1131PL17RCP31201.pdf

PDF 919 KB Posted

Attached to
Smart Cities Integrated Planning Technical Specialist Services Federal contract opportunity
Solicitation number
1131PL-17-R-CP31204
Issued by
United States Trade and Development Agency

About this file

COMBINED SYNOPSIS SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to Smart Cities Integrated Planning Technical Specialist Services, newest first.
File Type Posted
SF-30_Amendment_001.pdf PDF
Encl_3_Past_Performance_Questionnaire_USTDA_RFQ-CO201531173.docx DOCX document
Encl_1_SF-1449_1131PL17RCP31204_(fillable).pdf PDF
Sample_Pricing_Worksheet_and_Level_of_Effort.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U . S . T R A D E A N D D E V E L O P M E N T A G E N C Y

SUBJECT: Request for Proposal for India: Smart Cities Integrated Planning Technical Specialist Services (Technical Advisory Services)

SOLICITATION NUMBER: 1131PL-17-R-CP31204

ISSUANCE DATE: August 14, 2017 CLOSING DATE: September 13, 2017, 4:00 pm EST

This is a combined synopsis/solicitation for commercial item prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6 and procedures in Subpart 13.1 as supplemented with additional information included in this notice. This announcement constitutes the only Request for Proposal (RFP); proposals are being requested and written solicitation will not be issued.

This solicitation is being issued In Accordance With (IAW) FAR Subpart 13.104. The Government will award a contract resulting from this solicitation to the RFP respondent who is deemed responsible and is determined, based on the evaluation factors, to represent the best value to the Government.

This procurement is unrestricted under NAICS Code 541690. Award is limited to U.S. Firms or U.S. individuals. Contractor and subcontractor personnel used shall be either U.S. citizens on non-U.S. citizens lawfully admitted for permanent residence in the United States. Contractor use of subcontractors is limited to less than fifty percent of the proposed price.

The Government intends to award a Time and Materials (T&M (Fixed Labor Rate/Labor Day)) contract with Cost Reimbursable Line Items for Travel with an 18-month period of performance as a result of this RFP. The total estimated number of labor days for this contract is 380 days;

broken down as follows: estimated 246 in labor days and estimated 134 in travel days to, within, and from India (Note: RFP Respondent may follow this USTDA’s estimated Level of Effort in their price proposal or independently estimate theirs (accompanied with narratives)). Travel (which is cost reimbursable) will be required during the performance of this contract. No profit or fee shall be added to travel.

Proposals should set forth any exceptions/assumptions taken with regard to the Performance Work Statement (PWS) or any other aspect of the RFP or any other information that you find necessary and pertinent to your Proposal (for example, the RFP Respondent may follow the USTDA’s estimated Level of Effort spreadsheet or independently estimate theirs (accompanied with narratives)). However, RFP Respondents are cautioned that any exceptions/assumptions to the terms and conditions of the solicitation will be at their own risk. Any exceptions or assumptions should clearly identify the paragraph and term or condition to which the exception or assumption is being made and include supporting rationale.

The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-95.

I. INSTRUCTIONS TO RFP RESPONDENTS

The provision at FAR 52.212-1, Instructions to Offerors-Commercial, applies to this acquisition with addendum as follows:

1. Proposal Due Date: Your proposal (technical, management, past performance, and price) must be received no later than 4:00 pm EST on September 13, 2017. Late proposals will be processed in accordance with FAR 52.212-1(f).

2. Proposal Submission: Send your proposal by email to contractproposals@ustda.gov.

Proposals submitted by fax or to alternate email addresses will NOT be accepted.

3. Questions Relating to This RFP: All questions concerning this solicitation should be directed to Ms. Angela Williams at awilliams@ustda.gov. The question cutoff date is 12 Noon EST on August 21, 2017. Please reference the Solicitation Number in the Subject Line of your email.

4. Notice Regarding Suspension/Debarment/Ineligibility: Any contract awarded to a contractor who, at the time of award, is suspended, debarred, and ineligible for receipt of contract with Government Agencies or in receipt of a notice of proposed debarment from any Government Agency, is voidable at the option of the Government.

5. System for Award Management (SAM) Database: All Contractors must be registered in the SAM database via https://www.sam.gov/portal/public/SAM/ in order to be eligible for contract award. Lack of registration in SAM will make an RFP respondent ineligible for award as described in FAR 52.204-7. However, do NOT delay submission of your Proposal pending receipt of a CAGE code.

