RD_2050070_-_MP_0.15_Plans_Final.pdf

PDF 6 MB Posted

Attached to
AOP_construction_2050070_MP_0. 15 Federal contract opportunity
Solicitation number
12010919Q0096
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

RD 2050070 - MP 0.15 Plans Final

View the file

Other files for this federal contract opportunity

Other files attached to AOP_construction_2050070_MP_0. 15, newest first.
File Type Posted
WD_AK20190006_01042019.pdf PDF
12010919Q0096_AOP_construction_2050070_MP_0.15-v2.pdf PDF
2050070_0.15_FSSS_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE, REGION 10

TONGASS NATIONAL FOREST

THORNE BAY RANGER DISTRICT

CONSTRUCTION PLANS FOR:

AOP CULVERT REPLACEMENT

NFSR 2050070 MP 0.15

LOCATION MAP

VICINITY MAP

FOREST ENGINEER

APPROVED BY:

DATE

TONGASS NATIONAL FOREST

DISTRICT RANGER

DATE

THORNE BAY DISTRICT

RECOMMENDED BY:

PREPARED BY:

INDEX TO SHEETS

NO. DESCRIPTION

1 TITLE SHEET

GENERAL NOTES & SCHEDULE OF

QUANTITIES

TYPICAL ROADWAY SECTION & POINT

TABLES

4 ROAD PLAN & PROFILE

5 CULVERT GENERAL LAYOUT

6 STRUCTURE EXCAVATION & BACKFILL

7 FOOTING DETAILS

8 PRECAST DETAILS

9 ROCK WEIR DETAILS

10 STREAM SIMULATION DETAILS

11 DEWATERING REQUIREMENTS

XS1 ROAD CROSS SECTIONS

PROJECT

LOCATION

JUNEAU

Craig

KEY MAP

140°142°

58°

138° 136°

Sitka

132°134°136°138°140°142°

60°

Yakutat

C A N

A D

A

A

LA

S K A

62°

Skagway

56°

54°

132°134°

Ketchikan

Wrangell

Petersburg

128°130°

60°

58°

HOONAH

VICINITY MAP

PROJECT

LOCATION

MATERIAL

SOURCE

THORNE BAY

K

LA

W O

C K

MATERIAL SOURCES

GOVERNMENT FURNISHED

CHANNEL ROCK

RIPRAP

UNCLASSIFIED BORROW

WASTE SITE

CONTRACTOR FURNISHED

STREAMBED SIMULATION ROCK

ALL OTHER MATERIALS ARE

CONTRACTOR FURNISHED

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

GENERAL NOTES &

ESTIMATED

QUANTITIES

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

GENERAL NOTES

DESIGN: This structure is designed for HL-93 live loading in accordance with AASHTO LRFD Bridge Design Specifications, 7th Edition.

HYDROLOGY AND HYDRAULICS: This structure has been designed to pass a Q100 flood event with a headwater depth to culvert rise ratio less than

0.8. Flow data is provided on Sheet 5.

SPECIFICATIONS: Construct the project in compliance with Federal Highway Administration Standard Specifications for Construction of Road and Bridges on Federal Highway Projects (FP-14) and applicable Forest Service Supplemental Specifications.

ROAD WORK: Depths of all materials are given as final compacted depths. Remove all berms, existing or created, unless designated to remain, to allow drainage of water from the traveled way.

DEWATERING & EROSION CONTROL PLAN: Submit a dewatering and soil erosion and sediment control plan to the contracting officer for approval at least fifteen (15) days prior to beginning work. See Section 157 of the Supplemental Specifications, the notes on Sheet 6, and the general requirements shown on Sheet 11. Construct temporary means to divert the flow of the live stream as necessary to perform work. Do not pump water from excavations directly into the live stream.

DISPOSAL: All materials designated for removal become the property of the contractor and are to be disposed of by removing from the forest in an environmentally safe manner in accordance with all local, state and federal requirements. Dispose of excess or unsuitable material at the location designated in FSSS Section 105. Hauling of excess or unsuitable material is incidental to associated work.

TEMPORARY TRAFFIC CONTROL: Submit a temporary traffic control plan to the Contracting Officer for approval at least 30 days prior to intended use.

IN-STREAM WORK: All in-stream work will be done between June 15th and September 1st. Allowance shall be given to the Forest Service to capture and remove fish and other aquatic organisms from within the construction work area prior to and during work activities.

EQUIPMENT STORAGE: Storage of all equipment on government lands will be at a location approved by the CO.

