet with sink
Chino.Simmons Callout #4 Overhead Cabinet and Bottom Cabinet with sink
Chino.Simmons Callout #2Overhead Cabinet and Bottom Cabinet with sink
Chino.Simmons Callout #6 Sink
Chino.Simmons Callout #3Overhead Cabinet and Bottom Cabinet with sink
| GWCC Childcare Center Cabinet and Sink Replacement |
| GWCC Childcare Center Cabinet and Sink Replacement |
| Unit Costs |
| GWCC Childcare Center2 |
| IMG_0697 |
| IMG_0698 |
| IMG_0699 |
| IMG_1285 |
| IMG_1286 |
| IMG_1287 |
| IMG_1288 |
| IMG_1289 |
| IMG_1290 |
| IMG_1291 |
| IMG_1292 |
| IMG_1293 |
| IMG_1294 |
| IMG_1295 |
| IMG_1296 |
| IMG_1297 |
| IMG_1298 |
| IMG_1299 |
| IMG_1300 |
| IMG_1301 |
| IMG_1302 |
| IMG_1303 |
| IMG_1304 |
| IMG_1305 |
| IMG_1306 |
| IMG_1307 |
| IMG_1308 |
| IMG_1309 |
| IMG_1310 |
| IMG_1311 |
File details come from the government source that posted it.