1-SOW final 2.20.24.docx

DOCX document 2 MB Posted

Attached to
Fort Hall Fire Pipe Replacement Federal contract opportunity
Solicitation number
75H70124Q00019
Issued by
Department of Health and Human Services Indian Health Service

About this file

This statement of work outlines the requirements for a fire supply pipe replacement project at a health clinic in Fort Hall, Idaho. The scope of work includes demolishing the existing fire supply pipe from the first subfloor joint to the footing, installing a new pipe that meets NFPA 13 standards using corrosion-resistant materials, replacing an existing backflow preventer, inspecting exterior buried piping, conducting hydrostatic testing, and providing operation and maintenance documentation and staff training. Submittals such as qualifications, schedules, safety plans, and test results are required. Work must comply with standards including NFPA 13, NFPA 25, OSHA, and ASTM, and be coordinated with facility staff. The related federal contract opportunity is a solicitation from the Department of Health and Human Services Indian Health Service for the fire supply pipe and backflow preventer replacement project described in the statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Hall Fire Pipe Replacement, newest first.
File Type Posted
4-US DOL Wage Detrmination ID20240038 Dated 1-12-2024.pdf PDF
B01 75H70124Q00019.pdf PDF
3-ILSM.pdf PDF
A11 Pre-Solicitation SAM notice DRAFT.pdf PDF
2-ICRA Construction Matrix 2.0 Assessment.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

STATEMENT OF WORK

Fire Supply Pipe Replacement

I. Overview

A. Site Location

Replacement of the fire supply pipe and fire check valve will occur at the Not-tsoo Gah-nee Indian Health Center, located in Fort Hall, Idaho. The Not-tsoo Gah-nee Indian Health Center (NGHC) is located on the Shoshone-Bannock Tribes and the Northwestern Band of Shoshoni Tribal community at Fort Hall, Idaho approximately 10 miles north of Pocatello, Idaho. The GPS coordinates of the Clinic are 43.0269°N 112.4278°W.

33 North Mission Road Fort Hall, ID 83203

A sitemap is included in the attachments.

B. Objective and Background

The purpose of this work is to remove and replace the existing fire supply pipe and the existing fire check valve located on the grounds of the Not-tsoo Gah-nee Indian Health Center. The existing fire supply pipe’s condition show signs of corrosion with a substantial risk of failure and the check valve is showing signs of leakage.

C. Work Summary

The fire supply pipe replacement shall include:

1. Demolish the existing pipe, joints, insulation, and hangers from the first subfloor joint to the restrained connection at the footing.

2. Install new pipe, joints, hangers, and insulation.

3. Replace existing fire check valve.

4. Inspect exterior buried pipe near the footing to assess the material type and condition.

5. Backfilling and compaction of ground that was excavated.

6. Provide testing and reports for new pipe and backflow preventer.

II. Technical Requirements

A. Codes, References, and Standards

1. NFPA 13 Standard for the Installation of Sprinkler Systems

2. NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems

3. NFPA 99 Health Care Facilities Code

4. NFPA 101 Life Safety Code

5. OSHA 1926.651 Excavations

6. ASTM D 698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort

B. Submittals

The Contractor shall provide submittals on the items listed below. COR approval is required for each submittal before proceeding with that portion of work. Submittals shall be reviewed and approved within five (5) working days of receipt.

1. Initial Submittals (included with contractor proposal):

a. Certifications for the Lead Contractors demonstrating proof of NICET certification (or approved equal, as indicated under Section II., C. Quality Assurance, 1. Qualifications and experience).

2. Pre-Installation:

a. Gantt chart (or equivalent) describing all the overall schedule of project activities.

b. Materials data sheets and equipment list

c. Interim Life Safety Measures Preliminary Assessment

d. Contractors Safety and Accident Prevention Plan

e. Hydrostatic Test Plan

f. Inspection report on the material and condition of exterior buried pipe

3. During Installation:

a. Daily Report

b. Payroll

4. Materials

a. Fire Supply Pipe. Include corrosive characteristics or secondary coating.

b. Fittings / connections

c. Hangers

d. Insulation

e. Backflow Preventer

5. Post-Installation:

a. Hydrostatic Test Result

b. Inspecting, Testing, and Maintenance (ITM) Documents

C. Quality Assurance

1. Qualifications and Experience:

a. Plans must be prepared by a Project Manager or Lead Installer with a minimum NICET Level III certification, or COR and CO approved equal.

b. The Contractor shall be equipped with all necessary special tools, hardware, computer, and communications equipment that may be deemed necessary to perform the scope of work.

c. All materials supplied must be new, first quality and the manufacturer’s latest model capable of complying with all requirements of this specification and shall have been in continuous production and in continuous service in commercial applications for at least one year. Obsolete equipment shall not be used.

d. All materials and components used in the fire pipe replacement must meet NFPA 13 requirements, including ASTM, ASME, and UL standards referenced in NFPA 13 7.1.1.1.–7.9.5. All parts and materials must be replaced with equal or greater characteristics, including material types, sizes, flow rates, finishes, pressure and strength ratings, thermal factors, etc.

D. Material Specifications

1. Fire Supply Pipe

a. New piping must be in accordance with current industry standards for a wet pipe system with corrosion preventative properties.

b. Fire supply pipe replacement must be corrosive resistant or include a corrosive resistant coating.

c. Minimum Schedule 40

E. Work Execution Requirements

1. General:

a. The project includes the removal and installation of an NFPA 13 and NFPA 25 code compliant fire supply pipe and backflow preventer system in an existing fire sprinkler system.

b. Work Coordination: All work shall be coordinated with the COR and local facility contacts.

c. An initial site visit is required for accurate bidding and system verification.

