SUPERVISOR'S OFFICE BLDG. 2002 REMODEL Federal contract opportunity
Solicitation number
1205M619Q0051
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to SUPERVISOR'S OFFICE BLDG. 2002 REMODEL, newest first.
File Type Posted
Amendment__01.pdf PDF
Copy_to_Submit_Solicitation_1205M619Q0051.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 135

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

1205M619Q0051 06/26/2019 UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY 6. DELIVER BY (Date) Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue Suite 3A.

Everett, WA 98201

See Section F.2

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

JORGE A SOMOZA CO

PERRY BYRD TECHNICAL POC

783-6053 684-7242

a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.

This request does not commit the Government to pay any costs incurred in the preparation of the

19 July 2019 by 2:00 PM submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

(a) (b) (c) (d) (e) (f) SO Building #2002 Remodel

Headquarters Office Colville National Forest

Do Not Enter Prices Here

See Schedule of Items

Mail Quote to Contracting Officer Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue, Suite 3A

Everett, WA 98201 or e-mail to jsomoza@fs.fed.us or fax at

(425) 783-0129

Technical Point of Contact is Perry Byrd at 509-684-7242

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

DUNS:_______________

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a) mailto:jsomoza@fs.fed.us

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

SO BUILDING #2002 REMODEL

Headquarters Office

Colville National Forest Stevens County, Washington

The quoter must quote on all items. Award will be on an all or none basis to quoter whose quote represents the best value to the Government, price and other factors considered (reference Section M).

If quoter does not intend to charge for an item, an “O” or “No Cost” should be shown.

ITEM

NO.

DESCRIPTION METHOD

OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

Base Items

Area A:

2nd Floor

Includes all materials and labor to relocate existing and install new electrical outlets, CAT6 IT ports and lines; and ceiling drop down poles with IT and electrical. Includes repair of ceiling title and wall finishing’s where need for electrical and IT work.

L.S.Q

EA

Area B:

East

Includes all materials and labor to demolish existing walls, electrical, IT, window, doors, and cove base.

Construct new metal stud, sheetrock walls, noise dampening insulation, with electrical & IT. Finish prep and paint of all interior walls to match exist color & texture.

Area C:

West

Includes all materials and labor to demolish existing walls, electrical, IT, doors, and cove base. Construct new metal stud, sheetrock walls, noise dampening insulation, with electrical & IT. Finish prep and paint of all interior walls to match exist color & texture.

Total Base Items Quote $______

Option Items

Option

Includes all materials and labor to demolish existing carpet titles and base throughout south hallway. Install new carpet titles and base throughout.

Includes all materials and labor to demolish existing carpet titles and base throughout. Install new carpet titles and base throughout. Includes moving and replacing boxes and furniture.

Includes all materials and labor to demolish existing carpet titles and base throughout. Install new carpet titles and base throughout. Includes moving and replacing boxes and furniture.

Includes all materials and labor to demolish existing carpet titles and base throughout remaining mailroom. Install new carpet titles and base throughout.

Includes moving and replacing boxes and furniture.

L.S.Q. EA 1 $______

Total Option Items Quote $______

Total Quote (All Items) $_____

**Designated Method of Measurement:

LSQ - Lump Sum Quantities. These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

Quote Due Dates

If you wish to be considered, submit your quote by 19 July 2019.

Quotations received after 2:00 p.m. on the dated indicated will not be considered.

Payment Security

If the project is quoted with a total price greater than $35,000, payment security is required in the form of a Payment Bond or Letter of Credit at 100% of the total project price. Reference Section I.

Notes: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed – Price Construction Contracts shall not be in addition to the contract price. Include bond payments under the schedule of items.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

If Offeror (quoter) does not intend to charge for an item, a price of “0” or “NO COST” should be shown.

If the price is left blank or shown as “No Bid”, the entire offer (quote) may be considered Non- Responsive.

System of Award Management Requirement

No award will be made to a Contractor not registered in the System of Award Management (SAM). In addition, the Contractor’s Representations and Certification must be listed in the SAM database.

Reference https://www.acquisition.gov or https://www.sam.gov/portal/public/SAM/.

Note: There is no fee to register and use this site.

