Sol_No_1205G219R0004.pdf
PDF 1 MB Posted
- Attached to
- Seal Rock Campground Reconstruction Federal contract opportunity
- Solicitation number
- 1205G219R0004
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No_003.pdf | ||
| Amendment_No_002.pdf | ||
| Amendment_No_001.pdf | ||
| J-6_Bio-Preffered_Products_Plan.pdf | ||
| J-3_Wage_Determination_No_WA20190048_06282019.pdf | ||
| J-2_Seal_Rock_CG_Reconstruction_Drawings_Final_6_19_19.pdf | ||
| J-1_Seal_Rock_Campground_Specifications_Final_6_19_2019.pdf | ||
| J-5_Experience_and_Past_Performance_Questionnaire.pdf | ||
| J-4_Fire_Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
1205G219R0004
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
07/10/2019
PAGE OF PAGES
1 52
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
Olympic National Forest, AQM, Contracting North 1835 Black Lake Blvd., Suite A Olympia, WA 98512
Olympic National Forest, AQM, Contracting North 1835 Black Lake Blvd., Suite A Olympia, WA 98512
9. FOR INFORMATION
CALL:
A. NAME
Miley Sutherland
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(360) 956-2471
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Seal Rock Campground Reconstruction.
a.) This is a firm, fixed price contract.
b.) The period of performance for this contract is 120 calendar days. The Forest Service will close the campground during construction.
c.) This is a ‘Best Value” solicitation. See additional requirements in Sections L and M of this solicitation.
d.) This acquisition is a Total Small Business set-aside.
e.) The Government Estimate for the total of the Base and all Option Items is between $500,000.00 and
$1,000,000.00.
11. The Contractor shall begin performance within 30 calendar days and complete it within 120 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See F.2.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 4:30 pm (hour) local time 08/13/2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
DUNS:_____________ 16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
CONSTRUCTION RFP SOL NO 1205G219R0004
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
SEAL ROCK CAMPGROUND RECONSTRUCTION PROJECT
(FINAL Design - 6/19/2019)
NUMBER
DESCRIPTION
METHOD
OF MEAS
UNIT
QUANTITY
PRICE
TOTAL
BASE:
010250-1
Construction Staking
LSQ
LS
Lump Sum
011900-1
Mobilization
024102-1
Removal and Disposal - Existing Structures
024102-2
Removal and Disposal - Excess Fill and Vegetation Removed
033540
Concrete Sidewalk -4 ft.
AQ
LF
129400-1
Site Furnishings - 6' Concrete Picnic Tables
(Installed)
EA
129400-2
Site Furnishings - Steel Fire Ring (Installed)
129400-3
Site Furnishings - Unit Markers
131110-1
Pedestrian Timber Stair
221100-1
Waterline - 1" HDPE, Including Trench, Pipe Zone & Bedding Material, Backfill, Compaction
221100-2
Daylight Drain - 1inch
221102
Curb Valve and Box - 1-inch
221105
Hydrant - With Concrete Pad
311000
Clearing and Grubbing
312100
Project Site Preparation and Grading (Spur Modifications, New Family Unit, Day Use and Tent Pads, Paths, Road Work)
321200-1
Hot Mix Asphalt Paving (Lower Road Widening and
Patching where new Waterline Crosses Lower Road
Only)
Ton
321204-1
Crushed Aggregate Base - Grading C (For Under Asphalt Widening on Lower Road Only)
DQ
CY
321204-2
Crushed Aggregate Surface Course - Grading G (For
Spurs, Pullouts & Paths)
321210
Rockery Retaining Wall
SF
1,075
322100-1
