RD_2050070_-_MP_0.15_Plans_Final.pdf
PDF 6 MB Posted
- Attached to
- AOP_construction_2050070_MP_0. 15 Federal contract opportunity
- Solicitation number
- 12010919Q0096
About this file
RD 2050070 - MP 0.15 Plans Final
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD_AK20190006_01042019.pdf | ||
| 12010919Q0096_AOP_construction_2050070_MP_0.15-v2.pdf | ||
| 2050070_0.15_FSSS_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, REGION 10
TONGASS NATIONAL FOREST
THORNE BAY RANGER DISTRICT
CONSTRUCTION PLANS FOR:
AOP CULVERT REPLACEMENT
NFSR 2050070 MP 0.15
LOCATION MAP
VICINITY MAP
FOREST ENGINEER
APPROVED BY:
DATE
TONGASS NATIONAL FOREST
DISTRICT RANGER
DATE
THORNE BAY DISTRICT
RECOMMENDED BY:
PREPARED BY:
INDEX TO SHEETS
NO. DESCRIPTION
1 TITLE SHEET
GENERAL NOTES & SCHEDULE OF
QUANTITIES
TYPICAL ROADWAY SECTION & POINT
TABLES
4 ROAD PLAN & PROFILE
5 CULVERT GENERAL LAYOUT
6 STRUCTURE EXCAVATION & BACKFILL
7 FOOTING DETAILS
8 PRECAST DETAILS
9 ROCK WEIR DETAILS
10 STREAM SIMULATION DETAILS
11 DEWATERING REQUIREMENTS
XS1 ROAD CROSS SECTIONS
PROJECT
LOCATION
JUNEAU
Craig
KEY MAP
140°142°
58°
138° 136°
Sitka
132°134°136°138°140°142°
60°
Yakutat
C A N
A D
A
A
LA
S K A
62°
Skagway
56°
54°
132°134°
Ketchikan
Wrangell
Petersburg
128°130°
60°
58°
HOONAH
VICINITY MAP
PROJECT
LOCATION
MATERIAL
SOURCE
THORNE BAY
K
LA
W O
C K
MATERIAL SOURCES
GOVERNMENT FURNISHED
CHANNEL ROCK
RIPRAP
UNCLASSIFIED BORROW
WASTE SITE
CONTRACTOR FURNISHED
STREAMBED SIMULATION ROCK
ALL OTHER MATERIALS ARE
CONTRACTOR FURNISHED
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
GENERAL NOTES &
ESTIMATED
QUANTITIES
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
GENERAL NOTES
DESIGN: This structure is designed for HL-93 live loading in accordance with AASHTO LRFD Bridge Design Specifications, 7th Edition.
HYDROLOGY AND HYDRAULICS: This structure has been designed to pass a Q100 flood event with a headwater depth to culvert rise ratio less than
0.8. Flow data is provided on Sheet 5.
SPECIFICATIONS: Construct the project in compliance with Federal Highway Administration Standard Specifications for Construction of Road and Bridges on Federal Highway Projects (FP-14) and applicable Forest Service Supplemental Specifications.
ROAD WORK: Depths of all materials are given as final compacted depths. Remove all berms, existing or created, unless designated to remain, to allow drainage of water from the traveled way.
DEWATERING & EROSION CONTROL PLAN: Submit a dewatering and soil erosion and sediment control plan to the contracting officer for approval at least fifteen (15) days prior to beginning work. See Section 157 of the Supplemental Specifications, the notes on Sheet 6, and the general requirements shown on Sheet 11. Construct temporary means to divert the flow of the live stream as necessary to perform work. Do not pump water from excavations directly into the live stream.
DISPOSAL: All materials designated for removal become the property of the contractor and are to be disposed of by removing from the forest in an environmentally safe manner in accordance with all local, state and federal requirements. Dispose of excess or unsuitable material at the location designated in FSSS Section 105. Hauling of excess or unsuitable material is incidental to associated work.
TEMPORARY TRAFFIC CONTROL: Submit a temporary traffic control plan to the Contracting Officer for approval at least 30 days prior to intended use.
IN-STREAM WORK: All in-stream work will be done between June 15th and September 1st. Allowance shall be given to the Forest Service to capture and remove fish and other aquatic organisms from within the construction work area prior to and during work activities.
EQUIPMENT STORAGE: Storage of all equipment on government lands will be at a location approved by the CO.
