12010920Q0081.pdf

PDF 593 KB Posted

Attached to
8 Fathom Road and Bridge Maintenance Federal contract opportunity
Solicitation number
12010920Q0081
Issued by
Department of Agriculture Forest Service R10-Alaska Region

View the file

Other files for this federal contract opportunity

Other files attached to 8 Fathom Road and Bridge Maintenance, newest first.
File Type Posted
12010920Q0081_A002.pdf PDF
12010920Q0081_A001.pdf PDF
Drawings.pdf PDF
Relevant Experience Evaluation Form.pdf PDF
8FATHOM_FSSS.DOCX DOCX document
Construction Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1007117

ALASKA REGIONAL OFFICE

709 WEST 9TH STREET

JUNEAU AK 99802

Denise.Murphy@USDA.GOV

a. NAME

DENISE MURPHY

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

907-743-9531

106/25/2020

12010920Q0081

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Sections B. through J. of the following pages.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

calendar days and complete it within ________________ ________________ calendar days after receiving

Section J.

07/09/2020

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time

_______________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

ALASKA REGIONAL OFFICE

709 WEST 9TH STREET

JUNEAU AK 99802

DENISE MURPHY

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 28

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12010920Q0081

2020 8 Fathom Road and Bridge Maintenance Delivery: 09/15/2021 Delivery Location Code: 0116

USDA FOREST SERVICE

TONGASS NF KETCHIKAN AREA FED BLDG

648 MISSION STREET

KETCHIKAN AK 99901 US

Period of Performance: 08/01/2020 to 09/15/2021

8 Fathom Bridge and Road Maintenance Base Item

Option Item 1

(Option Line Item)

Option Item 2

(Option Line Item)

Option Item 3

(Option Line Item)

Option Item 4

(Option Line Item)

Option Item 5

(Option Line Item)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

8 Fathom Road & Bridge Maintenance

Contract Line Items (CLINs):

Item # Schedule of Supplies/Services Quantity Pay Unit Unit Price Amount 0001 Basie Item – Road 8580

0001AA 151 - Mobilization 1 LS $ $

0001AB 573 – Bridge repair 2 LS $ $

0001AC* 251 – Haul & place class 5 riprap 100 CY $ $

0001AD* 201 - Clearing and grubbing 1 AC $ $

0001AE 834 - Clean ditches 300 LF $ $

0001AF* 204 - Unclassified borrow, placement method 4, finish method A 80 CY $ $

0001AG* 625 - Seeding, dry method 0.5 AC $ $

Total Items 0001: $ 1001 Option Item 1- Road 8580

1001AA 602 - Remove/reinstall, 24” CMP 1 EA $ $

Total Items 1001:

2001 Option Item 2- Road 8580 2001AA 834 - Clean ditches 900 LF $ $

Total Items 2001: $

3001 Option Item 3- Road 8580

3001AA 834 – Cleaning & reconditioning culverts 24” diameter & under 2 EA $ $

Total Items 3001: $

4001 Option Item 4- Road 8580

4001AA* 251 – Haul & place class 3 riprap 30 CY $ $

Total Items 4001: $

5001 Option Item 5- Road 8580

5001AA* 625-Seeding, dry method 0.25 AC $ $

Total Items 5001: $

LS – Lump Sum; CY – Cubic Yard; AC – Acre; LF – Linear Foot; EA - Each

* - Denotes Contract Quantities

Additional Terms:

1) Quoters must submit prices for all Items in the Schedule of Items above.

2) Disclosure of the Magnitude of Construction Projects:

Between $25,000 and $100,000

3) Payment bonds are required if your total price (sum of all Items above) exceeds $35,000 but is less than or equal to

$150,000. The clause at FAR 52.228-13 applies.

4) Bid bonds, payment bonds, and performance bonds are required if your total price (sum of all Items above) exceeds

$150,000. The clauses at FAR 52.228-1, 52.228-2, 52.228-11, 52.228-12, 52.228-14, and 52.228-15 apply.

5) Any applicable costs/bond premiums for payment protections, bid bonds, payment bonds, or performance bonds applicable at those thresholds shall be included in your price for payment under Mobilization.

6) Mobilization does not include on-site construction activities including the movement of personnel, materials, or equipment within the project site.

7) Payment for bond premiums in accordance with (IAW) Federal Acquisition Regulation ((FAR) 48 CFR Chapter 1) Clause

52.232-5 Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.

8) Payment will be made on actual work performed as described in FS-14 109.01 as attached, unless otherwise noted.

9) Payment will be made IAW Section G.2. only for those Items listed on the Schedule of Items above.