SEEDING: Seed and mulch all disturbed soil that is not within travel way or stream channel. Use Tongass Seed Mix. See FSSS Section 625

CONCRETE: Use Class A(AE) Concrete for Precast members. The required 28-day compressive strength (F'c) is 3,000 psi with an entrained air content of 5% ± 1%. Finish all precast elements with an ordinary surface finish.

Make all concrete in accordance with an approved mix design. Chamfer all exposed edges of concrete 3/4" and fillet all acute angles 3" unless otherwise noted.

REINFORCING STEEL: Use reinforcing steel of the deformed type conforming to AASHTO M31 (ASTM A615) Grade 60. Concrete cover is as shown; where not shown it must conform to AASHTO. Cut and bend reinforcing steel in conformance with ACI 315. Lap splice bars 2' min.

HARDWARE AND STRUCTURAL STEEL: Use shapes, plates and bars meeting the requirements of ASTM A36, unless otherwise specified in these plans.

Use hardware meeting the requirements of ASTM A325, except as noted in the drawings.

WELDING: Weld in accordance with the Structural Welding Code, AWS D1.1.

ITEM

NO. ITEM DESCRIPTION UNIT QUANTITY REMARKS

15101 MOBILIZATION LUMP SUM ALL

TRAFFIC CONTROL, FIRE PROTECTION, EQUIPMENT

CLEANING, AND ANY MAINTENANCE OF EXISTING NFS

ROADS FOR CONTRACTOR ACCESS IS INDIRECT TO THIS

PAY ITEM

15221 CONSTRUCTION SURVEY AND STAKING LUMP SUM ALL

15713 SOIL EROSION & POLLUTION CONTROL LUMP SUM ALL INCLUDES DEWATERING. SEE GENERAL NOTES

20301

REMOVAL OF EXISTING CORRUGATED STEEL PIPE,

METHOD A

EACH 1

20411

UNCLASSIFIED BORROW EXCAVATION, PLACEMENT

METHOD 2

CUBIC YARD 270 CQ

GOVERNMENT SOURCE. ASSUMES 20% OF EXCAVATED

MATERIAL IS UNSUITABLE. QUANTITY IS IN-PLACE

AND NOT ADJUSTED FOR SHRINK/SWELL.

25101 PLACED RIPRAP, CLASS 2 CUBIC YARD 24 CQ GOVERNMENT SOURCE.

55217 PRECAST CONCRETE MEMBER, CULVERT FOOTING LINEAR

FOOT

60303 11'-0" SPAN x 3'-6" RISE CORRUGATED

ALUMINIZED-STEEL STRUCTURAL PLATE ARCH, 0.111"

THICKNESS

LINEAR

FOOT

CORRUGATED ARCH MATERIAL SHALL BE ALUMINIZED

STEEL. GALVANIZED STEEL WILL NOT BE ALLOWED.

MANUFACTURER TO CERTIFY CULVERT MEETS HL-93

LOADING WITH THE MINIMUM COVER SHOWN ON THESE

PLANS.

62504 SEEDING, DRY METHOD LUMP SUM ALL

USE TONGASS SEED MIX. SEE FSSS SECTION 625.

APPROXIMATELY ~2400 SQ FT

64802

PLACED STREAMBED SIMULATION MATERIAL

BED CLASS 0.15, METHOD A CUBIC YARD 18 CQ

COMMERCIAL SOURCE. SEE SHEET 10 FOR GRADATION

REQUIREMENTS. MATERIAL FROM THE EXCAVATION

MEETING THE GRADATION FOR BED CLASS 0.15 MAY BE

SALVAGED AND INCORPORATED INTO THE SIMULATED

STREAMBED.

64804

PLACED STREAMBED CHANNEL ROCK FOR CULVERT

BANKS, CLASS CR-1, METHOD A CUBIC YARD 29 CQ

GOVERNMENT SOURCE. SOME SORTING WILL BE

REQUIRED. ROCK SALVAGED FROM THE EXCAVATION

MEETING THE GRADATION FOR CLASS CR-1 MAY BE

SALVAGED AND INCORPORATED INTO THE SIMULATED

STREAMBED.

64806

PLACED STREAMBED CHANNEL ROCK FOR ROCK

WEIRS, RIBS, & ISOLATED BOULDERS, CLASS CR-1,

METHOD A

CUBIC YARD 20 CQ

GOVERNMENT SOURCE. SOME SORTING WILL BE

REQUIRED. ROCK SALVAGED FROM THE EXCAVATION

MEETING THE GRADATION FOR CLASS CR-1 MAY BE

SALVAGED AND INCORPORATED INTO THE SIMULATED

STREAMBED.