SEEDING: Seed and mulch all disturbed soil that is not within travel way or stream channel. Use Tongass Seed Mix. See FSSS Section 625
CONCRETE: Use Class A(AE) Concrete for Precast members. The required 28-day compressive strength (F'c) is 3,000 psi with an entrained air content of 5% ± 1%. Finish all precast elements with an ordinary surface finish.
Make all concrete in accordance with an approved mix design. Chamfer all exposed edges of concrete 3/4" and fillet all acute angles 3" unless otherwise noted.
REINFORCING STEEL: Use reinforcing steel of the deformed type conforming to AASHTO M31 (ASTM A615) Grade 60. Concrete cover is as shown; where not shown it must conform to AASHTO. Cut and bend reinforcing steel in conformance with ACI 315. Lap splice bars 2' min.
HARDWARE AND STRUCTURAL STEEL: Use shapes, plates and bars meeting the requirements of ASTM A36, unless otherwise specified in these plans.
Use hardware meeting the requirements of ASTM A325, except as noted in the drawings.
WELDING: Weld in accordance with the Structural Welding Code, AWS D1.1.
ITEM
NO. ITEM DESCRIPTION UNIT QUANTITY REMARKS
15101 MOBILIZATION LUMP SUM ALL
TRAFFIC CONTROL, FIRE PROTECTION, EQUIPMENT
CLEANING, AND ANY MAINTENANCE OF EXISTING NFS
ROADS FOR CONTRACTOR ACCESS IS INDIRECT TO THIS
PAY ITEM
15221 CONSTRUCTION SURVEY AND STAKING LUMP SUM ALL
15713 SOIL EROSION & POLLUTION CONTROL LUMP SUM ALL INCLUDES DEWATERING. SEE GENERAL NOTES
20301
REMOVAL OF EXISTING CORRUGATED STEEL PIPE,
METHOD A
EACH 1
20411
UNCLASSIFIED BORROW EXCAVATION, PLACEMENT
METHOD 2
CUBIC YARD 270 CQ
GOVERNMENT SOURCE. ASSUMES 20% OF EXCAVATED
MATERIAL IS UNSUITABLE. QUANTITY IS IN-PLACE
AND NOT ADJUSTED FOR SHRINK/SWELL.
25101 PLACED RIPRAP, CLASS 2 CUBIC YARD 24 CQ GOVERNMENT SOURCE.
55217 PRECAST CONCRETE MEMBER, CULVERT FOOTING LINEAR
FOOT
60303 11'-0" SPAN x 3'-6" RISE CORRUGATED
ALUMINIZED-STEEL STRUCTURAL PLATE ARCH, 0.111"
THICKNESS
LINEAR
FOOT
CORRUGATED ARCH MATERIAL SHALL BE ALUMINIZED
STEEL. GALVANIZED STEEL WILL NOT BE ALLOWED.
MANUFACTURER TO CERTIFY CULVERT MEETS HL-93
LOADING WITH THE MINIMUM COVER SHOWN ON THESE
PLANS.
62504 SEEDING, DRY METHOD LUMP SUM ALL
USE TONGASS SEED MIX. SEE FSSS SECTION 625.
APPROXIMATELY ~2400 SQ FT
64802
PLACED STREAMBED SIMULATION MATERIAL
BED CLASS 0.15, METHOD A CUBIC YARD 18 CQ
COMMERCIAL SOURCE. SEE SHEET 10 FOR GRADATION
REQUIREMENTS. MATERIAL FROM THE EXCAVATION
MEETING THE GRADATION FOR BED CLASS 0.15 MAY BE
SALVAGED AND INCORPORATED INTO THE SIMULATED
STREAMBED.
64804
PLACED STREAMBED CHANNEL ROCK FOR CULVERT
BANKS, CLASS CR-1, METHOD A CUBIC YARD 29 CQ
GOVERNMENT SOURCE. SOME SORTING WILL BE
REQUIRED. ROCK SALVAGED FROM THE EXCAVATION
MEETING THE GRADATION FOR CLASS CR-1 MAY BE
SALVAGED AND INCORPORATED INTO THE SIMULATED
STREAMBED.
64806
PLACED STREAMBED CHANNEL ROCK FOR ROCK
WEIRS, RIBS, & ISOLATED BOULDERS, CLASS CR-1,
METHOD A
CUBIC YARD 20 CQ
GOVERNMENT SOURCE. SOME SORTING WILL BE
REQUIRED. ROCK SALVAGED FROM THE EXCAVATION
MEETING THE GRADATION FOR CLASS CR-1 MAY BE
SALVAGED AND INCORPORATED INTO THE SIMULATED
STREAMBED.