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 – Scope of the Contract The Tongass National Forest requires construction work on the Hoonah Ranger District involving road maintenance and bridge repair work on the 8 Fathom road system, FSR 8580 Chichagof Island, SE Alaska. This project will mainly consist of: pulling and replacing a bridge, Grading, culvert reinstallation, culvert inlet cleaning, clearing and grubbing of the LTF/MAF, haul and placement of riprap for armoring of streambanks, finishing and compacting of road prism fills according to the 204 FSSS, providing smooth transitions, implementation of erosion control plans, application of seed and fertilizer to disturbed areas. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to maintain the facilities in accordance with the typical drawings and specifications attached herein.

End haul waste material site locations to be identified and staked by Forest Service. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.

The Contractor shall furnish all labor, materials, equipment, supervision and transportation to perform all work listed on the schedule of supplies/services as ordered.

C.2 – Project Description and Location

1. Description: The project is located on the 8 Fathom Road System, Hoonah Ranger District of the Tongass National Forest.

It is approximately 13.25 miles southwest of Hoonah, Alaska on Chichagof Island.

Base Bid Work:

ROAD# MILEPOST CLIN WORK DESCRIPTION

8580 0.0 4A Clear blowdown and use logs to stabilize bank, remove alders along MAF/LTF area and dispose

8580 0.80 5A Ditch left side 100’ 8580 1.42 5A Ditch left side 200’ to bridge.

8580 1.934 2A/3A/6A Remove bridge superstructure, armor stream banks/sills with riprap, reconstruct bridge abutments, reinstall the bridge superstructure.

8580 3.709 2A/3A/6A Remove bridge superstructure, armor stream banks/sills with riprap, reconstruct bridge abutments, reinstall the bridge superstructure.

In-stream work windows for the bridges are:

MP 1.934 June 25 to Sep 1 MP 3.709 June 1 to Aug 1

Option Item Work:

ROAD# MILEPOST CLIN WORK DESCRIPTION

8580 4.02 1B/2B/4B Repair road washout, remove/reinstall exposed 24” CMP. Armor CMP inlet and ditch 200’ to the bridge

8580 7.2 2B/3B Ditch left 300’, remove beaver dams, clean (2) – 48” cmp inlets and install two French drains.

8580 8.0 2B/4B Repair road washout, ditch right side 400’ between culverts, armor 30’ of ditch at washout area with class 3 riprap.

Potential bidders are encouraged to examine the work sites prior to bidding on this project.

2. Other Site Use: IAW Agriculture Acquisition Regulation (AGAR) Clause 452.236-72 Use of Premises, the Contractor may be allowed to use locations away from the project site for related purposes (e.g., camping, equipment and/or material storage, prefabrication constructs, etc.) upon written approval from the applicable Authorized Official (i.e., District Ranger, Forest Supervisor, or Regional Forester) IAW FAR 52.236-7 Permits and Responsibilities.

3. Government Furnished Equipment, Materials, and/or Information: The Government will provide the following items at the location(s) described. The Contractor is responsible for transportation of these items to the project site, and for safe handling and storage prior to use in construction. Materials not incorporated into the work will remain the property of the Government.

Designated rock sources for this project are shown on sheet 3 of the Drawings:

Road #8580 MP 0.02, 10.93

Submit a development plan to the CO for approval prior to commencing any development activities.

Designated waste material sites will be staked on the ground by FS.

C.3 – Technical Specifications

1) Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)

The Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects, FP-14, are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

ISBN 0-16-051430-4

The FP-14 U.S. Customary version is only available through the Federal Lands Highway Headquarters office:

Headquarters Washington DC David K. Green Construction Standards Engineer Internet: David.Green@fhwa.dot.gov Mail: Federal Highway Administration

HFPD-3

400 Seventh Street, SW Washington D.C. 20590

Or available on line at https://flh.fhwa.dot.gov/resources/specs/

The attached Special Project Specifications and Forest Service Supplemental Specifications (FSSS) to the FP-14 are hereby made part of this Task Order.

BEST MANAGEMENT PRACTICES BMP’S Soil and Water Conservation Handbook FSH 2509.22 are incorporated and required to be implemented in this contract.

The BMP Soil and Water Conservation Handbook, FSH 2509.22 can be found at:

http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf

Special Site Restrictions:

1) No equipment will be permitted to work in the creek.

2) No work will be done below ordinary high water except the installation of riprap.

3) Title 16 concurrence will be obtained for the installation of the riprap.

Design Criteria:

1) Provide additional bank and abutment protection along the banks on upstream side of structure. Alignment of the bridge will be maintained in the current road corridor.