SCHEDULE OF QUANTITIES

CQ= CONTRACT QUANTITY (SEE SECTION 109.02(B) OF THE STANDARD SPECIFICATIONS);

OPTIONAL ITEMS

20501 ROCK EXCAVATION CUBIC YARD 10

SUBSURFACE CONDITIONS HAVE NOT BEEN ASSESSED.

BEDROCK MAY BE ENCOUNTERED AND ROCK

EXCAVATION MAY BE REQUIRED

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

CONTROL POINT TABLE

POINT #

CP-1

CP-2

CP-3

NORTHING

1416846.24

1416705.18

1416558.16

EASTING

2821844.24

2821658.05

2821505.71

ELEVATION

405.73

392.71

390.58

DESCRIPTION

SET-RPC

SET-RPC

SET-RPC

CP-1

CP-2

CP-3

S °0

'0

"W

.7

S °5

'0

"W

.6

CENTERLINE POINTS

POINT #

NORTHING

1416894.4062

1416825.8705

1416817.1333

1416800.1600

1416774.7604

1416754.4597

1416736.6609

1416717.6112

1416698.5614

1416673.1618

EASTING

2821865.1557

2821815.8680

2821805.8830

2821785.2336

2821754.3328

2821729.6354

2821707.9816

2821684.8060

2821661.6305

2821630.7297

ELEVATION

401.81

400.47

398.19

395.80

394.76

394.34

393.91

393.49

392.92

DESCRIPTION

STA 10+95.03 CL ROAD - PC CURVE

STA 11+80 CL ROAD - BEGIN CONSTRUCTION

STA 11+93.27 CL ROAD - PT CURVE

STA 12+20 CL ROAD

STA 12+60 CL ROAD

STA 12+91.97 CL ROAD - CL CULVERT

STA 13+20 CL ROAD

STA 13+50 CL ROAD

STA 13+80 CL ROAD

STA 14+20 CL ROAD - END CONSTRUCTION

LAYOUT POINTS

POINT #

NORTHING

1416742.2745

1416734.1144

1416775.4390

1416767.2789

EASTING

2821748.9790

2821740.0673

2821718.6114

2821709.6997

ELEVATION

385.96

385.96

384.24

384.24

DESCRIPTION

BOTTOM OF FOOTING

BOTTOM OF FOOTING

BOTTOM OF FOOTING

BOTTOM OF FOOTING

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

TYPICAL ROADWAY

SECTION & POINT

TABLES

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

TYPICAL ROAD SECTION

NOT TO SCALE

Centerline Road

8'-0" 8'-0"

16'-0"

1.5 1

1.5

Clearing Limits

Clear to: Toe of Fill, Cut Daylight, or 5' min. shown.

5'-0" min.

Native surface

5'-0" min.

2%

Profile grade

ROAD CENTERLINE POINTS

SURVEY CONTROL POINTS

SET-RPC = Red Plastic Cap Control Point set by DJ&A.

See PROJECT CONTROL MAP for location of CONTROL POINTS.

CULVERT LAYOUT POINTS

See Sheet 5 for location of CULVERT INVERT POINTS

FLOW

PROJECT CONTROL MAP

Scale: 1" = 75'

2%

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

11+00 12+00 13+00 14+00 15+00

-10.57%

-1.42%

S T A

.0

E L

.8

S T A

.0

E L

.9

120.00' VC

B V C S

.0

B V C E

.8

E V C S

.0

E V C E

.6

PVI STA:12+40.00

PVI ELEV:395.47

K: 13.12

CP-1

CP-2

390390

11+00

12+00 13+00 14+00 15+00

PC: 10+95.03

PT

.2

CURVE DATA:

R=215.00 L=98.24' Δ=26°10'50"

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

ROAD PLAN &

PROFILE

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

PLAN

PROFILE

LEGEND

Existing Edge of Shoulder

Existing Culvert

Existing Edge of Water Major Contour (5') Minor Contour (1')

EXISTING FEATURES

Existing Edge of Road

> > Existing Ditch

Existing Ground at Centerline Road

Centerline Road Finished Grade

Remove & dispose existing culvert

New culvert

New Edge of Road

New Pipe Arch Culvert

Remove & Dispose Existing Corrugated Steel Pipe

STA 11+80

BEGIN ROAD WORK

MATCH EXISTING

Centerline Road

' 8

STA 14+20

END ROAD WORK

MATCH EXISTINGNew Toe of Fill, typ.

