OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
1205M618Q0011
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
3-26-2018
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT/ / TASK ORDER NO. 5. REQUISITION/PURCHASE REQUEST NO.
903705
6. PROJECT NO.
7. ISSUED BY CODE 05M6 8. ADDRESS OFFER TO
Block 7
USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, Contracting Officer 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067 E-mail: bajohnson03@fs.fed.us
9. FOR INFORMATION
CALL:
A. NAME
Brian A. Johnson
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(425) 783-6056
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
FSR 36 – 3610 - 39 ROAD UPGRADES
Mt. Baker-Snoqualmie National Forest Mt. Baker Ranger District
Washington State (Whatcom County)
11. The Contractor shall begin performance within 5 calendar days and complete it within * calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES
13. . ADDITIONAL SOLICITATION REQUIREMENTS:
12B. CALENDAR DAYS
A. Sealed offers in original and zero (0) copies to perform the work required are due at the place specified in Item 8 by 2:00 PM (hour) local time April 16, 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee [ ] is, [X] is not required. If project is priced over $150,000, offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than thirty (30) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 1 of 161 mailto:bajohnson03@fs.fed.us
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
IPP
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
Invoice Processing Platform IPP
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return c o p i e s to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
AMOUNTS
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 2 of 161
PART I—THE SCHEDULE
SECTION B—SUPPLIES OR SERVICES AND PRICES/COSTS
FSR 36 – 3610 – 39 ROAD UPGRADES
Mt. Baker-Snoqualmie National Forest (Zone 1) Mt. Baker Ranger District
Washington State (Whatcom County)
B.1 SCHEDULE OF ITEMS
BASE ITEMS - FSR 36, 3610, & 39
Item Number Description Pay
Unit Qty Unit Price Total
15101 Mobilization LS 1 $ $ 20301 Removal and Disposal of Asphalt EA 5 $ $ 20302 Removal of Culverts EA 5 $ $ *20950 Pipe Bedding Material, Government Furnished CY 18 $ $
*25101A Placed Riprap, Class 2, Government Furnished, Headwall and Ditch dam CY 28 $ $
*25101B Placed Riprap, Class 4, Government Furnished, Splash Pad CY 44 $ $
*25101C Placed Riprap, Class 6, Government Furnished, Splash Pad at Rd 36 MP 2.15 CY 21 $ $
25501 Mechanically Stabilized Earth wall, gabion-faced, Compaction Method C (Section 209) SY 28 $ $
25507 Compaction Testing for MSE wall LS 1 $ $
32451 Aggregate Surfacing, 1-1/4" Minus WSDOT, Commercial Source, Compaction Method A TN 15 $ $
40401 Minor Hot Mix Asphalt Concrete, AR4000 – ½” agg TN 35 $ $
60275A 24" HDPE Pipe, Compaction Method B, Government Furnished LF 90 $ $
60275B 36" HDPE Pipe, Compaction Method B, Government Furnished LF 150 $ $
60275C 48" HDPE Pipe, Compaction Method B, Government Furnished LF 55 $ $
62201A Equipment Rental, Excavator 150 hp/with thumb (minimum) HR 8 $ $
62201B Equipment Rental, Dump Truck, 10 C.Y. Capacity (minimum) HR 4 $ $
*62529 Seeding and Mulching, Seed Mix C-1 AC 0.23 $ $
Total: $
*Indicates contract quantity (See FP-03 Section 109.02) AC = Acre; CY = Cubic Yard; EA = Each; HR = Hour; LF = Linear Foot; LS = Lump Sum; SY=Square Yard; TN=Ton
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 3 of 161
B.1 SCHEDULE OF ITEMS (Continued)
Option 1 - FSR 39 MP 7.73 Item
Number Description Pay Unit Qty Unit Price Total
20301 Removal and Disposal of Asphalt EA 1 $ $ 20302 Removal of Culverts EA 1 $ $ *20950 Pipe Bedding Material, Government Furnished CY 3 $ $
*25101A Placed Riprap, Class 2, Government Furnished, Headwall and Ditch dam CY 3 $ $
*25101B Placed Riprap, Class 4, Government Furnished, Splash Pad CY 6 $ $
40401 Minor Hot Mix Asphalt Concrete, AR4000 – ½” agg TN 7 $ $
*60275B 36" HDPE Pipe, Compaction Method B, Government Furnished LF 50 $ $
*62529 Seeding and Mulching, Seed Mix C-1 AC 0.03 $ $
Option 2 - FSR 36 MP 2.12-2.15
Number Description Pay Unit Qty Unit Price Total
*20401 Roadway Excavation, Measured in place CY 100 $ $ 30326 Road Reconditioning LF 300 $ $
32451 Aggregate Surfacing, 1-1/4" Minus WSDOT, Commercial Source, Compaction Method A TN 12 $ $
