Lake_Chelan_Erosion_Control_Phase_8_CONSTRUCTION_RFP.pdf

PDF 4 MB Posted

Attached to
Lake Chelan Erosion Control Phase 8 Federal contract opportunity
Solicitation number
1205GG19R0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Lake Chelan Erosion Control Phase 8 Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Lake Chelan Erosion Control Phase 8, newest first.
File Type Posted
Lake_Chelan_Erosion_Control_Phase_8_Attachments.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

1205GG19R0004

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

09/20/2019

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

978139

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

USDA Forest Service Okanogan-Wenatchee NF Wenatchee SO

215 Melody Lane Wenatchee WA, 98802

9. FOR INFORMATION

CALL:

A. NAME Mariah Morris-Titus, CO B. Jason Peterson, COR

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 509-664-9317 (Mariah) 509-664-9395 (Jason)

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

USDA Forest Service Okanogan-Wenatchee NF

Chelan RD Chelan County

Lake Chelan Erosion Control Phase 8

11. The Contractor shall begin performance within 15 calendar days and complete by March 31, 2020.

award, notice to proceed. This performance period is mandatory, negotiable. (See Section F.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

DUNS:_______________

EMAIL: ______________

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract.

The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

CONSTRUCTION RFP 1205GG19R0004

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

Lake Chelan Erosion Control – Phase 8

Sites 5a and 5b Chelan Ranger District

Okanogan Wenatchee National Forest Chelan County

B- 1 - SCHEDULE OF ITEMS

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

PRICE

TOTAL

Site 5a (T.29 N. R.20E, Sec 15)

15756(b) Erosion Control, Permanent Excelsior Fiber Wattles Zones B, D, E & F.

Foot

15756(d) Erosion Control, Log (Horizontal Large Woody Debris). Two (2) piece in Zone B.

Twelve (12) piece in Zone D. Eight (8) piece in Zone E. Thirty (30) piece in Zone F. Wood is Government Furnished at Prince Creek, Contractor haul.

Each

25202(b) Special Rock Embankment, Erosion Control Treatment T3, Treatment Zone B, D, E and F. Total length 848’

Ton

25202(b.1) Special Rock Embankment, Erosion Control Treatment T3S Modified, Treatment Zone A, and C. Total length 183’

Site 5a

NO.

DESCRIPTION

PAY

EST.

QTY.

Site 5b (T.29 N. R.20E, Sec 15)

15756(c) Erosion Control, Geotextile, Type IV.A 12’ Wide Rolls Required.

15756(b) Erosion Control, Permanent Excelsior Fiber Wattles Zones A.

15756(d) Erosion Control, Log (Horizontal Large Woody Debris). Twenty (20) piece in Zone A. Wood is Government Furnished at Prince Creek, Contractor haul.

Each

25202(a) Special Rock Embankment, Erosion Control Treatment T1, Treatment Zone A.

Total length 340’

Site 5b

PROJECT

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

B-3 – NOTE: To be considered for this award, quoter must submit pricing for both Site 5a and 5b.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

Project consists of furnishing the construction and materials necessary to complete shoreline erosion control treatments at two sites on the South shoreline of Lake Chelan in Chelan County, Washington. Construction consists of furnishing and installing special rock embankment, large woody debris, erosion control products as well as other incidental items in a variety of configurations called treatments at locations staked on the ground by the Government prior to commencing work. This work is being done to fulfill the requirements of an Article (1) Forest Service Erosion Control Plan to the license issued by the United States of America Federal Energy Regulatory Commission (FERC) to Public Utility District No. 1 of Chelan County (Chelan PUD) for Lake Chelan Hydroelectric Project No. 637 located on the Chelan River near the city of Chelan, Washington.

C.2 PROJECT LOCATION

The proposed Lake Chelan Shoreline Erosion Control Phase 8 work is located at two sites on the south shoreline of Lake Chelan on the Lake Chelan Ranger District of the Okanogan and Wenatchee National Forest. The primary access to this site is by boat or barge. The Lady of the Lake private commercial ferry does not stop at these sites. The boat ramp nearest the project sites is located at Twentyfive Mile Creek State Park. Other boat ramps are available at Shrine Beach, Lake Chelan State Park, Chelan Riverwalk Park, Old Mill Park and Lake Shore Marina. Commercial barge service is available on Lake Chelan from Mountain Barge Services LLC, 1222 W. Woodin Ave, Chelan, WA 98816 phone (509)682- 2493. The availability of boat ramps varies depending on the water level of Lake Chelan.