6. Special Contract Requirements: This Request for Proposal (RFP) includes the following additional contract terms and conditions:

CONTRACTOR FOLLOW-ON (INELIGIBILITY): The Contractor and its subcontractors shall be ineligible to compete for, as a prime or subcontractor or otherwise, USTDA funded activities that result from this contract. USTDA reserves the right to grant a waiver, based upon FAR 9.503, if preclusion of the contractor or its subcontractors from the follow-on activity would not be in the Government's interest.

This restriction shall remain in effect for three years from the completion of this contract.

The contractor agrees to include this provision in all subcontracts to this contract.

7. Contract Clauses: The clauses at 52.212-4, Contract Terms and Conditions-Commercial Items and 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items, apply to this acquisition.

mailto:contractproposals@ustda.gov mailto:awilliams@ustda.gov https://www.sam.gov/portal/public/SAM/

8. Responses Shall Be Submitted In THREE Separate Volumes As Follows:

VOLUME I(a): TECHNICAL PROPOSAL:

**No pricing information shall be included as part of the technical Proposal. All pricing information shall be included in a separate volume as noted on page 5 of this RFP**

Technical Proposal shall not exceed 15 pages in length. Any additional pages will not be evaluated.

(a) The technical Proposal shall clearly describe relevant technical background and professional experience related to evaluating and implementing urban and regional smart city and infrastructure planning projects as it relates to the Performance Work Statement (PWS), including experience in drafting Terms of Reference/Scopes of Work and Budgets for studies, pilot projects, and technical assistance activities that promote integrated critical infrastructure systems.

(b) The technical Proposal shall also clearly describe relevant technical knowledge areas that support the evaluation and implementation of urban and regional smart city and infrastructure planning projects– such as technical experience with energy generation/transmission/distribution systems and procedures, multi-modal transportation networks, information and communications infrastructure; and relevant regulations and standards as related to the PWS.

The RFP respondent(s) shall confine submissions to essential matters, sufficient to define the Proposal and provide an adequate basis for evaluation. RFP respondent(s) are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each Proposal. No material may be incorporated in the Proposal by reference in order to circumvent the page limitation. Please submit the technical Proposal as a searchable PDF.

The following documents are not included in the page limitation:

a. Cover Page

b. Table of Contents

c. Executive Summary: Although this section will not be evaluated, if included, it should allow technical reviewers to quickly understand the critical elements of the Proposal including the most salient features of the RFP respondents’ technical vision and approach, the key personnel and capabilities to accomplish the desired results. This section shall be limited to 1 page. Any additional pages will not be reviewed.

d. Resume/Curriculum Vitae (CV): Resumes/Curriculum Vitae (CVs) submitted as part of the Proposal, may not exceed 3 pages per person. Any additional pages shall not be reviewed.

VOLUME I(b): PAST PERFORMANCE:

a. Relevant Past Performance Information:

i. For all RFP Respondents submitting a Proposal:

RFP respondents shall submit a list of no more than three past performance references within the past five years, consisting of the contract number, contract type (preferably time-and-materials/labor hour contracts), the entity (federal, state, or local Government, or private sector) for which the work was performed, a summary of the relevant work, and the name of the person (e.g. contracting or technical) to be contacted with their address, telephone, and email address. Past performance will be considered relevant if the contract demonstrates relevant experiences that are similar in size, scope, and complexity to the effort described in this solicitation.

The Government reserves the right to obtain past performance information from any available source, to include the U.S. Government’s Past Performance Information Retrieval System (PPIRS), and may contact customers other than those identified by the RFP Respondent when evaluating past performance.

RFP respondents are authorized to provide information on problems encountered on the identified contracts and the RFP Respondents' corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the RFP Respondent's past performance. The source selection authority shall determine the relevance of similar past performance information.

1. For RFP Respondents WITH existing and relevant USTDA past performance (see definition of relevancy in a.i. above)

Per a.i. above, if some or all of the submitted three past performance references are from USTDA, USTDA will attempt to retrieve records for the referenced past performance effort either from the U.S. Government’s Past Performance Information Retrieval System (PPIRS) or from records internal to USTDA or from both. No further action is required by the RFP Respondent.

