CompleteSolicitation.pdf
PDF 13 MB Posted
- Attached to
- South Warner EA Cultural Survey Federal contract opportunity
- Solicitation number
- 1204T019Q0020
About this file
Complete Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PacketToCompleteAndReturn.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1204T019Q0020
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
04/15/2019 952855
1 1
SIUSLAW NATIONAL FOREST
3200 SW JEFFERSON WAY
CORVALLIS OR 97331
USDA FOREST SERVICE
See Section F
USDA FOREST SERVICE
FREMONT-WINEMA NF HQ
1301 SOUTH G STREET
LAKEVIEW
OR 97630
541 750-7116DARCY RAPOZA
04/25/2019 1600 PT
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
South Warner EA Cultural Survey Lakeview Ranger District Fremont-Winema National Forest
Cultural Resource Survey
Delivery: See Section F
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
BID SCHEDULE
SOUTH WARNER EA CULTURAL SURVEY
Lakeview Ranger District
Fremont-Winema National Forest
B-1 BID SCHEDULE
ITEM
NO. DESCRIPTION UOM
UNIT OF
ISSUE
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
1 Survey Areas (4,275 Acres Total –
Informational purpose, Not for Cost/Payment)
1.1 SW-1 – 210 acres Ea Ea 1 $ $
1.2 SW-2 – 10 acres Ea Ea 1 $ $
1.3 SW-3 – 2 acres Ea Ea 1 $ $
1.4 SW-4 – 24 acres Ea Ea 1 $ $
1.5 SW-5 – 35 acres Ea Ea 1 $ $
1.6 SW-6 – 119 acres Ea Ea 1 $ $
1.7 SW-7 – 10 acres Ea Ea 1 $ $
1.8 SW-8 – 54 acres Ea Ea 1 $ $
1.9 SW-9 – 390 acres Ea Ea 1 $ $
1.10 SW-10 – 50 acres Ea Ea 1 $ $
1.11 SW-11 – 54 acres Ea Ea 1 $ $
1.12 SW-12 – 38 acres Ea Ea 1 $ $
1.13 SW-13 – 543 acres Ea Ea 1 $ $
1.14 SW-14 – 631 acres Ea Ea 1 $ $
1.15 SW-15 – 93 acres Ea Ea 1 $ $
1.16 SW-16 – 37 acres Ea Ea 1 $ $
1.17 SW-17 – 4 acres Ea Ea 1 $ $
1.18 SW-18 – 14 acres Ea Ea 1 $ $
1.19 SW-19 – 121 acres Ea Ea 1 $ $
1.20 SW-20 – 35 acres Ea Ea 1 $ $
1.21 SW-21 – 61 acres Ea Ea 1 $ $
1.22 SW-22 – 227 acres Ea Ea 1 $ $
1.23 SW-23 – 70 acres Ea Ea 1 $ $
1.24 SW-24 – 162 acres Ea Ea 1 $ $
1.25 SW-25 – 1,135 acres Ea Ea 1 $ $
1.26 SW-26 – 7 acres Ea Ea 1 $ $
1.27 SW-27 – 8 acres Ea Ea 1 $ $
1.28 SW-28 – 28 acres Ea Ea 1 $ $
1.29 SW-29 – 64 acres Ea Ea 1 $ $
1.30 SW-30 – 39 acres Ea Ea 1 $ $
Total Items for Item 1.1-1.30 $
2 Known Cultural Site Condition
Assessments
2.1 39-21-01-01P/Lithic Scatter Ea Ea 1 $ $
2.2 39-21-23-01P/Arborglyph Ea Ea 1 $ $
2.3 39-21-25-01P/Lithic Scatter Ea Ea 1 $ $
2.4 39-22-05-01P/Lithic Scatter Ea Ea 1 $ $
2.5 39-21-25-02P/Lithic Scatter Ea Ea 1 $ $
2.6 39-22-19-01P/Peeled Tree Ea Ea 1 $ $
2.7 39-22-19-02P/Peeled Tree Ea Ea 1 $ $
2.8 39-22-19-03P/Peeled Tree Ea Ea 1 $ $
2.9 40-21-01-01P/Lithic Scatter Ea Ea 1 $ $
2.10 40-21-11-01H/Hist FS Admin Ea Ea 1 $ $
2.11 40-21-11-02P/Lithic Scatter Ea Ea 1 $ $
2.12 40-22-05-01P/Lithic Scatter Ea Ea 1 $ $
2.13 40-22-08-03P/Lithic Scatter Ea Ea 1 $ $
2.14 40-22-18-01M/Lithic Scatter Ea Ea 1 $ $
2.15 40-22-20-01P/Lithic Scatter Ea Ea 1 $ $
2.16 40-22-20-02P/Lithic Scatter Ea Ea 1 $ $
2.17 40-22-20-03P/Lithic Scatter Ea Ea 1 $ $
2.18 40-22-27-01P/Lithic Scatter Ea Ea 1 $ $
2.19 40-22-27-02P/Lithic Scatter Ea Ea 1 $ $
2.20 40-22-27-03P/Lithic Scatter Ea Ea 1 $ $
2.21 40-22-27-04P/Lithic Scatter Ea Ea 1 $ $
2.22 40-22-27-05P/Lithic Scatter Ea Ea 1 $ $
2.23 40-22-27-06P/Lithic Scatter Ea Ea 1 $ $
2.24 40-22-29-04P/Lithic Scatter Ea Ea 1 $ $
2.25 40-22-32-05P/Lithic Scatter Ea Ea 1 $ $
2.26 41-22-02-01H/Cow Camp Ea Ea 1 $ $
Total Items for Item 2.1-2.26
Grand Total
DUNS # ______________________________________
EMAIL ADDRESS _____________________________
For technical information contact: Michelle Durant at 541-353-2755, mdurant@fs.fed.us.