*62529 Seeding and Mulching, Seed Mix C-1 AC 0.07 $ $
Option 3 - FSR 36 MP 1.43
Number Description Pay Unit Qty Unit Price Total
20302 Removal of Culverts EA 1 $ $ *20950 Pipe Bedding Material, Government Furnished CY 3 $ $
*25101A Placed Riprap, Class 2, Government Furnished, Headwall and Ditch dam CY 3 $ $
*25101B Placed Riprap, Class 4, Government Furnished, Splash Pad CY 6 $ $
32451 Aggregate Surfacing, 1-1/4" Minus WSDOT, Commercial Source, Compaction Method A TN 10 $ $
*60275B 36" HDPE Pipe, Compaction Method B, Government Furnished LF 40 $ $
*62529 Seeding and Mulching, Seed Mix C-1 AC 0.04 $ $
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 4 of 161
B.1 SCHEDULE OF ITEMS (Continued)
Option 4 - FSR 3610 MP 0.69
Item Number Description Pay
Unit Qty Unit Price Total
20302 Removal of Culverts EA 1 $ $ *20950 Pipe Bedding Material, Government Furnished CY 3 $ $
*25101A Placed Riprap, Class 2, Government Furnished, Headwall and Ditch dam CY 2 $ $
*25101B Placed Riprap, Class 4, Government Furnished, Splash Pad CY 2 $ $
32451 Aggregate Surfacing, 1-1/4" Minus WSDOT, Commercial Source, Compaction Method A TN 10 $ $
*60275A 24" HDPE Pipe, Compaction Method B, Government Furnished LF 45 $ $
*62529 Seeding and Mulching, Seed Mix C-1 AC 0.04 $ $
TOTAL PRICE Base Items: $__________
TOTAL PRICE Option 1 - FSR 39 MP 7.73: $__________
TOTAL PRICE Option 2 - FSR 36 MP 2.12-2.15: $__________
TOTAL PRICE Option 3 - FSR 36 MP 1.43: $__________
TOTAL PRICE Option 4 - FSR 3610 MP 0.69: $__________
Total Price (All Items): $__________
Note: The offeror must provide a price on all items to be considered for contract award.
B.2 PAYEMENT FOR BOND PREMIUMS
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
B.3 FAR 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED
LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within thirty (30) calendar days. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 5 of 161
B.4 FUNDING NOTICE TO OFFERORS
Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation’s closing date. In the vent the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.
B.5 INCORPORATION OF TECHNICAL PROPOSAL
The Contractor’s technical proposal, including revisions and amendments made prior to contract award, will be incorporated into this contract upon award. The Contractor’s personnel shall meet or exceed the qualification standards, experience levels and trade background as set forth in the technical proposal and contract.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 6 of 161
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
This project includes, but is not limited to, the construction or reconstruction for repairs consisting of, vegetation removal, excavation, embankment and subgrade construction, aggregate surfacing, asphalt removal and surfacing, roadway reconditioning, seeding and mulching, culvert removal/installation, new culvert installment, and MSE gabion-faced wall construction. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the Contract.
Contractor must verify that there are no utilities in the project site, before beginning excavation.
C.2 PROJECT LOCATION
The project work area is located south of Glacier, WA on FSR 39, 36, and 3610 (in several Section of T38N-R7E & T39N-R7E). From Bellingham, WA, take State Hwy 542 east approximately 36 miles to FSR 39 (Glacier Creek Road). Project starts on FSR 39: on FSR 39, drive south approximately 8 miles to FSR 36; on FSR 36, drive northwest approximately 3 miles to FSR 3610. A district map showing the road system is available for viewing at the district office.
C.3 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS
The Government's estimate is: between $100,000 and $250,000
C.4 CONTRACT TIMING AND RESTRICTIONS
Wildlife: From April 1st to September 23rd, all activities that generate noise levels above 92 decibels shall occur between 2 hours after sunrise and 2 hours before sunset.
Sediment reduction: Construction sites shall be dewatered or isolated from flowing waters to prevent generation of sediment and minimize turbidity. Every effort shall be made to avoid stream crossings with heavy equipment. A single round-trip equipment crossing of the stream channel shall be allowed, if necessary. Equipment operation within the stream channel inside of the approximate culvert footprint is permissible so long as the stream has been dewatered.