New Tent Pad Single, Size 14'X14' (TYP but Varies), Includes Edgers and Bedding)
322100-2
Tent Pad (Modifications only including New Edger &
Expansions)
CONSTRUCTION RFP SOL NO 1205G219R0004
(FINAL Design - 6/19/2019)
322100-3
Tent Pad (Including New Edger Only)
322100-4
Family Unit (Including Aggregate Surface & New Edger)
322100-5
Day Use Pads (Including Aggregate Surface & New Edger)
322622-1
Precast Concrete Curb - 8' (Spurs)
322640-1
Pavement Marking - 4-inch Wide (Reflectorized White)
323150
Fence - Wood 3-Rail
323155
Wood Edgers (Lower Road Spurs Only) - Trees from Onsite w/ Bark Peeled
TOTAL BASE:
CONSTRUCTION RFP SOL NO 1205G219R0004
OPTION ITEM #1 (Road Work):
010250-2
Construction Staking
011900-2
Mobilization
024102--3
Removal and Disposal - Culvert and Asphalt
026460
Colored Concrete Dumpster Pad
321200-2
Hot Mix Asphalt Paving (Roads, Spurs and Dumpster Pad Aprons)
Ton
321214
Slurry Seal Type I (East Parking Lot)
SY
321202
Asphalt Repairs (Minor Patching)
SY
321204-1
Asphalt)
322205
Barrier Rocks (Imported Commercial Source)
322623-2
Precast Concrete Curb - 6' (Parking Lot)
322622-3
Precast Concrete Curb - 8' (Dumpster Pads)
322640-2
Pavement Markings (Directional Arrows Reflectorized
322640-3
Pavement Marking - 4-inch Wide (Reflectorized
322640-4
Pavement Marking - Accessible Symbol
323116
Road gate - 28 Foot - Double
332228
Culvert - 18-inch Galv. Corrugated Metal Pipe (16 Gage, 2 2/3"x1/2" Corrugations)
TOTAL OPTION #1:
CONSTRUCTION RFP SOL NO 1205G219R0004
(FINAL Design - 6/19/2019)
OPTION ITEM #2 (Comfort Station):
033540
Concrete Sidewalk - 4 ft.
133401
Pre-cast Concrete Vault Restroom (Double Unit) - Installed
321204-3
Crushed Aggregate Surface Course - Grading G (Apron)
321204-4
Sidewalk)
322205
Barrier Rocks (Imported Commercial Source)
TOTAL OPTION #2:
OPTION ITEM #3 (Utility Tables)
129400-4
Site Furnishings - Utility Table (Installed)
TOTAL OPTION #3:
OPTION ITEM #4 (Replace Beach Access Stairs)
024102-3
Removal and Disposal - Existing Stairs, Railing and Concrete
061533
New Stairs to Beach (Includes Stairs, Railing and Concrete Landing/Stairs)
131110-2
Pedestrian Timber Stair
321204-5
Crushed Aggregate Surface Course - Grading G (For Paths Between Stairs)
TOTAL OPTION #4:
Offeror is required to submit an offer price for all items.
Alternate proposals will not be considered.
CONSTRUCTION RFP SOL NO 1205G219R0004
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
GENERAL SPECIFICATIONS
SEAL ROCK CAMPGROUND RECONSTRUCTION
(Final – 6/19/2019)
1.1 SCOPE OF CONTRACT
A. This project consists of reconstructing the Seal Rock Campground.
B. Demolition work includes the following:
1. Demolition of the existing wood beach access stairs, removal and disposal of existing concrete picnic tables, steel fire rings, wood unit markers, hydrants, sumps, wood posts, concrete curb stops, wood stairs at campsites, and wood fencing/railing.
C. New construction work includes the following:
1. Reconstruction of existing camping spurs including widening/lengthening of spurs, new aggregate surfaced picnic pads, concrete picnic tables, fire rings, concrete pads and hydrants w/ associated waterline, valves and drain lines and associated appurtenances, aggregate paths, tent pads, wood stairs at camping sites, rockery retaining walls, concrete curbs, asphalt road work and new wood edgers along the lower road. Waterlines to new hydrants will connect to the existing water system.