NOTE: Contractor MUST register in the Central Contractor Registration (CCR) data base and Online Representations and Certifications Applications (ORCA). These are now consolidated at the following site: https://www.sam.gov/portal/public/SAM/ mailto:mdurant@fs.fed.us https://www.sam.gov/portal/public/SAM/
C-1 DESCRIPTION OF WORK
Item 1 - Cultural Resource Survey
The contract area lies within the administrative boundaries of the Lakeview Ranger District of the Fremont-Winema National Forest in south-central Oregon. The project, called the South Warner EA, covers 70,996 acres (Figure 1). Within the defined project boundary, 30 high probability areas, areas that are the more likely to contain cultural resources, were determined. High probability areas were determined using environmental data, such as distance from water, slope and proximity to distinct ecotone changes, and previously known cultural site data. The high probability areas were then randomly numbered as cultural survey units.
Thirty (30) survey units (Units SW-1 to SW-30) need to be covered by a cultural resource survey (Figures 2-13). In addition to the survey units, 26 known sites need to be found, assessed for condition, and site report data updated. Prior to survey, existing archaeological, historical, and ethnographical information relevant to the project area shall be reviewed. This material shall include, but is not limited to, past Forest Service survey reports.
Professional cultural resource survey techniques shall be employed. Transect spacing shall be no more than 20 meters except as noted below. Coverage may use, where appropriate, meander, contour, or compass oriented transects. Areas more likely to contain archaeological sites (for example; adjacent to streams, prominent ridges, rock overhangs, etc.) shall be investigated more intensively using transects spaced ten meters apart. Contractor shall make a reasonable effort to locate sites in areas with minimal mineral soil visibility by closely examining mineral soil exposures such as the back dirt of rodent burrows and root-wads. If ground visibility is less than 10%, the Contractor can boot scrape approximately one (1) meter square area. The Contractor shall re-spread the duff removed when examination of the mineral soil in the scraped area is completed.
Recommendations shall be made by the contractor as to areas requiring further examination, including subsurface testing. However, no subsurface testing is to be conducted under this contract.
Avoid areas of extreme health hazard (i.e.; hazardous materials, burning fires, etc.), note the location of such areas and make their location known to the Forest Service. Changes in survey strategy due to environmental conditions shall be discussed with the COR. Significant changes shall be approved by the Contracting Officer (CO) prior to making the change.
Contact with the COR and Government Technical Monitor (Inspector) shall be maintained consistently throughout the cultural resource survey.
When cultural sites are found, a buffer shall be flagged. The buffer shall extend 10 meters out from the site boundary. Each flag shall be readily visible and spaced 10 meters apart, using designated color flagging provided by the COR. Isolates shall not be flagged.
Central or off-site datums shall be established at each cultural site found. Each datum tag shall be inscribed with the date of documentation and a Fremont-Winema Forest site number. Datums shall be identified by the Contractor using two aluminum tags supplied by the COR. The COR will provide instruction on how to number the sites according to the Fremont-Winema Forest numbering system. If a tree is used as a datum point, then one tag shall be nailed to the base (no more than 6" from the ground) and one tag shall be nailed to the trunk at eye level. Do no use trees with trunks <10 inch DBH. Do not pound in the nails so that they are flush with the trunk. Ensure that a ¼ of the length of nail protrudes outward from the trunk. The site form shall contain a description of the datum and the cardinal direction the tag is facing.
A UTM coordinate shall be taken from the cultural site datum and isolate location using Global Positioning System (GPS) equipment capable of being downloaded and post-processed. A minimum of 30 points shall be collected at the datum using a maximum PDOP of 8. For sites larger than about 30m diameter, a GPS polygon representing the area of the site shall also be collected.