Culvert Installations (60275 A, B, & C) and Road Resurfacing Activities: The roads may be closed from Monday at 0800 through Friday at 1700 during the duration of this work. FSR 39 (Glacier Creek Road) closure dates are limited from September 10th through October 31st. The in-stream water work window for this project is July 16th- October 1st (as approved by FS Fish Biologist). The in-stream fish window applies to the culverts on FSR 39 from MP 0.00 to MP 3.11.
MSE (gabion-faced) wall (25501): The Road may be closed from Monday at 0800 through Friday at 1700 during the duration of this work.
For all other work as described in this project: The roads may be closed for up to 1 hr at a time during performance of this work.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 7 of 161
No work is allowed on Weekends or Federal Holidays without written request by the Contractor to the CO for review and approval.
Road Closure Approval and Signage: Road closure dates (longer than 1 hr) must be submitted at least 3-weeks in advance of the road closure dates, to the Contracting Officer. If more time is needed for any of these sites, the Contractor should identify each location to the Contracting Officer at the pre-work meeting.
Road closure signage (as identified below) is required for FSR 39 and must be installed at least 10 days prior to planned closure(s) and removed (after the road closure is complete) but within 1-week of the road closure completion. Road Closure sign shall include the purchase, installation, maintenance, and removal with the following information.
Road Closed for Construction
Date to Date Time to Time
Contact USFS Mt Baker District Office for additional information at 360-856-5700
The sign shall meet MUTCD compliance for Highway signs, reflective, R11-2 with a size of 60” wide x 48” tall posted on 2 – 4”x4”x12’ pressure treated posts, White with Black lettering, and shall have Red or Orange identifier flags (no less than 8”x8”) at each top corner.
The Road closure signage shall be installed at MP 1.00 (Thompson Creek Bridge) on FSR 39.
All work related to sign and post installation is incidental to Item 15101, Mobilization.
C.5 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS (FP-03)
These specifications are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resultant contract. They are available online at https://flh.fhwa.dot.gov/resources/specs/fp-03/fp-03usc.pdf.
C.6 APPLICABLE SPECIFICATIONS
Standard and Supplemental Specifications applicable to this contract for the FP-03 are shown in the specification listings contained in the attachments. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The Supplemental Specifications for the FP-03 specifications shown on the specification lists are physically attached.
C.7 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 8 of 161 https://flh.fhwa.dot.gov/resources/specs/fp-03/fp-03usc.pdf
C.8 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.9 WDFW-USFS MOU PROVISIONS (JAN 2012)
A copy of this MOU must be on site at all times when work is conducted under the provisions of Appendix A. A full copy of the WDFW-USFS MOU will be provided at the pre-work meeting.
The following provisions are applicable to this contract:
GENERAL PROVISIONS APPLICABLE TO ALL APPENDIX A PROJECTS
Fish-bearing Waters
1. Streams which meet the Washington State Forest Practices Act physical criteria for fish presence (WAC 222-16-031 Interim Water Typing System) are assumed to be fish- bearing unless documented survey information is available that provides evidence of a lack of fish presence.
2. The Forest Service will consult with WDFW to agree on the status of streams that meet the physical criteria for fish presence but where biological information is incomplete, inconclusive, or not well documented.
Timing
1. Freshwater hydraulic projects conducted under Appendix A in fish-bearing streams or in tributary streams within ¼ mile of fish-bearing streams will be implemented only during the work periods outlined in Appendix D unless the Forest Service fisheries biologist and the WDFW Area Habitat Biologist agree that implementing the activity outside of the normal work period would be unlikely to cause negative impacts to fish and fish habitat. The location of the project within a watershed, site-specific conditions, circumstances, nature of the proposed work, and fish species and life stages actually present at the project site may make alternative instream work periods acceptable for many projects. Any agreements to modify the work periods in Appendix D for specific projects or specific sites shall be documented by
WDFW.
2. Those portions of hydraulic project work that occur outside or above the bankfull channel and have little or no potential to negatively affect fish or fish habitat are not subject to the work periods specified in Appendix D. Examples of such work include replacing bridge decking, constructing a bridge superstructure after footings are in place, and building up the fill over a culvert that is in place. These projects are still bound by the other provisions in Appendix A.