During the contract, the Contractor must always have an active status in SAM during the life of this contract. Invoices will be paid using the financial information provided in the Contractor’s SAM profile. Failure to keep an active status may result in payment delays and other administration delays.

https://www.acquisition.gov/

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

This project consists of providing all labor, materials, and equipment to demolish existing walls, window, carpet, and base, complete, including doors, electrical and IT outlets. Construct new metal stud, sheetrock walls with noise reducing insulation, electrical and IT data outlets. Reuse existing doors and frames where possible. Paint new walls, and install new carpet and rubber base. Reuse existing electrical lines, breakers, CAT6 IT cables where possible.

C.2 PROJECT LOCATION

Project is located at the Headquarters Office. See attached maps for exact location.

765 S. Main, Colville, WA

C.3 PRICE RANGE

The Government's estimate is: between $25,000 and $100,000.

C.4 APPLICABLE SPECIFICATIONS (CSI PROJECTS)

The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.

C.5 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.6 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS

(FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.7 SPECIAL PROJECT SPECIFICATIONS

Special Project Specifications applicable to this contract are attached.

SECTION SPECIFICATION

01 01 00 SUMMARY

01 02 30 SCHEDULE OF ITEMS

02 11 00 DEMOLITION OF BUILDING INTERIOR & SITE FEATURES

07 21 00 BUILDING INSULATION

07 92 00 JOINT SEALANTS

08 71 00 DOOR HARDWARE

09 22 16 NONLOAD BEARING METAL STUDS

09 26 00 GYPSUM BOARD ASSEMBLIES

09 65 30 RESILIANT WALL MOLDING

09 68 00 CARPETING

09 90 10 PAINTING

26 00 10 GENERAL TECHNICAL PROVISIONS

26 00 50 BASIC METHODS AND MATERIALS

27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS

27 15 00 COMMUNICATIONS HORIZONTAL CABLING

Project Drawings

The attached listed drawings (7 pages) are part of this solicitation and any resultant contract.

SHEET DESCRIPTION

AS-1 VICINIITY MAP

AS-2 SITE PLAN

A-1 BLDG. #2002 FLOOR PLAN – OPTION 1 & 4

A-2 2ND FLOOR ELECTRICAL – AREA A

A-3 1ST FLOOR EAST – AREA B, OPTION 2

A-4 1ST FLOOR WEST – AREA C, OPTION 3

A-5 SCHEDULES/DETAILS

C.8 BIOBASED PRODUCTS

The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.

The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).

The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets

Roof coating Hydraulic fluid Diesel fuel additives Greases

Dust suppressant 2-cycle engine oil Absorbents

Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material

In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.

The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.

The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.

The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-1 Contractor Inspection Requirements (APR 1984)

52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG 1996) http://www.arnet.gov/far/ FSDefaultUser

**NOTE** [SELECT APPROPRIATE CLAUSE AND DELETE REMAINDER]

cvanalyn Use in Supply and Services when the contract amount is expected to be at or below the SAP threshold and inclusion of the clause is necessary to ensure an explicit understanding of the contractor’s inspection responsibilities .

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/?q=browsefar

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 days after the contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

F.3 SUSPENSION FOR OTHER THAN GOVERNMENT CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.

F.4 NOTICE TO PROCEED

A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer’s Representative (COR). No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.

F.5 REQUIRED SUBMITTALS

The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.

Submittal Title Referenced By

Specification No.

Submittal Date

Schedule of Work/Progress Schedule Schedules For Construction Contracts

[FAR 52.236-15]

With Quote and then Updated when Necessary

Job Specific Safety Plan Section H & Accident Prevention clause

[FAR 52.236-13]

Prior to Work Starting

Copy of Required Insurance Coverage Section H Prior to Work Starting Designation of Representative R6-FS- 6300-6

Superintendence by the Contractor

[FAR 52.236-6]

If appointing a Representative

Notification of Subcontracting & SF1413 - Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorship Subcontractors [not required for material suppliers]

Subcontracts (Labor Standards)

[FAR 52.222-11

and Section G]

Prior to Subcontractor Starting Work

Payroll Record WH347 Certified Payrolls submitted weekly

Payrolls And Basic Records

[FAR 52.222-8]

Weekly Hard Copy

Drug Free Workplace Policy Drug-Free Workplace

[FAR 52.223-6]

If awarded to an individual

Biobased or BioPreferred Products Section C & I With quote and then in accordance with