The Contractor shall maintain a survey notebook with draft copies of site records. The notebook, or a readable copy of the notebook, shall be provided to the Forest Service upon completion of the field survey.
All cultural site records shall be documented using the Oregon SHPO site forms. Each site record shall include at a minimum: a cultural site form, sketch map, location map, and labeled photographs.
Each cultural site record shall contain a statement giving directions to the site, as part of the site location information. Directions to the site shall be specific, giving road names and/or numbers, distances, and direction. Directions shall be sufficient for someone to navigate from either the Lakeview Ranger District office as appropriate to the site without prior knowledge of the area.
The cultural site data should provide a detailed description of the site, including an overall description of the site, artifact and feature descriptions, artifact densities, artifact and feature sketches or maps, and whatever other information is pertinent and necessary to characterize the site.
If diagnostic artifacts are present, an appropriately referenced date range for each artifact shall be indicated on the site form.
Descriptions of disturbances to the site shall be detailed. Whenever possible describe the severity of the impacting agent(s). For example, use words like “intense,” “minimal,” or “light.” If erosion is noted, describe the erosion type (i.e. rill, pedestalling, and/or sheet erosion). Describe cattle damage in detail (i.e. post holing, trampling, wallowing, and/or trailing). If cattle are trailing, describe the number of trails and the depth and width of the trails.
Report the discovery of human remains, burial sites, looting or vandalism to the COR immediately. The COR will ensure that NAGPRA and ARPA provisions are implemented such as contacting appropriate tribes, law enforcement, medical examiner and the forest archaeologist. Human remains shall at all times be treated with the utmost respect and dignity. For looting and/or vandalism cases, keep personnel out of the area, note site location, take no more than five overview photographs with photo documentation noted on a separate photo log and leave the area. Vendors may be approached by and should cooperate with law enforcement.
Document whether or not a site maybe sensitive to fire. For example, describe the fuel load present on and/or around the site (i.e. Is highly flammable vegetation present? What is the fuel load depth?).
Document wood remains at historic sites. Note if an arborglyph or culturally modified tree is in a dense thicket of immature trees. Note if the cultural material or features present on site could be affected by thermal alteration.
Cultural site sketch maps shall be on 8-1/2 x 11 inch graph paper, complete with appropriate scale, orientation (north arrow) and legend identifying symbols used. The site datum, site boundaries, site buffer, notable ecological features, cultural features, diagnostic artifacts, non-diagnostic tools (bifaces, hammerstones, groundstone, etc.), looted/vandalized disturbance areas and pertinent cultural data shall be included on the site sketch maps. All attachments shall be clearly labeled and identified.
A minimum of two digital pictures (maximum of 3 megapixel resolution) shall be taken of each known site. One picture of the site datum in relation to the overall site and one overview picture of the site showing the general topography. Additional photographs showing pertinent site characteristics, features, and diagnostic artifacts (with scale) may also be included. A photographic log shall be kept of the photographs taken.
Note in table format all isolates in the survey report. An isolate form shall be completed only for prehistoric diagnostic isolates. The date range for diagnostic artifacts should be stated on the form with an appropriate reference. Accompanying the form should be a USGS 7.5’ topographic map showing the isolate location. All prehistoric diagnostic artifacts shall be photographed. All isolate photographs shall be included with the isolate form. Do not flag or establish a datum for isolates.
Sites located during the survey that are found to extend outside of the survey area shall be documented in-full unless the site is found to extend onto private property. If the site is found to extend onto private property, the sketch map and site description shall indicate that the site continues for an unknown distance.
A draft report and final report, including all specified documentation, shall be submitted to the COR.
The report shall meet SHPO specifications for format and content. The report shall include as appendices; survey maps, complete cultural site forms, photographs of the cultural sites, complete prehistoric diagnostic isolate forms for isolates and complete revisited cultural site condition assessment forms with associated maps, sketches and photographs.
The report shall include a management summary, summary of work accomplished and a list of all cultural sites recorded in the project area (both previously and newly recorded cultural sites). Included in this list shall be the site # (both agency number and trinomial if assigned), site type (i.e., lithic scatter, can scatter, etc.), and post-processed GPS coordinates (UTM). Include in the final report a brief description of noted but not formally recorded cultural items (i.e. items which do not meet cultural site and isolate definitions, or which are not more than 50 years old).
Survey coverage maps shall be made employing USGS 7.5 minute series quads. A unit area map depicting location of units, an area surveyed map depicting transects, and a cultural site location map (including new and previously recorded sites) shall be made for each unit. For cultural sites that are less than about 30 meter diameter, plot the site as a point. For cultural sites that are larger than about 30 meter diameter, plot the site as a polygon. Each site shall be clearly labeled on the location map. All maps shall list base map, scale, township and range. On photocopies of USGS 7.5' series quadrangle maps, the section lines and section numbers shall be clearly visible or highlighted.