3. Hydraulic projects conducted in intermittent non-fish-bearing streams that are dry during the proposed work are not subject to the work periods specified in Appendix D unless the USFS fish biologist determines the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 9 of 161
4. Hydraulic projects conducted in wetted non-fish-bearing streams that are greater than ¼ mile from fish-bearing waters are not subject to the work periods specified in Appendix D unless the USFS fish biologist determines the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.
Fish Protection
1. The intake on any pump used for diverting water from a fish-bearing waterbody shall be screened with material that has openings no larger than 5/64 inch for square openings, measured side to side, or 3/32 inch diameter for round openings, and the screen must have at least one square inch of functional screen area for every gallon per minute (gpm) of water drawn through it. For example, a 100 gpm-rated pump would require at least a 100 square inch screen. Screen maintenance shall be adequate to prevent injury or entrapment to juvenile fish and shall remain in place whenever water is withdrawn from the waterbody through the pump intake.
2. Fish within construction sites that will be dewatered or isolated from the main waterbody shall be captured and safely moved from the job site. Fish capture and transportation equipment shall be available on the job site during all inwater activities.
3. If at any time, as a result of project activities, a fish kill occurs, fish are observed in distress, or water quality problems develop that may present a threat to fish life, the Forest Service shall immediately notify the Washington Military Department’s Emergency Management Division at 1-800-258-5990.
Erosion Control
1. Alteration or disturbance of the bed, banks, and bank vegetation of waterbodies shall be minimized and limited to that necessary to construct the project.
2. Erosion prevention and control methods shall be used as necessary during and immediately after project implementation to minimize loss or displacement of soils and to prevent delivery of sediment into waterbody. These may include, but are not limited to, operational techniques, straw bales, silt fencing, erosion control blankets, temporary sediment ponds, and/or immediate mulching of exposed areas. Disturbed ground with the potential to deliver sediment into waterbodies shall be revegetated or protected from surface erosion by seeding, mulching, or other methods prior to the fall rainy season.
3. After project completion, disturbed streambanks and lakeshores shall be revegetated with site-appropriate vegetation to maintain soil stability and provide shade and future sources of large wood. Revegetation can be accomplished by planting or natural reproduction, depending on site conditions.
Dewatering
1. Where the project-specific provisions require worksite isolation from flowing waters and/or dewatering, a written dewatering plan shall be prepared prior to the start of the
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 10 of 161 instream work that describes the method of bypass, location and construction of any coffer dams or diversion dams, the number and size of pumps to be used, and backup plans in place in case of mechanical failure or unanticipated storm events. The dewatering plan does not require review or approval by WDFW.
2. The dewatering system will be designed and installed to minimize erosion and sediment delivery to watercourses and to withstand all streamflows anticipated during the construction period.
3. Water bypassed around the site will be returned to the stream channel downstream of the work site. The bypass discharge point shall be designed to minimize erosion and scour of the stream channel, banks, and vegetation.
4. Wastewater from project activities within the dewatered area shall be routed to an area outside the bankfull channel to allow removal of fine sediment and other contaminants prior to infiltrating back into waterbodies.
5. Water shall be reintroduced back into the channel in a manner that minimizes the mobilization of fines and sediment into downstream waters.
6. Any materials used to construct the dewatering system will be removed prior to the completion of the project.
Heavy Equipment
1. The use of heavy equipment within the bankfull channel in streams and below the ordinary high water line in lakes is discouraged. If such work is necessary, operation of heavy equipment in these areas shall be minimized and appropriate measures shall be taken to minimize damage to streambanks and streambed.
2. Accumulations of soil or debris shall be removed from drive mechanisms (wheels, tires, tracks, etc.) and undercarriage of all heavy equipment prior to its working within the bankfull channel in streams or below the ordinary high water line in lakes.
3. To prevent contamination, equipment used around waterbodies shall be free of external petroleum-based products. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities. All machinery fueling and maintenance involving petroleum products shall occur at a sufficient distance from stream channels, waterbodies, or wetlands to prevent delivery of potential contaminants. Spill containment equipment and material shall be on site.
Concrete and Treated Wood
1. Fresh concrete, concrete by-products, or other chemical contaminants shall not be allowed to enter waterbodies. Structures containing concrete shall be sufficiently cured to prevent leaching prior to contact with the waterbody.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 11 of 161
2. Wood treated with creosote or with pentachlorophenol in heavy oil solvent may not be used for wood components that will be over or in contact with water in hydraulic projects. Wood treated with any pentachlorophenol formulation may not be used for in- water contact (i.e., within the 100 year floodplain). All treated wood used for hydraulic projects shall meet or exceed the criteria and guidance established in the most current edition of 'Best Management Practices For the Use of Treated Wood in Aquatic and Other Sensitive Environments' developed by the Western Wood Preservers Institute, Wood Preservation Canada, Southern Pressure Treaters' Association, and Timber Piling Council, and any current amendments or addenda to it. Current amendments and addenda include but may not be limited to 'Amendment #1: CCA - Chromated Copper Arsenate', dated October 25, 2006; and 'Addendum #1: ACC - Acid Chromated Copper', dated February 28, 2007.