This project requires work on Lake Chelan at two time periods. The first is during high-pool lake levels (October to December) to pre-position rock at the project sites and the second is during low-pool lake levels (December to March) to complete the erosion control work.

Prospective offers are advised to verify the availability of planned boat launches during low-pool periods.

The work sites are Site No. 5a and 5b. Sites are located in Section 15, Township 29 North, Range 20 East, Willamette Meridian (WM) in Chelan County, Washington. The project site may be reached from Chelan, Washington by traveling up Lake Chelan approximately 30 miles from the Lady of the Lake boat dock. The project site is approximately 5 miles up-lake from the Twentyfive Mile Creek State Park boat ramp.

C.3 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF

WORK/SPECIFICATIONS (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.4 APPLICABLE SPECIFICATIONS (ROAD PROJECTS)

Standard and Supplemental Specifications for FP-03 shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The Supplemental Specifications shown on the specification list are physically attached.

C.5 PRICE RANGE

The Government's estimate is: Between $250,000 and $500,000

C.6 DESCRIPTION OF WORK

The construction of erosion control measures required by this contract at Site No. 5a and 5b are required as part of the license issued by FERC for the Lake Chelan Hydroelectric Project No. 637-041 to the Chelan PUD.

C.7 PROJECT CONTROL

To prevent the introduction of seeds of noxious weeds onto National Forest land, Contractor shall ensure all equipment moved onto National Forest land and Lake Chelan is free of soil, seeds, vegetative matter or other debris that could contain or hold seeds. Contractor shall employ whatever cleaning methods necessary to insure compliance with this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land. Upon request of Forest Service, arrangements will be made for Forest Service to inspect each piece of equipment prior to being moved onto National Forest land.

All boats or barges will also need to be washed prior to being placed into Lake Chelan. The CO will request a 3 month history of all bodies of water that the vessel has been on prior to being brought to Lake Chelan.

Boats coming from outside of Lake Chelan must:

• Clean equipment that has come into contact with water by removing all visible native and non-native plants, algae or mud from shoes, waders, life vests, boat hulls and engines, trailers and other gear. Use a stiff-bristled brush to clean equipment.

• Drain any accumulated water from boats or gear – including water used in cleaning – back into the lake, stream, or other waterbody from which it came. If draining water away from a water body, water must be disposed of down a sewage drain, not a storm drain.

• Rinse all surfaces with potable water.

If the boat has previously been used in waters with known contaminants or aquatic invasive species, the boat operator is required to use one of the following decontamination techniques listed below:

• Drying method: Once gear is fully dry, allow it to remain dry for an additional 48 hours before using again in Washington waters.

• Hot water: Hard non-porous surfaces, like trailers, engines and shovels, require constant exposure to water heated to a minimum of 140 degrees Fahrenheit for 15 seconds by soaking or using a hot water pressure washer. Porous materials and gear with multiple folds or cavities, such as boots, waders or nets, require constant exposure for in water heated to 120 degrees Fahrenheit for a minimum of five minutes.

• Freeze: Freeze your gear to a temperature of 14 degrees Fahrenheit for a minimum of eight hours or 15 degrees to 32 degrees Fahrenheit for a minimum of 24 hours.

• Chemical method: Chemical treatments should not be done near a waterbody. Soak gear in undiluted antibacterial Formula 409® for 10 minutes. Rinse thoroughly in a contained area. Rinse water must be disposed of down a sewage drain, not a storm drain. Always follow label instructions before use. This method may cause surface cracking of rubber or loss of water repellency.

The Forest Service may require inspection of equipment prior to activities to ensure that all cleaning and decontamination has been completed satisfactorily.

Contractor is responsible for protecting workers from injury. Refer to FAR 52.236- 13, Accident Prevention, for full text.

The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer.

The Government is not responsible for loss of or damage to equipment, materials, or supplies stored on-site during performance of this contract.