FL

OW

20'

ROAD CONSTRUCTION NOTES:

1. All road work, including hauling and disposing of excess and unsuitable material, is incidental to Item 20411.

2. Embankment quantities shown are in-place quantities and not adjusted for shrink/swell. Quantity shown assumes 20% of excavated material will not be suitable for reuse.

3. Haul & dispose unsuitable material to the waste site designated in FSSS Section 105.

270 CY Unclassified Borrow

Construct Rock Weir, typ. See sheet 9

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

Culvert

3+60 3+80 4+00 4+20 4+40

EL 385.96

Bottom of Footing EL 384.25

Bottom of Footing

EL 389.0

Channel Bottom

FG EL 394.76

at Centerline Road

EL 387.3

Channel Bottom

-3.8%

4+00

Layout Pt.

Layout Pt.

Layout Pt.

Layout Pt.

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

CULVERT GENERAL

LAYOUT

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

Channel Bottom EL

10'1

2' min.

cover

SECTION THRU CENTERLINE CULVERT

Scale: 1" = 20'

Centerline Road Remove existing culvert

New Edge of Road

Stream Thalweg

PLAN

Toe of Fill, typ.

3+60

4+40

Existing ground

11'-0" Span x 3'-6" Rise Aluminized-Steel Structural Plate Arch

45'-0" Precast Footing

44'-0" Culvert

HYDRAULIC DATA:

Drainage Area= 0.25 Sq. Mi.

Q2= 33.3 CFS

Bankfull Width= 7'

Depth= 0.9'

Q100= 99.9 CFS

Depth= 3.31' HW/D= 0.77Bevel pipe on upstream end of culvert. See DETAIL on this sheet.

4+203+80

FLOW

Construct Rock Weir, typ. See sheet 9

Centerline Culvert (STA 3+96.54) @ Centerline Road (STA 12+91.97)

See sheet 3 for Footing Layout Points Table.

Furnish and place 12 CY Class 2 Riprap.

Typical of both ends. See DETAIL on this sheet ty p

11'-0" Span x 3'-6" Rise Aluminized-Steel Structural Plate Arch

Class 2 Riprap

2'

Fill slope

New culvert

Top of bank

RIPRAP DETAIL

NOT TO SCALE

2'

Top of bank in culvert/top of concrete footing

Concrete Footing

STEP BEVEL END DETAIL

BEVEL INLET END ONLY

Concrete Culvert Footing

1'

R is e

1'

1.5

Fill Slope

7'-0" Bankfull Width

11'-0" Span

R is e

Precast Concrete Footing. See Sheet 7

TYPICAL SECTION

Not to Scale

Layout PT Layout PT

See Sheet 9 & 10 for channel and bank dimensions and construction details

Q100= 392.31'

*Q2= 389.91'

Elevations at inlet of culvert

11'-0" Span x 3'-6" Rise Aluminized-Steel Structural Plate Arch

86°56'

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONTOUR INTERVAL = 1'

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

STRUCTURAL

EXCAVATION &

BACKFILL

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

PLAN

STRUCTURE EXCAVATION NOTES:

1. Complete structure excavation in accordance with FP-14 Section 209.

2. The contractor is solely responsible for excavation support and compliance with all applicable OSHA regulations.

3. Notify the CO immediately if bedrock or soft, unsuitable soils are encountered.

FLOW

Existing corrugated steel pipe

Approximate culvert excavation limits 1

6 New Concrete FootingsEdge of Existing Road

2' min.

Existing culvert

STRUCTURAL EXCAVATION & BACKFILL SECTION

NOT TO SCALE

Existing ground

Finished ground Backfill (704.03a) See "STRUCTURE BACKFILL NOTES" on this sheet.

Culvert Backfill limit

DEWATERING AND SOIL EROSION CONTROL NOTES:

1. Protect against soil erosion and sedimentation during construction in accordance with

FP-14 Section 157, the project permits, Forest Service Handbook (FSH) 2509.22, Region 10 BMPs for Erosion Control, and the Guidance for the Invasive Plant Managment Program (Krosse 2017). Prepare and submit a soil erosion and sediment control plan to the CO for approval.

2. Dewater the excavation in accordance with FP-14 Sections 208 and 157 and the requirements on sheet 11.

3. Contractor should anticipate water infiltrating the excavations.

4. Culvert excavation, riprap and rock weir placement, and backfill are to be completed in accordance with the Contract Specifications. Standing or running water in the work area does not relieve the contractor from meeting the specifications.