D. Option Items:
1. Road Work: Includes removal and disposal of existing sections of asphalt and one culvert, repaving and patching of asphalt sections of roads, paving of spur widening on lower road, construction of dumpster pads, slurry seal of a parking lot and pavement marking, installation of a new culvert, gate, barrier rocks and curb stops.
2. Comfort Station: Includes installation of a new double vault restroom with aggregate and concrete path.
3. Utility Tables: Includes installation of utility tables at the picnic pads.
4. Replace Beach Access Stairs: Includes removal of existing wood stairs to the beach and construction of new wood stairs, aggregate path and timber stairs.
E. Quantities associated with these options are identified in the Schedule of Items.
CONSTRUCTION RFP SOL NO 1205G219R0004
1.2 PROJECT LOCATION
A. The project is located in the Hood Canal Ranger District of the Olympic National Forest, Jefferson County, Washington. From Quilcene, Washington, travel south on State Highway
101 toward Brinnon for 10.6 miles. Turn left onto the Seal Rock Campground road.
47°42'28.42"N 122°53'36.16"W
1.3 SITE INFORMATION AND LIMITATIONS
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. The Campground and Day Use Areas will be closed to the public during construction.
The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access.
2. Contractor will provide all materials and labor necessary to protect streams and lakes, wet or dry, during construction activities. The Contractor will be required to submit a stream and lake protection plan and receive approval from the Contracting Officer, in writing, prior to the beginning of construction. The plan will include measures to prevent sediment runoff from stockpiled materials (including disposal areas) as well.
3. All construction equipment shall be pressure washed before entering National Forest
System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and
State regulations.
4. Water is available at the site for construction purposes from the Forest Service water system.
5. Toilet facilities are available at the site.
6. Power is available at the site for construction purposes but is limited (Host Site connection and at restrooms).
1.4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
A. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic and public has been submitted by the contractor and approved by the Contracting Officer and Washington
Department of Transportation. Construction signing for traffic control shall conform to the
Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
CONSTRUCTION RFP SOL NO 1205G219R0004
1.5 WORK CAMPS, STAGING AND STORAGE AREAS
A. Areas for staging operations and storage of materials shall be approved by the CO. The
Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site. Camping will be permitted within the construction area.
1.6 INSPECTION OF WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.7 START DATE
A. Winter 2019/2020
1.8 CONTRACT TIME
A. Base Items: 120 Calendar Days
1.9 SPECIFICATIONS
A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.
010250 CONSTRUCTION STAKING
011250 MEASUREMENT AND PAYMENT
011900 MOBILIZATION
013300 SUBMITTALS
014100 QUALITIY CONTROL
023701 SEDIMENT AND EROSION CONTROL MEASURES
024100 WASTE MATERIAL DISPOSAL
024102 REMOVAL AND DISPOSAL OF EXISTING STRUCTURES
026460 DUMPSTER PAD
033000 CAST IN PLACE CONCRETE
061533 WOOD STAIRS
099100 PAINTING
099300 STAIN FINISHING
129400 SITE FURNISHINGS
131110 PEDESTRIAN TIMBER STAIRWAY
133401 PRECAST CONCRETE VAULT RESTROOM
221100 WATER DISTRIBUTION SYSTEMS
221102 CURB VALVES AND BOXES
221105 WATER HYDRANTS
CONSTRUCTION RFP SOL NO 1205G219R0004
311000 CLEARING AND GRUBBING
312000 EARTHWORK
312100 PROJECT SITE PREP AND GRADING
312225 EXCAVATION AND EMBANKMENT
321200 HOT MIX ASPHALT PAVING AND REPAIRS
321204 CRUSHED AGGREGATE BASE OR SURFACE COURSE
321210 ROCKERY RETAINING WALL
321214 SLURRY SEAL
322100 FAMILY UNIT, DAY USE PAD AND TENT PAD
322205 BARRIER ROCK
322622 PRECAST CONCRETE CURB STOPS
322640 PAVEMENT MARKINGS
323116 GATES FOR ROADS
323125 WOOD FENCE
323130 WOOD EDGERS
332228 CULVERT PIPE AND PIPE ARCHES
1.10 Attachments to Statement of Work/Specifications (AGAR 452.211-73) (FEB 1988)
The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.