SCHEDULE OF QUANTITIES
CQ= CONTRACT QUANTITY (SEE SECTION 109.02(B) OF THE STANDARD SPECIFICATIONS);
OPTIONAL ITEMS
20501 ROCK EXCAVATION CUBIC YARD 10
SUBSURFACE CONDITIONS HAVE NOT BEEN ASSESSED.
BEDROCK MAY BE ENCOUNTERED AND ROCK
EXCAVATION MAY BE REQUIRED
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CONTROL POINT TABLE
POINT #
CP-1
CP-2
CP-3
NORTHING
1416846.24
1416705.18
1416558.16
EASTING
2821844.24
2821658.05
2821505.71
ELEVATION
405.73
392.71
390.58
DESCRIPTION
SET-RPC
SET-RPC
SET-RPC
CP-1
CP-2
CP-3
S °0
'0
"W
.7
S °5
'0
"W
.6
CENTERLINE POINTS
POINT #
NORTHING
1416894.4062
1416825.8705
1416817.1333
1416800.1600
1416774.7604
1416754.4597
1416736.6609
1416717.6112
1416698.5614
1416673.1618
EASTING
2821865.1557
2821815.8680
2821805.8830
2821785.2336
2821754.3328
2821729.6354
2821707.9816
2821684.8060
2821661.6305
2821630.7297
ELEVATION
401.81
400.47
398.19
395.80
394.76
394.34
393.91
393.49
392.92
DESCRIPTION
STA 10+95.03 CL ROAD - PC CURVE
STA 11+80 CL ROAD - BEGIN CONSTRUCTION
STA 11+93.27 CL ROAD - PT CURVE
STA 12+20 CL ROAD
STA 12+60 CL ROAD
STA 12+91.97 CL ROAD - CL CULVERT
STA 13+20 CL ROAD
STA 13+50 CL ROAD
STA 13+80 CL ROAD
STA 14+20 CL ROAD - END CONSTRUCTION
LAYOUT POINTS
POINT #
NORTHING
1416742.2745
1416734.1144
1416775.4390
1416767.2789
EASTING
2821748.9790
2821740.0673
2821718.6114
2821709.6997
ELEVATION
385.96
385.96
384.24
384.24
DESCRIPTION
BOTTOM OF FOOTING
BOTTOM OF FOOTING
BOTTOM OF FOOTING
BOTTOM OF FOOTING
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
TYPICAL ROADWAY
SECTION & POINT
TABLES
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
TYPICAL ROAD SECTION
NOT TO SCALE
Centerline Road
8'-0" 8'-0"
16'-0"
1.5 1
1.5
Clearing Limits
Clear to: Toe of Fill, Cut Daylight, or 5' min. shown.
5'-0" min.
Native surface
5'-0" min.
2%
Profile grade
ROAD CENTERLINE POINTS
SURVEY CONTROL POINTS
SET-RPC = Red Plastic Cap Control Point set by DJ&A.
See PROJECT CONTROL MAP for location of CONTROL POINTS.
CULVERT LAYOUT POINTS
See Sheet 5 for location of CULVERT INVERT POINTS
FLOW
PROJECT CONTROL MAP
Scale: 1" = 75'
2%
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
11+00 12+00 13+00 14+00 15+00
-10.57%
-1.42%
S T A
.0
E L
.8
S T A
.0
E L
.9
120.00' VC
B V C S
.0
B V C E
.8
E V C S
.0
E V C E
.6
PVI STA:12+40.00
PVI ELEV:395.47
K: 13.12
CP-1
CP-2
390390
11+00
12+00 13+00 14+00 15+00
PC: 10+95.03
PT
.2
CURVE DATA:
R=215.00 L=98.24' Δ=26°10'50"
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
ROAD PLAN &
PROFILE
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
PLAN
PROFILE
LEGEND
Existing Edge of Shoulder
Existing Culvert
Existing Edge of Water Major Contour (5') Minor Contour (1')
EXISTING FEATURES
Existing Edge of Road
> > Existing Ditch
Existing Ground at Centerline Road
Centerline Road Finished Grade
Remove & dispose existing culvert
New culvert
New Edge of Road
New Pipe Arch Culvert
Remove & Dispose Existing Corrugated Steel Pipe
STA 11+80
BEGIN ROAD WORK
MATCH EXISTING
Centerline Road
' 8
STA 14+20
END ROAD WORK
MATCH EXISTINGNew Toe of Fill, typ.