5. Dewatering is the sole responsibility of the contractor. Develop and submit to the CO a project-specific dewatering and sediment control plan with the excavation plan for approval. Sheet 11 illustrates the general dewatering requirements and possible methods and equipment and is not considered adequate or complete for this project.

Develop and submit a project-specific dewatering plan including drawings and a written outline illustrating and describing proposed layout, methods, and equipment. See sheet 11 for dewatering flows during construction. Approval of the contractor's dewatering plan does not relieve the contractor from completing the work as required. If the contractor's methods are not producing adequate results, the contractor must re-evaluate and submit another dewatering plan. Re-submittal of the dewatering plan, if required, is incidental to the work.

Limits of excavation per OSHA. See "STRUCTURE EXCAVATION NOTES" on this sheet

Material meeting FP-14 Specification

704.06 outside of the Culvert Backfill limits shown.

STRUCTURE BACKFILL NOTES:

1. Backfill limits shown here are the minimum requirements. Place backfill in accordance with FP-14 Section 209, and as shown on these Plans, with material meeting the requirements of Subsection 704.03a. Compact backfill material in accordance with FP-14 Subsection 209.10, Compaction Method 2.

Any material outside the Backfill limits shown is considered Road Embankment and the material must meet the requirements of FP-14 Subsection 704.06.

2. It is assumed that material conserved from the structure excavation at this site will meet the requirement for Backfill (704.03a) or Road Embankment (704.06). Some mixing and sorting may be required to meet the material specification. Haul and dispose unsuitable and excess material to the designated waste site. Haul and disposal of unsuitable and excess material is paid with Item 20411.

6" Foundation Fill leveling course

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONTOUR INTERVAL = 1'

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

FOOTING DETAILS

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

DETAIL A

Note to Scale

Fill key with non-shrink grout

4" 5" 3"

2"

11'-0" Culvert Span

10'-1"

Foundation stem wall

INSTALLATION DETAIL

Not to Scale

DETAIL A

1'-3" 1'-0" 1'-3"

(3 x c on t.

E ac h F ac e m ax on c en te r

STREAM SIDEFILL SIDE

10"

9"

#4 U-bar @ 24" o.c.

#4 vert. @ 12" o.c.

NOTES:

1. Provide 2" clear cover for all reinforcement unless otherwise shown.

2. o.c. = on center.

3. Use 24" min. lap splice for all reinf. bars.

FOOTING DETAIL

Scale: 3/4" = 1'-0"

ITEM DESCRIPTION

STRUCTURAL CONCRETE, CLASS A(AE)

REINFORCING STEEL

Cubic Yard

Pounds

21.7

UNIT QUANTITY

Informational Quantities shown above are for the precast culvert footing and considered incidental to Item 55217.

INFORMATIONAL QUANTITIES

1. A limited foundation investigation was conducted at this site and no soft soils or bedrock were encountered. Notify the CO immediately if bedrock or very soft clay soils are encountered within the limits of the foundations shown in these PLANS. In no case should the footing be placed directly on large boulders, random outcroppings of bedrock, or soft soils without prior approval.

2. Prepare foundation in accordance with Section 208 of the Specifications.

Foundation must be approved in writing by the CO prior to placing the leveling course.

FOUNDATION NOTES

Elevation shown on Sheet 5

Bottom of Ftg.

6" typ.

cl r.

Undisturbed native ground

3'-6"

(4) #4 x cont. Top & Bottom

@ 12" on center

#4 x 3'-2" @ 12" o.c. Place footings on 6" min.

compacted leveling course material meeting the requirements of Foundation Fill (704.01) (Incidental to other Items)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

PRECAST DETAILS

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

6" 6"

44'-0" Culvert

45'-0" Footing

End of Culvert, typ.

Mechanical Splice, typical both sides of wall and footing. See DETAIL on this sheet.

(3) Interior Sections @ 9'-0" = 27'-0"9'-0" Exterior Section, typ.

1 Contractor may adjust precast segment lengths shown depending upon setting equipments capabilities. Footing weight is approximately 975 lb/ft.

Mechanical Splice, typ. both sides of footing and wall.

See Detail on this sheet.

Typical Foundation Segments

Splice location at 1/2 height of stem wall

Alternate locations (on each side of stem wall) for Post-Installed Anchors/Plate Alternative. See Details this sheet

Prior to fabricating precast footings submit for approval shop drawings detailing segment lengths, splice connections, proposed concrete mix design, pick locations, and selected connection for culvert.

