1127-25P Bid Sheet.xlsx
XLSX spreadsheet 43 KB Posted
- Attached to
- Hayden Ranch Structural Stabilization State and local contract opportunity
- Solicitation number
- 1127-25P
- Issued by
- Colorado
About this file
The document is a detailed bid sheet prepared by A&M Renovations on November 11, 2023, for Colorado Mountain College's Hayden Ranch Structural Stabilization project located south of Leadville, Colorado. The project involves comprehensive structural stabilization and immediate repairs for 16 historic buildings on the ranch, including a Ranch/Bunk House, multiple barns, a Ranch House, various sheds, a chicken coop, hen house, garage, horse barn, log cabin, and other auxiliary structures. The bid sheet provides a systematic breakdown of potential repair categories, including immediate repairs, long-term repairs for slab on grade, and long-term repairs for stem wall foundations, covering essential structural elements such as roofing, foundation work, framing, and general construction conditions.
The bid sheet does not include specific pricing totals, with most line items showing "$-0", suggesting this is a preliminary estimating document or a template for potential contractors to complete. Notable technical considerations include specific recommendations for foundation work, such as potentially lifting structures, installing new foundations, implementing French drains, and addressing roofing materials like cedar shingles or corrugated metal. The project location at 5801 Hwy 24 in Leadville requires careful assessment of site-specific challenges, including varying ground grades and the presence of a stream under one of the buildings, which may impact repair strategies and costs.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 1127-25P Hayden Ranch Structural Stabilization.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
| Prepared by A&M Renovations |
| November 11, 2023 |
COST SUMMARY--ALL BUILDINGS
| Building | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| 1. Ranch / Bunk House | |||
| 2. Large Barn, North Wing | |||
| 2. Large Barn, South Wing | |||
| 2. Large Barn, East Wing | |||
| 3. Ranch House | |||
| 4. Shed | |||
| 5. Chicken and Rabbit Coop | |||
| 6. Hen House / Tack Room | |||
| 7. Storage Shed | |||
| 8. Garage | |||
| 9. Garage / Storage | |||
| 10. Barn / Manger | |||
| 11. Horse Barn | |||
| 12. Shed | |||
| 13. Privy | |||
| 14. Log Cabin | |||
| 15. Work Shed | |||
| 16. Slaughterhouse | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 |
| Add Contingency | $ - 0 | $ - 0 | $ - 0 |
| Total with Contingency | $ - 0 | $ - 0 | $ - 0 |
Contingency Percentage
1. Ranch-Bunk House
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
1. Ranch / Bunk House
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
| Notes |
| o Please note in your pricing if you are assuming lifting the Ranch/Bunk House and installing a new foundation beneath it or leaving the building at its current elevation, setting new pressure treated timber sills or concrete grade beams into the earth, and digging a French drain around the structure to protect it from water infiltration. |
2. Large Barn (N)
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
2. Large Barn, North Wing
| Scope Item | Immediate Repairs | Long Term Repairs |
| Roofing | ||
| Foundation | ||
| Roof Framing | ||
| Hayloft Floor Framing | ||
| Wall Framing | ||
| General Conditions | ||
| Overhead and Profit | ||
| Total |
| Notes |
| The structural plans call for replacing the 1x straight sheathing now being used as a roof covering with cedar shingles or corrogated metal because the straight sheathing does not adequately protect the structure. |
| Contractor may also price keeping the original style roof, remove the layer of straight sheathing, install plywood and an underlayment of 30# felt and/or Ice & Watershield, then install straight sheathing back on top |
2. Large Barn (S)
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
3. Large Barn, South Wing
Scope Item Immediate Repairs Long Term Repairs/ Slab on Grade
| Roofing |
| Foundation |
| Roof Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
2. Large Barn (E)
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
2. Large Barn, East Wing
Scope Item Immediate Repairs Long Term Repairs/ Slab on Grade
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
| Notes |
| o The pricing for At Grade Framing/Foundation, Long Term does not include raising the structure and installing a continuous 8" thick concrete stem wall as this does not appear to be feasible in this location, giving the varying grade of the surrounding earth and the presence of a stream running under the building. |
3. Ranch House
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
3. Ranch House
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Roof/Ceiling Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
4. Shed
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
4. Shed
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Roof/Ceiling Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
5. Chicken-Rabbit Coop
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
5. Chicken and Rabbit Coop
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof/Ceiling Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
6. Hen House-Tack Room
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
6. Hen House / Tack Room
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof/Ceiling Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
7. Storage Shed
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
7. Storage Shed
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Roof/Ceiling Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
8. Garage
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
8. Garage
Scope Item Immediate Repairs Long Term Repairs/ Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof/Ceiling Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
9. Garage-Storage
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
9. Garage / Storage
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| At Grade Framing / Foundation | $ - 0 |
| Roof Framing | $ - 0 |
| Roof/Ceiling Framing | $ - 0 |
| Wall Framing | $ - 0 |
| General Conditions | $ - 0 |
| Overhead and Profit | $ - 0 |
| Total | $ - 0 |
Notes
10. Barn-Manger
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
10. Barn / Manger
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Hayloft Floor Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
11. Horse Barn
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
11. Horse Barn
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
12. Shed
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
12. Shed
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof/Ceiling Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
13. Privy
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
13. Privy
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
14. Log Cabin
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
14. Log Cabin
Scope Item Immediate Repairs Long Term Repairs/ Stem Wall
| Roofing |
| At Grade Framing / Foundation |
| Roof Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
15. Work Shed
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
15. Work Shed
Scope Item Immediate Repairs Long Term Repairs/ Stem Wall
| Roofing |
| Foundation |
| At Grade Framing / Foundation |
| Roof Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
16. Slaughterhouse
| Hayden Ranch |
| Cost Estimates for Structural Stabilization |
16. Slaughterhouse
| Scope Item | Immediate Repairs | Long Term Repairs/ | ||
| Slab on Grade | Long Term Repairs/ |
Stem Wall
| Roofing |
| At Grade Framing / Foundation |
| Roof Framing |
| Wall Framing |
| General Conditions |
| Overhead and Profit |
| Total |
Notes
File details come from the government source that posted it. Updated .