FL
OW
20'
ROAD CONSTRUCTION NOTES:
1. All road work, including hauling and disposing of excess and unsuitable material, is incidental to Item 20411.
2. Embankment quantities shown are in-place quantities and not adjusted for shrink/swell. Quantity shown assumes 20% of excavated material will not be suitable for reuse.
3. Haul & dispose unsuitable material to the waste site designated in FSSS Section 105.
270 CY Unclassified Borrow
Construct Rock Weir, typ. See sheet 9
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
Culvert
3+60 3+80 4+00 4+20 4+40
EL 385.96
Bottom of Footing EL 384.25
Bottom of Footing
EL 389.0
Channel Bottom
FG EL 394.76
at Centerline Road
EL 387.3
Channel Bottom
-3.8%
4+00
Layout Pt.
Layout Pt.
Layout Pt.
Layout Pt.
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
CULVERT GENERAL
LAYOUT
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
Channel Bottom EL
10'1
2' min.
cover
SECTION THRU CENTERLINE CULVERT
Scale: 1" = 20'
Centerline Road Remove existing culvert
New Edge of Road
Stream Thalweg
PLAN
Toe of Fill, typ.
3+60
4+40
Existing ground
11'-0" Span x 3'-6" Rise Aluminized-Steel Structural Plate Arch
45'-0" Precast Footing
44'-0" Culvert
HYDRAULIC DATA:
Drainage Area= 0.25 Sq. Mi.
Q2= 33.3 CFS
Bankfull Width= 7'
Depth= 0.9'
Q100= 99.9 CFS
Depth= 3.31' HW/D= 0.77Bevel pipe on upstream end of culvert. See DETAIL on this sheet.
4+203+80
FLOW
Construct Rock Weir, typ. See sheet 9
Centerline Culvert (STA 3+96.54) @ Centerline Road (STA 12+91.97)
See sheet 3 for Footing Layout Points Table.
Furnish and place 12 CY Class 2 Riprap.
Typical of both ends. See DETAIL on this sheet ty p
11'-0" Span x 3'-6" Rise Aluminized-Steel Structural Plate Arch
Class 2 Riprap
2'
Fill slope
New culvert
Top of bank
RIPRAP DETAIL
NOT TO SCALE
2'
Top of bank in culvert/top of concrete footing
Concrete Footing
STEP BEVEL END DETAIL
BEVEL INLET END ONLY
Concrete Culvert Footing
1'
R is e
1'
1.5
Fill Slope
7'-0" Bankfull Width
11'-0" Span
R is e
Precast Concrete Footing. See Sheet 7
TYPICAL SECTION
Not to Scale
Layout PT Layout PT
See Sheet 9 & 10 for channel and bank dimensions and construction details
Q100= 392.31'
*Q2= 389.91'
Elevations at inlet of culvert
11'-0" Span x 3'-6" Rise Aluminized-Steel Structural Plate Arch
86°56'
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONTOUR INTERVAL = 1'
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
STRUCTURAL
EXCAVATION &
BACKFILL
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
PLAN
STRUCTURE EXCAVATION NOTES:
1. Complete structure excavation in accordance with FP-14 Section 209.
2. The contractor is solely responsible for excavation support and compliance with all applicable OSHA regulations.
3. Notify the CO immediately if bedrock or soft, unsuitable soils are encountered.
FLOW
Existing corrugated steel pipe
Approximate culvert excavation limits 1
6 New Concrete FootingsEdge of Existing Road
2' min.
Existing culvert
STRUCTURAL EXCAVATION & BACKFILL SECTION
NOT TO SCALE
Existing ground
Finished ground Backfill (704.03a) See "STRUCTURE BACKFILL NOTES" on this sheet.
Culvert Backfill limit
DEWATERING AND SOIL EROSION CONTROL NOTES:
1. Protect against soil erosion and sedimentation during construction in accordance with
FP-14 Section 157, the project permits, Forest Service Handbook (FSH) 2509.22, Region 10 BMPs for Erosion Control, and the Guidance for the Invasive Plant Managment Program (Krosse 2017). Prepare and submit a soil erosion and sediment control plan to the CO for approval.
2. Dewater the excavation in accordance with FP-14 Sections 208 and 157 and the requirements on sheet 11.
3. Contractor should anticipate water infiltrating the excavations.
4. Culvert excavation, riprap and rock weir placement, and backfill are to be completed in accordance with the Contract Specifications. Standing or running water in the work area does not relieve the contractor from meeting the specifications.