Other precast/prefabricated footing options that meet size, strength and functionality of concrete footings shown may be submitted for review and approval.

PRECAST FOUNDATION ELEVATION

Not to Scale

TYPICAL PRECAST SEGMENT

Not to Scale

Undisturbed Soil

1 2

PLAN SECTION

ELEVATION

BOLTED ALTERNATE

Footing Segment

Undisturbed Soil

Footing Segment

3/4"Ø A325 Bolts.

7/8"x 1-1/2" vert. slotted holes in flanges, typ.

Footing splice shown wall splice similar.

(2) 1/2"Ø x 8" Headed Concrete Anchors @ 6" o.c.

WT8x20x 0'-10" typical

Face of Footing

ELEVATION

POST-INSTALLED ANCHORS ALTERNATE

1'-3"

6"11 2" 6" 11

2"

11 2

11 2

P/L 5/16" x 8" x 1'-3" w/ 13/16"Ø holes

3/4"Ø x 6" Hilti HAS-E Rod or approved equal.

Embed 3-1/2" and secure w/ approved epoxy system

MECHANICAL SPLICE DETAIL

Not to Scale

Leveling Course

Place precast segments on leveling course

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Rock Weir

EL 387.1

STA 4+23

Rock Weir

EL 388.1

STA 3+96

Rock Weir

EL 389.2

STA 3+69

Rock Rib

STA 4+12

Rock Rib

STA 3+85

4+00

DRAWING

TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

ROCK WEIR DETAILS

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

ROCK WEIR PLAN - OUTSIDE CULVERT

Not to Scale

FL

O

W

W

W/3 W/3 W/3

Apex

60° m ax.60° max.

Backfill with native streambed material flush with top of surface rocks.

Layout PT.

location

Bank

FLOW

New streambed

Footer Rock.

Excavate and place below streambed as shown

Rock Weir Layout PT. Location (top of rock)

SECTION A-A

Not to Scale

Provide gaps in Surface Rocks in the middle 13 of the channel

Surface and Rocks to be 12"-18" dia.

(Channel Rock Class CR-1 )

4'-0"±

Key rocks into bank

Place Surface Rocks and Footer Rocks as close together as possible so that gaps between any of the rocks are minimized, except as noted.

Footer Rock, typ.

Surface Rock, typ.

Key in rock weir to stream bank for rock weirs outside of culvert, see DETAIL this sheet.

Place and embed Isolated Boulder, Class CR-1. See sheet 10 for layout locations

30° typ.

ROCK WEIR PLAN

NOT TO SCALE

Streambed Simulation Rock, Bed Class 0.15 between rock weirs.

See sheet 10

FLOW

Slight contraction to bankfull width just upstream of rock weir.

Construct continuous hardened banks the entire length of the culvert with Class CR-1 Channel Rock

1 9

Stream Thalweg

Edge of Bank, typ. Vary bankfull width along length of riffle. See TYPICAL RIFFLE SECTION on Sheet 10

1 9

Existing ground along new stream thalweg

New culvert

Streambed Simulation Rock, Bed Class 0.15 between rock weirs.

See sheet 10STREAM PROFILE

NOT TO SCALE

FLOW

Surface rock.

Surface and Footer Rocks to be 12"-18" dia.

(Channel Rock Class CR-1 )

FLOW Riffle Length Varies

Pool Length

Varies 4' to 6'

1.9%

Streambed grade between weirs

ROCK WEIR PROFILE

NOT TO SCALE

Step Height Varies: 5" to 7"

Pool Depth Varies: 4" to 8"

Channel Rock Bank outside of structure. Cover with slash from clearing and grubbing and unsuitable material conserved from excavation.

Place seeding on channel banks.

Typical of both sides.

STA 4+30

Transition Channel Rock banks and Streambed Simulation Rock into existing steam.

STA 4+30

End Channel Rock banks and Streambed Simulation Rock.

Transition into existing steam.

STA 3+69

Begin Channel Rock banks and Streambed Simulation Rock. Tie into existing steambed and banks.

Rib rock will be in contact with the adjacent piece and protrude ±3" from stream bed.

ROCK WEIR & RIB NOTES

Vary direction, shape, and orientation of the ribs. Ribs to be angled 30°± perpendicular to centerline of pipe. Ribs oriented straight across the channel are not desirable

3 Rock Weir & Rib placement is 1'± from designated station shown in profile. The spacing and configuration of rock weirs maybe adjusted in the field by the CO to fit actual streambed conditions.

Footer rock to control scour.

A

A

Construct Rock Rib from Class CR-1 Channel Rock, typ. See NOTES on this sheet.

30°

(3) Rock Weirs

±27' Rock Weir spacing ±27' Rock Weir spacing3 3

±27' Rock Rib Spacing3

STA 3+69

Begin Channel Rock banks and Streambed Simulation Rock. Tie into existing steambed and banks.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

STREAM SIMULATION

DETAILS

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

Construct continuous hardened banks the entire length of the culvert with Channel Rock, Class CR-1. Typical both sides (See FSSS 705.08)

Streambed Simulation Rock, Bed Class 0.15

TYPICAL POOL SECTION

NOT TO SCALE

TYPICAL RIFFLE SECTION

NOT TO SCALE

7'-0"± Bankfull Width

1'-6"± 1'-6"±

Bankfull Width at Riffle Varies: 6'-0"± to 7'-0"±

TYPICAL ROCK WEIR SECTION

NOT TO SCALE

6'-0"± Weir Length

Surface Rocks, typ.

Footer Rocks, typ.

Bank. Slight width contraction just upstream.

See PLAN on sheet 9

New pipe-arch culvert

Top of rock weir beyond

Pool- See PROFILE on sheet 9

New pipe-arch culvert

New pipe-arch culvert

Streambed Simulation Rock, Bed Class 0.15

PROPORTIONS CLASS 0.15

1 UNITS 10" - 4"

2 UNITS 4" - 2"

2 UNITS 2" - 1"

1 UNITS 1" - 0.5"

1/2 UNITS <No. 10 (FINES)

BED CLASS 0.15 STREAMBED SIMULATION ROCK

FIELD MIX GUIDE

Construct continuous hardened banks the entire length of the culvert with Channel Rock, Class CR-1. Typical both sides (See FSSS 705.08)

New pipe-arch culvert

TYPICAL ROCK RIB SECTION

NOT TO SCALE

Construct Rock Rib with Channel Rock CR-1 to span Bed Width. Rock Rib to protrude 3" above Stream Bed

Riffle Stream Bed Elevation

Channel dimensions same as above TYPICAL RIFFLE SECTION

Bed Width at Riffle Varies: 5'-0"± to 6'-0"±

2'-0"± 2'-0"±

Varies:

1'-6" to 2'

Varies:

1'-6" to 2'

Varies: 21"-27"

±2'-0"

Inter-mix streambed material as directed by CO during placement of Channel Rock Bank to seal voids throughout the section.

FOOTNOTES:

FOOTNOTES:

The final channel bottom should be a dense, well interlocked streambed with low permeability. Compact each layer and fill surface voids by washing in fine material. Use water pressure, tamping rods, and similar hand operated equipment to force fine material into all surface voids.

THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT THE STREAM FLOW

DOES NOT GO SUBSURFACE THROUGH THE CULVERT FOR A 48 HOUR

PERIOD AFTER RE-WATERING.

Native material meeting the gradation for the specified Bed Class, and Channel Rock may be salvaged and incorporated into the simulated streambed.

1'-6" min.

1'-6" min.

ISOLATED BOULDER LOCATIONS

STATION

OFFSET

DISTANCE

FROM CL

PIPE (FT)

OFFSET

DIRECTION

BOULDER

DIAMETER SIZE

(IN)

PROTRUSION

ABOVE

SURFACE

(IN)

3+77 1.1' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"

3+80 2.0' LEFT 12" - 18" (CLASS CR-1) 6" - 9"

3+82 1.2' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"

3+90 1.9' LEFT 12" - 18" (CLASS CR-1) 6" - 9"

3+93 1.6' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"

4+05 2.3' LEFT 12" - 18" (CLASS CR-1) 6" - 9"

4+09 0.8' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"

4+16 1.3' LEFT 12" - 18" (CLASS CR-1) 6" - 9"

4+20 1.0' RIGHT 12" - 18" (CLASS CR-1) 6" - 9"

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

4/2 3/1

9 1 4:

B

RE

ND

AN

F

:\6

4 U

SF

S

- T

ON

GA

SS

N

F

AO

P

SI

TE

S

(1 4)

\D W

G\

-R

D2

-M P0

.15 -D

ES

IG

N.

DW

G;

REGION 10

ALASKAN REGION

DEWATERING

REQUIREMENTS

Apr-19

M. JENSEN

B. MCCRAY

M. JENSEN

AOP CULVERT

TONGASS

THORNE BAY

REPLACEMENTS

PRINCE OF WALES

RANGER DISTRICT

NATIONAL FOREST

NFSR 2050070-MP 0.15

11BYPASS DAM PROFILE VIEW

Impervious membrane key trench, fill with clean gravel as needed to control seepage under impervious membrane

Anchor impervious membrane (sandbags, stones, etc.)

Impervious membrane

Sandbags

Bypass pipe 18" diameter minimum

Streambed

Existing Culvert

PUMP

PUMP

Top of excavation (estimated)

Remove sediment from pumped water using filtration (e.g. "siltbags"), dispersion onto landscape (e.g. using perforated pipe), settling basin and/or addition of flocculates.

modify as needed to meet downstream turbidity requirements.

To downstream energy dissipater

Sandbag by-pass & "feeder" dams location to be staked by contractor and approved by the CO

By-pass pump use for installing and removing gravity by-pass dams and diversions

Construct backwater dam to prevent water from entering work area from downstream

D/S Flo w

(No turbidity)

Energy dissipater as needed to prevent turbidity (e.g.

plastic sheets, stones).

By-pass discharge location to be staked by contractor and approved by CO.

PUMP

Stream by-pass pipe. Diameter as specified, watertight joints, minimum grade 2% downstream.

PLAN

Upstream sump pump place in cutoff trench or sump at depth needed to dewater excavation

Sedimats- details & number of rows per manufacturer

Elbow joints as needed, typ.

Edge of exiting road, typ.

Edge of active channel, typ.

BYPASS DAM ELEVATION VIEW

4' Overflow

12" min. Varies

Sandbags

Streambed Pipe as needed

GEOTEXTILE-WRAPPED STRAW

BALE SEDIMENT CONTROL WEIR

SECTION VIEW PLAN VIEW

STREAM FLOW

Granular Backfill Section 703.03(a)

Straw bales

Granular Backfill Section 703.03(a)

Straw bales

Geotextile mirafi 140N or equal

Stream Flow

SANDBAG BYPASS DAM DETAILS

Anti-seep collar. place anti-seep collar over membrane & pipe, then cut membrane to allow water through pipe.

6 mil plastic sheeting minimum

Bypass pipe

Downstream sump pump place in cutoff trench or sump at depth needed to dewater excavation

NOTES:

1. Design dewatering flow for construction is 34 CFS.

2. The plan shown here is intended to represent the general dewatering requirements and not applicable to a specific site.

submit a plan specific to the site.

3. Contractor to determine the size of the bypass pipe based on the specified flow.

4. Ensure that the bypass pipe and dam are leak-proof. Do not proceed with construction until the implemented dewatering plan has been inspected and accepted by the CO in writing.

5. Ensure pumps are be clean and free of leaks and placed in a containment kit.

6. Excavate draw down pool for sumps a minimum of 2 feet below the bottom of the excavation and a minimum of 5 feet in diameter.

7. Maintain all elements of the operation in order to dewater the foundation, facilitate construction, prevent harm to aquatic organisms (not just fish) and prevent sediment and turbidity from entering the stream. Construct the dewatering system in a manner which enables USFS biologists to collect and transport organisms from the live channel, just before completion of the diversion dam.

8. Operate pumps (preferably electric) downstream of the bypass dam if the dam does not seal thoroughly. Maintain a pump running 24 hours a day in the downstream sediment retention dam to divert water containing sediment to the forest floor where it will be filtered before entering back into the stream.

Leave pumps in position on site even if water discharge drops considerably, to be prepared for storm flows.

Provide ditches and/or sumps along outside of foundation as necessary to dewater foundations

New Culvert Footings

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

11+80.00

12+20.00

12+60.00

12+91.97

13+10.00

13+40.00

13+80.00

14+20.00

-20 0 20

-20 0 20

-20 0 20

-20 0 20

-20 0 20

-20 0 20

-20 0 20

-20 0 20

Existing ground, typ.

8'8' Typ.Typ.

Match existing cross slopes

1.5

Typical fill slope, both sides

Match existing cross slopes

NFSR 2050070 MP 0.15

ROAD CROSS SECTIONS

AOP CULVERT REPLACEMENT

ENGINEERS

PLANNERS

SURVEYORS

AutoCAD SHX Text

PREPARED BY :

SHEET XS1 OF XS1

Sheets and Views
1 COVER
2 QTY
3 TYP
4 ROAD
5 Culvert
6 Excavation
7 Footing
8 Precast
9 Stream
10 Stream (2)
11 Dewater
XSEC1
2019-06-06T13:06:43-0800
TYLER GUNN
2019-06-11T11:00:14-0800
LEONARD JOB, P.E.