FAR 52.223-2

Release of Claims Form Section I Prior to Final Payment Submittals Section J As required in Specifications Shop Drawings – Electrical As-builts As required Prior to Final Payment Metal Studs Spec. 09 22 16 Prior to Work Starting Sheet Rock Spec. 09 26 00 Prior to Starting Work Paint Spec. 09 90 00 Prior to Starting Work Rubber Base Spec. 09 65 30 Prior to Starting Work Electrical Spec. 26 00 50 Prior to Starting Work IT Cables Spec. 27 15 00 Prior to Starting Work IT Outlet Face Plate Spec. 27 15 00 Prior to Starting Work Carpet Spec. 09 68 00 Prior to Starting Work

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

NOTE: PRECONSTRUCTION CONFERENCE

The Contractor shall meet with the Government to discuss contract terms and work performance requirements, and Work Progress Schedule. The meeting will take place after contract award and it will take place at the Headquarters Office located in Colville, WA.

Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the conference.

If the Contractor’s designated representative or foreman does not attend the scheduled post award conference, the Government will reschedule the meeting and will not issue the Notice to Proceed until the foreman is present at the meeting. The meeting must be rescheduled within 3 days. If the Contractor is unable to meet the reschedule date, the contract may be terminated for cause.

G.2 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

G.3 CONTRACTING OFFICER’S AUTHORITY

In no event shall any understanding or agreement between the Contractor and any Government employee other than the Contracting Officer on any contract, modification, change order, letter or verbal direction to the Contractor be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by an appointed Contracting Officer. The Contractor is hereby put on notice that in the event a Government employee other than the Contracting Officer directs a change in the work to be performed, it is the Contractor’ responsibility to make inquiry of the Contracting Officer before making the deviation. Payments will not be made without being authorized by the appointed Contracting Officer with the legal authority to bind the contract.

G.4 REPRESENTATIVES AND AUTHORITIES

The contract will be administered by an authorized representative of the Contracting Officer. In no event, however, will any understanding or agreement, modification, change order or other matter deviating from the terms of the contract between the contractor and any person other than the Contracting Officer be effective or binding upon the Government, unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of this contract.

The Contracting Officer’s Representative (COR) will be designated by the Contracting Officer as the authorized representative of the Contracting Officer. The COR is responsible for monitoring performance and the technical management of the effort required hereunder, and should be contact regarding question or problem of technical nature.

G.5 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

1. Approve Change Orders and Modifications

2. Take Action to terminate the contract for default or Government convenience

3. Make contract adjustments under the Differing Site Conditions clause

4. Grant extensions of contract time.

5. Approve assignment of claims.

6. Make final decisions under the Disputes clause

7. Make final acceptance under the contract.

8. Make final decisions under the Suspension of Work clause.

9. Make equitable adjustments.

10. Authorize change in amount of Payment Retention.

11. Approve subcontractors.

12. Approve payment with deductions or final payment.

13. Approve use and possession prior to completion.

14. Enforce the warranty provisions.

G.6 SUPPLEMENTAL DEFINITIONS

Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

A. Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.

B. Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.

C. Clearing Limits - The limits of clearing as designated on the ground, shown on the drawing or designated in the Special Project Specifications.

D. Contract Pay Item - A pay item designated on the bid schedule and described by a specification.

E. Contracting Officer (CO) - The person executing this contract on behalf of the

Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.

F. Contracting Officer's Representative (COR) - The on-site contract administrator for the

Contracting Officer. The duties and responsibilities of the Contracting Officer’s Representatives are defined in a letter of designation issued by the Contracting Officer.

There may be person(s) appointed in writing by the Contracting Officer to help the Contracting Officer’s Representative to conduct and document inspections according to contract specifications and provisions. This person would be titled COR; however, their authorities are strictly limited, not to exceed the authority to issue to the Contractor a Notice of Noncompliance.

It is important the Contractor read the designations of each person.

G. Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

H. Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plants, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.

I. Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.

J. Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.

K. Materials - Any substances for use in the construction of the project and its appurtenances.

L. Notice of Noncompliance - A written notice from the Contracting Officer’s representative which documents, for the Contractor’s attention, specific performance deficiencies.

M. Original Contract Quantities - Those quantities shown in the Schedule of Items as awarded.

N. Right of Way - A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.

O. Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.