5. Dewatering is the sole responsibility of the contractor. Develop and submit to the CO a project-specific dewatering and sediment control plan with the excavation plan for approval. Sheet 11 illustrates the general dewatering requirements and possible methods and equipment and is not considered adequate or complete for this project.
Develop and submit a project-specific dewatering plan including drawings and a written outline illustrating and describing proposed layout, methods, and equipment. See sheet 11 for dewatering flows during construction. Approval of the contractor's dewatering plan does not relieve the contractor from completing the work as required. If the contractor's methods are not producing adequate results, the contractor must re-evaluate and submit another dewatering plan. Re-submittal of the dewatering plan, if required, is incidental to the work.
Limits of excavation per OSHA. See "STRUCTURE EXCAVATION NOTES" on this sheet
Material meeting FP-14 Specification
704.06 outside of the Culvert Backfill limits shown.
STRUCTURE BACKFILL NOTES:
1. Backfill limits shown here are the minimum requirements. Place backfill in accordance with FP-14 Section 209, and as shown on these Plans, with material meeting the requirements of Subsection 704.03a. Compact backfill material in accordance with FP-14 Subsection 209.10, Compaction Method 2.
Any material outside the Backfill limits shown is considered Road Embankment and the material must meet the requirements of FP-14 Subsection 704.06.
2. It is assumed that material conserved from the structure excavation at this site will meet the requirement for Backfill (704.03a) or Road Embankment (704.06). Some mixing and sorting may be required to meet the material specification. Haul and dispose unsuitable and excess material to the designated waste site. Haul and disposal of unsuitable and excess material is paid with Item 20411.
6" Foundation Fill leveling course
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONTOUR INTERVAL = 1'
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
FOOTING DETAILS
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
DETAIL A
Note to Scale
Fill key with non-shrink grout
4" 5" 3"
2"
11'-0" Culvert Span
10'-1"
Foundation stem wall
INSTALLATION DETAIL
Not to Scale
DETAIL A
1'-3" 1'-0" 1'-3"
(3 x c on t.
E ac h F ac e m ax on c en te r
STREAM SIDEFILL SIDE
10"
9"
#4 U-bar @ 24" o.c.
#4 vert. @ 12" o.c.
NOTES:
1. Provide 2" clear cover for all reinforcement unless otherwise shown.
2. o.c. = on center.
3. Use 24" min. lap splice for all reinf. bars.
FOOTING DETAIL
Scale: 3/4" = 1'-0"
ITEM DESCRIPTION
STRUCTURAL CONCRETE, CLASS A(AE)
REINFORCING STEEL
Cubic Yard
Pounds
21.7
UNIT QUANTITY
Informational Quantities shown above are for the precast culvert footing and considered incidental to Item 55217.
INFORMATIONAL QUANTITIES
1. A limited foundation investigation was conducted at this site and no soft soils or bedrock were encountered. Notify the CO immediately if bedrock or very soft clay soils are encountered within the limits of the foundations shown in these PLANS. In no case should the footing be placed directly on large boulders, random outcroppings of bedrock, or soft soils without prior approval.
2. Prepare foundation in accordance with Section 208 of the Specifications.
Foundation must be approved in writing by the CO prior to placing the leveling course.
FOUNDATION NOTES
Elevation shown on Sheet 5
Bottom of Ftg.
6" typ.
cl r.
Undisturbed native ground
3'-6"
(4) #4 x cont. Top & Bottom
@ 12" on center
#4 x 3'-2" @ 12" o.c. Place footings on 6" min.
compacted leveling course material meeting the requirements of Foundation Fill (704.01) (Incidental to other Items)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
PRECAST DETAILS
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
6" 6"
44'-0" Culvert
45'-0" Footing
End of Culvert, typ.
Mechanical Splice, typical both sides of wall and footing. See DETAIL on this sheet.
(3) Interior Sections @ 9'-0" = 27'-0"9'-0" Exterior Section, typ.
1 Contractor may adjust precast segment lengths shown depending upon setting equipments capabilities. Footing weight is approximately 975 lb/ft.
Mechanical Splice, typ. both sides of footing and wall.
See Detail on this sheet.
Typical Foundation Segments
Splice location at 1/2 height of stem wall
Alternate locations (on each side of stem wall) for Post-Installed Anchors/Plate Alternative. See Details this sheet
Prior to fabricating precast footings submit for approval shop drawings detailing segment lengths, splice connections, proposed concrete mix design, pick locations, and selected connection for culvert.