Provide the Forest Service with a bound paper copy of the final report, three unbound copies of the final report as well as a PDF and an editable Word 2013 copy of the final survey report and site reports, GIS shapefiles (ArcGIS 10.5.1 shapefiles or shapefiles compatible to ArcGIS 10.5.1 for each site and isolate), and original contractor field notes on a removable hard drive. All reports and forms shall be neatly formatted and typed (in Word 2013 format). The unbound copy of the final report shall be printed on acid-free paper (including cultural site and isolate forms).
Provide both the raw and post-processed GPS data files as well as ArcGIS 10.5.1 shapefiles or shapefiles compatible to ArcGIS 10.5.1 to the COR with the final report.
Item 2 - Known cultural site condition assessments
Condition assessments need to be conducted for 26 previously recorded or known cultural sites (Table 1).
Table 1. List of Known Sites that Require Condition Assessments (LS=Lithic Scatter).
Unit FS or
Agency # Fremont- Winema #
Smithsonian # Site Type Last Site Visit Date
Site Size
SW-4 6020200964
39-21-01- 01P Lithic Scatter 1980s 1
SW-9 6020201013
39-21-23- 01P Arborglyph 1987 0.09
SW-
13 6020200967
39-21-25- 01P Lithic Scatter 1980 1
SW-1 6020200237
39-22-05- 01P 35LK2198 Lithic Scatter 1987 0.16
SW-
13 6020200968
39-21-25- 02P Lithic Scatter 1980 4
SW-5 6020200612
39-22-19- 01P 35LK2199 Peeled Tree 1987 0.09
SW-5 6020200610
39-22-19- 02P 35LK2200 Peeled Tree 1987 0.09
SW-5 6020200611
39-22-19- 03P 35LK2201 Peeled Tree 1987 0.09
SW-
14 6020200370
40-21-01- 01P Lithic Scatter 1981 1
SW-
15 6020200371
40-21-11- 01H
Hist. FS Admin. 1982 0.6
SW-
14 6020200049
40-21-11- 02P Lithic Scatter 1978 1
SW-
14 6020200208
40-22-05- 01P Lithic Scatter 1978 1
SW-
14 6020200159
40-22-08- 03P Lithic Scatter 1978 1
SW-
21 6020200462
40-22-18- 01M Lithic Scatter 1978 2
SW-
22 6020200458
40-22-20- 01P Lithic Scatter 1978 1
SW-
22 6020200459
40-22-20- 02P Lithic Scatter 1978 1
SW-
22 6020200460
40-22-20- 03P Lithic Scatter 1978 1
SW-
25 6020200457
40-22-27- 01P 35LK2182 Lithic Scatter 1987 100
SW-
24 6020200911
40-22-27- 02P 35LK2227 Lithic Scatter 1986 0.25
SW-
24 6020200912
40-22-27- 03P 35LK2228 Lithic Scatter 1986 1.8
SW-
24 6020200913
40-22-27- 04P 35LK2229 Lithic Scatter 1986 0.1
SW-
24 6020200914
40-22-27- 05P 35LK2230 Lithic Scatter 1986 0.7
SW-
24 6020200915
40-22-27- 06P 35LK2231 Lithic Scatter 1986 0.5
SW-
22 6020200456
40-22-29- 04P Lithic Scatter 1978 1
SW-
23 6020200446
40-22-32- 05P Lithic Scatter 1980s 1
SW-
25 6020200620
41-22-02- 01H Cow Camp 2010 1
A condition assessment form shall be completed for each known site that is revisited. Each site condition assessment shall include at a minimum: a condition assessment form, sketch map, location map, and labeled photographs.
Directions to the site shall be specific, giving road names and/or numbers, distances, and direction.
Directions shall be sufficient for someone to navigate from the Lakeview Ranger District offices, as appropriate, to the site without prior knowledge of the area.
Descriptions of disturbances to the site shall be detailed. Whenever possible describe the severity of the impacting agent(s). For example, use words like “intense,” “minimal,” or “light.” If erosion is noted, describe the erosion type (i.e. rill, pedestalling, sheet erosion). Describe cattle damage in detail (i.e. post holing, trampling, wallowing, trailing). If cattle are trailing, describe the number of trails, and the depth and width of the trails.
Report the discovery of human remains, burial sites, looting or vandalism to the COR immediately. The COR will ensure that NAGPRA and ARPA provisions are implemented such as contacting appropriate tribes, law enforcement, medical examiner and the forest archaeologist. Human remains shall at all times be treated with the utmost respect and dignity. For looting and/or vandalism cases, keep personnel out of the area, note site location, take no more than five overview photographs with photo documentation noted on a separate photo log and leave the area. Vendors may be approached by and should cooperate with law enforcement.