Invasive Species Control
1. All materials and equipment used in the construction of hydraulic projects shall be free of aquatic invasive species and noxious weeds. Materials and equipment used at a project site at which aquatic invasive species are already established shall be decontaminated so that no viable aquatic invasive species are transported from the job site.
Permanent Culvert Installation and Replacement
NOTE: Permanent culvert installation and replacement projects include installation of new culverts that are installed for more than one year and replacement of existing culverts with similar or larger structures.
In addition to the General Provisions Applicable to All Projects, the following project specific provisions apply when conducting permanent culvert installation or replacement projects.
1. In non fish-bearing waters, provisions highlighted with a * are not required.
2. *Culverts in fish-bearing streams shall be designed, installed, and maintained to provide passage for all fish species and all life stages that are likely to be encountered at the site.
3. *Culverts in fish-bearing streams shall be designed and installed based on the stream simulation approach. Stream simulation designs are intended to mimic the natural stream characteristics and processes.
4. *Site investigations and selections of appropriate stream simulation culvert designs will be guided by the current version of Forest Service design manual “Stream Simulation: An Ecological Approach to Providing Passage for Aquatic Organisms as Road-Stream Crossings” or the current version of Washington State “Design of Road Culverts for Fish Passage”.
5. *Forest Service shall notify WDFW when it begins the design process for a fish passage culvert. Collaboration is encouraged on these projects and can be initiated by either agency.
6. *A Forest Service staff with expertise in stream processes and fish habitat shall be on-site during initial culvert placement and placement of streambed materials inside the pipe for all culverts in fish-bearing streams.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 12 of 161
7. *Installation of baffled culverts in fish-bearing streams is not included under Appendix A.
8. *Installation of culverts in fish-bearing streams utilizing the “Hydraulic Method” or “No-Slope” method are not included under Appendix A.
9. Culverts shall be designed, installed and maintained to accommodate the 100-year peak flow with consideration of the sediment load and wood likely to be encountered.
10. Culverts shall be designed, installed and maintained to avoid negative channel changes such as inlet scouring or erosion of the streambed or banks downstream of the project.
11. The crossing structure shall consist of a single culvert.
12. Construction sites shall be dewatered or isolated from flowing waters to prevent delivery of sediment to watercourses.
13. Every effort shall be made to avoid stream crossings with heavy equipment. A single round-trip equipment crossing of the stream channel shall be allowed, if necessary. Equipment operation within the stream channel inside of the approximate culvert footprint is permissible so long as the stream has been dewatered.
Other
1. A copy of this MOU shall be available on site at all times when work is conducted under the provisions of Appendix A.
C.10 BIOBASED PRODUCTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulation foam
Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 13 of 161
Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases
Dust suppressant 2-cycle engine oil Absorbents
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements.
The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 14 of 161
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 15 of 161
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 16 of 161
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, 52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31, 2018. The time stated for completion shall include final cleanup of the premises.
Note: The Government is currently estimating work to start around August 01, 2018.
F.3 NOTICE TO PROCEED
A Notice to Proceed will be issued in writing by the Contracting Officer. No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.