2. For RFP Respondents WITHOUT existing and relevant

USTDA past performance

Submit the Past Performance Questionnaire (Enclosure 3) to its submitted three references (see a.i.) for completion. The references (not the RFP respondents) must return the completed Questionnaire to the email address indicated no later than the closing date of this solicitation. The RFP Respondent is solely responsible for ensuring the questionnaire is completed and returned by the respective references on or before the deadline. Any past performance questionnaire returned directly by the RFP respondents may not be considered.

The Questionnaire includes instructions that must be reviewed and followed carefully. Responses must be typed into the provided, editable Microsoft Office Word Document Past Performance Questionnaire (RFP Enclosure 3).

In the case of an RFP respondent without any record of relevant past performance or for whom information on past performance is not available FAR 15.305(a)(2)(iv) states that the RFP respondent may not be evaluated favorably or unfavorably on past performance. The RFP respondents, in this case, shall be rated as “Unknown Confidence (Neutral)" - which is neither favorable nor unfavorable.

VOLUME II: MANAGEMENT PROPOSAL:

**No pricing information shall be included as part of the management Proposal. All pricing information shall be included in a separate volume as noted on page 5 of this

RFP**

The management proposal shall not exceed 2 pages in length. Any additional pages will not be evaluated.

(a) The management proposal shall clearly describe relevant corporate experience with managing Time-and-Materials/Labor Hour Contracts. The proposal shall show a demonstrated capability to manage Time-and-Materials/Labor Hour contract project efforts, the capability to convey accurate and timely project status, and the capability to provide cost/schedule/performance metrics required by the Government.

The RFP respondent(s) shall confine submissions to essential matters, sufficient to define the proposal and provide an adequate basis for evaluation. RFP respondent(s) are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each Proposal. No material may be incorporated in the proposal by reference in order to circumvent the page limitation. Please submit the management proposal as a searchable PDF.

VOLUME III: PRICE:

Price Proposal: (a) RFP respondents shall submit their price proposal using Standard Form (SF) 1449- Solicitation/Contract/Order for Commercial Items. Each RFP respondent should ensure the CAGE CODE and DUNS Numbers are placed in Block 17A and complete blocks 24 (with pricing information), 30A, 30B, and 30C.

(b) RFP respondents shall also submit a breakdown of the price proposal in a Microsoft Excel Spreadsheet complete with traceable formulas. The price proposal excel spreadsheet must be accompanied with narratives (to support the price Proposal) in a word document. ALL PRICE

NUMBERS SHALL BE ROUNDED UP, NO CENTS.

(b) RFP Respondent may follow the USTDA’s sample pricing spreadsheet or independently estimate theirs (accompanied with narratives) to include their total proposed mix of labor categories, labor rates (fully loaded), and labor days needed to meet all the requirements contained in the PWS.

II. EVALUATION PROCEDURES

a. EVALUATION FACTOR 1: TECHNICAL: The following sub-factors are of equal importance:

Sub-factor 1: Relevant Technical Experience: The RFP respondent's relevant technical background and professional experience related to advising, preparing and implementing smart city and infrastructure planning projects as it relates to 3.0 and 8.0 of the PWS shall be evaluated to determine the likelihood that the RFP respondent can successfully perform the contract requirements and the degree of the risk of non-performance.

Sub-factor 2: Proposed Workplan and Impact Strategy: The RFP respondent's recommended work plan to conduct Tasks 3.2-3.5. The work plan should also include a detailed strategy to access and track the potential of U.S. exports and positive development impacts that may result from this contract shall be evaluated to determine the likelihood that the RFP respondent can successfully perform the contract requirements and the degree of the risk of non-performance.

The impact of the ratings of Technical Subfactors 1 and 2 on the overall Technical Factor rating is further explained in this paragraph. If the rating of Technical Subfactor 1 (or Technical Subfactor 2) is Acceptable, then such a rating will have no positive or negative impact on the overall rating for the Technical Factor. For example, if the rating of Technical Subfactor 1 (or Technical Subfactor 2) is Acceptable and the rating of Technical Subfactor 2 (or Technical Subfactor 1) is Outstanding, then the overall Technical Factor rating will be Outstanding. On the other hand, if the rating of Technical Subfactor 1 (or Technical Subfactor 2) is Unacceptable, then such a rating will have a negative impact on the overall rating for the Technical Factor. In that case, the overall Technical rating will be Unacceptable —regardless of the rating of Technical Subfactor 2.

b. EVALUATION FACTOR 2: MANAGEMENT (of Time and Materials/Labor Hour

Contracts): The RFP Respondent’s relevant corporate experience with managing Time-and- Materials/Labor Hour Contracts shall be evaluated to determine the likelihood that the RFP Respondent can successfully perform the contract requirements and the degree of the risk of non-performance.