Document whether or not a site maybe sensitive to fire. For example, describe the fuel load present on and/or around the site (i.e. Is highly flammable vegetation present? Guess what the fuel load depth is).
Document wood remains at historic sites. Note if an arborglyph or culturally modified tree is in a dese thicket of immature conifers. Note if the cultural material or features present on site could be affected by thermal alteration.
If diagnostic artifacts are present, an appropriately referenced date range for each artifact shall be indicated on the site form.
Cultural site sketch maps shall be on 8-1/2 x 11 inch graph paper, complete with appropriate scale, orientation (north arrow) and legend identifying symbols used. The site datum, site boundaries, site buffer, notable ecological features, cultural features, diagnostic artifacts, non-diagnostic tools (bifaces, hammerstones, groundstone, etc.), looted/vandalized disturbance areas and pertinent cultural data shall be included on the site sketch maps. Make a note on the form and maps that the site continues for an unknown distance, if a site is found to extend onto private property. All attachments shall be clearly labeled and identified.
A minimum of two digital pictures (maximum of 3 megapixel resolution) shall be taken of each known site. One picture of the site datum in relation to the overall site and one overview picture of the site showing the general topography. Additional photographs showing pertinent site characteristics, features, and diagnostic artifacts (with scale) may also be included. A photographic log shall be kept of the photographs taken.
Locate the original datum. If the original datum cannot be located, establish central or off-site datums at each known site that is revisited. Datums shall be identified by the Contractor using two aluminum tags supplied by the COR. Tag both new and original datums. Tags shall be inscribed with the date of visit and the assigned agency site number. If a tree is used as a datum point, then one tag shall be nailed to the base (no more than 6" from the ground) and one tag shall be nailed to the trunk at eye level. The condition assessment form shall contain a description of the datum and the cardinal direction the tag is facing.
A UTM coordinate shall be taken from the new or original site datum location using Global Positioning System (GPS) equipment capable of being downloaded and post-processed. A minimum of 30 points shall be collected at the datum using a maximum PDOP of 8. For sites larger than about 30m diameter, a GPS polygon representing the area of the site shall also be collected.
Flag a buffer around each known site revisited. The buffer shall extend 10 meters out from the site boundary. Each flag shall be readily visible from the adjacent flag, using designated color flagging provided by the COR.
Sites that are found to extend outside of the survey area shall be documented in-full unless the site is found to extend onto private property. If the site is found to extend onto private property, the sketch map and site description shall indicate that the site continues for an unknown distance.
C-2 PROJECT LOCATION
The project area is located approximately 3 air miles east of the town of Lakeview, Oregon, in the Warner Mountains within Lake County. Survey units fall within the jurisdiction of the Lakeview Ranger District of the Fremont-Winema National Forest. Survey unit legals are as follows:
Survey Unit Township, Range, Section(s)
SW-1 39S, 22E, 05
SW-2 39S, 22E, 05
SW-3 39S, 21E, 09
SW-4 39S, 21E, 02
SW-5 39S, 22E, 19
SW-6 39S, 22E, 21, 28, 33
SW-7 39S, 21E, 04
SW-8 39S, 21E, 20, 21
SW-9 39S,21E, 22, 23
SW-10 39S, 21E, 10
SW-11 39S, 21E, 26, 27
SW-12 39S, 21E, 19
SW-13 39S, 21E, 24, 25; 39S, 22E, 30
SW-14 39S, 22E, 32; 40S, 22E, 05, 06, 08; 40S, 21E, 01, 11, 12
SW-15 40S, 21E, 10, 11
SW-16 40S, 21E, 01
SW-17 40S, 21E, 01
SW-18 40S, 21E, 12
SW-19 40S, 21E, 01, 12
SW-20 40S, 22E, 18
SW-21 40S, 22E, 18
SW-22 40S, 22E, 19, 20, 29
SW-23 40S, 22E, 29, 32
SW-24 40S, 22E, 27
SW-25 40S, 22E, 27, 34; 41S, 22E, 02, 03
SW-26 41S, 22E, 02
SW-27 41S, 22E, 04
SW-28 41S, 21E, 01
SW-29 40S, 21W, 36
SW-30 41S, 21E, 16, 21
Access
(a) Project Location: Attached survey unit maps show general locations.
(b) Accessibility: The survey units may be reached by Forest Service roads suitable for 4 wheel drive vehicles during the normal operating season. The Forest Service assumes no obligation to plow snow or to perform special maintenance to keep roads open. It is the Contractor's obligation to verify and get approval from Forest Service on travel routes.