Other precast/prefabricated footing options that meet size, strength and functionality of concrete footings shown may be submitted for review and approval.
PRECAST FOUNDATION ELEVATION
Not to Scale
TYPICAL PRECAST SEGMENT
Not to Scale
Undisturbed Soil
1 2
PLAN SECTION
ELEVATION
BOLTED ALTERNATE
Footing Segment
Undisturbed Soil
Footing Segment
3/4"Ø A325 Bolts.
7/8"x 1-1/2" vert. slotted holes in flanges, typ.
Footing splice shown wall splice similar.
(2) 1/2"Ø x 8" Headed Concrete Anchors @ 6" o.c.
WT8x20x 0'-10" typical
Face of Footing
ELEVATION
POST-INSTALLED ANCHORS ALTERNATE
1'-3"
6"11 2" 6" 11
2"
11 2
11 2
P/L 5/16" x 8" x 1'-3" w/ 13/16"Ø holes
3/4"Ø x 6" Hilti HAS-E Rod or approved equal.
Embed 3-1/2" and secure w/ approved epoxy system
MECHANICAL SPLICE DETAIL
Not to Scale
Leveling Course
Place precast segments on leveling course
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Rock Weir
EL 387.1
STA 4+23
Rock Weir
EL 388.1
STA 3+96
Rock Weir
EL 389.2
STA 3+69
Rock Rib
STA 4+12
Rock Rib
STA 3+85
4+00
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
ROCK WEIR DETAILS
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
ROCK WEIR PLAN - OUTSIDE CULVERT
Not to Scale
FL
O
W
W
W/3 W/3 W/3
Apex
60° m ax.60° max.
Backfill with native streambed material flush with top of surface rocks.
Layout PT.
location
Bank
FLOW
New streambed
Footer Rock.
Excavate and place below streambed as shown
Rock Weir Layout PT. Location (top of rock)
SECTION A-A
Not to Scale
Provide gaps in Surface Rocks in the middle 13 of the channel
Surface and Rocks to be 12"-18" dia.
(Channel Rock Class CR-1 )
4'-0"±
Key rocks into bank
Place Surface Rocks and Footer Rocks as close together as possible so that gaps between any of the rocks are minimized, except as noted.
Footer Rock, typ.
Surface Rock, typ.
Key in rock weir to stream bank for rock weirs outside of culvert, see DETAIL this sheet.
Place and embed Isolated Boulder, Class CR-1. See sheet 10 for layout locations
30° typ.
ROCK WEIR PLAN
NOT TO SCALE
Streambed Simulation Rock, Bed Class 0.15 between rock weirs.
See sheet 10
FLOW
Slight contraction to bankfull width just upstream of rock weir.
Construct continuous hardened banks the entire length of the culvert with Class CR-1 Channel Rock
1 9
Stream Thalweg
Edge of Bank, typ. Vary bankfull width along length of riffle. See TYPICAL RIFFLE SECTION on Sheet 10
1 9
Existing ground along new stream thalweg
New culvert
Streambed Simulation Rock, Bed Class 0.15 between rock weirs.
See sheet 10STREAM PROFILE
NOT TO SCALE
FLOW
Surface rock.
Surface and Footer Rocks to be 12"-18" dia.
(Channel Rock Class CR-1 )
FLOW Riffle Length Varies
Pool Length
Varies 4' to 6'
1.9%
Streambed grade between weirs
ROCK WEIR PROFILE
NOT TO SCALE
Step Height Varies: 5" to 7"
Pool Depth Varies: 4" to 8"
Channel Rock Bank outside of structure. Cover with slash from clearing and grubbing and unsuitable material conserved from excavation.
Place seeding on channel banks.
Typical of both sides.
STA 4+30
Transition Channel Rock banks and Streambed Simulation Rock into existing steam.
STA 4+30
End Channel Rock banks and Streambed Simulation Rock.
Transition into existing steam.
STA 3+69
Begin Channel Rock banks and Streambed Simulation Rock. Tie into existing steambed and banks.
Rib rock will be in contact with the adjacent piece and protrude ±3" from stream bed.
ROCK WEIR & RIB NOTES
Vary direction, shape, and orientation of the ribs. Ribs to be angled 30°± perpendicular to centerline of pipe. Ribs oriented straight across the channel are not desirable
3 Rock Weir & Rib placement is 1'± from designated station shown in profile. The spacing and configuration of rock weirs maybe adjusted in the field by the CO to fit actual streambed conditions.
Footer rock to control scour.