1.11 Biobased Products
The Contractor must comply with Section 9002 of the Farm Security and Rural
Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal
Environmental, Energy, and Transportation Management,” and the Federal Acquisition
Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulation foam
Concrete and asphalt release fluids Fluid-filled transformers
Wood and concrete sealers Composite panels
CONSTRUCTION RFP SOL NO 1205G219R0004
Adhesive and mastic removers Carpets
Roof coating Hydraulic fluid
Diesel fuel additives Greases
Dust suppressant 2-cycle engine oil
Absorbents
Biobased products that are designated for preferred procurement under USDA’s
BioPreferred program must meet the required minimum biobased content as stated in the
USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product
Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts.
CONSTRUCTION RFP SOL NO 1205G219R0004
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
CONSTRUCTION RFP SOL NO 1205G219R0004
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG 1996)
E.2 AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project site.
E.3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.
E.4 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
CONSTRUCTION RFP SOL NO 1205G219R0004
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within __30__ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the work in 120 calendar days. The time stated for completion shall include final cleanup of the premises.
F.3 FAR 52.236-15 SCHEDULES for CONSTRUCTION CONTRACTS (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting
Officer for approval three copies of a practicable schedule showing the order in which the
Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting
Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting
Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the
Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government.
In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the
CONSTRUCTION RFP SOL NO 1205G219R0004
contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
CONSTRUCTION RFP SOL NO 1205G219R0004
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within __15__ days after the date of contract award. The conference will be held at the Olympic
National Forest, Supervisor’s Office.
G.2 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the
Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.3 CONTRACT RELEASE
When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein.
Reservations: ______________"
CONSTRUCTION RFP SOL NO 1205G219R0004
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 Landscape Preservation
EROSION CONTROL MEASURES
a. Contractor shall minimize sediment laden water from entering the stream. Install check dams and sediment fences as necessary to minimize the entry of silt-laden water into streams or other water bodies.
b.Dewater any live streams prior to culvert removal or other in stream work.
c. Seed and mulch all disturbed areas within 7 days of completing the project.
LANDSCAPE PRESERVATION
a. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.
b.Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
c. Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live steams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
d.Mechanized equipment shall not be operated in live streams without written approval by the
Contracting Officer.
e. Prevention of Oil Spills – If the Contractor maintains storage facilities for oil or oil products on project Area, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.
CONSTRUCTION RFP SOL NO 1205G219R0004
f. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and
Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR
112) including certification by a registered professional engineer.
H.2 Cleaning Of Equipment
Cleaning of Off-Road Equipment used by the Contractor for contract work shall be conducted outside the boundary of any National Forest Service land prior to moving each piece of equipment onto the project. The Contractor shall notify the Forest Service prior to moving each piece of equipment onto the project. Upon request from the Forest Service, arrangement will be made for Forest Service to inspect each piece of equipment prior to it being placed into service.
The Contractor shall use cleaning methods necessary to ensure equipment is free of all attached mud, dirt, and plant parts. If noxious weeds are present at a project site, cleaning may also be required before moving between locations within the same project. These measures will assist to prevent the introduction/spread of the seeds of noxious weeds onto National Forest land. The
Contractor shall certify in writing, compliance with the above requirements.
“Off-road Equipment” includes all machinery other than log truck, chip vans, pickup trucks or vehicles used to transport personnel on a daily basis.
H.3 Plan For Weather-Caused Suspensions Of Work
The Contractor shall prepare a plan for weather-caused suspensions of work to ensure preservation of resources affected on the work site or sites. The plans shall be consistent with the requirements in the
LANDSCAPE PRESERVATION clause contained in this contract. The plan shall be submitted in writing to the Contracting Officer for review. The plan shall distinguish between short-term shut-downs caused by intermittent weather activity and longer-term shut-downs associated with the advent of winter. If rejected by the Contracting Officer, the Contractor shall revise the plan and re-submit it for consideration within three working days of verbal or written notification by the Contracting
Officer. The Contractor shall take action consistent with the plan before suspending activity on the site(s). Acceptance of the plan by the Contracting Officer in no way waives any of the requirements of the LANDSCAPE PRESERVATION clause.
CONSTRUCTION RFP SOL NO 1205G219R0004
H.4 Industrial Fire Precaution Levels
The Contractor shall comply with the operations restrictions in accordance with the Washington
State Industrial Fire Precaution Level (IFPL) system. The IFPL system is used to help prevent wildfires by regulating work in the woods during the summer fire season.
The US Forest Service and the Washington DNR use the four-level industrial regulation system.
The Precaution Levels are:
Level I Closed Fire Season Fire equipment and fire watch service is required.
Level II Partial Hoot Owl Limits certain activities to between the hours of 8 p.m. and 1 p.m.
Level III Partial Shutdown Prohibits some activities altogether and limits other activities to between the hours of 8 p.m. and 1 p.m.
Level IV General Shutdown All operations prohibited
Operation: Power Saws
Precaution Level Landing Tractor/Skidder Other Woods Saws
I. Closed Season Fire Watch Fire Watch Fire Watch
II. Partial Hoot Owl Fire Watch Hoot Owl Hoot Owl
III. Partial Shutdown Hoot Owl Hoot Owl Prohibited
IV. General Shutdown Prohibited Prohibited Prohibited
Other Operations
Precaution Level Loading Blasting Welding
I. Closed Season Fire Watch Fire Watch Fire Watch
II. Partial Hoot Owl Fire Watch Hoot Owl Hoot Owl
III. Partial Shutdown Hoot Owl Hoot Owl Hoot Owl
IV. General Shutdown Prohibited Prohibited Prohibited
This project is located in one of the following zones:
652SW Southern portion of the Pacific RD
The Fire Precaution Class can be found at: http://www2.wadnr.gov/IFPL/ifpltoday.html or by calling 1-800-527-3305.
H.5 Use of Premises
General: During the construction period the Contractor will have full access to all construction areas. The existing Buildings and compound will continue to be used by
USFS personnel and shall remain accessible to USFS staff throughout the course of construction. Contractor storage areas are to be approved by the CO prior to the start of construction.
Provide access to and from site as required by law and by the Government:
http://www2.wadnr.gov/IFPL/ifpltoday.html%20or%20by%20calling%201-800-527-3305 http://www2.wadnr.gov/IFPL/ifpltoday.html%20or%20by%20calling%201-800-527-3305
CONSTRUCTION RFP SOL NO 1205G219R0004
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
Sanitation: Sanitation facilities are available at the site.