Erosion Control Treatments for Site 5a

3.2.1 Erosion Control Treatments for Site 5a

Total length of Treatment 5a is 1031 lineal feet. Zones A and C are 183’ lineal feet and will be treated with the T3S Modified Single Row Rock Placement treatment. Zones B, D, E and F are 848 lineal feet and will be treated with the T3 Double Row Rock Placement treatment.

Additional site data: General overall slope, P1 ~ 90+% max, P2~90% slightly less.

Soils: Stony surfaces, steep silty sands and rocky colluvial slopes >30%.

Maximum bluff height: 40 feet

Table 1: Treatments for Site 5a Treatment Zone

Length (Feet)

Treatment Type (See Drawings)

Treatment Description

A 53 T3S Modified Single Row Rock Placement. No LWD B 32 T3 Double Row Rock Placement. Include 2 pieces

LWD

C 130 T3S Modified Single Row Rock Placement. No LWD D 194 T3 Double Row Rock Placement. Include 12 pieces

LWD

E 129 T3 Double Row Rock Placement. Include 8 pieces

LWD

F 493

T3

Double Row Rock Placement. Include 30 pieces

LWD

Site 5a 1982 Site 5a, by MGY, 03/23/99

Site 5a , 03/23/99 Moderate U/S exposure, Bedrock limits both ends and some spots in middle face or near angle of repose Toe, sl undercut 0’-110’ Till, silty sand (SM) matrix. 50% coarse gravel to 3’ boulders, angular to subround More larger cobbles at toe Downslope (1085’), angular to subground gravel and cobbles, mostly 2” to 3’ Face with grass, moss, clean rocks, shrubs (+) Toe, some sl. Undercutting at toe (-), rocky below1100’ (=) Upslope burned off, Some visual screening by vegetation, face blends with similar materials upslope 110’-200’ Rocky drainage area,mostly grass covered, with shrubs and small trees (+) Few signs of erosion. Some spots sl. Undercut (=).

200’-480’ More exposed U/S (N60oW).

Face with grass, shrubs, ferns, moss, trees.

About 50% sl. Undercut (=).

480’-980’ Near vertical at top of face. Rockier at toe.

Grass, duff, moss, small trees, rock clean (+).

Less grass 500’+ About 600’, face fresh, top of face more active, fewer shrubs, other veg.

980’-end at 1075’ bedrock Very exposed U/S, long fetch. Downslope flatter.

Comparison with 1982 photos (Site 5, all/4): Shape of face unchanged.

Face still shows a good deal of bare soil and some rocks as previously.

Most of lip less pronounced. Shrubs and trees more numerous and larger in most areas. (+)

At Site 5b 340 lineal feet will be treated with the T1 Modified – Enhanced Placed Rock treatment, all of Site 5b will be treated with LWD.

Additional Site data:

Soils: Stony surfaces, steep silty sands and rocky colluvial slopes >30%.

Maximum Bluff Height : 40 feet

Table 2: Treatments for Site 5b

Treatment Zone

Length (Feet)

Treatment Type (See Drawings)

Treatment Description

A 340’

T1

Enhanced Placed Rock. Include 20 pieces LWD

0’ – end at 330’ bedrock Moderately exposed U/S. Limited by bdrk both ends. Steep face with vegetation.

Till, silty sand (SM) matrix with 30%-40% coarse gravel to 3’ boulders.

SI. Overhang to near vertical at top. Remainder of face near angle of repose.

Face with grass, duff, shrubs, sm. trees (+).

Toe about 20% sl. Undercut at toe, about 10% undercut and destabilizing up to mid-face (-).

225’-250’ & 280’-330’ Fresher erosion face, little veg., near angle of repose.

Comparison to 1982 photo ((Site 5, 4/4) difficult due to angle):

Site shows more and larger vegetation.

One tree, previously on the brink, lost to erosion.

Overall improved, but not undercut. (+/-)

3.1 Mitigation Measures Included

Of the group of sites in this site-specific plan, sites 5a and 5b are defined as being group 3 sites in the Settlement Agreement, selected for treatment based on visual impact of the erosion occurring at the sites.