2) Armor rip rap installed at culvert inlet will not encroach on the natural stream channel.

3) The proposed undertaking has been reviewed by a Forest Service archaeologist. Some of the activities proposed occur in areas considered to be of high probability for cultural resources and include a ground disturbance component with the potential to extend into previously non-disturbed areas (by initial road building or maintenance activities). As per Section 106 of the National Historic Preservation Act, prior to any ground disturbing activities, a Forest Service Archaeologist needs to examine these locations and determine if there is any potential for an adverse effect to potential extant historic properties eligible to the National Register. The bridges are of modern origin and any changes to the bridges themselves are not of Heritage concern. The contract may be awarded as long as the contract does not preclude potential mitigation for proposed actions which might adversely effect an historic property.

If any historic properties are found upon the Heritage survey, any potential adverse effects are to be mitigated in the manner described in 36 CFR 800.

4) Consult with botanist prior to earth disturbance for identification of sensitive plant locations and avoidance.

https://flh.fhwa.dot.gov/resources/specs/ http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf

5) Ensure any soil overburden resulting from construction activities is stored away from stream channels and adjacent stream banks.

6) Use natural fiber matting such as coconut as an alternative to straw bales for erosion control to limit introduction of invasive plants.

7) Inspect all sources of construction rock or gravel for the presence of invasive plants, and treat any infestations prior to transportation of these materials to the project area.

8) Revegetate disturbed ground if prompt natural regeneration is not expected. Use local native vegetation when available, or an approved weed-free seed mix. See current Tongass National Forest revegetation guidelines for detailed procedures and appropriate mixes.

9) Minimize the removal of trees and other roadside vegetation to suppress weeds during transportation improvement projects.

Best Management Practices: Bridge Installations:

1. Develop and approve a site-specific erosion control plan including silt fencing or other erosion control options, seeding requirements, fueling locations, and placement of excess excavation materials FSH 2509.22 14.3, 14.5, 14.8, 14.12.

2. Minimize number of equipment stream crossings FSH 2509.22 14.14.

3. Recommend fueling occurring distance greater than 100’ from surface waters FSH 2509.22 12.8.

4. Divert ditch flow before it enters active channel (as feasible) FSH 2509.22 14.3, 14.9

5. Avoid unnecessary removal of large, stable pieces of woody debris FSH 2509.22 14.14.

6. Wash and inspect tools and construction equipment to remove attached soil or plant parts prior to entering the construction site. When mechanical equipment cleaning must occur on NFS lands, reference 2509.22 (R10 BMP Handbook) No. 15.2 to prevent water contamination and risk to humans. (FSM 2509.2, FSH 2109.14, Chapter 40 & National Technical Guide FS- 990a).

7. Inspect all active gravel and borrow sources before use and transport, if appropriate. If weeds are present avoid infested areas. Treat infested areas until weeds are controlled. Avoid establishing new material sources in areas where weeds are present. (FSM 2903(7)) See All Resources BMP 3.3, 3.4.

8. Avoid blading roads or pulling ditches when weeds are in seed set stage. (FSM 2904.08(4)).

9. If new infestations occur at a borrow pit that was previously approved, that pit may not be used as a material source for that project unless the top 8" of contaminated material is removed and stockpiled.

(FSM 2903(7)) See All Resources BMPs 3.1 to 3.5.

10. Acquire necessary state and federal permitting, concurrence, and fish timing windows FSH 2509.22 14.6. All instream work will be conducted within fish timing windows established through Title 16 consultation with ADF&G. Fish timing windows for each project site (BMPs 14.6; 14.14; AqEco 2). Timing restrictions will utilize time periods that ensure the lowest risk to fish species, and often coincide with periods of low water.

11. Equipment use in live streams will be minimized to the extent possible. Most work will occur from the road. Equipment will only access the channel at designated stream crossing sites and to perform detailed site-specific construction.

Equipment will not be stored, maintained or repaired within the stream channel or floodplain. (BMPs 14.14, AqEco 2).

•A Spill containment kit will be kept on site. (BMPs 12.8; AqEco 2). •Work during rainfall events will be avoided to the extent practicable, and work will be conducted during lower water conditions in June and July. (BMPs 14.6; 14.14;

AqEco 2). •All instream work will be conducted within fish timing windows established through Title 16 consultation with ADF&G. Fish timing windows for each project site are summarized in the following table: (BMPs 14.6; 14.14;

AqEco 2). Project Site Timing Window 8580-1.934 June 25- September 1; 8580-3.709 June 1-August 1.

C.4 General Work Requirements

1) Contractor shall provide all equipment, materials and labor necessary to complete the work.

