Amendment 0001_ Clarifications to Question.pdf
PDF 395 KB Posted
- Attached to
- Mechanical Grapple Piling Services Federal contract opportunity
- Solicitation number
- 12-046W-20-R-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001 to 12-046W-20-R-0004.pdf | ||
| Solicitation_12-046W-20-R-0004_2020_MechanicalPiling.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional information about the units you are reviewing for piling:
Both Mandatory and optional areas will be thinned on a 15 foot spacing this summer and boles will be cut into 10 foot pieces through a separate contract. Residual trees will be spaced anywhere from 15-30 feet apart.
Grapple piling start date of end of August will allow for the material to be cut.
Mandatory Units have not been masticated and the majority of the optional units have been masticated.
Clarifications elements of the grapple piling Statement of work:
Material to be piled is the created and existing slash. Slash sizes to be piled can be found in c1a of the solicitation.
Brush can be compacted only as need to create piling space or to allow for access to cut material.
No cutting of brush or competing vegetation’s will be done under this solicitation
No pulling of brush will be permitted.
Brush grapple (rakes) as described in section c2.2e of the solicitation are acceptable pieces equipment. Please make sure all your equipment listed in your proposal meets all the Equipment specs proved in the section c2.2