Amendment Two - Eagle Creek.pdf

PDF 205 KB Posted

Attached to
Eagle Creek Trail Bridge Replacement Federal contract opportunity
Solicitation number
12046W20R0002
Issued by
Department of Agriculture Forest Service

About this file

This document is an amendment to a solicitation for the Eagle Creek Trail Bridge Replacement project. The amendment provides clarification on technical aspects of the project specifications. It indicates the correct material for the waterline is 4" HDPE inside an 8" insulated HDPE jacket, and that the 16" x 0.375 steel pipe piles must be advanced using a drill head rather than placed into predrilled holes. Additionally, it provides instruction to mail bid bonds to the Mt. Hood National Forest Zigzag Ranger Station, and attaches the full geotechnical drill log report. The related opportunity posting indicates it is a solicitation from the USDA Forest Service for the Eagle Creek Trail Bridge Replacement project.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION 1. CONTRACT ID CODE Page of Pages

1 1

2. Amendment 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No.

TWO 03/30/2020

6. Issued By: Code 7. Administered By: Code

USDA Forest Service-Mt. Hood National Forest

16400 Champion Way

Sandy, Oregon 97055

See Block 6

8. Name and Address of Contractor

(X) 9A. Amendment of Solicitation No.

12046W20R0002

9B. Dated (See Item 11)

03/10/2020

10A. Modification of Contract No.

10B. Date Issued (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE

CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the Contract

Order No. in item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _1__ copies to the issuing office.

14. Description of Amendment (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

*** EAGLE CREEK TRAIL BRIDGE REPLACEMENT***

Site visit attendees were: PVH Construction, Ridge2River, Norterra Services, RL Reimers Co. The contractors observed the site first hand. No additional

Q&A that went beyond what can be found in the plan set and specifications.

Questions via email: 1. The bid schedule calls out a 4 inch galvanized waterline inside a 10 HDPE sleeve yet the drawings are specifically calling for a 4”

HDPE waterline installed inside an 8” HDPE casing with closed cell foam insulation filling the annular space. Which is correct? The plan set is correct. A 4” HDPE carrier line inside an 8” insulated HDPE jacket. 2. Plan sheet 7 of 15 indicates that the 16” x 0.375 steel pipe shell pipe is to be drilled to 40ft Bgs using an under-reaming system. Will it be acceptable to instead use a vertical drill rig to drill a 24” hole and then place the 16” casing in it and fully concrete the exterior and then install the inner concrete and rebar as shown? No, the drilling must advance the pipe pile with the drill head – these piles are not designed as drilled shafts, therefore setting them into the drilled holes after the drilling is not acceptable.

Requested full geotechnical drill log report for the Eagle Creek Trail Bridge project. See attached.

Bid Bonds are now to be mailed to: Mt. Hood National Forest, Zigzag Ranger Station (Attention: Leslie Solberg-AQM), 70220 E. Hwy. 26, Zigzag, Oregon

( the office is currently closed to the public) By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer 16A. Name and Title of Contracting Officer

Leslie Solberg 15B. Contractor/Offeror Date Signed 16B. United States of America Date Signed

(Authorized Signature) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV.10-83)

PRESCRIBED BY GSA

FAR (48CFR) 53.243