The RFP Respondent shall also be evaluated on demonstrated capability to manage Time-and-Materials/Labor Hour contract project efforts, the capability to convey accurate and timely project status, and the capability to provide cost/schedule/performance metrics required by the Government to determine the likelihood that the RFP respondent can successfully perform the contract requirements and the degree of the risk of non-performance.

c. EVALUATION FACTOR 3: RELEVANT PAST PERFORMANCE: Government's intent is to evaluate each RFP respondent's past performance - including technical performance; timeliness of performance; quality/customer satisfaction; and cost control - to determine whether the RFP respondent consistently delivered quality service in a timely manner in the past. This factor will be evaluated on the basis of relevant past performance information, including performance on contracts of a comparable nature scope and complexity to those in the current solicitation. The past performance information to be evaluated includes information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant. The information presented in RFP respondents' proposals, together with information from any other sources available to the Government (e.g., Government-controlled Contractor performance databases and references including contractual, technical, and end-user representatives) may be considered.

In the case of an RFP respondent without a record of relevant past performance or for whom information on past performance is not available FAR 15.305(a)(2)(iv) states that the RFP respondent may not be evaluated favorably or unfavorably on past performance. The RFP respondent, in this case, shall be rated as "Neutral" - which is neither favorable nor unfavorable.

d. EVALUATION FACTOR 4: PRICE: A price evaluation will be conducted in accordance with FAR 13.106-3 to determine completeness (i.e. all information required by the RFP has been submitted and is accurate) and fair and reasonableness. The Government may also conduct price realism for the purpose of assessing whether an RFP respondent’s unrealistically low price reflects on its understanding of the PWS requirements or the risk inherent in the RFP respondent’s approach. Price Proposals found to be unrealistically low (an indication of “buy – in”) will be ineligible for award. The evaluated price will be used in the tradeoff analysis between price and technical factors to determine best value.

Award Basis: Proposal will be evaluated on the following factors: Technical, Management, Relevant Past Performance, and Price. Within the Technical Factor, Technical Subfactors 1 and 2 are of equal importance. Award will be made, using the tradeoff process, to the contractor whose Proposal represents the best value to the Government. The non-price factors (Technical, Management, and Past Performance) when combined are significantly more important than price. However, as technical merit of the proposals becomes more equal, price may become a determining factor.

Table 1. Technical Ratings: Technical factor and sub-factors shall be evaluated using the following adjectival ratings:

Rating Description Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The Proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies.

Proposal is unawardable.

Table 2. Past Performance Confidence Assessments: Past Performance factor shall be evaluated using the following adjectival ratings:

Rating Description Substantial Confidence Based on the RFP respondent’s recent/relevant performance record, the Government has a high expectation that the RFP respondent will successfully perform the required effort.

Satisfactory Confidence Based on the RFP respondent’s recent/relevant performance record, the Government has a reasonable expectation that the RFP respondent will successfully perform the required effort.

Limited Confidence Based on the RFP respondent’s recent/relevant performance record, the Government has a low expectation that the RFP respondent will successfully perform the required effort.

No Confidence Based on the RFP respondent’s recent/relevant performance record, the Government has no expectation that the RFP respondent will be able to successfully perform the required effort.

Unknown Confidence (Neutral) No recent/relevant performance record is available or the RFP respondent’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Best Value Award Determination

The Government will make an award to the RFP respondent whose proposal conforms to the PWS requirements and is determined, based on the evaluation factors, to represent the best value to the Government. The Government seeks to award to the RFP respondent who gives USTDA the greatest confidence that it will best meet or exceed the requirements affordably. This may result in an award to a higher rated, higher priced RFP respondent, where the decision is consistent with the evaluation factors and the Contracting Officer reasonably determines that the technical superiority of the higher priced RFP respondent merits the additional price.

The Government may award based on initial proposals received, without further discussions.

Accordingly, each RFP respondent should submit their proposal to the Government using the most favorable terms from a technical and price standpoint. Pursuant to FAR Part 15.306(c), if discussions are held, the Contracting Officer shall establish a competitive range of the most highly rated proposals. If the number of most highly rated proposals exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range.