Noxious weed control will be addressed by: 1) limiting foreign soils being brought into the sites;

2) limiting ground disturbance to areas below elevation 1,100 feet, the normal maximum lake level; and, 3) obtaining large rock from a weed-free certified pit. Every effort will be made to keep existing slopes and vegetation as stable as possible during treatment.

These sites all have fairly good natural vegetation that will fill in once toe erosion is stabilized.

However, spot shoreline plantings may be completed by Forest Service personnel at select sites where plantings are needed.

Large Woody Debris (LWD) will be used to benefit fish and address wave action where possible at a ratio (1/1) of disturbed shoreline as agreed to with permitting agencies. This set of treatment allows for LWD placement to be incorporated into approximately 1371 linear feet of shoreline treatments. It will not be a continuous treatment but a selected piece anchored occasionally until we reach the appropriate amount. It will be done so that it does not interfere with dock access or other recreational shoreline to water access at the campgrounds. T1 a n d T 3 treatments include excavation that is used in the LWD calculation. We have calculated 1188 lineal feet of these treatments with excavation disturbances of approximately 1.5 feet, so we have a square footage of required LWD of approximately 1782 square feet. With “average” pieces of LWD being a 20-foot log and 14-16 inches in diameter, each log would represent about 25 square feet of mitigation. Thus we are planning to place approximately 72 “average” logs within the treatment areas that allow for LWD.

3.2 Implementation and Effectiveness Monitoring

The effectiveness monitoring schedule is based on when each site will be treated. The timelines for site treatment are outlined in Chapter 1 of the Lake Chelan Comprehensive Management Plan. The monitoring will be focused on the evaluation of four distinct focus areas:

1. Slope stabilization with an objective of reaching a 90-percent success rate in the treated areas.

2. Presence of native vegetation with an objective of reaching ratio of native to non-native vegetation similar to that found on nearby on undisturbed slopes on 90 percent of treated area. This will take into account the percentage of rock, and bare spots as this is a very dry hostile natural environment.

3. Presence of noxious weeds with an objective of not introducing any new noxious weeds through the course of treatment. Implementation methodologies are designed to exclude the introduction of noxious weeds. Treated areas will be monitored on an ongoing basis to determine if the methodologies employed are sufficient to meet the project objectives.

4. Stability of LWD with an objective of minimizing movement. Large loose objects could become hazardous to the site users.

All sites will be monitored 1, 3 and 5 years following treatment at the sites. For efficiency, some sites monitoring may be conducted when additional vegetation is being planted following the initial stabilization. LWD inspections and slope stability inspections will be conducted during drawdown times to allow inspection of anchoring devices. Noxious weed and vegetation inspections will occur after leaf-out, typically in the May-to-June time period. These inspections will be coordinated with other erosion control implementation steps to provide travel and time efficiencies when possible.

C.8 NATIONAL ENVIRONMENTAL POLICY ACT and PERMITTING

4.1 NEPA

The Forest Service accepted the Final Environmental Assessment (FEA) for Hydropower for Lake Chelan Hydroelectric Project, FERC Project No. 637, FERC, October 2003, for erosion control treatments. Materials included in the FEA detailed all previously conducted survey work, and proposed site-specific treatment areas that were measured and mapped at 10-foot increments. The proposed specific treatments have not materially changed since the date of issuance of the FEA and, as such, will be consistent with the intent of the original proposed treatments.

4.2 Permitting

To ensure that site-specific permitting requirements are met, Project Files, including biological evaluation data, cultural resources, and consultation, will be created or updated, to provide additional site-specific information in a timely manner over the life of the License. Project Files include the Biological Evaluation (BE) data and U.S. Fish and Wildlife Service (USFWS) concurrence letters, the Cultural Resources information, and the Joint Aquatic Resources Permit Application (JARPA).

The USFWS concurred with the Forest Service findings of “may affect not likely to adversely affect” the northern spotted owl (Strix occidntalis caurina), gray wolf (Canis lupus), and grizzly bear (Ursus arctos) in the Biological Evaluation for Lake Chelan Erosion Sites in letters dated August 15, 2007 and April 8, 2008. These letters were included as part of the Site-Specific Erosion Control Plan (Sites 5a, 5b, 8a, 8b, 10a, 10b and 12) submitted to the

FERC in August, 2017. The proposed treatments at the sites covered in this site-specific plan are consistent with the BE and a programmatic consistency form will be completed to document meeting requirements in the BE. The USFWS will review annual site specific program consistency analysis forms (PCF), which are tied to a larger programmatic analysis of the entire project over the 25 years of erosion control treatment.