2) Warning signs shall be provided by the Contractor and shall be placed in accordance with Manual of Uniform Traffic Control

Devices (MUTCD), current edition, standards while work is in progress. This shall include “Slow Moving Equipment” signs attached to all road surface equipment.

3) Contractor shall notify the COR three working days prior to the day of beginning work on a road in order to coordinate inspection activities during Forest Service business hours, unless otherwise approved in writing by the Contracting Officer’s Representative.

C.5 – Landscape Preservation (addendum to AGAR 452.236-74)

1) Waste motor oil, fuels, lubricants, bitumen, and/or other similar hydrocarbons shall be collected and returned to either the supplier or a recycling service licensed to collect these fluids/materials. They shall not be wasted, deposited, flushed, or let on the ground or buried.

2) The Contractor shall confine operations to within the clearing limits or other areas designated in the Contract and/or attachments as approved, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Materials which fall outside of these limits shall be retrieved, disposed of, or incorporated into the work as directed by the CO.

3) Prevention of Oil Spills – If the Contractor maintains storage facilities for oil, oil products, or other hydrocarbon substances on or within the project area/site, appropriate preventative measures shall be taken to ensure that any spill of such oil, oil products, or other hydrocarbon substances does not enter any stream or other waters of the United States, or that of any of the individual States.

4) If the total oil, oil products, or other hydrocarbons storage exceeds 1320 gallons, or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and submit to the CO a Spill Prevention Control and Countermeasures (SPCC) Plan.

Such plan shall meet the applicable Environmental Protection Agency requirements (40 CFR 112) including certification by a registered professional engineer.

C.6 – Use of Premises (addendum to AGAR 452.236-72)

1) This area contains black and/or brown bear habitat, and is therefore, subject to frequent or infrequent travel and/or presence by these wild animals. They might be habituated to humans, and/or food-conditioned, which may pose a threat to Contractor personnel; it is the responsibility of the Contractor to ensure any personnel are “bear aware” and able to minimize impacts to these animals by securing attractants out of reach or attainment by the animal(s).

2) Sanitary Facilities: Unless provided otherwise, the Contractor shall provide and maintain the following facilities (if applicable):

a) Potable water supplies for drinking, washing, and cooking that comply with State of Alaska drinking water regulations (18

AAC 80).

b) Wastewater systems for domestic sewage that comply with State of Alaska wastewater disposal regulations (18 AAC 72).

c) Design, operation, and maintenance of all solid waste systems on lands under Forest Service jurisdiction meet all Federal, State, and local requirements. This includes, but is not limited to:

i) Federal regulations 40 CFR 243, 40 CFR 245, 40 CFR 257, 40 CFR 258, and;

ii) State regulations 18 AAC 60.

iii) Removal of all solid wastes and/or residues, with proper disposal at/in approved commercial landfills.

d) Meet the requirements of 40 CFR 112 (Oil Pollution Prevention) for fuel storage, and the requirements of 33 CFR 150 and 33 CFR 154 for facilities involved with transferring oil or hazardous materials in bulk.

3) Do not begin any camp development at the project site/area, either land-based or water-based (floating), until a plan for development, occupation, and cleanup is submitted and approved by the CO. The plan shall include the following information at a minimum:

a) Location and size of the proposed camp development, including a map.

b) Wastewater system.

c) Number site users, and dates of occupancy.

d) Power supply system.

e) Water supply system.

f) Sewage and waste disposal systems plan.

g) Building layout, shop area, and living quarters.

h) Camp road and trail layout.

i) Clearing limits and slash disposal locations.

j) Material borrow areas.

k) Dock and access location (if water-based).

l) Equipment and fuel storage area, and SPCC plan.

m) Incinerator location and ash disposal plan.

n) Solid waste control plan (to prevent food/attractant conditioning of wild animals).

o) Helicopter operations plan.

p) Site restoration plan.

q) Fire prevention and control plan.

4) Do not leave temporary bridges in place between September 15 and March 15, unless approved in writing in advance by the

CO.

5) The CO will review the plan as submitted for completeness and applicability. Any necessary modifications to the Contractor’s plans will be discussed with the Contractor prior to approval. Any modifications agreed upon will be incorporated into a revised set of plans.

6) There are no known eagle nest trees in the vicinity of the project area, but if such trees are discovered, no disturbance will be allowed within 330 feet of the trees, and additional mitigation measures may be applied.