Utilities: Water is available and may be used by the Contractor’s personnel. Electrical power is available at the construction site
CONSTRUCTION RFP SOL NO 1205G219R0004
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es):
http://www.dm.usda.gov/procurement/policy/agar.html
52.202-1 Definitions (NOV 2013)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant against Contingent Fees (MAY 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform
Employees of Whistleblower Rights (APR 2014)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreement or
Statements (JAN 2017)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
(MAY 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(OCT 2018)
52.204-13 System for Award Management Maintenance (OCT 2018)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (OCT 2015)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
(JULY 2013)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (OCT 2018)
52.211-18 Variation in Estimated Quantity (APR 1984)
52.215-2 Audit and Records -- Negotiation (OCT 2010)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)
52.219-8 Utilization of Small Business Concerns (OCT 2018)
52.219-14 Limitations on Subcontracting (JAN 2017)
52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013)
52.222-3 Convict Labor (JUNE 2003)
52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation
(MAR 2018)
52.222-6 Construction Wage Rate Requirements (AUG 2018)
52.222-7 Withholding of Funds (MAY 2014)
52.222-8 Payrolls and Basic Records (AUG 2018)
CONSTRUCTION RFP SOL NO 1205G219R0004
52.222-9 Apprentices and Trainees (JULY 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (MAY 2014)
52.222-12 Contract Termination - Debarment (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (MAY 2014)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
(MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015)
52.222-26 Equal Opportunity (SEPT 2015)
52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
52.222-35 Equal Opportunity for Veterans (OCT 2015)
52.222-36 Equal Opportunity for Workers with Disabilities (JULY 2014)
52.222-37 Employment Reports on Veterans (FEB 2016)
52.222-40 Notification of Employees Rights under the National Labor Relations Act
(DEC 2010)
52.222-50 Combating Trafficking in Persons (JAN 2019)
52.222-54 Employment Eligibility Verification (OCT 2015)
52.222-55 Minimum Wages under Executive Order 13658 (DEC 2015)
52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001)
52.223-18 Encouraging Contractor Policies to Ban Test Messaging While Driving
(AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1 Authorization and Consent (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-2 Additional Bond Security (OCT 1997)
52.228-5 Insurance—Work on a Government Installation (JAN 1997)
52.228-11 Pledges of Assets (AUG 2018)
52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)
52.228-14 Irrevocable Letter of Credit (NOV 2014)
52.228-15 Performance and Payment Bonds – Construction (OCT 2010)
52.229-3 Federal, State, and Local Taxes (FEB 2013)
52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014)
52.232-17 Interest (MAY 2014)
52.232-23 Assignment of Claims (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer – System for Award Management
(OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
52.233-1 Disputes (MAY 2014)
52.233-3 Protest after Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
CONSTRUCTION RFP SOL NO 1205G219R0004
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991)
52.236-14 Availability and Use of Utility Services (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984)
52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JULY 1995)
52.243-4 Changes (JUNE 2007)
52.244-6 Subcontracts for Commercial Items (JAN 2016)
52.246-21 Warranty of Construction (MAR 1994)
52.248-3 Value Engineering – Construction (OCT 2015)
52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) --
Alternate I (SEP 1996)
52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, Or
Removal of Improvements (APR 2012)
52.249-10 Default (Fixed-Price Construction) (APR 1984)
52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts
(NOV 1996)
452.236-71 Prohibition against the Use of Lead-Paint (NOV 1996)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
452.236-77 Emergency Response (NOV 1996)
I.2 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
CONSTRUCTION RFP SOL NO 1205G219R0004
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7
CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov .
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov , with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report not later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
http://www.biopreferred.gov/ http://www.sam.gov/
CONSTRUCTION RFP SOL NO 1205G219R0004
I.3 FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
CONSTRUCTION RFP SOL NO 1205G219R0004
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the
Buy American statute is waived for construction material that is a COTS item. (See FAR
12.505(a) (2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b) (2) and (b) (3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph
(b) (2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy
American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United
States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
CONSTRUCTION RFP SOL NO 1205G219R0004
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b) (3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
CONSTRUCTION RFP SOL NO 1205G219R0004
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(e) In the event the contract is terminated for default, the offeror is liable for any cost of acquiring the work that exceeds the amount of its offer, and the bid guarantee is available to offset the difference.
I.4 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)
If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.
I.5 ORDER OF PRECEDENCE—CONSTRUCTION
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
CONSTRUCTION RFP SOL NO 1205G219R0004
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Title Pages
1. Specifications 169
2. Project Drawings 28
3. DOL Wage Decision No. WA170047 03/10/2017 12
4. Fire Protection and Suppression (R6-FS-6300-52) 9
5. Experience & Past Performance Questionnaire 2
6. Planned Use of Bio-Preferred Products 1
CONSTRUCTION RFP SOL NO 1205G219R0004
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
NOTE: Offerors…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.