A JARPA is being submitted to the Washington Department of Fish and Wildlife (WDFW), Washington Department of Ecology (Ecology), USFWS, and the Army Corps of Engineers (Corps). The JARPA is the formal request for Nationwide Permit 13 Bank Stabilization from the Corps. It also addresses Ecology’s 401 Water Quality Certification permit and the WDFW’s Hydraulic Project Application (HPA) addressed under the 2005 HPA Memorandum of Understanding.

4.3 Cultural Resources

The project area was surveyed for cultural resources during the relicensing project. A project description has been submitted to Pete Cadena, Okanogan-Wenatchee National Forest Archaeologist, for review. A report will be submitted to the Washington State Historic Preservation Office and concurrence documented prior to commencing project activities. Nation-to-Nation letters were sent to the Confederated Tribes of the Colville Reservation and the Confederated Tribes and Bands of the Yakama Indian Nation in February 2018.

C.9 MATERIAL SOURCES

The Contractor is responsible for finding sources of rock and other materials such as LWD needed for this contract. The nearest local source of rock is Tunnel Hill Granite, 9 Howard Flats Road, Chelan, WA 98816 phone (509)682-2569.

C.10 PERFORMANCE PERIOD

It is anticipated that contract award will be made by October 31, 2019. Award will be made in accordance with Section M of this solicitation.

The estimated starting date for on-site work is Fall (November 1, 2019). All work shall be completed during the winter/spring drawdown period for 2019-2020 with all work completed not later than March 31, 2020 or the end of the drawdown period, whichever occurs first. The Contractor shall maintain progress at a rate which shall assure completion within the contract time.

Do not submit a proposal unless you can complete all work within this established timeline.

C.11 WORK PROCEDURES

All work related to this project shall be performed in accordance with the following:

• All applicable OSHA Safety Regulations and all applicable federal, state, county and local laws and regulations.

• US Army Corps of Engineers Section 404 Permit (Nationwide No.13) with attached special conditions.

• Final USDA Forest Service Site-Specific Erosion Control Plan as a requirement of the FERC license granted to the Chelan PUD for the Lake Chelan Hydroelectric Project No.

637-041.

• If Archeological features or items are discovered during excavation, operations will stop until a qualified archeologist or other qualified professional archeologist approved by the Contracting Officer can review the site.

C.12 TECHNICAL SPECIFICATIONS

The following listed specifications and SPECIAL PROJECT SPECIFICATIONS are hereby made a part of this Request for Proposals and any resultant contract award:

a. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 U.S. Customary Units, U.S. Department of Transportation, Federal Highway Administration, 2003. The full FHWA specifications are available for downloading at the following URL: http://www.wfl.fha.dot.gov/design/specs/fp03.htm.

Copies of these specifications are available from the U.S. Government Printing Office, Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402. The following sections are included in the contract by reference:

DIVISION 100 GENERAL REQUIREMENTS

Section 101 Terms, Format, and Definitions Section 102 Bid, Award, and Execution of Contract Section 103 Scope of Work Section 104 Control of Work Section 105 Control of Material Section 106 Acceptance of Work Section 107 Legal Relations and Responsibility to the Public Section 108 Prosecution and Progress Section 109 Measurement and Payment

DIVISION 150 PROJECT REQUIREMENTS

Section 151 Mobilization Section 153 Contractor Quality Control Section 156 Public Traffic Accommodation Traffic During Work Limitation on Construction Operations Nighttime Operations Traffic and Safety Supervisor Section 157 Soil Erosion Control http://www.wfl.fha.dot.gov/design/specs/fp03.htm