P. Special Project Specifications - Specifications which detail the conditions and requirements peculiar to the individual project, including but not limited to CSI format specifications and additions and revisions to Standard Specifications.

Q. Specifications - A general term applied to all written directions and requirements pertaining to performance of work.

R. Standard Specifications - Specifications established for Region wide use for construction of facilities which cover most items of work likely to be performed; such as Earthwork, Base Courses, Pavement, Concrete, etc.

S. Utility Services - Are services such as electricity, gas, steam, water and sewage.

T. Work Order - An order written by the Contracting Officer or Contracting Officer’s

Representative, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.

G.7 NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:

A. The name, address and telephone number of the subcontractor.

B. The date upon which the subcontract was entered into and its duration.

C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

D. Documentation of the subcontractor's representative authority.

E. A copy of the Statement of Acknowledgement form (SF-1413) must be provided to the

Contracting Officer prior to any subcontractor work beginning.

Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

G.8 INVOICE PROCESSING PLATFORM (IPP)

The Forest Service is utilizing the Invoice Processing Platform (IPP) for the electronic submission and tracking of contracts/purchase orders, invoices and payment information. IPP is a secure Government-wide, Web-based invoice processing service. Visit https://www.ipp.gov/ to learn more.

Upon award of a contract, Contractors must register at https://www.ipp.gov/vendors/enrollment-vendors

All invoices must be submitted via the electronic Invoice Processing Platform (IPP). Paper copies of invoices will no longer be accepted. The Contractor must also attach a detailed invoice in IPP.

G.9 PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

https://www.ipp.gov/ https://www.ipp.gov/vendors/enrollment-vendors https://www.ipp.gov/vendors/enrollment-vendors

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observation and measurements.

(b) Weather conditions: Typical NE Washington weather.

(c) Transportation facilities: City & State highways.

(d) Elevation: 1,650’

H.2 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

H.3 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.

A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The

Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

C. Government inspections and tests are for the sole benefit of the Government and do not--

1. Relieve the Contractor of responsibility for providing adequate quality control measures;

2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

3. Constitute or imply acceptance; or

4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.

D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.

The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

G. If the Contractor does not promptly replace or correct rejected work, the Government may

(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or

(2) terminate for default the Contractor's right to proceed.

H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.

However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

H.4 WARNING SIGNS AND RESTRICTIONS

Contractor shall be totally responsible for safety signing, barricades and other signing to maintain a safe site to the public and Government employees.

H.5 JOB SPECIFIC SAFETY PLAN

Prior to allowing any work to commence on the project, the Contractor shall provide a written job specific safety plan that recognizes the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: blasting, heavy equipment operation, traffic control on haul routes, loading an unloading of materials, site security, noises and dust contract and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA Regulations. The plan shall include all tasks and related activities anticipated to successfully complete the work.

H.6 SAFETY ITEMS

(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.

(b) The following checked activities have been identified by the Government as potential safety hazards.

[ ] Confined Entry Space.

[ ] Temporary excavation/deep trenching/slope stability.

[ ] Tree Felling.

[ ] Fall hazard from work heights exceeding six feet.

[ ] Blasting.

[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[ ] Heavy equipment operation.

[ ] Tree climbing and/or tower climbing.

[ ] Fire hazards.

[ ] Hazard materials handling.

[X] Electrical hazard.

[ ] Hydraulic and/or pneumatic and/or other high pressure hazards.

[ ] Mechanical hazards such as pulleys, springs, etc.

[X] Power tool operation including eye protection.

[X] Overhead hazards.

H.7 PERSONAL PROTECTIVE EQUIPMENT

1. 29 CFR 1910 Subpart I, OSHA’s General Industry Personal Protective Equipment (PPE) standard contains the general requirements for the provision of personal protective equipment and requires employers to perform a hazard assessment to select appropriate PPE for hazards that are present or likely to be present in the workplace. OSHA requires that many categories of personal protective equipment meet or be equivalent to standards developed by the American National Standards Institute (ANSI).

2. Before a worker begins operating equipment, the Contractor will train the workers in the safe operation and use of equipment.