Only one award will result from this RFP. Proposals that do not address all requirements presented in the PWS may not be considered for award.

//Signed//

GARTH A. HIBBERT

USTDA Contracting Officer

Enclosures:

1. Standard Form 1449 with Clauses and Performance Work Statement

2. Sample Pricing and Estimated Level of Effort Spreadsheet

3. Past Performance Questionnaire

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

1131PL-17-R-CP31204

Angela M. Williams 703-875-4271

1131PL

Same as Box 9

1131PL

Same as Box 9

U.S. Trade and Development Agency Finance Office invoices@ustda.gov

1 Time and Materials (Fixed Labor Rate/Labor Day) Contract 1 for the India-Smart Cities Integrated Planning Technical Specialist Services (Technical Advisory Services) with Cost Reimbursable Line Items for Travel.

See Performance Work Statement for Period of Performance

541690

08/10/2017

09/11/2017

12:00PM EST

1131PL

U.S. Trade and Development Agency Office of Acquisition Management 1000 Wilson Boulevard, Suite 1600 Arlington, Virginia 22209-4901

1131PL

SECTION B – CONTINUATION OF SF-1449 BLOCKS

B.1 SCHEDULE OF SUPPLIES/SERVICES:

(Continuation from Standard Form 1449, block 19 through 24)

Contract Type: Time and Materials (Fixed Labor Rate/Labor Day) Contract

1.0 DIRECT LABOR

(DL)

NAME, TITLE AND LABOR

CATEGORY

DAILY (8HR)

RATE EFFORT NO. DAYS

ITEM TOTAL

Project Manager and Urban Planner 0 Assistant Urban Planner 0 Transportation Specialist 0 IT Specialist 0 Energy Specialist 0 Admin 0

0 0

2.0 OTHER DIRECT

COSTS (ODC) Expense Type (unit type) UNIT COST # OF UNITS ITEM TOTAL

Misc. including telephone, printing (multiple) 0 DBA Insurance 0 Medevac Coverage 0

4.0 REIMBURSABLES Expense Type (unit type) UNIT COST # OF UNITS ITEM TOTAL International Airfare (RT Trips) 0 Domestic India Airfare ( RT Trips) 0 MI&E (Days) (average across India) 0 Lodging (Days) (average across India) 0 Local Transportation (Days) 0 Taxi to and From Airport (Trips) 0 Visas (Individual) 0

0TOTAL CONTRACT VALUE

Sample Pricing Sheet: India Smart Cities Integrated Planning Technical Specialist Services

SUBTOTAL DIRECT LABOR

SUBTOTAL OTHER DIRECT COSTS (ODC)

3.0 TOTAL FIXED PRICE CLINS 1.0 and 2.0

SUBTOTAL REIMBURSABLES

Task

Number Task Name

Labor Days:

U.S. based work

Labor Days:

India based work

Labor Days:

Total

# of

International

Trips

# of

Domestic

India Trips

# of Trip Days in India

3.1

Initial Meetings with USTDA Regional and

Program Evaluations Office - - -

Project Manager and Urban Planner - - -

Assistant Urban Planner - - -

Transportation Specialist - - -

IT Specialist - - -

Energy Specialist - - -

Administrative Support - - -

3.2 Smart Cities Initiative Progress Assessment

Project Manager and Urban Planner - - 0

Assistant Urban Planner - - 0

Transportation Specialist - - 0

IT Specialist - - 0

Energy Specialist - - 0

Administrative Support - - 0

3.3

Travel to India for Kick Off Meetings with

Smart Cities Officials in Ajmer (Rajasthan), Allahabad (Uttar Pradesh) and other cities identified in 3.2.

Project Manager and Urban Planner

Assistant Urban Planner

Transportation Specialist

IT Specialist

Energy Specialist

Administrative Support

3.4

Provide Advisory Services for Ajmer

(Rajasthan) and Allahabad (Uttar Pradesh)

Project Manager and Urban Planner

Assistant Urban Planner

Transportation Specialist

IT Specialist

Energy Specialist

Administrative Support

Assumes 13 business days for all (2.5 weeks). Allows for trips to 6 cities. Assumes 1 weekend, plus 2 travel days for per diem/lodging= 4 additional days.