F.4 REQUIRED SUBMITTALS
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Referenced By Specification No. Submittal Date
Planned Schedule of Work See Section M Include with Quote
Job-Specific Safety Plan Paragraph H.3 Prior to Work Starting
Hazardous Spill Plan FSSS 107.20 Prior to Work Starting
Quality Control Plan FP-03 153.02 Prior to Work Starting
Other Submittals FP-03 & FSSS As required in specifications
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 17 of 161
F.5 MATERIAL CERTIFICATIONS, INVOICES, TESTING REPORTS & OTHER
SUBMITTALS
Submit the following certificates, test reports, samples and test data for this project (1 set each). See FP- 03 sections 104, and 106 for timely submittal and approval by the Contracting Officer. Materials associated with the following Pay Items will require certifications and/or testing reports submitted to the Contracting Officer Representative prior to implementation on the project:
ITEM DESCRIPTION SUBMITTAL TIME FOR
GOVERNMENT
APPROVAL
15101 Mobilization Traffic Control Plan 7 days Road Closure Requests 7 days Equipment Cleaning Notification 7 days 25501 Gabion MSE Wall System Specifications Sheets 7 days Manufacturer’s Instructions 7 days 25507 Compaction Testing Testing Agency Certification 7 days
Sieve and Proctor Results 7 days Compaction Testing Results 7 days 32451 Aggregate Surfacing Material Certification 7 days
Gradation Report 7 days Weed Free Certification 7 days Angularity Confirmation 7 days 40401 Asphalt Concrete Mix Design 7 days 60275 Culverts Length and Placement Survey 7 days Dewatering Plan 7 days
Erosion Control Plan 7 days Road Closure Signage 7 days 62529 Seed and Weed Free Straw Mulch Seed Mix 7 days
Weed Free Certification 7 days
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 18 of 161
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 calendar days after the date of contract award. The conference will be held at:
USDA Forest Service Mt. Baker Ranger District 810 State Route 20 Sedro-Woolley, WA 98284-1263
G.2 GOVERNMENT FURNISHED PROPERTY (GFP)
The Government will provide the following item(s) and material sources to the Contractor for use in the performance of his contract. Contractor is responsible for separation, load, and haul to project site. This property shall be used, maintained, and installed by the Contractor.
Item No. Description Quantity Source Location *20950 Bedding Material As Required FSR 3610 MP 0.04 *25101 A, B, C Riprap As Required FSR 36 MP 4.23 60275 A, B, C HDPE Culverts As Required Koma Kulshan Boneyard
G.3 NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The Contractor and subcontractor shall fill out the SF 1413, Statement and Acknowledgement and submit to the Contracting Officer. Other written notification shall include as a minimum:
a. The name, address and telephone number of the subcontractor.
b. The date upon which the subcontract was entered into and its duration.
c. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
d. Documentation of the subcontractor's representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
G.4 INVOICE PROCESSING PLATFORM (IPP)
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted. The Contractor must also attach a detailed invoice in IPP.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 19 of 161
G.5 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 20 of 161
SECTION H -- SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
a. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observations and measurements.
b. Weather conditions: Seasonal - Varies by season
c. Transportation facilities: Road Access is good, except locations at MP 2.27 & 2.71 on FSR 39.
Contractors are advised to visit the project prior to bidding and to ensure that the type of equipment planned for work is able to SAFELY navigate the access route.
d. Elevation: 1,300’ to 4,700’
e. Other Physical Data: None
H.2 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 21 of 161 specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
H.3 SAFETY PLAN
Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the Contracting Officer that is in accordance with OSHA Regulations. Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The safety plan shall include the Personal Protective Equipment (PPE) that the Contractor provides for his/her employees at no cost to them. It shall include how often the PPE is inspected to insure that it is not defective or damaged. It shall include steps the Contractor takes to insure that his/her workers are using the PPE on the worksite and what steps the Contractor uses if an employee is found to be working without the required PPE.
The Contractor shall include any safety training he/she provides to his/her employees.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 22 of 161
H.4 SAFETY ITEMS
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards:
[X] Temporary excavation/deep trenching/slope stability.
[X] Tree Felling.
[X] Heavy equipment operation.
[X] Fire hazards.
[X] Hydraulic and/or pneumatic and/or other high pressure hazards.
[X] Power tool operation including eye protection.
H.5 FSAR 4G52.222-704 PERSONAL PROTECTIVE EQUIPMENT (FEB 2007)
1. The Contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The Contractor shall provide, at no cost to the employee, to each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. These chaps must be approved by Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh to the top of the boot on each leg.
5. The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
6. The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1- 1997.
7. The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
RFQ No. 1205M618Q0011 FSR 36 - 3610 - 39 Road Repairs Page 23 of 161
8. The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
H.6 USE OF PREMISES
A. The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
B. Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Forest Service land or lands administered by the Forest Service, the Contractor shall obtain written permission from the appropriate Ranger District. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a work order will specify all conditions and requirements.
Sanitation facilities shall be provided for all employees of the Contractor and members of the campsite.
C. It is further stipulated that in addition to clean-up of any campsites, the Contractor shall remove his equipment from National Forest Service land before final acceptance and payment of the contract.
D. The Contractor shall provide and maintain sanitary facilities. There shall be a minimum of one toilet for each ten employees. Solid waste shall be dispose of in accordance with applicable Federal, State and local regulations.
H.7 CONTRACTOR’S USE OF EXISTING ROADS
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.