C.7 – Construction Stakes, Lines, and Grades

1) The Government will designate the beginning stations for work areas listed in Section J. The Government will mark the clearing limits around rock borrow sources on National Forest Land, and will also provide initial centerline and reference controls to establish road alignment and timber structures. Additional staking required by, and installed by, the Contractor will be incidental to other work so the Contractor will provide any other construction survey work required to complete the project.

2) Areas of weak ground may be crossed on this project. The initial embankment depth shall be as shown on the drawings, or as determined by the CO. The Contractor must re-establish the centerline grade and alignment IAW Section 152 of the FP-14 as construction progresses, and prior to placement of borrow excavation. Re-established design grades may be re-staked by the CO to meet local conditions. Final grades may be at elevations other than those shown on the drawings, but in no instance will they be lower than that of the surrounding ground elevations. When directed by the CO, the Contractor must return to previously constructed road or trail embankments and place additional borrow material where subsidence has occurred as a result of construction traffic displacement of unstable and/or weak soil underlying the roadway.

C.8 – Disposal of Waste Material The Contractor shall remove all waste material from the project areas, and dispose offsite unless otherwise specified in the contract.

C.9 – Emergency Control (addendum to AGAR 452.236-77)

1) Immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project areas which are caused by the Contractor’s employees, equipment, or through prosecution of the work, whether set directly or indirectly as a result of construction operations, with or without direction by the Forest Service. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government resulting from fires set or caused by Contractor’s employees or resulting from construction operations.

2) Contractor’s Responsibility for Controlling Other Emergencies – When requested by the CO, allow the Forest Service to temporarily use employees and equipment for emergency control work. Payment will be made at not less than the current area rate established or adopted by the Forest Service through partnership with the National Wildfire Coordinating Group (NWCG).

3) Firefighting equipment will be required during the fire season from May 10 through August 31, and during any other period of heightened fire danger designated by the CO.

4) The Contractor shall furnish rust-free fire tools to equip all workers employed in the Contractor’s operations at each separate work site. These tools shall be maintained in serviceable condition, and kept in one or more weather-tight fire tools boxes.

These boxes shall be painted red, marked “Tools for Fire Only” with letters at least 3” high, and kept sealed. Post a list of the contents inside each fire tool box so as to be visible when opened. Minimum required quantities and types of tools are described here:

Kind of Tool No. of People Working in Area 1-4 5-9 10-15 16-20 Axe, d.b. chopping, 32” min. handle 1 1 2 3 Shovels, L.H. R.P., No. 0 or larger 1 3 6 7 Pulaski, 32” min. handle 2 3 7 10 File, 10” mill bastard 1 1 1 2 Pumps, backpack cans, 5-gal filled with water 1 2 2 3

5) Equip each internal combustion engine with a spark arrester qualified and rated USDA-Forest Service Standard 5100-1, unless it is:

a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger; there shall be no exhaust bypass;

b) A multi-position engine, such as on a chainsaw, which is equipped with a screen arrester, as described in the Forest Service

Spark Arrester Guide;

c) A spark arrester, which does not meet the requirements in the guide may be approved upon submission of acceptable proof that the arrester is at least 80% efficient in retention, attrition, or destruction of carbon particles. Such arrester may be required to meet higher standards as improvements in design and efficiency are discovered;

d) A passenger-carrying vehicle or light truck intended primarily for use on roads, and equipped with a factory-designed muffler and exhaust system, or;

e) A heavy-duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory-designed muffler and with a vertical stack exhaust system extending above the cab.

Properly install and constantly maintain in serviceable condition all exhaust equipment described above, including spark arresters and mufflers.

6) Equip each unit of mobile or stationary power equipment, including trucks, with one shovel, and at least one fire extinguisher meeting one of the following specifications:

a) 2 ½ pound size or larger dry chemical type;

b) 4 pound size or larger carbon dioxide type.

Test or check each extinguisher for proper function prior to the beginning of fire precautionary periods, and provide each gasoline power saw with one chemical-pressurized fire extinguisher of not less than 8oz. capacity by weight. Maintain the extinguisher in good working order at all times.

7) Do not burn camp refuse, brush, slash, or debris such as that resulting from clearing around camps or on rights-of-way, without the written approval of the CO. Submit written requests for burning to the CO at least 48 hours in advance of intended burning.

The CO will approve of routine camp refuse disposal incineration in the camp development plan described in H.4 above.

C.10 – Contractor’s Use and Maintenance of Existing Roads The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract.