2. Pre-Installation:

a. The Contractor shall coordinate and conduct a kickoff meeting with the COR and IHS staff. The meeting shall compromise of:

i. Introductions between IHS and the Contractors team members. This will begin initial discussion on the needs, concerns, and scheduling of the replacement process.

ii. The Contractor shall participate in the meeting onsite with IHS staff. If necessary, the CO and/or COR may participate via teleconference rather than onsite.

b. Contractors will develop and present a Hydrostatic Test Plan, which will describe the test procedures in accordance to NFPA 13, a minimum of two (2) weeks prior to the Acceptance Test.

c. Provide a plan for conducting fire supply pipe and backflow preventer removal and installation activities within an occupied and operating health clinic. This plan will include methods to address the following:

i. Levels of construction noise

ii. Construction detritus and dust accumulation

d. Infection Control Risk Assessment (ICRA)

i. Weekly Construction and Infection Control Checklist shall be reviewed and evaluated in consultation with the Infection Control Officer.

ii. Activities that result in excessive dust accumulation within the health center, such as cutting and demolition, will require the Contractor to use approved methods to contain and minimize dust dispersion. Methods for dust control are listed in the attached Infection Control Construction Risk Assessment Approval Checklist and require strict adherence. Contractor methods will be evaluated on a weekly basis by the Infection Control Officer.

e. Interim Life Safety Measures Plan

i. The Contractor is responsible for notifying and gaining advance approval from the IHS Safety Officer for any modifications or disabling of life safety systems as necessary to complete this work. Examples include temporary modification of exit paths or temporarily disabling an alarm system. In such instances, the Contractor shall implement interim measures acceptable to the IHS Safety Officer. The minimum content of the Impairment Plan is:

1. Scope of Impairment

2. Methods to Provide Equivalent Protection

3. Impairment Precautions

f. Hazard Inspection

i. Construction will take place in and around a facility constructed from 1989 – 1990. A comprehensive inspection for the presence of hazardous materials has not been conducted.

ii. As part of preparing the Safety and Accident Prevention Plan, the Contractor shall inspect work areas for the presence of potential safety hazards and hazardous materials consistent with the health and safety regulations applicable to this Contract. This includes inspecting for the presence of Asbestos Containing Materials (ACM’s) prior to any renovation or demolition work.

iii. The asbestos inspection shall be completed by a State Licensed Asbestos Inspector consistent with 40 CFR Part 61, Subpart M (Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP)).

iv. If the Contractor’s hazard inspection finds any reason to suspect the presence of lead-based paint, the work area shall be tested for the presence of lead-based paint by a certified lead-based paint inspector.

v. The outcome of the Contractor’s inspection of the work area shall be included with the Safety and Accident Prevention Plan submittal. In the event that new suspected or confirmed hazardous materials are found during the Contractor’s inspection, a Contract Modification shall be negotiated to assure the requirements of applicable health and safety regulations are met.

3. Exterior Pipe Inspection

a. Excavate portion of exterior buried pipe. Provide an assessment detailing the properties and condition of pipe and provide a submittal report.

Note: Replacement of exterior pipe may be considered under a contract MOD if COR/CO determines necessary.

b. The excavation for the exterior pipe inspection process shall be monitored for integrity by contractor in accordance with all applicable NFPA and OSHA standards.

c. After pipe inspection, compaction of initial backfill and backfill materials shall be done in such a way that the sufficient backfill has been placed to ensure that compaction equipment will not damage the pipe. Any damage resulting from the backfilling or compaction of the backfill shall be corrected at the cost of the contractor. At all times precautions should be taken to prevent flotation of the pipeline due to entry of water into the trench.

4. Installation

a. Demolish the existing fire supply pipe, hangers, joints, insulation, and other components in this location; including the faulty backflow preventer.

b. Remove all construction debris and material remains from work area.

c. Install new fire pipe, including hangers, joints, and insulation.

d. Install new backflow preventer. Test for proper operation and provide required documentation and tags.

5. Hydrostatic Test

a. Conduct a Hydrostatic Test according to the approved plan. This test shall be conducted in the presence of the COR or other parties identified by the COR.

b. The Systems shall be tested in accordance with the latest published edition of NFPA 25 and equipment manufacturers’ testing procedures and guidelines.

6. Post-Installation:

a. The Contractor will assemble and provide in a binder all inspection, testing and maintenance (ITM) documents according to NFPA 25. In addition, the documents will contain the manufacturer’s original product datasheets, specifications, installation instruction sheets, and descriptive information for all major components of the replacement project.

b. The scope of work also includes training local staff on any necessary operations of the system and requirement maintenance tasks and frequencies of those tasks. This training may be conducted in conjunction with the closeout meeting or as a standalone activity. If the latter, the Contractor shall coordinate the training with the COR seven (7) days in advance.

c. After the Acceptance Test is concluded and accepted by the COR, the contractor shall coordinate a closeout meeting with the COR. The closeout meeting shall be given with seven (7) days of advanced notice. The Contractor will brief the closeout participants of the following:

i. Overview of the system

ii. O&M Best Practices

iii. Warranty Information

III. Attachments

Attachment A – Building sitemap for Fire Supple Pipe Replacement Attachment B – Aerial View of Fire Supply Pipe Approximation Attachment C – Interim Life Safety Measure Plan Preliminary Assessment

Attachment A – Buildings for Fire Pipe Replacement Fort Hall Service Unit - Fort Hall, ID

Attachment B – Aerial View of Fire Supply Pipe Approximation image1.PNG image2.png image3.png

File details come from the government source that posted it. Updated .