Urban Planners: Assumes 30 business days over 3 trips. Each trip visit 2 cities (6 domestic airfares); total extra days= 6 weekend days + 6 travel days=12

Specialists: Assumes 20 business days over 2 trips. Each trip visit 2 cities (4 domestic airfares);

total extra days= 4 weekend days + 4 travel days= 8 additional days

Estimated Level of Effort (in days) Worksheet: India Smart Cities Integrated Planning Technical Specialist Services

B.2 G&A/FRINGE/OVERHEAD/PROFIT:

None

B.3. CONTRACT ADMINISTRATION DATA

(Continuation from Standard Form 1449, block 18A.)

1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals;

a. CONTRACTOR: TBD

b. GOVERNMENT: Contracting Officer

US Trade and Development Agency

1000 Wilson Blvd., Suite 1600

Arlington, VA 22209-3901

Contracting Officer Representative

US Trade and Development Agency

1000 Wilson Blvd., Suite 1600

Arlington, VA 22209-3901

3.5

Smart Cities Activity Development and Review

(DM)

Project Manager and Urban Planner

Assistant Urban Planner

Transportation Specialist

IT Specialist

Energy Specialist

Adminstrative Support

0 - 0 0 - 0

Title Labor Days India LD

International

Trips India Trips

Days in

India

Project Manager and Urban Planner - 0 - 0 -

Assistant Urban Planner - 0 0 0 -

Transportation Specialist - 0 0 0 -

IT Specialist - 0 0 0 -

Energy Specialist - 0 0 0 -

Adminstrative Support - 0 0 0 0

Total - 0 0 0 -

Urban Planners: Assumes 20 business days over 3 trips. Each trip visit 2 cities (6 domestic airfares); total extra days= 6 weekend days + 6 travel days=12

Specialists: Assumes 20 business days over 2 trips. Each trip visit 2 cities (4 domestic airfares;

total extra days= 4 weeks days + 4 travel days= 8 additional days

SECTION C- CONTRACT CLAUSES

a. PROVISIONS INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016

52.209-7 Information Regarding Responsibility Matters JUL 2013

52.216-31 Time-and-Materials/Labor-Hour Proposal Requirements FEB 2007

Commercial Item Acquisition

52.225-25 Prohibition on Contracting with Entities Engaging In OCT 2015

Certain Activities or Transactions Relating to Iran

Representations and Certifications

b. CLAUSES INCORPORATED BY REFERENCE

52.203-17 Contractor Employee Whistleblower Rights and APR 2017

Requirement To Inform Employee of Whistleblower Rights

52.204-4 Printed or Copied Double-Sided on Post Consumer Fiber MAY 2011

Content Paper

52.204-13 System for Award Management OCT 2016

52.204-19 Incorporation by Reference of Reps and Certs DEC 2014

52.212-4 Contract Terms and Conditions—Commercial Items, ALT I JAN 2017

52.228-3 Worker’s Compensation Insurance (Defense Base Act) JUL 2014

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business DEC 2013

Subcontractors

c. CLAUSES INCORPORATED BY FULL TEXT

52.212-5 Contract Terms and Conditions Required to Implement JAN 2017

Statues or Executive Orders—Commercial Items

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or

Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and

Further Continuing Appropriations Act 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and

Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).

X__ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract

Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111- 117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (31 U.S.C.

6101 note).

_X_ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility

Matters (Jul 2013) (41 U.S.C. 2313).

___ (10) [Reserved]

___ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).

___ (ii) Alternate I (Nov 2011) of 52.219-3.

___ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).

___ (ii) Alternate I (Jan 2011) of 52.219-4.

___ (13) [Reserved]

___ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).

___ (ii) Alternate I (Nov 2011).

___ (iii) Alternate II (Nov 2011).

___ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C.

644).

___ (ii) Alternate I (Oct 1995) of 52.219-7.

___ (iii) Alternate II (Mar 2004) of 52.219-7.

X__ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C.

637(d)(2) and (3)).

___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637

(d)(4)).

___ (ii) Alternate I (Nov 2016) of 52.219-9.

___ (iii) Alternate II (Nov 2016) of 52.219-9.

___ (iv) Alternate III (Nov 2016) of 52.219-9.

___ (v) Alternate IV (Nov 2016) of 52.219-9.

___ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).

___ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).

___ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C.

637(d)(4)(F)(i)).

___ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set- Aside (Nov 2011) (15 U.S.C. 657f).

___ (22) 52.219-28, Post Award Small Business Program Re-representation (Jul 2013) (15 U.S.C. 632(a)(2)).

___ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically

Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C.