Such roads are those which are necessary for direct access to designated material borrow sites, quarries, stockpile sites, waste areas, campsites, equipment loading/unloading ramps and/or other approved work areas. The roads authorized for use will be subject to the following general conditions:

1) Federal Regulations contained in 36 CFR 261.12; except vehicle weight will not exceed that of the American Association of

State Highway and Transportation Officials (AASHTO) HS20-44 and/or U80 Loading. Submit written requests to the CO for approval to use L90 and/or U102 overload Loadings on roads authorized for use. Regulations prohibit damaging a road or blocking a road open to use by others, except as otherwise provided in the Specifications deemed a part of this contract.

2) The Government will not snowplow roads for the Contractor’s use. The Contractor may snowplow any road designated for their use. A permit defining snowplowing requirements is required, and will be issued by the District Ranger, upon request by the Contractor. Repair any damage to the road prism or structures caused by snowplowing and/or snow removal operations.

Vehicles, other than conventional over-the-snow vehicles (i.e. snowmobiles/snowmachines), will not be permitted to use roads when there is an average of more than 4” of snow, unless the road has been snowplowed.

3) The Contractor is responsible for, and will perform road maintenance on, Forest Service roads in the construction area commensurate with their use. Perform road maintenance at such intervals that prevent deterioration of the roadway, or as directed by the CO. Such road maintenance requirements for existing roads shall be performed IAW the following:

a) Maintain existing roadbed by blading and shaping the traveled way and shoulders. Do not undercut banks. Maintain established drainage structures and/or berms, and place additional drainage structures/berms where necessary to protect embankments.

b) Perform all seasonal weather cleanup, including removal of bank sloughs, minor slides, and fallen timber, all of which can be accomplished by a motor patrol grader equipped with a front end blade, or comparable equipment, and by the use of hand tools. Replace eroded materials from fill slopes, and clean out drainage ditches and culverts subject to the above equipment limitations.

c) Deposit the material removed from slides or other sources in locations approved by the CO.

C.11 – Disposal of Merchantable Timber

1) All dead and down timber encountered during prosecution of this work that meets the Forest Service merchantability standards, and is logged during prosecution of this contract, remains the property of the Government. If logged, the Contractor must deck logs in the immediate vicinity IAW Section 201 of the FP-14.

2) Buck trees in various lengths to obtain the greatest utilization of material meeting the following utilization standards. The

Minimum merchantable piece must be 6” in diameter inside brk at the small end, 12’ in length, and have either a net scale of 33 1/3% of its gross scale for a sawlog or produce not less than 50% of its gross volume in firm usable pulp chips.

3) Trim allowance must be a maximum of 12” for log lengths up to 40’. An additional 2” of trim will be allowed for each 10’ section of log length over 40’.

4) The Contractor must use the Humboldt undercut felling technique when felling merchantable timber. Buck all limbs flush with merchantable logs.

5) All dead trees which are sufficiently tall enough to reach the roadbed are designated for cutting. Fell other fire-dangerous dead trees or unstable trees within a 200’ slope distance of the center line of the road, when marked by the Forest Service. Treat all timber described in this subsection by meeting utilization standards IAW Specification 201 of the FP-14, unless relieved by the CO in writing.

6) Cut and use timber designated by the CO for construction, without charge.

C.12 – Water Crossings The Contractor must schedule and conduct bridge and instream work to avoid and/or minimize disturbance to streams. Specifically:

1) Do not cross streams or other waterways without CO approval.

2) Submit a written crossing plan to the CO for approval at least 14 calendar days before the creek crossing is planned. Two machine crossings will be permitted during the timing window for all waterways designated on the work list(s) as fish streams.

Outside of this time period, no machine crossings will be permitted. Crossing streams with Off Highway Vehicles (OHVs) for access to work sites is permitted without restrictions.

3) Limit machine crossings to two times for all live streams not designated on the work list(s) as fish streams with pipes 48” and larger diameter installed.

C.13 – Contractor Responsibility to Notify the Government The Contractor must notify the COR when leaving the project area for 3 or more days, and within 24 hours before returning to the project area.

C.14 – Product Substitution Requests

1) When submitted within 30 days after contract award, the CO will consider formal requests for substitution of products, equipment, and/or methods, in place of those specified. Requests submitted after 30 days of award will be considered only in case of product unavailability, or other conditions beyond the control of the Contractor. Requests must provide the information required by, and in the format specified by, 2) below.