(c) ATV’s may be used on this contract with permission from the Contracting Officer, in accordance with all resource protection measures in effect at the time permission is granted.
(d) Boundaries: Survey units have not been flagged.
C-3 SPECIFIC WORK REQUIREMENTS
The Contractor shall provide all services necessary to conduct a cultural resources survey, to include site records, a final report, and map of findings. Cultural resource survey and report format and content shall be sufficient to satisfy current Secretary of the Interior’s Standards and Guidelines for Archaeology and Historic Preservation and SHPO Protocol. The guidelines and protocol are available for review at the Bly Ranger District Office or on the internet at http://www.nps.gov/local-law/arch_stnds_0.htm . The SHPO Protocol is available for review at http://www.oregon.gov/oprd/HCD/ARCH/Pages/index.aspx.
Artifacts shall not be collected and no testing is to be performed.
IN THE REPORTS, PHOTOGRAPHS SHALL BE NO LARGER THAN 3.5" X 5". EACH
PHOTOGRAPH SHALL BE LABELED WITH CULTURAL SITE OR ISOLATE NUMBER, DATE,
DIRECTION OF VIEW, AND A BRIEF DESCRIPTION. LABELED JPEG IMAGES SHALL BE
PROVIDED ON A REMOVABLE HARD DRIVE.
C-4 PERSONNEL QUALIFICATIONS
Individuals working on the contract must meet the minimum professional qualifications outlined in the Secretary of the Interior’s Standards and Guidelines, Archaeology and Historic Preservation’s “Professional Qualifications Standards” (Federal Register vol. 48, no. 190, 9-29-83, Part IV, pg. 44738- 44739). Throughout the duration of the contract, the Principal Investigator should be monitoring the activities of the Crew Chiefs and Field Crew. To meet the minimum professional qualifications in archaeology:
• Principle Investigator: The minimum professional qualifications for the Principal Investigator are:
1) A graduate degree in anthropology with an archaeology emphasis,
2) Demonstrated ability to carry out research to completion as evidenced by timely completion of previous contracts undertaken within the past three years and no current contracts which are past their completion dates,
3) one year of full-time professional experience in archeological administration and research relevant to Southeastern Oregon archeology
4) Supervisory field and analytical experience,
• Field Supervisors/Crew Chiefs: A minimum of a bachelor's degree in anthropology, archeology, history or a closely related field with a minimum of six months general archeological field experience and three months of previous field archeological supervisory experience conducting similar work.
• Field Crew: Completion of or satisfactory progress toward a bachelor’s, degree in anthropology, archaeology, history or a closely related field, or six months previous experience in archeological field work. (For example, completion of an archeological field school is considered satisfactory qualification for an initial position (first archaeological job) if that individual will be constantly supervised by a higher qualified individual).
C-5 DEFINITIONS
Artifact: any portable object, at least 50 years old, that shows evidence of human manufacture, modification, or use.
Cultural: of, or pertaining to culture. The regularized, patterned, learned behavior shared by members of an interacting social group and passed from generation to generation, comprising the groups technology, economy, religion, arts, social organization, and more. A groups partly subconscious consensus on how things are done. Aspects of culture vary among contemporary groups and change through time. Culture may be viewed as a complex set of instrumental behaviors interposed between a group and its natural and social environment, and may be said to constitute the groups adaptation to its environment.
Central Datum: a fixed reference point established near the center of a cultural site. It is used to make horizontal measurements during site mapping and to mark the site for future identification.
Cultural Resource Survey: a continuous surface inspection of an entire survey area, aimed at locating and recording all cultural properties that have surface indications, by walking close-interval (≤20 meters) parallel transects until the area has been thoroughly examined.
Cultural Site: a location of human activity, occupation, or use identifiable through a cultural resource survey. A site consists of at least ten associated artifacts within a 30 meter diameter area, or a single feature.
Data Dictionary: used by GPS units to collect selected information; equivalent to a paper form providing a list of features and/or attributes to be selected during GPS collection describing site characteristics. A data dictionary specifically designed by the USFS (Pathfinder Office v.5.10) for this contract will be made available to the contractor.
Diagnostic Artifact: a time sensitive artifact used for relative dating (e.g., projectile point, amethyst glass, glass or ceramic container with makers mark, tin can with soldered hole-in-top, etc.). If diagnostic artifacts are present, an appropriately referenced date range for each artifact shall be indicated on the site form.
Dilution of Precision (DOP): an indicator of the quality of a GPS derived position. It is the result of a calculation that takes into account each satellites location relative to the other satellites in the constellation to predict the accuracy of positions obtained with that constellation. A low DOP indicates a higher probability of location accuracy.
Feature: literally, human made, not natural; any non-portable object that shows evidence of human manufacture, modification, or use.