A
A
Construct Rock Rib from Class CR-1 Channel Rock, typ. See NOTES on this sheet.
30°
(3) Rock Weirs
±27' Rock Weir spacing ±27' Rock Weir spacing3 3
±27' Rock Rib Spacing3
STA 3+69
Begin Channel Rock banks and Streambed Simulation Rock. Tie into existing steambed and banks.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
STREAM SIMULATION
DETAILS
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
Construct continuous hardened banks the entire length of the culvert with Channel Rock, Class CR-1. Typical both sides (See FSSS 705.08)
Streambed Simulation Rock, Bed Class 0.15
TYPICAL POOL SECTION
NOT TO SCALE
TYPICAL RIFFLE SECTION
NOT TO SCALE
7'-0"± Bankfull Width
1'-6"± 1'-6"±
Bankfull Width at Riffle Varies: 6'-0"± to 7'-0"±
TYPICAL ROCK WEIR SECTION
NOT TO SCALE
6'-0"± Weir Length
Surface Rocks, typ.
Footer Rocks, typ.
Bank. Slight width contraction just upstream.
See PLAN on sheet 9
New pipe-arch culvert
Top of rock weir beyond
Pool- See PROFILE on sheet 9
New pipe-arch culvert
New pipe-arch culvert
Streambed Simulation Rock, Bed Class 0.15
PROPORTIONS CLASS 0.15
1 UNITS 10" - 4"
2 UNITS 4" - 2"
2 UNITS 2" - 1"
1 UNITS 1" - 0.5"
1/2 UNITS <No. 10 (FINES)
BED CLASS 0.15 STREAMBED SIMULATION ROCK
FIELD MIX GUIDE
Construct continuous hardened banks the entire length of the culvert with Channel Rock, Class CR-1. Typical both sides (See FSSS 705.08)
New pipe-arch culvert
TYPICAL ROCK RIB SECTION
NOT TO SCALE
Construct Rock Rib with Channel Rock CR-1 to span Bed Width. Rock Rib to protrude 3" above Stream Bed
Riffle Stream Bed Elevation
Channel dimensions same as above TYPICAL RIFFLE SECTION
Bed Width at Riffle Varies: 5'-0"± to 6'-0"±
2'-0"± 2'-0"±
Varies:
1'-6" to 2'
Varies:
1'-6" to 2'
Varies: 21"-27"
±2'-0"
Inter-mix streambed material as directed by CO during placement of Channel Rock Bank to seal voids throughout the section.
FOOTNOTES:
FOOTNOTES:
The final channel bottom should be a dense, well interlocked streambed with low permeability. Compact each layer and fill surface voids by washing in fine material. Use water pressure, tamping rods, and similar hand operated equipment to force fine material into all surface voids.
THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE STREAM FLOW
DOES NOT GO SUBSURFACE THROUGH THE CULVERT FOR A 48 HOUR
PERIOD AFTER RE-WATERING.
Native material meeting the gradation for the specified Bed Class, and Channel Rock may be salvaged and incorporated into the simulated streambed.
1'-6" min.
1'-6" min.
ISOLATED BOULDER LOCATIONS
STATION
OFFSET
DISTANCE
FROM CL
PIPE (FT)
OFFSET
DIRECTION
BOULDER
DIAMETER SIZE
(IN)
PROTRUSION
ABOVE
SURFACE
(IN)
3+77 1.1' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"
3+80 2.0' LEFT 12" - 18" (CLASS CR-1) 6" - 9"
3+82 1.2' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"
3+90 1.9' LEFT 12" - 18" (CLASS CR-1) 6" - 9"
3+93 1.6' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"
4+05 2.3' LEFT 12" - 18" (CLASS CR-1) 6" - 9"
4+09 0.8' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"
4+16 1.3' LEFT 12" - 18" (CLASS CR-1) 6" - 9"
4+20 1.0' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/2 3/1
9 1 4:
B
RE
ND
AN
F
:\6
4 U
SF
S
- T
ON
GA
SS
N
F
AO
P
SI
TE
S
(1 4)
\D W
G\
-R
D2
-M P0
.15 -D
ES
IG
N.
DW
G;
REGION 10
ALASKAN REGION
DEWATERING
REQUIREMENTS
Apr-19
M. JENSEN
B. MCCRAY
M. JENSEN
AOP CULVERT
TONGASS
THORNE BAY
REPLACEMENTS
PRINCE OF WALES
RANGER DISTRICT
NATIONAL FOREST
NFSR 2050070-MP 0.15
11BYPASS DAM PROFILE VIEW
Impervious membrane key trench, fill with clean gravel as needed to control seepage under impervious membrane
Anchor impervious membrane (sandbags, stones, etc.)