DIVISION 200 EARTHWORK

Section 207 Earthwork Geotextile

DIVISION 250 SLOPE REINFORCEMENT AND RETAINING WALLS

Section 252 Special Rock Embankment and Rock Buttress

DIVISION 600 INCIDENTAL CONSTRUCTION

Section 620 Stone Masonry Section 624 Topsoil

DIVISION 700 MATERIALS

Section 705.03 Rock for Masonry Structures Section 705.04 Rock for Special Rock Embankment Section 722.03 Rock Bolts Section 713.13 Erosion Control Bales, Wattles, Logs and Rolls, Type 5.C Section 713.18 Permanent Rolled Erosion Control Products Section 714.01 Geotextile- Table 714.4 type IV-A

Specifications referenced under the Standard Specifications may be obtained from the following sources:

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO) Publications. For sale by AASHTO, P.O. Box 96716, Washington, DC 20090-6716, telephone (800)231-3475, fax (800)525-5562, Web site at www.aashto.orgb. The following

SPECIAL PROJECT REQUIREMENTS:

C.13 BIOBASED PRODUCTS

The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.

The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).

The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases

Dust suppressant 2-cycle engine oil Absorbents

Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material

In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.

The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.

The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.

The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/?q=browsefar

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG

1996)

E.2 AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at the project site.

E.3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT

The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.

E.4 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

https://www.acquisition.gov/?q=browsefar

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/?q=browsefar

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than March 31, 2020. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

G.2 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits.

Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

1. Approve Change Orders and Modifications

2. Take Action to terminate the contract for default or Government convenience

3. Make contract adjustments under the Different Site Conditions clause

4. Grant extensions of contract time.

5. Approve assignment of claims.

6. Make final decisions under the Disputes clause

7. Make final acceptance under the contract.

8. Make final decisions under the Suspension of Work clause.

9. Make equitable adjustments.

10. Authorize change in amount of Payment Retention.

11. Approve subcontractors.

12. Approve payment with deductions or final payment.

13. Approve use and possession prior to completion.

14. Enforce the warranty provisions.

G.3 CONTRACT RELEASE

When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein. Reservations:______________"

G.4 GOVERNMENT-FURNISHED PROPERTY

(a) The Government shall deliver to the Contractor, at the time and locations stated in this contract, the Government-furnished property described in the Schedule or specifications. If that property, suitable for its intended use, is not delivered to the Contractor, the Contracting Officer shall equitably adjust affected provisions of this contract in accordance with the Changes clause when --

(1) The Contractor submits a timely written request for an equitable adjustment; and

(2) The facts warrant an equitable adjustment.

(b) Title to Government-furnished property shall remain in the Government. The Contractor shall use the Government-furnished property only in connection with this contract. The Contractor shall maintain adequate property control records in accordance with sound industrial practice and will make such records available for Government inspection at all reasonable times, unless the clause at Federal Acquisition Regulation 52.245-1, Property Records, is included in this contract.

(c) Upon delivery of Government-furnished property to the Contractor, the

Contractor assumes the risk and responsibility for its loss or damage, except --

(1) For reasonable wear and tear;

(2) To the extent property is consumed in performing this contract; or

(3) As otherwise provided for by the provisions of this contract.

(d) Upon completing this contract, the Contractor shall follow the instructions of the

Contracting Officer regarding the disposition of all Government-furnished property not consumed in performing this contract or previously delivered to the Government. The Contractor shall prepare for shipment, deliver f.o.b. origin, or dispose of the Government property, as may be directed or authorized by the Contracting Officer. The net proceeds of disposal shall be credited to the contract price or shall be paid to the Government as directed by the Contracting Officer.

(e) If this contract is to be performed outside the United States of America, its territories or possessions, the words "Government" and "Government- furnished" (wherever they appear in this clause) shall be construed as "United States Government" and "United States Government-furnished," respectively.

Property to be Furnished Delivery Point Time of Delivery

1. Large Woody Debris Available at Prince Creek N/A

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

H.2 FAR 52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

A. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observations and measurements.

B. Weather conditions: Typical for East Slopes of the Cascades and Central Washington. The elevation of this project is approximately 2200 feet. Typical day time temperatures are in the 70’s to 80’s and typical night time temperatures are in the 40’s to 50’s. The typical work season is late-May to mid- November.