Global Positioning System (GPS): a locational system which uses satellites to precisely plot a spot on the surface of the earth. GPS units used by/for the Forest Service must be capable of being downloaded and post-corrected. Executive Order 12906 and OMB Circular No. A-16 requires the collection and maintenance of spatial data collected by/for the federal government comply with specified precision and accuracy standards. Most recreation grade GPS units are unable to be post-processed and thus the accuracy of the data generated by them cannot be verified.
Isolate: a location of human activity consisting of fewer than ten associated artifacts within a 30 meter diameter area.
Mineral soil: exposed ground areas devoid of vegetation.
Off-Site Datum: a fixed reference point established outside a cultural site boundary. It is used to make horizontal measurements during site mapping and to mark the site for future identification.
Point Dilution of Precision (PDOP): type of DOP measurement. A numerical figure of merit expressing the relationship between the error in user position and the error in satellite position. Values considered good for positioning are low. Low PDOP is associated with widely separated satellites. A PDOP Mask of ‘8’sets the highest value at which a GPS receiver will be allowed to compute positions.
Universal Transverse Mercator (UTM): mapping coordinate grid system based upon one of many different mapping projections. The Forest Service in Region 6 uses a projection in UTM Zone 10, North American Datum of 1983 (CONUS NAD83). The data is displayed in meters easting and northing.
C-6 DELIVERABLES
The Contractor shall submit a written Progress Report to the COR every 30 days following issuance of the Notice to Proceed. The report shall contain the following information in a letter format:
(a) Percentage of project work completed.
(b) Brief statement of work accomplished.
(c) Draft copies of site records or a list of sites with location data encountered during the period of work.
(d) Any special problems or items of interest encountered during the period of work.
(e) Projection of next month’s work schedule
A draft version (including site/prehistoric diognostic isolate forms, maps, and sketches) of the final report will be reviewed and accepted by the COR prior to completion of the final report. Additional drafts may be required prior to completion and submission of the final report.
The final report format and content shall be sufficient to satisfy current Secretary of the Interior’s Standards and Guidelines for Archaeology and Historic Preservation and SHPO Protocol, and will be judged on clarity, content, thoroughness of archival research and accuracy. Contractor shall furnish one
(1) bound paper copy of the final report as well as a PDF and an editable Word 2013 copy of the final survey report and site reports, GIS shapefiles (ArcGIS 10.5.1 shapefiles or shapefiles compatible to ArcGIS 10.5.1 for each site and isolate), and original contractor field notes on a removable hard drive.
All reports and forms shall be neatly formatted and typed (in Word 2013 format). The unbound copy of the final report shall be printed on acid-free paper (including cultural site and isolate forms).
All data produced in the performance of this contract shall become the sole property of the Government.
The Contractor agrees not to assert any rights of common law or inequity or establish any claim to statutory copyright in such data. The Contractor shall not publish or reproduce such data in whole or in part or in any manner or form, or authroize others to do so, without the written consent of the Government, until such time as the Government may have released such data to the public.
All forms of media statements regarding work under this contract shall be referred to and issued by the Government.
The Contractor hereby grants to the Government, a royalty-free, nonexclusive, and irrevocable license throughout the work to 1) publish, translate, reproduce, deliver, perform, use, and dispose of, in any manner, any and all data which are not first produced or composed in the performance of this contract, but which are incorporated in the work furnished under this contract, and 2) to authorize others to do so.
The distribution of information relating to this contract shall be governed by Public Law 96-95, October 31, 1979 (93 Stat.727), as follows:
Section 3. (a) Information concerning the nature and location of any archaeological resource for which the excavation or removal requires a permit or other permission under this Act or under any other provision of Federal law may not be made available to the public under subchapter II of Chapter 5 of the Title 5 of the United States Code or under any other provision of law unless the Federal land manager concerned determines that such disclosure would:
(1) further the propose of this Act or the Act of June 27, 1960 (16 USC 469-469c), and
(2) not create a risk of harm to such resources or to the site at which such resources are located.
The Government will coordinate with the Oregon State Historic Preservation Officer (SHPO), local Tribes, other pertinent ethnic groups, and the Advisory Council on Historic Preservation. Should any group or individual contact the Contractor with any concerns regarding the project, these concerns shall be directed in writing to the COR.
The Government will make progress payments to the contractor when requested as work progresses.
Unless the contractor requests a smaller amount, the Government will compute each progress payment as twenty five percent (25%) of the total cost of the contract, less the sum of all previous progress payments made by the Government under this contract. The COR will initiate payment under the following conditions:
a) Upon completion and acceptance of half (1/2) of the cultural resource field survey with associated draft copies site records and field notes. Partial payments during the field work may be granted with submission of progress reports and draft site forms.
b) Upon completion and acceptance of the second half (1/2) of the cultural resource field survey with draft copies of associated site records. Partial payments during the field work may be granted with submission of progress reports and draft site forms.
c) Upon completion and acceptance of the draft survey report and associated site forms.
d) Upon completion and acceptance of the final report and associated site forms.