Impervious membrane
Sandbags
Bypass pipe 18" diameter minimum
Streambed
Existing Culvert
PUMP
PUMP
Top of excavation (estimated)
Remove sediment from pumped water using filtration (e.g. "siltbags"), dispersion onto landscape (e.g. using perforated pipe), settling basin and/or addition of flocculates.
modify as needed to meet downstream turbidity requirements.
To downstream energy dissipater
Sandbag by-pass & "feeder" dams location to be staked by contractor and approved by the CO
By-pass pump use for installing and removing gravity by-pass dams and diversions
Construct backwater dam to prevent water from entering work area from downstream
D/S Flo w
(No turbidity)
Energy dissipater as needed to prevent turbidity (e.g.
plastic sheets, stones).
By-pass discharge location to be staked by contractor and approved by CO.
PUMP
Stream by-pass pipe. Diameter as specified, watertight joints, minimum grade 2% downstream.
PLAN
Upstream sump pump place in cutoff trench or sump at depth needed to dewater excavation
Sedimats- details & number of rows per manufacturer
Elbow joints as needed, typ.
Edge of exiting road, typ.
Edge of active channel, typ.
BYPASS DAM ELEVATION VIEW
4' Overflow
12" min. Varies
Sandbags
Streambed Pipe as needed
GEOTEXTILE-WRAPPED STRAW
BALE SEDIMENT CONTROL WEIR
SECTION VIEW PLAN VIEW
STREAM FLOW
Granular Backfill Section 703.03(a)
Straw bales
Granular Backfill Section 703.03(a)
Straw bales
Geotextile mirafi 140N or equal
Stream Flow
SANDBAG BYPASS DAM DETAILS
Anti-seep collar. place anti-seep collar over membrane & pipe, then cut membrane to allow water through pipe.
6 mil plastic sheeting minimum
Bypass pipe
Downstream sump pump place in cutoff trench or sump at depth needed to dewater excavation
NOTES:
1. Design dewatering flow for construction is 34 CFS.
2. The plan shown here is intended to represent the general dewatering requirements and not applicable to a specific site.
submit a plan specific to the site.
3. Contractor to determine the size of the bypass pipe based on the specified flow.
4. Ensure that the bypass pipe and dam are leak-proof. Do not proceed with construction until the implemented dewatering plan has been inspected and accepted by the CO in writing.
5. Ensure pumps are be clean and free of leaks and placed in a containment kit.
6. Excavate draw down pool for sumps a minimum of 2 feet below the bottom of the excavation and a minimum of 5 feet in diameter.
7. Maintain all elements of the operation in order to dewater the foundation, facilitate construction, prevent harm to aquatic organisms (not just fish) and prevent sediment and turbidity from entering the stream. Construct the dewatering system in a manner which enables USFS biologists to collect and transport organisms from the live channel, just before completion of the diversion dam.
8. Operate pumps (preferably electric) downstream of the bypass dam if the dam does not seal thoroughly. Maintain a pump running 24 hours a day in the downstream sediment retention dam to divert water containing sediment to the forest floor where it will be filtered before entering back into the stream.
Leave pumps in position on site even if water discharge drops considerably, to be prepared for storm flows.
Provide ditches and/or sumps along outside of foundation as necessary to dewater foundations
New Culvert Footings
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
11+80.00
12+20.00
12+60.00
12+91.97
13+10.00
13+40.00
13+80.00
14+20.00
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
Existing ground, typ.
8'8' Typ.Typ.
Match existing cross slopes
1.5
Typical fill slope, both sides
Match existing cross slopes
NFSR 2050070 MP 0.15
ROAD CROSS SECTIONS
AOP CULVERT REPLACEMENT
ENGINEERS
PLANNERS
SURVEYORS
AutoCAD SHX Text
PREPARED BY :
SHEET XS1 OF XS1
| Sheets and Views |
| 1 COVER |
| 2 QTY |
| 3 TYP |
| 4 ROAD |
| 5 Culvert |
| 6 Excavation |
| 7 Footing |
| 8 Precast |
| 9 Stream |
| 10 Stream (2) |
| 11 Dewater |
| XSEC1 |
| 2019-06-06T13:06:43-0800 | |
| TYLER GUNN |
| 2019-06-11T11:00:14-0800 | |
| LEONARD JOB, P.E. |
File details come from the government source that posted it.