3. The Contractor shall provide the appropriate personal protective equipment for the work required to be performed in the contract/task order, whenever necessary by reason of hazards or processes encountered that may cause injury or impairment in the function of any part of the body. Except for foot protection, all PPE must be provided by the employer at no cost to the employee. Includes:

• Head Protection

• Hearing Protection

• Eye/Face Protection

• Leg Protection

• Foot Protection

• Hand Protection

4. PPE must be sanitary and in reliable condition. Contractor must not use defective or damaged PPE. PPE must be inspected by the Contractor prior to use on each work shift to ensure it is in serviceable condition.

5. A checklist of applicable PPE guidelines typical for the work performed under this contract/task order is provided at the internet links below. This does not relieve the Contractor of the responsibility of performing a risk assessment or providing the necessary PPE for their operations.

Reference https://www.osha.gov/SLTC/personalprotectiveequipment/index.html or OSHA 3151- 12R 2003 Personnel Protective Equipment Booklet. The booklet can be found at https://www.osha.gov/Publications/osha3151.pdf .

H.8 LEGAL RELATIONS AND RESPONSIBILITIES

A. Government's Responsibility for Utilities

1. The Government will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.

2. The Government will identify, in Special Project Specifications, known locations of underground installations other than culverts and drains the Contractor could encounter in the progress of work under the contract; typically telephone cables, water supply pipes. and induction loops within the pavement.

B. Contractor's Responsibility for Utilities

In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the restoration of service.

H.9 USE OF PREMISES

The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.

H.10 PROSECUTION OF WORK

A. The following special controls will affect the Contractor’s prosecution of work:

Employees will be working on-site. Area A & B – start work Summer/July. Option 1, 2, 4 – start work Summer/July. Area C – start work Nov./Dec. Option 3 – start work Nov./Dec.

B. The Contractor may encounter other contractors performing work on projects in the area.

C. Utilities made available by the Government for use by the Contractor are: Potable water, sanitation, 110v.

H.11 DISPOSAL OF MATERIAL

Designated disposal sites for this project are as follows:

Debris encountered in the construction (metals, etc.) and other waste materials generated in the construction (cartons, scrap, etc.) shall be removed and disposed of in a State or County approved site off of National Forest Service Land.

H.12 DAMAGES

If the Contractor does not complete the work within the designated contract time, actual excess costs will be assessed, such as - but not limited to, additional COR and Inspector time and travel.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.dm.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.203-19 Prohibition of Requiring Certain Internal Confidentiality Agreement or Statements (JAN 2017)

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(OCT 2018)

52.204-13 System for Award Management Maintenance (OCT 2018)

52.204-19 Incorporation by Reference of Representations and Certifications

(DEC 2014)

52.204-22 Alternative Line Item Proposal (JAN 2017) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (JULY 2018) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-6 Construction Wage Rates Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014)

52.222-13 Compliance with Construction Wage Rates Requirements and Related Regulations (MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014)

52.222-19 Child Labor-Cooperation with Authorities and Remedies (JAN 2018) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000

(MAY 2014)

52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.html Tiffany Taylor **NOTE**[USE IF CONTRACT REQUIRES PHYSICAL ACCESS TO GOV’T FACILITY OR INFORMATION SYSTEM]

52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JULY 2014)

52.222-50 Combating Trafficking in Persons (JAN 2019) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017)

52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction

Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011)

52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance—Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (AUG 2018) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)

52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management

(OCT 2018)

52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)

Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)

FSDefaultUser

**NOTE** [USE IF APPLICABLE]

FSDefaultUser

**NOTE** [USE IF APPLICABLE]

FSDefaultUser

**NOTE** [USE IF APPLICABLE]

FSDefaultUser

**NOTE** [USE IF APPLICABLE]

FSDefaultUser

**NOTE** [ USE IF APPLICABLE]

FSDefaultUser

**NOTE** [USE IF APPLICABLE]

**NOTE** [ USE IF APPLICABLE]

52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984)

52.244-6 Subcontracts for Commercial Items (JAN 2019) 52.245-1 Government Property (JAN 2017) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)

(APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts

(NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

I.2 FAR 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE

ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the life of the contract.

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

I.3 FAR 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

https://acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/ FSDefaultUser

**NOTE** [ USE IF APPLICABLE]

FSDefaultUser

**NOTE** [ USE IF GOVT RETAINS RESPONSIBILITY]

**NOTE** [USE IF APPLICABLE]

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.