H.3 WA Use Tax Clause for Construction Contracts: The Contractor is liable for Use Tax, in accordance with State of Washington Code 458-20-173, Sub-paragraph (8), which states: “Thus the use tax applies to all property provided by the federal Government to the Contractor for installation or inclusion in the contract work as well as to all Government provided tooling”.

H.4 Conformity with Drawings and Specifications: Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.

H.5 Warning Signs and Restrictions: Contractor shall be totally responsible for safety signing, barricades and other signing to maintain a safe site to the public and Government employees.

H.6 Emergency Control:

A. Contractor's Responsibility for Fighting Fire.

1. The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work.

2. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor' agents or employees.

B. Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

C. Contractor's Responsibility for Responding to Emergencies.

When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment form the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Change clause, or under an Emergency Equipment Rental Agreement. Payment will be made at not less than the current area rates established by the Government. Employees and equipment will be released from emergency operations when other labor and equipment adequate for the protection of the area are obtained.

NOTE: See Fire Plan Requirements referenced in Section J.

H.7 Job Specific Safety Plan: Prior to the prework meeting, the Contractor shall provide a written job specific safety plan that recognizes the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: fall protection, heavy equipment operation, permitted confine space entry, traffic control on haul routes, loading an unloading of materials, site security, noises and dust contract and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA Regulations. The plan shall include all tasks and related activities anticipated to successfully complete the work.

H.8 Accident Prevention: The Contractor shall provide and maintain work environments and procedures, which will (1) safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; (2) avoid interruptions of Government operations and delays in project completion dates; and (3) control costs in the performance of this contract. A Safety Plan will be requested before starting work.

H.9 Storage of Materials and Equipment: Materials shall be stored to assure the preservation of their quality and fitness for work. Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.

H.10 Landscape Preservation and Hazardous Materials:

A. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.

B. Contractor shall notify the Government of any hazardous materials and or waste (as defined in 29

CFR 1910.1200) to be used on the job and will have Material Safety Data Sheets (MSDS's) for those materials available on the job. All such materials shall be labeled in accordance with Federal and State regulations.

C. Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Mechanized equipment shall not be operated in live streams without written approval by the

Contracting Officer.

D. Prevention of Oil Spills - If the Contractor maintains storage facilities for oil or oil products on the Project Area, Contractor shall take appropriate preventive measures to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States and shall conform to Federal, State, and Local regulations.

If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, Contractor shall prepare a Spill Prevention Control and Countermeasure (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

All petroleum products or other hazardous substances shall not be released on or into land or into rivers, streams, and impoundments, or into natural or manmade channels leading thereto. Servicing of all equipment shall be done only in the areas approved by Contracting Officer or designated representative. Contractor shall properly dispose of vehicle oil filters (drained of free-flowing oil), oily rags, and waste oil in accordance with Local, State, and Federal regulations off of Government property and shall transport such material in accordance with State and Federal regulations.

Contractor shall immediately take action to notify appropriate agencies including Contracting Officer, or designated representative, contain, and cleanup without expense to the Government, all petroleum products or other hazardous substance (as defined in 29 CFR 1910.120) releases on/or in the vicinity of the project of construction operations. Contractor shall be held liable for all damages and costs of additional labor, subsistence, equipment, supplies and transportation deemed necessary by the Government for the containment and cleanup of petroleum products releases caused by Contractor’s employees or resulting from construction operations.

H.11 Use of Premises:

A. The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.

B. Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Forest Service land or lands administered by the Forest Service, the Contractor shall obtain written permission from the appropriate Ranger District. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a work order will specify all conditions and requirements.

Sanitation facilities shall be provided for all employees of the Contractor and members of the campsite.

C. It is further stipulated that in addition to clean-up of any campsites, the Contractor shall remove his equipment from National Forest Service land before final acceptance and payment of the contract.

D. The Contractor shall provide and maintain sanitary facilities. There shall be a minimum of one toilet for each ten employees. Solid waste shall be dispose of in accordance with applicable Federal, State and local regulations.

H.12 Use of Water: The Contractor may use water from the project site. Pumping from other locations must be approved by the Contracting Officer. All pump intakes shall be equipped with a screen meeting the National Marine Fisheries Service criteria, mesh size (3/32 inch) and at least one square inch of functional screen area per each gallon per minute (gpm) of pump capacity…