2) Submit separate requests for each substitution. Support each request with the following:

a) Complete data substantiating compliance of proposed substitution item(s) with the requirements stated in contract documents:

i) Product identification, including manufacturer’s name and address;

ii) Manufacturer’s literature, identifying:

(1) Product description;

(2) Reference standards, and;

(3) Performance and test data.

iii) Samples, as applicable (see AGAR 452.236-76);

iv) Name and address of similar projects on which the substitution product has been used, and date of the installation;

v) Comparative data of item(s) to be deleted through substitution. Include drawings to the same (or larger) scale as pertinent portion of contract documents and marked to show how differences will be accommodated;

vi) Show the complete system/assembly as revised to accommodate the proposed alternative for difference in performance, size, configuration, connection(s) service, accessibility, or any other signification characteristics;

vii) Show the complete layout of the system except that which is identical to contract documents, unless unchanged portion must be shown to indicate clearances, etc.;

viii) Include complete detail drawings of supports for all substitute equipment, and complete load calculations for adequacy of support prepared and signed by a registered structural engineer.

(1) Itemized comparison of the proposed substitution with product specified; list significant variations.

(2) Data relating to changes in construction schedule.

(3) Any effect of substitution on separate contracts.

(4) List of changes required in other work or products.

(5) Accurate cost data comparing proposed substitution with product specified.

(6) Proposed amount of change to the contract value.

(7) Designation of required license fees or royalties.

(8) Designation of availability of maintenance services, and/or sources of replacement materials.

3) Substitutions will not be considered for acceptance when:

a) They are merely indicated or implied on shop drawings, or product data submittals without a formal request received from the Contractor;

b) They are requested directly by a subcontractor or supplier;

c) Acceptance will require substantial revision of contract documents, or;

d) Substitution has not been requested IAW this and related contract clauses.

4) Substitute products must not be ordered or installed without written acceptance by the CO.

5) The CO will determine acceptability of proposed substitutions in consultation with other Government employees with knowledge of the project and/or product(s).

6) Number of Substitution Submittals: only one proposed alternative will be considered for each substituted item. The Contractor must provide the originally-specified item(s) if the substitution proposal is rejected.

C.15 – Contractor Substitution Request Representation and Responsibilities

1) In making a formal request for substitution of item(s), the Contractor represents that they:

a) Have investigated the product proposed to substitute the originally-specified item, and have determined that it is either equal to, or superior to, the original item in all respects to that originally-specified item;

b) Will provide the same or better warranties and bond(s) for the substitute as for the originally-specified item;

c) Will coordinate the installation of any accepted substitution into the work, and will make such changes as may be required for the work to be completed in all respects;

d) Will waive any and all claims for additional costs caused by substitution, which may not be readily apparent, and may become apparent only subsequently, and;

e) Cost data is complete and includes related costs under the contract, other than:

i) Costs under separate contracts, and;

ii) CO costs for redesign or revision of contract documents.

2) The Contractor assumes full responsibility that the substitution and/or alternate item(s) or procedure(s) will meet the job requirement(s).

3) The Contractor is solely responsible for the cost of redesign and modification(s) to this and other parts of the work caused by the substitution(s) or alternate item(s) furnished.

SECTION D – PACKAGING AND MARKING

D.1. – AGAR Clause(s) 452.37-71 Marking Deliverables (Feb 1988)

(a) The contract number shall be placed on or adjacent to all exterior mailing or shipping labels of deliverable items called for by the contract.

(b) Mark deliverables, except reports, for: 8 Fathom.

D.2 – Project Labeling for Official Correspondence The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent and/or identify and awarded contract or project. The Government-issued contract number must be referenced on all official communication, including but not limited to emails, starting upon written notice of contract award.

SECTION E – INSPECTION AND ACCEPTANCE

E.1 – FAR Clause(s) 52.246-12 Inspection of Construction (Aug 1996) 52.246-13 Inspection – Dismantling, Demolition, or Removal of Improvements (Aug 1996)

E.2 – AGAR Clause(s) 452.246-70 Inspection and Acceptance (Feb 1988)

(a) The Contracting Officer or the Contracting Officer’s duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at: Onsite at 8 Fathom.

E.3 – Contractor’s Quality Control Plan

1) The Contractor shall provide a quality control plan, which is mutually agreed upon with the Contracting Officer. This plan shall describe the Contractor’s method for ensuring all work meets the contract requirements. At minimum, the Quality Control Plan shall outline how the quality of work will be monitored, how the work crew will be supervised, and who will perform the quality control function. The Contractor shall provide the Contracting Officer with documentation of quality control inspections upon request.

2) The Contractor shall, within 5 days from receipt of a request from the Contracting Officer, submit a progress schedule to complete all work ordered within the time required by the Period of Performance. If the Contractor falls behind schedule, the Contractor shall take such action as necessary to recover. The Contracting Officer may require the Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time stated in the Period of Performance.

SECTION F – DELIVERIES OR PERFORMANCE

F.1 – FAR Clause(s) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) Fill In: (a)-…according to the terms of the Notice to Proceed…; (c)-…not later than 09/15/2021.

52.211-18 Variation in Estimated Quantity (Apr 1984) 52.242-14 Suspension of Work (Apr 1984) 52.242-17 Government Delay of Work (Apr 1984)

F.2 – AGAR Clause(s) 452.211-74 Period of Performance (Feb 1988) The period of performance of this contract is from 8/01/2021 through 09/15/2021.

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 – AGAR Clause(s) 452.215-73 Post Award Conference (Nov 1996) A post award or pre-work conference with the successful offeror is required. It will be scheduled within 45 days after the date of contract award. The conference will be held at: teleconference number to be determined.

G.2 – Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)

1) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform

(IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://ipp.gov. The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131.

2) Final Payment. The final invoice must be accompanied by a release of claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically accepted from the operation of the release.

Final payment will not be approved without a properly executed Contract Release, Form FS-6300-16.

3) In addition, when submitting the invoice, the Contractor shall submit payrolls, subcontractor payment information, and a spreadsheet detailing the payment breakdown IAW the CLINs in the Schedule of Items, Section B (either electronically in IPP, hard copy, or via fax) to the Contracting Officer (see FAR 52.232-5 Payments under Fixed Price Construction Contracts).

G.3 – Invoicing for Mobilization https://ipp.gov/ mailto:IPPCustomerSupport@fms.treas.gov

Mobilization includes movement of all personnel, equipment, and materials to the project site (under location of work as stated within the Statement of Work/Specifications below) that are necessary to complete the work. Invoices for mobilization will be paid at the contract price as stated in the Schedule of Supplies/Services.

When 5 percent of the original contract amount for other Items is earned through acceptance, then 50 percent of the Mobilization amount, or 5 percent of the original contract amount for other Items, whichever is less, will be paid.

When 10 percent of the original contract amount for other Items is earned through acceptance, then 100 percent of the Mobilization amount, or 10 percent of the original contract amount for other Items, whichever is less, will be paid.

Any remaining portion of the Mobilization amount will be paid after final acceptance and invoicing.

G.4 – Invoice Progress Payment Certification IAW FAR 52.232-5 Payments Under Fixed Price Construction Contracts, along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made (however, if the Contractor elects to delete paragraph (4) from the certification, the certification is still acceptable):

I hereby certify, to the best of my knowledge and belief, that –

(1) The amounts requested are only for performance IAW the specifications, terms, and conditions of the contract;

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, IAW subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier IAW the term and conditions of the subcontract, and;

(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.

Name and Signature Title Date

G.5 – Contract Administration Personnel

1) This contract will be administered by the Administrative Contracting Officer (ACO) located at:

Alaska Region, Acquisition Management Attn: Jon Gellings PO Box 21628 Juneau, AK 99802

2) All matters related to the performance of this contract shall be coordinated through the Contracting Officer (CO).

G.6 – Designation of Contracting Officer’s Representative (COR)

1) The CO designates the COR. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms and conditions of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the CO prior to completion of the contract.

2) The CO should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided that they do not affect the delivery schedule or performance period stated in the contract).

3) On all matters that pertain to the contract terms and conditions, the contractor must communicate with the CO. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR.

If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time and circumstance permit. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim IAW FAR 52.233-1 Disputes.

G.7 – Contractor’s Designated Representative It is required that the Contractor have a designated representative available on the project during the entire project and that the representative will be able to understand, read, and speak the English language. When designating a representative, the Contractor shall furnish a copy of the designation in writing to the CO. Such a designation shall clearly indicate the name and limitation(s) (if any) of authority of the representative. If the Contractor intends to designate a representative prior to the pre-work meeting called for in AGAR 452.215-73, the representative is strongly encouraged to attend that meeting.

G.8 – Worker’s Compensation Laws Alaska state law requires that most employers have Worker’s Compensation Insurance for their employees. The Forest Service furnishes contract award information to the Alaska Department of Labor. Failure to comply with the state worker’s compensation laws can be a felony offense in Alaska. For the definitions of “employer,” “employee,” and subcontractor,” rates of compensation, and other pertinent information, contact:

Alaska Department of Labor Workers Compensation Division

Special Investigations Unit PO Box 115512

Juneau, AK 99802-5521

(907) 465-5875

1-888-372-8330 (toll free), (907) 465-2797 (FAX)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 – FAR Clause(s) <Reserved>

H.2 – AGAR Clause(s) <Reserved>

PART II – CONTRACT CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 – FAR Clause(s) 52.252-2 Clauses Incorporated by Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as it they were given in full text. Upon request, the Contracting Officer will make their full text available.