Final payment under the contract will not be made until all Government-furnished property not utilized during performance of the contract has been returned to the COR.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984) 52.246-4 Inspection of Services--Fixed-Price (AUG 1996)
E-2 CONTRACTOR QUALITY CONTROL SYSTEM
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
E-3 QUALITY ASSURANCE
The Government may inspect 10% or more of the completed survey units. The Government will randomly select the time and place of the inspection without the Contractor’s knowledge. The Government will walk through the surveyed areas evaluating unit conditions and ensuring no sites were overlooked.
The Government may request a selection of completed draft cultural site records at any time for inspection to evaluate site recording procedures.
The Contractor shall resurvey any area or portion thereof that does not meet the terms of the contract. If the inspection reveals the need for rework, the Government will notify the Contractor immediately in writing. All rework shall be completed prior to proceeding with new areas.
http://www.arnet.gov/far/ FSDefaultUser
**NOTE** [SELECT APPROPRIATE INSPECTION CLAUSE.]
SECTION F--DELIVERIES OR PERFORMANCE
F-1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.211-16 Variation in Quantity (APR 1984) 52.242-15 Stop Work Order (AUG 1989)
F-2 FAR 52.211-10 COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the dates below. The time stated for completion shall include final cleanup of the premises.
F-3 PERIOD OF THE CONTRACT
Field Work - June 1, 2019 through October 31, 2019 Rough Draft – Due December 6, 2019 Final Report – Within 30 days of return of the draft report to the vendor
The date for delivery of the Draft Report to the COR is _December 6, 2019_. The COR will review the Draft Report and return it to the vendor in 30 days. Delivery of the Final Report with corrected edits shall be within 30 days of the return of the Draft Report to the vendor.
F-4 SCHEDULES FOR SERVICE CONTRACTS
Contractor shall, within ten (10) days from receipt of a request from the Contracting officer, submit a time chart or schedule of proposed progress to ensure completion of the work within the time set forth in this contract. If the Contractor's progress falls behind the schedule, Contractor shall take such action as necessary to improve progress; in addition the Contracting Officer may require the Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time specified.
1204T019Q0020 http://www.arnet.gov/far/
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 AGAR 452.215-73 Post Award Conference (NOV 1996)
(a) A post award conference with the successful quoter is required. It will be scheduled after contract award. The conference will be held at: Klamath Ranger District Office, Oregon unless otherwise changed by mutual agreement.
(b) Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the prework conference.
G-2 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
a. Survey unit .shp files.
b. Electronic and hard copies of the Oregon SHPO cultural site form and Fremont-Winema NF isolate form.
c. Electronic and hard copies of the Fremont-Winema NF cultural site condition assessment forms.
d. Flagging tape for marking sites.
e. Hard copies of previously recorded site records for conditon assessment analysis.
f. Aluminum tags for use as cultural site datums..
g. In-office use of pre-cultural resource survey research materials, including previous cultural resource surveys in the vicinity, known cultural sites, and historical documents. The contractor may make copies of these materials using in-office equipment.
h. Copy of a Forest map and MVUM maps.
The Contractor shall provide any additional materials required for the completion of the project.
G-3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 SAFETY
Prior to allowing any work to commence on the project, Contractor must submit a Safety Plan, to the Contracting Officer that is in accordance with State of Oregon OSHA Regulations. Such safety plan must include all tasks and related activities anticipated to successfully complete the work. Identify inherently hazardous conditions that could lead to serious injury or loss of life.
H-2 PERSONAL PROTECTIVE EQUIPMENT (PPE)
(a) The Contractor will train in the safe operation and use of equipment to be used in contract performance.
(b) PPE, including but not limited to PPE for the eyes, face, head and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
(c) Defective or damaged PPE shall not be used.
(d) The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support that is constructed with leather or other cut-resistant material which will protect the employee against contact with any running equipment.
(e)The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling or flying objects, wears a hardhat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
(f) The Contractor shall provide, at no cost to the employee, where there is potential for eye injury due to flying objects, eye protection that meets the minimum requirements of ANSI standard Z87.1-2003.
(g) The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise.
H-3 FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will—
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
H-4 FINAL CLEANUP
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all contractor’s rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
H-5 PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
H-6 AGAR 452.236-72 USE OF PREMISES (NOV 1996)
a. Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a camp site or trailer parking area of any employee working on the project for the Contractor.
b. Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State, and local regulations.
H-7 AGAR 452.236-74 CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION (NOV
1996)
A. Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
B. Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.