About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to CUSTER GALLATIN NATIONAL FOREST - O'Dell & Stocker AOP Replacement, newest first.
File Type Posted
ODellCreekAOP_Plans.pdf PDF
12034319Q0207.pdf PDF
StockerBranchAOP_Plans.pdf PDF
ODellCreekAOP_FSSS_FP-14.pdf PDF
StockerBranchAOP_FSSS_FP-14.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment 00001 changes STOCKER BRANCH AOP Line Item 602-01: 171” x 110” x 54’ PIPE ARCH CULVERT from 12 Gauge to 10 Gauge. Quoters must quote the attached amended schedule of items.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

00001

PAGE OF PAGES

5. PROJECT NUMBER (If applicable)

6. ISSUED BY

USDA Forest Service East Side Acquisition Team 3710 Fallon Street Suite C Bozeman, MT 59718

CODE 03H5 7. ADMINISTERED BY (If other than Item 6) CODE 03H5

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

12034319Q0207

9B. DATED (SEE ITEM 11)

07/15/2019

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER

964874

3. EFFECTIVE DATE

07/18/2019

1. CONTRACT ID CODE

07/18/2019

Wes Dudley Contract Specialist

Solicitation 12034319Q0207

O’Dell Creek & Stocker Branch AOP Culvert Replacement Project

Ashland Ranger District, Custer Gallatin National Forest, Rosebud County, MT

B – SUPPLIES OR SERVICES AND PRICES

B-1 O’Dell Creek AOP Culvert

ITEM

NO.

DESCRIPTION

METHO

D OF

MEASU

RE-

MENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151-01

MOBILIZATION

LSQ

Lump

Sum 1 $ $

152-01

CONSTRUCTION SURVEY AND

STAKING

Sum

157-13

SOIL EROSION CONTROL

Sum

201-01

CLEARING AND GRUBBING

Sum

203-04

REMOVAL & DISPOSAL OF EXISTING

CULVERT

Sum

208-01

EXCAVATION

DQ CY 602 $ $

204-03

EMBANKMENT

DQ CY 226 $ $

204-04

DISPOSAL OF EXCESS EXCAVATED

MATERIAL

DQ CY 159 $ $

209-01

STRUCTURE BACKFILL

DQ CY 217 $ $

209-03

BEDDING

DQ CY 20 $ $

251-04

CLASS 4 RIPRAP (Grade Control

Structure)

DQ CY 40 $ $

251-05

CLASS 4 RIPRAP (On embankment at culvert inlet)

DQ CY 15 $ $

705-01

IMPORTED STREAMBED MATERIAL DQ CY 40 $ $

301-01

SURFACE COURSE AGGREGATE DQ CY 40 $ $

602-01

96” x 50’ ROUND CULVERT (12 Gauge) LSQ

Sum

Ashland Ranger District, Custer Gallatin National Forest, Rosebud County, MT

ITEM

NO.

DESCRIPTION

METHO

D OF

MEASU

RE-

MENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

622-01 RENTAL EQUIPMENT AQ HR 4 $ $

623-01 GENERAL LABOR AQ HR 8 $ $

TOTAL QUOTE PRICE (O’Dell Creek AOP) $ _

B-2 Stocker Branch AOP

ITEM

NO.

DESCRIPTION

METHO

D OF

MEASU

RE-

MENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151-01 MOBILIZATION LSQ

Lump

Sum 1 $ $

152-01

CONSTRUCTION SURVEY AND

STAKING

LSQ

Lump

Sum 1 $ $

157-13 SOIL EROSION CONTROL LSQ

Lump

Sum 1 $ $

201-01 CLEARING AND GRUBBING LSQ

Lump

Sum 1 $ $

203-04

REMOVAL & DISPOSAL OF EXISTING

CULVERT

LSQ

Lump

Sum 1 $ $

208-01 EXCAVATION DQ CY 846 $ $

204-03 EMBANKMENT DQ CY 301 $ $

204-04

DISPOSAL OF EXCESS EXCAVATED

MATERIAL

DQ CY 89 $ $

209-01 STRUCTURE BACKFILL DQ CY 456 $ $

209-03 BEDDING DQ CY 32 $ $

Ashland Ranger District, Custer Gallatin National Forest, Rosebud County, MT

ITEM

NO.

DESCRIPTION

METHO

D OF

MEASU

RE-

MENT

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

251-04 CLASS 4 RIPRAP (Grade Control

Structure)

DQ CY 50 $ $

251-05 CLASS 4 RIPRAP (On embankment at culvert inlet)

DQ CY 15 $ $

705-01 IMPORTED STREAMBED MATERIAL DQ CY 80 $ $

301-01 SURFACE COURSE AGGREGATE DQ CY 45 $ $

602-01 171” x 110” x 54’ PIPE ARCH CULVERT

(10 Gauge)

LSQ

Lump

Sum 1 $ $

622-01 RENTAL EQUIPMENT AQ HR 4 $ $

623-01 GENERAL LABOR AQ HR 8 $ $

TOTAL QUOTE PRICE (Stocker Branch AOP) $ _

TOTAL QUOTE PRICE (Both Culverts) $ _

B-3 NOTES:

DQ = Design Quantity. “Design quantity” is a Forest Service method of measurement from the FS-96 Forest

Service Specifications for the Construction of Roads and Bridges. Under the FP-03 project specifications utilized in this contract this term is replaced by the term “Contract Quantity” (FSSS Section 101.04

Definitions). These quantities are based upon the original design data available prior to advertising the project. Contract quantities will be adjusted only when there are errors in the original design of 15% or more

(FSSS Section 109.02 Measurement Terms and Definitions). Work is measured in accordance with Section

109 and FSSS Section 109.

AQ = Actual Quantity. “Actual quantity” is determined from measurement of the completed work measured in accordance with Section 109 and FSSS Section 109.

LSQ = Lump Sum Quantity. “Lump Sum Quantity” denotes one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

The quoter must quote all items. Do NOT use fraction of cents in Unit Price.

Payment for bond premiums, or any costs associated with irrevocable letters of credit, in accordance with Clause

52.232-5, Payments Under Fixed-Price Contracts, shall not be in addition to the contract price. A good place to incorporate bonding costs is under mobilization.

2019-07-18T09:24:39-0600
WESLEY DUDLEY

File details come from the government source that posted it.