NFSR_18_MP_17.5_CULVERT_REPLACEMENT.pdf

PDF 1 MB Posted

Attached to
Replacement of an existing culvert Federal contract opportunity
Solicitation number
12046W18Q0013
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Project Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Replacement of an existing culvert, newest first.
File Type Posted
Wage_Rates.txt TXT text file
Culvert_Solicitation.pdf PDF
Fire_Prot__Supp.pdf PDF
Rd_18_Culvert_Replacement_Supplemental_Specs.pdf PDF
Rd_18_Spec_list.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

VICINITY MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVER SHEET

G-02 VICINITY MAP & TEMP TRAFFIC PLAN

C-01 EXISTING SITE PLAN

C-02 SITE PLAN

C-03 PROFILES & DISSIPATER DETAILS

G-04 ESTIMATE OF QUANTITIES & NOTES

G-05 STREAM BYPASS (GRAVITY)

G-06 STREAM BYPASS (PUMP)

LEAVING THE SANDY SUPERVISORS OFFICE, HEAD EAST ON US-26

TOWARD ZIGZAG 18.7 MILES. TURN LEFT ONTO EAST LOLO ROAD,

TRAVEL 6.7 MILES TO PROJECT SITE.

DESIGNED BY:

REVIEWED BY:

FISHERIES BIOLOGIST

HYDROLOGIST DATE

DATE

ENGINEER DATE

ENGINEER DATE

DISTRICT RANGER DATE

2/2 6/1

8 1 1:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

FT

QZ

JJ

YE

T0

GO

_0

OL

DR

L2

QA

\C

OV

ER

SH

EE

T_

LO

LO

_P

AS

S.

DW

G;

R06 PACIFIC NORTHWEST REGION

MOUNT HOOD NATIONAL FOREST

CLACKAMAS COUNTY

OREGON

NFSR 18 MP. 17.5

CULVERT REPLACEMENT

RECOMMENDED BY:

ZONE ENGINEER DATE

APPROVED:

FOREST ENGINEER DATE

ENGINEER DATE

STEVEN WEISNER Digitally signed by STEVEN WEISNER

Date: 2018.02.26 13:34:56 -08'00'

WALTER HISLOP Digitally signed by WALTER HISLOP Date: 2018.02.26 13:44:24 -08'00'

WALTER HISLOP Digitally signed by WALTER HISLOP Date: 2018.02.26 13:45:18 -08'00'

MATHEW HACKETT Digitally signed by MATHEW HACKETT Date: 2018.02.26 15:23:16 -08'00'

WALTER HISLOP Digitally signed by WALTER HISLOP Date: 2018.02.27 08:29:14 -08'00'

WALLACE WESTBROOK

Digitally signed by WALLACE

WESTBROOK

Date: 2018.02.27 09:15:45 -08'00'

TODD PARKER Digitally signed by TODD PARKER Date: 2018.02.27 09:24:58 -08'00'

HELMUT KREIDLER

Digitally signed by HELMUT

KREIDLER

Date: 2018.02.27 09:31:44 -08'00'

FS

FS

LOLO PASS ROAD

PROJECT

SITE

MP 17.5

ZIGZAG

0 1 2

MILES

LO

LO

P

ASS R

OAD

EA

ST

A

SC

HO

FF

R D

NFSR 18

NFRD 1027

FS

NFSR 1828

US

US

STOCKPILE SITE

AND PRIMARY

DISPOSAL SITE.

ALTERNATE

DISPOSAL SITE

LOCAL TRAFFIC ONLY

LOCAL TRAFFIC ONLY

G20-2

FS ROAD NUMBER

ROAD

CLOSED

W20-3

1. ERECT ALL ADVANCE WARNING SIGNS BEFORE STARTING CONSTRUCTION WORK.

2. NOT ALL DETAILS SHOWN ON THE TEMPORARY TRAFFIC CONTROL SHEETS MAY BE

APPLICABLE TO THIS PROJECT. THE CONTRACTOR MAY ADD OR DELETE INFORMATION

AND DETAILS IN THIS TRAFFIC CONTROL PLAN AS NECESSARY TO ACCOMMODATE

ACTUAL OPERATIONS WITH WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.

3. WHERE ADVANCE WARNING SIGNS, PLACED AS SHOWN, INTERFERE WITH PERMANENT

SIGNS, LOCATE THE WARNING SIGNS AS DETERMINED BY THE CO FOR BEST RESULTS.

VARY MESSAGES AS REQUIRED.

4. USE TYPE III OR HIGHER TYPE SHEETING ON ALL SIGNS AND CHANNELING DEVICES.

WARNING LIGHTS ARE NOT NORMALLY NEEDED ON DEVICES WITH TYPE III OR HIGHER

TYPE SHEETING, BUT MAY BE BENEFICIAL TO ATTRACT THE DRIVERS ATTENTION IN FOG

OR OTHER SPECIAL CONDITIONS. WHEN USED, APPLY THE APPROPRIATE TYPE OF

WARNING LIGHT (TYPE A, B, C, OR D) PER THE MUTCD CHAPTER 6F.

5. ADDITIONAL OR DIFFERENT MESSAGE SIGNS MAY BE REQUIRED TO FIT THE ACTUAL

CONSTRUCTION CONDITIONS.

6. ENSURE ALL SIGN SUPPORTS EXPOSED TO IMPACT BY TRAFFIC MEET THE

REQUIREMENTS OF NCHRP-350 FOR CRASH WORTHINESS.

7. DO NOT STORE TRAFFIC CONTROL DEVICES ALONG THE ROADWAY WHEN NOT IN USE.

COVER POST-MOUNTED SIGNS WHEN NOT APPLICABLE.

8. IF W20-1 IS ON A ROADWAY OTHER THAN THAT ON WHICH THE ACTUAL CONSTRUCTION

WORK OCCURS, INCLUDE A SUPPLEMENTARY PLAQUE INDICATING THE NAME OF THE

ROAD THE WORK IS ON.

9. IF SIGNS WILL BE IN PLACE MORE THAN 72 CONSECUTIVE HOURS, USE

GROUND-MOUNTED POST.

10. STATE STANDARDS MAY BE USED AS AN ALTERNATIVE IF APPROVED BY THE CO.

NOTE

W20-1

ROAD

WORK

AHEAD

END ROAD

WORK

G20-2

ROAD

CLOSED

500 FT

ROAD

CLOSED

1000 FT

W20-3

ROAD

WORK

AHEAD

W20-1

W20-3

ROAD

CLOSED

500 FT

ROAD CLOSURE WITHOUT FLAGGERS

R11-2 ATTACHED TO TYPE 3 BARRICADE FOR ROAD

CLOSURES BOTH SIDE OF CONSTRUCTION SITE.

END ROAD

WORK

ROAD CLOSED

1.5 MILES AHEAD

ROAD CLOSED

4 MILES AHEAD

DETOUR

DETOUR

USE ROAD 1828

USE ROAD 1828

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

2/2 6/1

8 1 3:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

W O2

FR

9D

4Y

KI

7L 1Y

YA

OB

RN

Q=

=\N

FS

R

M P

.5

CU

LV

ER

T

RE

PL

AC

EM

EN

T

-2

1-

.D W

G;

R06

PACIFIC NORTHWEST REGION

FOREST SERVICE

ROAD 18 MP 17.5

CULVERT

REPLACEMENT

MOUNT HOOD

NATIONAL FOREST

ZIGZAG RANGER DISTRICT

VICINITY MAP

TEMPORARY TRAFFIC PLAN

FS090523_R102013_L1-002.dwg

W.HISLOP

S.WEISNER

X.XXX

N

R

NFS

R 1

DOWNED TREES TO BE

MOVED AND DECKED AS

STAKED BY CO.

DOWNED TREES TO BE

MOVED AND DECKED AS

STAKED BY CO.

TEMPORARY BERM TO BE REMOVED.

0+

0+

SAW CUT EXISTING ASPHALT AS MARKED

APPROXIMATELY 56' FROM CL OF

EXISTING CULVERT BY CONTRACTING

OFFICER. TACK AND SEAL NEW ASPHALT

BLENDING WIDTH AND SLOPE TO MATCH

EXISTING.

AP

PR

O

X.

6'

APPROX. 4

1'

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

2/2 6/1

8 1 3:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

W O2

FR

9D

4Y

KI

7L 1Y

YA

OB

RN

Q=

=\N

FS

R

M P

.5

CU

LV

ER

T

RE

PL

AC

EM

EN

T

-2

1-

.D W

G;

R06

PACIFIC NORTHWEST REGION

FOREST SERVICE

ROAD 18 MP 17.5

CULVERT

REPLACEMENT

MOUNT HOOD

NATIONAL FOREST

ZIGZAG RANGER DISTRICT

EXISTING SITE PLAN

FS090523_R102013_L1-002.dwg

W.HISLOP

S.WEISNER

X.XXX

Feet 0 30 60

N

R

NFS

R 1

NEW 6' x 130'

CULVERT TO

BE INSTALLED.

NEW RIPRAP

DISSIPATER TO BE

CONSTRUCTED

0+

0+

SAW CUT EXISTING ASPHALT AS MARKED

APPROXIMATELY 56' FROM CL OF

EXISTING CULVERT BY CONTRACTING

OFFICER. TACK AND SEAL NEW ASPHALT

BLENDING WIDTH AND SLOPE TO MATCH

EXISTING.

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

2/2 6/1

8 1 3:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

W O2

FR

9D

4Y

KI

7L 1Y

YA

OB

RN

Q=

=\N

FS

R

M P

.5

CU

LV

ER

T

RE

PL

AC

EM

EN

T

-2

1-

.D W

G;

R06

PACIFIC NORTHWEST REGION

FOREST SERVICE

ROAD 18 MP 17.5

CULVERT

REPLACEMENT

MOUNT HOOD

NATIONAL FOREST

ZIGZAG RANGER DISTRICT

SITE PLAN

FS090523_R102013_L1-002.dwg

W.HISLOP

S.WEISNER

X.XXX

Feet 0 30 60

E

LE

V A

TI

O

N (F

E E

T)

E

LE

V A

TI

O

N (F

E E

T)

STATION (FEET)

EXCAVATION PROFILE

0+00 0+50 1+00 1+50 2+00 2+40

E

LE

V A

TI

O

N (F

E E

T)

E

LE

V A

TI

O

N (F

E E

T)

STATION (FEET)

EXCAVATION PROFILE

0+00 0+50 1+00 1+50 2+00 2+40

EXISTING SURFACE

NEW FINISHED SURFACE

EXISTING CULVERT TO BE

PARTIALLY REMOVED AND

ABANDONED IN PLACE

NEW 6' x 130' CULVERT TO BE INSTALLED

CLASS 5 RIPRAP

DISSIPATER TO BE

CONSTRUCTED

EXISTING SURFACE

REMOVE EXISTING CULVERT TO

APPROXIMATELY 2' BELOW

EXCAVATION FOR NEW CULVERT.

CRUSH AND CAP REMAINING SECTION

WITH BENTONITE / SUITABLE FILL TO

ABANDON IN PLACE.

REMOVE OR CRUSH AND

BURY EXISTING CULVERT

TO APPROXIMATELY 1'

BELOW NEW RIPRAP

DISSIPATER EXCAVATION.

NEW CULVERT PROFILE

EXISTING CULVERT PROFILE

DISSIPATER DETAILS

5'

5'

10'

ELEVATION FRONT VIEW

PLAN TOP VIEW

ELEVATION SIDE VIEW

CLASS 5 RIPRAP (NTS)

CO. TO STAKE POINT WHERE

NEW CULVERT EXITS GROUND

CULVERT INLET LOCATION IS ASSUMED.

CONTRACTOR TO LOCATE.

LOCATION OF NEW

RIPRAP DISSIPATER

EXCAVATION

2' NEW CULVERT

EXCAVATION DEPTH.

REMAINING PORTION OF EXISTING

CULVERT CRUSHED AND CAPPED.

THEN ABANDONED IN PLACE.

CAP CREATED WITH

BENTONITE / SUITABLE FILL MIX.

SLOPES

1V:1.5H

1V:1.5H

-150%

-2%

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

2/2 6/1

8 1 3:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

W O2

FR

9D

4Y

KI

7L 1Y

YA

OB

RN

Q=

=\N

FS

R

M P

.5

CU

LV

ER

T

RE

PL

AC

EM

EN

T

-2

1-

.D W

G;

R06

PACIFIC NORTHWEST REGION

FOREST SERVICE

ROAD 18 MP 17.5

CULVERT

REPLACEMENT

MOUNT HOOD

NATIONAL FOREST

ZIGZAG RANGER DISTRICT

CULVERT PROFILES

DISSIPATER DETAILS

FS090523_R102013_L1-002.dwg

W.HISLOP

S.WEISNER

NOTES:

1. CONSTRUCTION TOLERANCE: C

2. PRIOR TO ANY EXCAVATION, CALL “DIG SAFELY OREGON” 1-800-322-3244. PROVIDE

TICKET NUMBER TO C.O.

3. CONTRACTING OFFICER'S APPROVAL IS REQUIRED PRIOR TO, BUT NOT LIMITED TO,

THE PLACEMENT OF RIPRAP, BEDDING OR LEVELING COURSE OF ANY STRUCTURE.

ALLOW 72 HOUR NOTICE.

4. WATER SOURCE AND ALL RIGHTS AND PERMITS SHALL BE THE RESPONSIBILITY OF

THE CONTRACTOR.

5. MAINTAIN EXISTING SUPER-ELEVATION, CROWN, AND SLOPE OF ROAD. CREATE

SMOOTH TRANSITION TO EXISTING ROAD SURFACE AND PRISM.

6. REMOVE ALL BERMS, EXISTING OR CREATED, TO ALLOW DRAINAGE OF WATER FROM

THE TRAVELED WAY, UNLESS OTHERWISE DESIGNATED TO REMAIN.

7. CONTRACTOR'S ASSUMES FULL RESPONSIBILITY OF STORAGE OF ALL EQUIPMENT

ON GOVERNMENT LANDS. STORAGE LOCATIONS SHALL BE APPROVED BY THE CO.

8. DEPTHS OF ALL MATERIAL ARE GIVEN AS FINAL COMPACTED DEPTHS.

9. ALL CUBIC YARD QUANTITIES ARE IN-PLACE QUANTITIES.

10. CONTRACTOR TO REPAIR ANY DAMAGE TO THE EXISTING ROAD SYSTEM DUE TO

CONTRACTOR'S OPERATIONS, INSIDE OR OUTSIDE OF THE WORK AREA, AT

CONTRACTOR'S EXPENSE, PRIOR TO FINAL ACCEPTANCE.

11. INSTREAM WORK WINDOW IS JULY 15TH THROUGH AUGUST 31ST.

12. STORAGE OF ALL EQUIPMENT ON SITE WILL BE AT THE CONTRACTOR'S RISK AND

AT A LOCATION APPROVED BY THE CONTRACTING OFFICER.

EROSION AND SEDIMENT CONTROL NOTES:

1. CONTRACTOR SHALL SUBMIT TO THE CO A SOIL EROSION PLAN PRIOR TO

COMMENCEMENT OF ANY EXCAVATION OPERATIONS. CO APPROVAL SHALL BE

REQUIRED.

2. INITIATE STABILIZATION MEASURES AS SOON AS PRACTICAL IN PORTIONS OF THE

SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY

CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER WORK HAS CEASED.

3. INSPECT ALL SEDIMENT AND EROSION CONTROL DEVICES DAILY, OR MORE OFTEN

WHEN NEEDED (SUCH AS DURING RAINFALL EVENTS). REPAIR OR REPLACE

DAMAGED OR INEFFECTIVE DEVICES, OR ADD ADDITIONAL DEVICES IF NEEDED TO

CONTAIN SEDIMENT.

4. REMOVE SEDIMENT FROM ANY EROSION CONTROL DEVICES WHEN SEDIMENT DEPTH

EXCEEDS 6 INCHES.

5. SHAPE TO DRAIN ALL DISTURBED AREAS PRIOR TO MULCHING.

6. REMOVE NON-BIODEGRADABLE TEMPORARY SEDIMENT CONTROL MATERIALS WITHIN

7 DAYS OF FINAL ACCEPTANCE.

DISPOSAL SITE TYPICAL

NOTES:

SECTION VIEW

OUTSLOPE - 5% MIN. AWAY FROM ROADWAY

1V:1.5H 1V:1.5H

1. SCATTER MULCH OVER MATERIAL AND ENSURE WATER WILL DRAIN AWAY.

2. DISPOSAL AREA LIMITS TO BE FLAGGED BY THE CO.

3. MAINTAIN MINIMUM 5' DISTANCE FROM DOWNHILL SLOPES ON ALL SIDES

4. DISPOSAL MATERIAL MAY ALSO BE PLACED AGAINST CUT BANKS AS APPROVED BY CO.

ROADWAY CONSTRUCTION TYPICAL

3" ASPHALT

8" BASE AGGREGATE

MATCH EXISTING ROADWAY SLOPES AND WIDTHS

1' AGGREGATE SHOULDERS

COMPACTED SUITABLE

BACKFILL IN 24"

MAXIMUM LIFTS.

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

2/2 6/1

8 1 3:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

W O2

FR

9D

4Y

KI

7L 1Y

YA

OB

RN

Q=

=\N

FS

R

M P

.5

CU

LV

ER

T

RE

PL

AC

EM

EN

T

-2

1-

.D W

G;

R06

PACIFIC NORTHWEST REGION

FOREST SERVICE

ROAD 18 MP 17.5

CULVERT

REPLACEMENT

MOUNT HOOD

NATIONAL FOREST

ZIGZAG RANGER DISTRICT

ESTIMATE OF QUANTITIES

NOTES

FS090523_R102013_L1-002.dwg

W.HISLOP

S.WEISNER

X.XXX

ESTIMATE OF QUANTITIES

ITEM NO. DESCRIPTION UNIT QUANTITIES REMARKS

15101 MOBILIZATION LUMP SUM ALL INCLUDES BONDING, EQUIPMENT WASHING, AND FIRE PROTECTION

MEASURES

15713 SOIL EROSION & POLLUTION CONTROL LUMP SUM ALL INCLUDES PROJECT DEWATERING, SILT FENCE.

20102 CLEARING AND GRUBBING LUMP SUM ALL

20208 REMOVAL OF INDIVIDUAL TREES, DISPOSAL OF TOPS

AND LIMBS F(2), LOGS (I), STUMPS F(1)

LUMP SUM ALL REMOVAL OF TREES IN CONSTRUCTION AREA AS MARKED BY CO. TREES

MARKED AS FISH TREES TO BE PUSHED OVER SO THAT ROOT WAD

REMAINS INTACT AND SET ASIDE FOR SELF LOADER TO PICK UP. ALDERS

TO BE SCATTERED ON FILL SLOPE.

20301 REMOVAL OF EXISTING CULVERT (PARTIAL) EACH 1 REMOVAL OF EXISTING CULVERT INLET UNTIL MINIMUM OF 2' FROM NEW

CULVERT LAY. INCLUDES CRUSHING OF LEFT-IN-PLACE CULVERT INLET,

SEALING CULVERT INLET AREA WITH BENTONITE AND SUITABLE ONSITE

BORROW PRIOR TO PLACING BEDDING MATERIAL FOR NEW CULVERT.

20305 REMOVAL OF DOWNED TREES AND SLASH LUMP SUM ALL REMOVAL/MOVING FOR CONSTRUCTION ACCESS OF EXISTING DOWNED

TREES/SLASH ALONG ROAD HINGES IN CONSTRUCTION AREA. FISH

TREES TO BE MOVED FOR SELF LOADER TO PICK UP.

POST-CONSTRUCTION SLASH MAY BE SCATTERED ON REBUILT FILLSLOPE

PER CO'S DIRECTION.

20358 REMOVAL OF ASPHALT PAVEMENT, DISPOSAL METHOD a LUMP SUM ALL CONTRACTOR TO REMOVE ASPHALT PAVEMENT NEEDED FOR

EXCAVATION AND LEGALLY DISPOSE OF OFF GOVERNMENT LANDS.

20401 ROADWAY EXCAVATION, COMPACTION METHOD B,

FINISHING METHOD N/A

CUBIC YARD* 3100 EXCAVATION AND BACKFILL NECESSARY FOR NEW CULVERT

INSTALLATION

20415 UNSUITABLE EXCAVATION CUBIC YARD 600 DIFFERENCE BETWEEN EXCAVATION AND BACKFILL QUANTITIES

20950 PIPE BEDDING CUBIC YARD* 22 6" BEDDING UNDERNEATH CULVERT, MAY BE SAME AGGREGATE AS BASE

ROCK. COMMERCIAL SOURCE

25104 KEYED RIPRAP, CLASS 5 CUBIC YARD* COMMERCIAL SOURCE

32203 CRUSHED AGGREGATE BASE, GRADING B, COMPACTION

METHOD B

CUBIC YARD* 60 COMMERICAL SOURCE

40451 ODOT 3/4-INCH DENSE GRADED HMAC, LEVEL 2, PG64-22 TON 40 3" LIFT, MATCH WIDTH WHERE TIED IN TO EXISTING PAVEMENT

60276 72-INCH CORRUGRATED ALUMINIZED STEEL PIPE,

0.079-INCH THICKNESS, METHOD B

FOOT 130 60” 5X1 ROUND14GA ALZD CSP;

60” X 24”W BANDS

60”OR SPEC 24”W GASKET

62503 SEEDING, DRY METHOD LUMP SUM ALL ALL DISTURBED AREAS. GOV'T FURNISHED SEED.

62509 MULCHING, DRY METHOD LUMP SUM ALL ALL DISTURBED AREAS. CONTRACTOR TO PROVIDE CERTIFIED WEED

FREE MULCH

63501 TEMPORARY TRAFFIC CONTROL LUMP SUM ALL INCLUDES PLACING SIGNS AS SHOWN IN THE TEMPORARY TRAFFIC

CONTROL PLAN

* DENOTES CONTRACT QUANTITY

GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT CONTROL WEIR

BANKFULL

PLAN VIEW

ELEVATION VIEW

PROFILE VIEW

(NOT TO SCALE)

BYPASS TYPICAL PLAN VIEW

GEOTEXTILE

MIRAFI 140N

OR EQUAL

STRAW BALES

SECTION VIEW

STREAM FLOW

GRANULAR BACKFILL

SECTION 703.03(a)

STREAM FLOW GRANULAR BACKFILL

SECTION 703.03(a)

GEOTEXTILE MIRAFI 140N

OR EQUAL

STRAW BALES

SANDBAG BYPASS DAM DETAILS

(NOT TO SCALE)

BYPASS PIPE

6 MIL. PLASTIC

SHEETING

ANTI-SEEP COLLAR.

ROLL ANTI-SEEP COLLAR OVER

MEMBRANE & PIPE, THEN CUT

AND REMOVE MEMBRANE

FROM END OF PIPE.

IMPERVIOUS MEMBRANE KEY TRENCH,

FILL WITH CLEAN GRAVEL AS NEEDED

TO CONTROL SEEPAGE UNDER

IMPERVIOUS MEMBRANE

ANCHOR IMPERVIOUS MEMBRANE

(SANDBAGS, STONES, ETC.)

18" MIN.

IMPERVIOUS MEMBRANE SANDBAGS

BYPASS PIPE

OVERFLOW LESS THAN "BANKFULL"

18" MIN.

SANDBAGS

STREAMBED

STREAMBED

VARIES AS NEEDED

STREAM FLOW

CLEAR WATER SUMPS

ELBOW

JOINTS AS

NEEDED

BYPASS

PIPE

OUTLET LOCATION APPROVED

BY C.O.

(NOT TO SCALE)

FLOW

"BROWN WATER SUMP

REMOVE SEDIMENT / TURBIDITY BEFORE ALLOWING

WATER TO RE-ENTER STREAM

GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT

CONTROL WEIR

BANKFULL

CULVERT

A A

BYPASS

DAM (SEE

DETAILS)

IMPERVIOUS MEMBRANE KEY TRENCH.

KEY MEMBRANE INTO TRENCH BEFORE

DRAPING OVER SANDBAG DAM.

STABLE BENCH

TYPICAL SECTION A-A

EXCAVATION

SLOPE

1.5

VARIES AS NEEDED

BYPASS PIPE

CULVERT

NOTE:

THE DEWATERING & SEDIMENT CONTROL PLAN

SHOWS THE MINIMUM ACCEPTABLE CRITERIA.

MAINTAINING CLEAN WATER DOWNSTREAM OF THE

PROJECT IS THE RESPONSIBILITY OF THE

CONTRACTOR THROUGHOUT THE DURATION OF

THE PROJECT, 24 HRS./DAY

ANTI-SEEP COLLAR

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

2/2 6/1

8 1 3:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

W O2

FR

9D

4Y

KI

7L 1Y

YA

OB

RN

Q=

=\N

FS

R

M P

.5

CU

LV

ER

T

RE

PL

AC

EM

EN

T

-2

1-

.D W

G;

R06

PACIFIC NORTHWEST REGION

FOREST SERVICE

ROAD 18 MP 17.5

CULVERT

REPLACEMENT

MOUNT HOOD

NATIONAL FOREST

ZIGZAG RANGER DISTRICT

STREAM BYPASS

(GRAVITY)

FS090523_R102013_L1-002.dwg

W.HISLOP

S.WEISNER

FISH FENCE

FISH SCREEN

PUMP INTAKE OR SUMP

FLOW

B

A A

B

PUMP

IMPERVIOUS MEMBRANE

KEY

TRENCH

EDGE OF STREAM

UPSTREAM SANDBAG DAM

CLEAR WATER SUMP

UPSTREAM SANDBAG BYPASS DAM DETAILS

NOT TO SCALE

BYPASS PIPE TO PUMP OR

DISCHARGE

IMPERVIOUS MEMBRANE

CLEAR

WATER

SUMP

SANDBAGS

STREAMBED

IMPERVIOUS MEMBRANE KEY TRENCH

FILL WITH CLEAN GRAVEL

(AS NEEDED TO CONTROL SUBSURFACE FLOW)

ANCHOR IMPERVIOUS MEMBRANE

(SANDBAGS, STONES, ETC.)

FISH FENCE FISH SCREEN

PUMP INTAKE OR SUMP

WELDED WIRE FABRIC

AS NEEDED TO SUPPORT FISH

SCREEN

FLOWFISH SCREEN

32" OPENINGS

CLEAN GRAVEL

SECTION A - A

SANDBAGS SPILLWAY HEAVY MIL. PLASTIC SHEETING

SECTION B - B

FLOW

IMPERVIOUS MEMBRANE

BROWN WATER SUMP

KEY

TRENCH

DOWNSTREAM SANDBAG DAM

FLOW

CONTROL EROSION AT PIPE

DISCHARGE

CC

IMPERVIOUS MEMBRANE KEY TRENCH

FILL WITH CLEAN GRAVEL

(AS NEEDED TO CONTROL SUBSURFACE FLOW)

ANCHOR IMPERVIOUS

MEMBRANE

(SANDBAGS, STONES, ETC.)

DOWNSTREAM SANDBAG BYPASS DAM DETAILS

NOT TO SCALE

SECTION C - C STREAMBED

SANDBAGS

IMPERVIOUS MEMBRANE

REMOVE SEDIMENT / TURBIDITY BEFORE ALLOWING

WATER TO RE-ENTER STREAM

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

2/2 6/1

8 1 3:

S

W

EI

SN

ER

C :\U

SE

RS

\S W

EI

SN

ER

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

W O2

FR

9D

4Y

KI

7L 1Y

YA

OB

RN

Q=

=\N

FS

R

M P

.5

CU

LV

ER

T

RE

PL

AC

EM

EN

T

-2

1-

.D W

G;

R06

PACIFIC NORTHWEST REGION

FOREST SERVICE

ROAD 18 MP 17.5

CULVERT

REPLACEMENT

MOUNT HOOD

NATIONAL FOREST

ZIGZAG RANGER DISTRICT

STREAM BYPASS

(PUMP)

FS090523_R102013_L1-002.dwg

W.HISLOP

S.WEISNER

File details come from the government source that posted it.