637(m)).

___ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned

Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

_X_ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

_X_ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Oct

2016) (E.O. 13126).

_X_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X_ (28) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

___ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

___ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

___ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

_X__ (32) 52.222-40, Notification of Employee Rights Under the National Labor

Relations Act (Dec 2010) (E.O. 13496).

_X__ (33) (i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C.

chapter 78 and E.O. 13627).

_X_ (ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627).

_X__ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

___ (35) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (Oct 2016).

(Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).

Note to paragraph (b)(35): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.

___ (36) 52.222-60, Paycheck Transparency (Executive Order 13673) (Oct 2016).

___ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (Jun 2016) (E.O.13693).

___ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

___ (40) (i) 52.223-13, Acquisition of EPEAT® -Registered Imaging Equipment (Jun

2014) (E.O.s 13423 and 13514

___ (ii) Alternate I (Oct 2015) of 52.223-13.

___ (41) (i) 52.223-14, Acquisition of EPEAT® -Registered Television (Jun 2014) (E.O.s 13423 and 13514).

___ (ii) Alternate I (Jun 2014) of 52.223-14.

___ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42

U.S.C. 8259b).

___ (43) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).

___ (ii) Alternate I (Jun 2014) of 52.223-16.

_X_ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while

Driving (Aug 2011) (E.O. 13513).

___ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

___ (46) 52.223-21, Foams (Jun 2016) (E.O. 13696).

___ (47) (i) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

___ (ii) Alternate I (Jan 2017) of 52.224-3.

_X_ (48) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

___ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May

2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).

___ (ii) Alternate I (May 2014) of 52.225-3.

___ (iii) Alternate II (May 2014) of 52.225-3.

___ (iv) Alternate III (May 2014) of 52.225-3.

___ (50) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C.

3301 note).

___ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the

Department of the Treasury).

___ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense

Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

___ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

___ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(Nov 2007) (42 U.S.C. 5150).

___ (55) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505), 10 U.S.C. 2307(f)).

___ (56) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C.

4505, 10 U.S.C. 2307(f)).

_X_ (57) 52.232-33, Payment by Electronic Funds Transfer— System for Award Management (Jul 2013) (31 U.S.C. 3332).

___ (58) 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332).

___ (59) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

___ (60) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

_X_ (61) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C.

637(d)(12)).

___ (62) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).

___ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

___ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495)

___ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter

67.).

___ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

___ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards --

Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C.206 and 41 U.S.C. chapter 67).

___ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards --

Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

___ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-- Requirements (May 2014) (41 U.S.C. chapter 67).

___ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67).

___ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O.

13658).

___ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.

13706).

___ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792).

___ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C.

5112(p)(1)).

(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the

Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C.

637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iv) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.

(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vi) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(vii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(viii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(ix) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

(x) 52.222-40, Notification of Employee Rights Under the National Labor

Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xi) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter

67).

(xii) (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C.

chapter 78 and E.O. 13627).

(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O.

13627).

(xiii) 52.222-51, Exemption from Application of the Service Contract Labor

Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xiv) 52.222-53, Exemption from Application of the Service Contract Labor

Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).

(xvi) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(xvii) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (Oct 2016) (Applies at $50 million for solicitations and resultant contracts issued from

October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).

Note to paragraph (e)(1)(xvii): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the

Federal Register advising the public of the termination of the injunction.

(xviii) 52.222-60, Paycheck Transparency (Executive Order 13673) (Oct 2016).

(xix) 52.222-62, Paid sick Leave Under Executive Order 13706 (JAN 2017) (E.O.

13706).

(xx) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

(B) Alternate I (Jan 2017) of 52.224-3.

(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations.

(May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph

(e) of FAR clause 52.226-6.

(xxiii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels

(Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of Clause)

52.217-8 - Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The

Contracting Officer may exercise the option by written notice to the Contractor within five (5) calendar days.

52.217-8 Option to Extend Services NOV 1999

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The

Contracting Officer may exercise the option by written notice to the Contractor within 15 days.

52.252-2 Clauses Incorporated by Reference FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov

(End of clause)

SECTION D – ANY CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

D.1. PERFORMANCE WORK STATEMENT

ADVISORY AND ASSISTANCE SERVICES BY NON-GOVERNMENTAL SOURCES:

INDIA SMART CITIES INTEGRATED PLANNING TECHNICAL SPECIALIST SERVICES

1. SCOPE OF WORK

The United…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .