(1) SOO FINAL.pdf
PDF 4 MB Posted
- Attached to
- CONFERENCE ROOM UPGRADES Federal contract opportunity
- Solicitation number
- FA2823-22-Q-A032
About this file
This statement of objectives (SOO) and technical requirements package (TRP) outlines requirements for upgrading three conference rooms at Eglin Air Force Base. The scope of work includes designing and installing new audiovisual solutions, furniture, and connectivity in conference rooms 170, 208, and 223 in building 85. The contractor must provide all new equipment including displays, speakers, microphones, networking infrastructure, power systems, and control interfaces. The solution aims to standardize controls across rooms while delivering clear audio, optimal visuals, and flexible layouts. Connectivity requirements include installing new network drops and fiber runs to specified communication rooms. The contractor must also remove and dispose of existing equipment, perform repairs and installations, and provide training.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_r 6.18.docx | DOCX document | |
| (1) COMBO v6.17.pdf | ||
| (1) COMBO v6.13.pdf | ||
| QA_r 6.6.docx | DOCX document | |
| QA.docx | DOCX document | |
| (1) COMBO_v6.1.pdf | ||
| (1) COMBO.pdf | ||
| (1) COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21 Apr 2022
Statement of Objectives (SOO) Technical Requirements Package (TRP)
Design/Solution/Products/Install an Upgrade/Redesign of Existing B85 Conference Rooms
Purpose: Obtain updated conference room (CR) solution with proposal. Key features: standardization, ease of management, audio clarity anywhere in room, clear communication, user-friendly, optimal display, efficient acoustics, adjustable sound level, utilize existing hardware and infrastructure where applicable.
The ultimate goal is to obtain audio/visual (A/V) capability and functionality driven to support our core mission.
Fact: The most efficient, cost effective solution and design with proposal for an updated conference room with current “state-of-the-art” technology knowledge lies with industry subject matter experts. Expectation is for the contractor to provide the most current commercially developed products. Goal is for contractor solution to make the most efficient use of space, maximum visibility, acoustics, connectivity and accessibility for users as a minimum to include products with upgradability and interoperability. When the contractor provides the latest generation, “state-of-the-art” OEM commercial technology products, the government receives an end-of-life product line with an expectation of having a “useful product lifespan” of no less than five years after manufacture production ends. Government expects to obtain no product components with less than five years life expectancy. Design for maximum productivity.
Overview:
Provide an A/V solution and proposal to upgrade conference rooms Building 85 Eglin AFB, FL.
o Rooms 170, 208, 223 o Include design, solution, hardware, installation, and training.
Reliable, high-quality presentation solution Technical solution to communicate and collaborate effectively and frequently o Contractor shall remove existing hardware, monitors, video wall, peripherals, and must pull all old wiring where applicable as part of solution. (with exception of government responsibilities noted)
A/V system control units shall be configured to operate standardized across conference rooms 170, 208 and 223 consistent and efficient login / access. Minimize steps.
No products may communicate using “any” wireless technology via interconnects (i.e. Bluetooth, WIFI, WIDI) o No cameras
Contractor shall run all required network connections for communication for each conference room.
o Reference attachment: 96th TW PWS 96TW-2022-00086.V2 20 APR22 and floor plan
Contractor shall provide additional connectivity (wire whips) as needed to connect to power. Sufficient power exists in all conference rooms for upgrades to occur.
o No abandoning in place strategy without prior facility manager or Civil Engineering approval.
o Electrical work shall comply with National Electric Code (NEC)
Security: Secret Collateral level Blue Lights in each room shall remain in place and functional.
Audio System: Speakers. Utilize existing ceiling and wall speakers in CR170, CR208 and CR223 where applicable.
o Existing speakers and layouts are defined in each room description.
If existing defined speakers do not function with A/V solution, contractor shall provide necessary hardware and components for presentation audio.
Public Address speakers must remain in place and operational.
o Public Address speakers will be marked prior to work start.
No Chairs are required for A/V solution. Chairs in drawings are depicted for visual representation only.
In any room where a wall needs to be repaired or a frame is needed to cover a void created by the removal of existing equipment – the contractor shall:
o Repair and/or install framework in a color scheme that compliments the current room.
Contractor shall supply all materials/products except for ceiling tiles and carpet squares.
Government furnished ceiling tiles and carpet squares to be installed by contractor.
Provide end-user operational training at completion of final installation.
Provide system admin training to administrators.
Customer networks defined as C2Net throughout this document.
Government shall dispose of the existing conference room tables at onset of A/V solution installation.
Contractors shall be escorted by the government at all times when on premise.
A/V solution shall include “as-built” drawings, diagrams and manuals.
Network connections that must be ran will utilize existing cable trays or J-hooks. If required contractor shall provide additional J-hooks.
Subfloor alarm equipment must be covered during contractor performed work.
Existing ceiling projector lifts in CR170 shall remain in place as is.
Projector screens present in any Conference Room shall remain in place as is.
96 Communication Squadron Guide for Network Installations (Ref: 96 CS Guide Eglin AFB, FL) o All fiber network connections will be of type LC.
o NIPR Cat 6 Copper. “White” color casing.
o SIPR Fiber. “Red” color casing.
Conference Room 170 (CR170) specific requirements: See diagram CR170.
CR170 room dimensions: 401 inches Length x 351 inch Width o Raised floor, 18” deep. Can be accessed at any point throughout the room.
Front Video Wall o Contractor shall remove and dispose of existing video/monitor wall o Contractor shall provide two (2) new 98 inch monitor’s (See diagram monitors #1 and 2) o Contractor shall utilize existing power source behind data wall to the new monitors.
o Contractor shall repair wall and provide frame to the standards listed in Technical Requirement
Overview above.
Monitors on Side Walls o Two new monitors 75” one on each side wall (Diagram monitors #3 and 4) o Contractor shall remove and provide to government the two (2) existing monitors.
Monitor Display Capabilities (for control presentation) o Layout 1: All four (4) monitors show the same image o Layout 2: Monitors 1, 3, 4 show the same image with monitor 2 showing a different image.
o Layout 3: All four monitors showing different image
Provide new Conference Table o Size and Shape: Boat shape o Seating for 11 individuals.
Five (5) on each side and one (1) on end farthest from front data wall monitors.
Leg room overhang depth estimate 15-20 inch.
Key: No leg obstruction where individual sits.
o Conference table installation and connectivity shall include all hardware and components – (Diagram
Station B, C and individual seat locations). Quantity and location for power, HDMI, NIPR, SIPR, C2NET, POTS and A/V system control unit.
Table shall provide power accessible to each seating location.
Government furnished POTS phone. Locate POTS drop centrally on table top.
Each individual seat requires one (1) NIPR, two (2) C2Net
Provide C2Net connection ports in box.
o Government shall install wiring/cable to the connector box contractor provided
Two (2) seats closest to front video wall (1 on each side of table) require two (2) SIPR, C2net, one (1) NIPR, HDMI
Provide a single A/V system control unit shared between these seats. (Ref Sta. B & C).
Portable lectern/podium – (Diagram Station D) o Contractor provided lectern/podium o Must be portable/movable o Contractor provide hardware and install flush mount floor panel connection box.
Connectivity access/plug-in via floor connection box for power, video, audio.
Provide two (2) NIPR, one (1) HDMI, and 1/8” analog audio jack to A/V System Shall have two standard power outlets (NEMA 5-15R) o Contractor shall provide gooseneck style microphone.
Rear room control station. (Diagram Station A) o Contractor shall provide the control workstation table o Color scheme (similar to conference table) o Size: seat one individual.
o Shall include A/V system control unit o Contractor provide hardware and install flush mount floor panel connection box.
o Connectivity access/plug-in via floor connection box for power, video, audio.
Provide two (2) C2Net, one (1) NIPR, SIPR, HDMI and 1/8” analog audio jack to A/V System Shall have two standard power outlets (NEMA 5-15R) Provide C2Net connection ports in box.
Government shall install wiring/cable to the connector box contractor provided Contractor shall provide 8” to 12” LCD touch panel room A/V system control units.
o Quantity two (2) each One (1) located at rear room control station (Station A) One (1) located at conference table within range of both control stations B & C A/V system control unit touch panel will include the operation of the A/V solution, CR170 lights (on/off/dim), digital signage inside (monitor overlay) and outside CR170 doors.
Lighting System o Contractor shall provide the ability to interface with existing model Lutron HP-2. (See attach CR170 Lights technical specifications) and recessed/CAN lights to control lighting. Shall be dimmable.
o Contractor shall provide the ability to interface with the Lutron HP-2 CR170 light system and recessed/CAN light system from the contractor provided touch panel A/V system control units which will be located at Stations A and B/C
Use existing lighting systems only. Contractor shall interface only. All current lighting stays.
Blue Lights not included.
Signage: Display room digital signage o Outside CR170 two (2) locations main and side entrance doors o Capabilities:
Signage (screen) shall be LCD type of 8” to 12”, programmable and activated by the A/V system control unit.
Display notifications (examples): Meeting in Progress, Conference in Session, etc.
Screen must be capable of displaying multiple colors (red, green, blue, etc.) in a typical standard legible font.
Locate / install signage (screens) most convenient as to allow for external power and data connections.
This could be above, or next to the door (potentially near Access Control keypad).
No wireless control of screens. Must be hardwired to A/V solution equipment.
o Inside CR170: Monitor presentation overlay (from A/V solution equipment)
To be displayed banner-style on the all wall monitor(s) Message can be static, moving, etc. and can be customized.
Speakers o Ceiling type
Utilize existing audio ceiling speakers.
Model Tannoy CVS6. See attached technical specifications
Quantity nine (9) each. See diagram for estimated locations o Front wall type
Utilize existing audio wall mounted speakers on front wall.
No part number or technical specifications available
Quantity two (2) each. See diagram for estimated locations o Room 168
Contractor shall not remove or utilize speakers.
Microphones o Contractor shall provide new microphone devices to provide accurate audio pickup for all “gallery” room and conference table seating o Contractor shall remove and dispose of existing hanging ceiling microphones, qty: 2 directly above conference table.
Contractor shall provide relevant equipment and racks required for A/V solution.
o Exception: Room 168 has a Government provided rack. (see attached R168 equipment rack)
Contractor has the option to use the Model WRK-24MDK rack.
If the rack is insufficient for contractor solution, Government shall dispose of the rack.
o Contractor shall locate required A/V solution support equipment in Room 168.
o Contractor shall remove existing R169 A/V system hardware and rack. Provide the hardware and rack to the government for disposal.
Contractor shall provide and install “all” system cabling / wiring not previously provided by the government
(existing NIPR and SIPR in room).
o Contractor shall install / run network infrastructure to B85 Communication rooms per 96th TW PWS
96TW-2022-00086.V2 20 APR22
o Exception customer net C2Net.
o Estimated distance NIPR 150 feet to R133 o Estimated distance SIPR 180 feet to R132
Electrical Power o Contractor shall provide required hardware and install power from existing CR170 infrastructure to all new contractor provided A/V solution hardware.
o Contractor shall provide power outlets (i.e. NEMA 5-15R, NEMA 5-20R, NEMA L6-30R, etc.) at AV rack location (Room 168).
o Contractor shall provide and install Uninterruptible Power Supply (UPS) at Audio Video (AV) rack location.
1 HDMI
1 NIPR
2 SIPR
2 C2NET
1 HDMI
1 NIPR
2 SIPR
2 C2NET
1 NIPR
2 C2NET
Si gn l o ca ti o n o u ts id e e n tr an ce d o o r
1 HDMI
1 NIPR
1 SIPR
2 C2Net 1/8" Analog Audio
Eglin AFB, FL 32542 Building 85, CR 170 Drawing Not to Scale
12 April 2022 Chairs displayed for representation only
Monitor #1 (New 98'’) Monitor #2 (New 98'’) M o ni to r
#4
N ew
M o nitor #3 (N ew
Page
POTS
Drop
351'’
Station A
Station B Station C
Station D
Room
Mantrap/ Foyer/
Vestibule
Sign location outside entrance door
Current Equipment rack
1 NIPR
2 C2NET
1 NIPR
2 C2NET
1 NIPR
2 C2NET
1 NIPR
2 C2NET
1 NIPR
2 C2NET
1 NIPR
2 C2NET
1 NIPR
2 C2NET
1 NIPR / 2 C2NET
A/V System Control Unit
Floor Connection
Box
Floor Connection
Box
A/V System Control Unit
Proposed A/V equipment rack
Lu tro n Ligh tin g C o n tro l
Ceiling Mounted speaker
Wall Mounted speaker
Legend:
Public Address speaker
Blue Lights
Door
Door
CR170
R
Job Name:
Job Number:
Model Numbers:
PageSPECIF ICATION SUBMITTAL hp246-1 04.05.04
Power EquipmentHP 2-4-6
Hi-Power Dimming Module System
Description
• Used to dim or switch heavily loaded zones. Allows a wall dimmer or one zone on a GRAFIK Eye 3000 Series Control Unit to control loads of up to
30,000W/VA.
• Dims or switches most popular lighting sources and load types.
• Available in one, two, and three-circuit Dimming Modules. Up to five Modules may be linked to obtain the necessary load capacity.
• Accepts either 120V or 277V input power. Not compatible with 220-240V, 230V, or 100V input power.
• Control using GRAFIK Eye 3000 Series Control Units, Lutron Wallbox Controls, Spacer System, or any incandescent dimmer or Class 2 momentary contact raise/lower control.
• Allows control of 277V loads using a 120V lighting control.
Typical Three-Circuit Dimming Module
120V Distribution Panel
Feed (input) circuits “feed through” to … … load (output) circuits.
HP-6
Dimming Module
• Control Circuit Wiring
• Dimmed Hot from Zone
GRAFIK Eye 3000 Series Control Unit
Lighting Load
Lighting Load
Job Number:
Model Numbers:
PageSPECIF ICATION SUBMITTAL hp246-2 04.05.04
Power EquipmentHP 2-4-6
Power
• Input power: 120V or 277V, 50/60Hz, phase-to-neutral.
• Load (output) circuits: 120V or 277V, 50/60Hz, any phase.
Adjustable Settings
• High-end trim reduces expensive relamping of incandescent/halogen sources.
• Provides raise/lower and “full on” functions when used with external momentary contact switches.
• Provides adjustable fade rate when used with Class 2 raise/lower control.
Weight
15 lbs. (6.8kg)
Mounting
Surface mount indoors only. Allow space for ventilating 200 BTUs/hour per load (output) circuit.
Environment
32-104°F (0-40°C). Non-condensing relative humidity less than 90%.
Specifications
Job Number:
Model Numbers:
PageSPECIF ICATION SUBMITTAL hp246-3 04.05.04
Power EquipmentHP 2-4-6
• All Dimming Modules accept either 120V or 277V input power. Do not mix voltages in the same Module.
• Each load circuit on HP-4 and HP-6 Dimming Modules can have different sources. Do not mix sources on the same load circuit.
• Up to five Modules may be linked to obtain the necessary load capacity.
• Do not use the HP Dimming Module with Capacitive Fluorescent Ballasts.
Model Number
HP-2
HP-4
HP-6
Number of Circuits
Source
Incandescent
Electronic Low Voltage2
Magnetic Low Voltage
Fluorescent (Hi-Lume/Compact SE/Eco-10)
Fluorescent (Tu-Wire)
Fluorescent (magnetic ballasts)
Fluorescent (electronic ballasts)
Neon/Cold Cathode
High-Intensity Discharge
Load Capacity per Circuit - Dimmed or Switched (Not to exceed N.E.C. capacity rating; control voltage is always 120V)
Dimmed (120V)
16A, 2000W/VA1
16A, 2000W/VA1
16A, 2000W/VA1
16A, 2000W/VA1
16A, 2000W/VA1
16A, 2000W/VA1
Switched (120V)
10A, 1200W/VA
10A, 1200W/VA
10A, 1200W/VA
16A, 1920W/VA
16A, 1920W/VA
16A
10A
10A, 1200W/VA
10A, 1200W/VA
Dimmed (277V)
16A, 4432W/VA
16A, 4432W/VA
Switched (277V)
Models, Sources, and Capacities
2 Requires electronic low voltage transformer approved for use with forward phase control dimmers.
1 Measured current will not exceed continuous load rating due to voltage drop in the dimmer.
Job Number:
Model Numbers:
PageSPECIF ICATION SUBMITTAL hp246-4 04.05.04
Power EquipmentHP 2-4-6
Dimensions
• Surface mount indoors.
• Dimming Module generates heat; mount only where ambient temperature is 32- 104°F (0-40°C).
• Provide proper space for cooling or the warranty will be void. Leave 6" (152mm) of clearance in front of the Module. Do not block the air channel between the back of the Module and the wall. The space between panels may be reduced to 4.5" (114mm) when mounting several Modules in a vertical layout.
• Mount Modules where audible noise is acceptable. (Modules hum slightly and relays click.)
• Mount Modules so line (mains) voltage wiring is at least 6 feet (1.8m) from sound or electronic equipment and wiring.
• Mount Modules within 7° of true vertical.
Bottom View
9 1/4" (235mm)
14 1/2" (368mm)
9 3/8" (238mm)
10 3/8" (264mm)
2" (51mm)
2 3/16" (56mm)
Right Side ViewFront View
6" (152 mm)
3" (76mm)
5 7/8" (150mm)
2 7/8" (73mm)
2 3/8" (60mm)
4 1/8" (104mm)
Low-voltage type Class 2 (PELV) wiring must enter here
Mounting
Module
HP-2
HP-4
HP-6
Maximum BTUs/Hour
Weight (Without Packaging)
11 lbs. (5.0kg)
13 lbs. (5.9kg)
15 lbs. (6.8kg)
3" (76mm)
Air Channel
6" (152 mm)
3" (76mm)
10" (253mm)
Job Number:
Model Numbers:
PageSPECIF ICATION SUBMITTAL hp246-5 04.05.04
Power EquipmentHP 2-4-6
• Each terminal accepts two #12 AWG (2.5mm2) wires.
• Each load circuit on HP-4 and HP-6 Dimming Modules can have different sources. Do not mix sources on the same load circuit.
• Do not use with generator-supplied power.
CL
AS
S 2 4
NEUTRAL
SSA
ZONE 3
ZONE 2
ZONE 1
HOT/LIVE CU WIRE ONLY
U S
A : C la ss
IE
C : P
E
LV
Load circuit terminals have factory-installed bypass jumper(s) between the H (Hot), SH (Switched Hot), and DH (Dimmed Hot) terminals of each load circuit.
Do not remove jumpers until installation is complete and load circuit is cleared of miswires/overloads.
Feed Wiring
• Pull dedicated feeds from distribution panel to Dimming Module(s): one feed for HP-2, two feeds for HP-4, three feeds for HP-6.
• Run separate neutrals for each feed - no common neutrals.
Prewiring Overview
Load Circuits
• (2) #12AWG Typical
• (3) #12AWG (2.5mm2) for dimmed fluorescent
To additional Dimming Modules (if used)
(3) #12AWG (2.5mm2)
Rear View of GRAFIK Eye Control Unit
Lighting Load
HP-6
Dimming Module
Dimmed Hot
Control Circuit Wiring
(3) #12AWG (2.5mm2)
Feeds
(2) #12AWG (2.5mm2) Typical
120V Distribution Panel
120V or 277V Distribution Panel
N N H H DH 1 2 3
CL
AS
S 2 4
NEUTRAL
SSA
ZONE 3
ZONE 2
ZONE 1
HOT/LIVE CU WIRE ONLY
U S
A : C la ss
IE
C : P
E
LV
R
Job Name:
Job Number:
Model Numbers:
PageSPECIF ICATION SUBMITTAL hp246-6 04.05.04
Power EquipmentHP 2-4-6
GRAFIK Eye Control Unit Wiring
Module-to-Module Wiring
• Pull three #12AWG (2.5mm2) wires between the Dimming Modules to be used on a zone.
• Modules must be daisy-chained.
• Connect the GRAFIK Eye Control Unit to the first Dimming Module used in the zone.
• Use two #12AWG (2.5mm2) wires to connect the Control Unit’s feed to the Dimming Module’s control circuit. This allows Dimming Modules to draw 40W/VA power for internal operations.
• Use one #12AWG (2.5mm2) wire to carry the zone’s dimmed (or switched) hot signal from the Control Unit to the Dimming Module. This allows the Control Unit to control the lighting loads.
• Make sure the power for the control circuit is 120V and on the same phase as the GRAFIK Eye Control Unit.
• Make sure the Control Unit’s feed can support all the Dimming Modules drawing off it. Each HP 2-4-6 Dimming Module draws approximately 0.1A of current.
• Use a separate raceway. Do not mix control circuit wiring with feed or load wiring.
Dimmed Hot Hot/Live
Neutral
Neutral Hot/Live
Rear View of GRX-3103 Control Unit
To additional loads
Control Circuit Feed
(3) #12 AWG
(2.5 mm2)
120VAC
Feed from Distribution Panel
HP 2-4-6
(3) #12 AWG (2.5 mm2)
To additional
HP 2•4•6
Modules (Five maximum)
Control Circuit Terminals
Job Number:
Model Numbers:
PageSPECIF ICATION SUBMITTAL hp246-7 04.05.04
Power EquipmentHP 2-4-6
N1 H1 DH1 SH1
N1 H1 DH1 SH1
120V Switched Load Circuits
Hi-lume® and Eco-10TM (Eco Series) Fluorescent Dimming Ballasts
N1 H1 DH1 SH1
120V or 277V Dimmed Load Circuits
All load types except Lutron Hi-lume® or Eco-10TM (Eco Series) Fluorescent Dimming Ballasts. Circuit 1 shown.
Typical Load Circuits
Neutral
Feed for Load Circuit 1 120V or 277V
Dimmed Hot
Neutral Load
Hot/Live
Feed-Through Load Circuit Terminal
HP-2
Load Neutral
Switched Hot
HP-2
Feed-Through Load Circuit Terminal
Neutral Hot/Live
Feed for Load Circuit 1 120V only
HP-2
Feed-Through Load Circuit Terminal
Neutral Hot/Live
Feed for Load Circuit 1 120V or 277V
Hi-Lume (FDB) or Eco-10 (ECO) Dimming Ballast
To additional Dimming Ballasts
White (Neutral)
Orange (Dimmed Hot)
Ground
Black (Switched Hot)
Conference Room 208 (CR208) specific requirements: See diagram CR208
CR208 dimensions: 237 inches Length x 176 inches Width o Raised floor, 18” deep. Can be accessed at any point throughout the room.
Front Video Wall o Contractor shall remove existing Samsung QM85D monitor and provide to the government.
o Contractor shall provide new 98 inch monitor (see diagram)
Monitor Display Capability Layout one (1) monitor display same image Layout two (2) monitor displays multiple images.
o Contractor shall utilize wall blocking and wall mount if applicable, or provide new standard mount.
o Contractor shall repair wall where required.
Equipment rack/cabinet/furniture o Contractor shall provide equipment rack/cabinet/furniture required for A/V hardware o Location: Corner of room to “right” side of the monitor o Government shall remove and dispose of the existing wooden credenza
Contractor shall provide a new conference table o Size and shape:
Rectangular shape Size L 144 inch x W 48 inch Leg room table overhang depth estimate 15-20 inch
Key: No leg obstruction where individual sits o Conference tabletop connectivity. Quantity and location for power, HDMI, NIPR, POTS, and A/V system control unit.
Contractor shall provide and install tabletop connection box Locate centrally on tabletop Contractor shall provide and install two (2) NIPR, one (1) HDMI, POTS, and A/V system control unit.
Government furnished POTS phone.
Contractor shall provide table power connectivity accessible to each seat location (max 11 seats) o Contractor shall provide one 8” to 12” touch panel A/V system control unit.
Control unit will operate the upgraded conference room A/V solution.
Control unit will operate the contractor provided digital sign placed on the outside of CR208
See below section digital signage No requirement to control lighting system
Uninterruptible Power Supply (UPS).
o Contractor shall provide UPS on all powered A/V solution equipment
Speakers o Ceiling type: Utilize existing audio speakers
Model Ambiance 62 Manufacture Cambridge Sound Works Quantity six (6) each. See diagram for estimated locations
Microphone(s) o Contractor shall provide new microphone device(s) to provide accurate audio pickup for room and conference table seating Contractor shall provide and install/run NIPR network infrastructure to R214 communication room.
o Distance estimate 190 feet (door to door). Linear footage
Contractor shall determine required length of wire/cable o Reference: 96th TW PWS 96TW-2022-00086.V2 20 APR22
Electrical Power o Contractor shall provide and install power hardware as needed from existing CR208 infrastructure to new contractor provided A/V solution hardware.
o Contractor shall provide additional connectivity (wire/whips) as needed to connect to power.
Conference room existing power will support the upgrade o Contractor shall provide power outlets (i.e. NEMA 5-15R, NEMA 5-20R, NEMA L6-30R, etc.) at AV rack location.
Digital Signage: Contractor shall provide digital signage o Location: Outside door.
o Signage (screen) shall be LCD type of 8” to 12”, programmable and activated by the A/V system control unit.
Display notifications (examples): Meeting in Progress, Conference in Session, etc.
Screen must be capable of displaying multiple colors (red, green, blue, etc) in a typical standard legible font.
o Locate / install signage (screen) most convenient as to allow for external power and data connections.
This could be above, or next to the door (potentially near Access Control keypad).
o Inside room signage to include overlay control on monitor same as CR170 o No wireless control of screens. Must be hardwired to A/V system equipment
Eglin AFB, FL 32542 Building 85, CR 208
Drawing Not to Scale 12 Aprilr 2022
Chairs for representation only
Monitor 98"
48'’
'’ HDMI
2 NIPR
POTS
A/V System Control
Unit
Proposed Equipment rack
Ceiling mounted spkr
Legend:Door
Public Address
Blue LightCR 208
Conference Room 223 (CR223) specific requirements: See diagram CR223
CR223 dimensions: Room not rectangular.
o 202 right side L, 208 left side L, center room 308 L inches x left of door 130 inches W, right of door 89 inches W, front monitor wall 182 inches W o Raised floor, 18” deep. Can be accessed at any point throughout the room.
Front Video Wall o Remove Samsung QM85D monitor and provide to government o Contractor shall provide new 98 inch monitor (see diagram monitor #1) o Contractor shall utilize wall blocking and wall mount if applicable, or provide new standard mount.
Contractor shall repair wall where required o Monitor Display Capability
Layout one (1) monitor display same image Layout two (2) monitor displays multiple images.
Equipment rack/cabinet/furniture o Contractor shall provide equipment rack/cabinet/furniture required for A/V hardware o Location: Corner of room to “left” side of the monitor o Government shall remove and dispose of the existing wooden credenza
Contractor shall provide a new conference table o Size and shape:
Rectangular shape Size L 144 inch x W 48 inch Leg room table overhang depth estimate 15-20 inch
Key: No leg obstruction where individual sits o Conference tabletop connectivity. Quantity and location for power, HDMI, NIPR, POTS, and A/V system control unit.
Contractor shall provide and install tabletop connection box Locate centrally on tabletop Contractor shall provide and install two (2) NIPR, one (1) HDMI, POTS, and A/V system control unit.
Government furnished POTS phone.
Table shall provide power accessible to each seating location (max 11 seats) o Contractor shall provide one 8” to 12” touch panel A/V system control unit.
Control unit will operate the upgraded conference room A/V solution.
Control unit will operate the contractor provided digital signage placed on the outside of CR223 No requirement to control lighting system
Uninterruptible Power Supply (UPS).
o Contractor shall provide UPS on all powered A/V equipment
Speakers o Ceiling type: Utilize existing audio speakers
Model Ambiance 62 Manufacture Cambridge Sound Works Quantity six (6) each. See diagram for estimated locations
Contractor shall provide and install/run NIPR network infrastructure to R214 communication room which is across the hall from CR223.
o Reference: 96th TW PWS 96TW-2022-00086.V2 20 APR22 o Distance estimate 50 feet (door to door). Linear footage.
Contractor shall determine required length of wire/cable
Electrical Power o Contractor shall provide and install power hardware as needed from existing CR223 infrastructure to new contractor provided A/V solution hardware.
o Contractor shall provide additional connectivity (wire/whips) as needed to connect to power.
Conference room existing power will support the upgrade o Contractor shall provide power outlets (i.e. NEMA 5-15R, NEMA 5-20R, NEMA L6-30R, etc.) at AV rack location.
Digital signage: Contractor shall provide digital signage o Location: Outside door.
o Signage (screen) shall be LCD type of 8” to 12”, programmable and activated by the A/V System Control unit.
Display notifications (examples): Meeting in Progress, Conference in Session, etc.
Screen must be capable of displaying multiple colors (red, green, blue, etc) in a typical standard legible font.
o Locate / install signage (screen) most convenient as to allow for external power and data connections.
This could be above, or next to the door (potentially near Access Control keypad).
o Inside room signage to include overlay control on monitor same as CR170 o No wireless control of screens. Must be hardwired to A/V system equipment.
Building 85, CR 223
Drawing Not to Scale 12 April 2022
Chairs shown for representation only
98" Monitor
2 NIPR
1 HDMI
1 POTS
48'’
182'’
A/V System Control Unit
Proposed Equipment rack
Ceiling Mounted speaker
Legend:
Public Address
Blue LIght
CR 223
Commonalities
Conference table top material specifications:
o High-pressure laminate o Solid Color Scheme: Teak or light to medium brown. “No wood-like grain style” tabletop.
o Must be able to sanitize the surface
All wiring and cabling shall be concealed in the conference table supports to access locations Contractor shall perform wall mounts for new wall displays/monitors where required.
“All” video monitors installed shall support up to 4K/60Hz resolution.
Audio and video. Provide visibility and clarity to all participants Common A/V controls across conference rooms 170, 208 and 223.
Non-proprietary hardware/software components.
o Goal prolong system life with ease of maintenance or support.
Removal of existing technology products.
Government shall disposition products not used in the upgrade where previously mentioned.
o Any products deemed useful/serviceable and not at end-of-life consider for re-use.
Government shall provide simplified room diagrams.
Contractor shall connect all A/V solution electrical power from wall or raised floor connections to conference table and other hardware as part of the upgrade. Contractor shall utilize existing power infrastructure.
Government shall provide switches, Cisco for SIPR, Juniper for NIPR for network connectivity.
Energy Star Mandate
The contractor shall ensure the solution with products meet Energy Star guidelines
Hardware and Associated Software and Peripherals
All hardware delivered under this DO shall include associated software, documentation and associated peripherals required for operations (such as control units, connectors, cables, drivers, adapters, etc.) as provided by the OEM.
This is true only if the applicable OEM provides such items with the product itself.
Software
For all software that is outside of hardware and purchased independently, the contractor shall provide the software license registered to the customer’s organization.
Customer Support / Warranty
The prime contractor shall provide 24x7 live telephone support during the warranty period to assist in isolating, identifying, and repairing software and hardware failures, or to act as liaison with the manufacturer in the event that the customer requires assistance in contacting or dealing with the manufacturer.
The contractor shall provide any OEM pass through warranty and standard commercial warranties applicable to the products being purchased at no cost.
Maintenance: Base Year: The contractor shall provide one (1) year warranty from date of completed installation. Include parts and functionality. The contractor shall perform routine, preventative, scheduled, and unscheduled maintenance actions required to keep the conference room infrastructure provided in an operational state. Includes end-user support to B85 team members to troubleshoot system or operational problems.
Option Years Maintenance: Provide proposal for option years. Opt Yr. 1, Opt Yr. 2, Opt Yr. 3, Opt Yr. 4
Product Maintenance
The contractor shall provide associated maintenance and upgrades to include spares/parts and emergency support, during the warranty period. In order to ensure new design enhancements and technological updates or advances, the contractor shall offer, under this Delivery Order (DO), hardware and software components available to the contractor's commercial customers. Furthermore, the contractor shall make available any commercially available updates to the hardware and software provided under this DO. If such updates are available to other customers without charge, then they shall also be made available to the Government without additional charge. The Contractor shall ship these updates to existing customers who have acquired the hardware/software being updated under this DO. Vendor commercial product offerings shall include “state of the art” technology, i.e., the most current proven level of development available in each product category.
Trade Agreement Act (TAA)
All proposed products must be compliant with the Trade Agreements Act of 1979 (TAA) and related clauses in Section I of this contract. In accordance with DFARS 252.225-7021, the Trade Agreements Certificate at DFARS 252.225-7020 shall be provided for each end item defined and specified in a solicitation that exceeds the TAA threshold subject to the waivers and exceptions provided in FAR 25.4, and DFARS 225.4 offered in response to any RFQ issued under this contract. Please note that Federal Acquisition Regulation (FAR) paragraph 25.103(e) includes an exemption from the Buy American Act (BAA) for acquisition of information technology that is commercial items.
Authorized Resellers
The contractor may be an authorized reseller of new OEM products proposed under this DO. The contractor may also procure directly from the OEM or utilize other legitimate distribution channels to provide the required products in accordance with the OEM’s policies on reselling. Any contractor’s channel relationships with their OEM partners (gold, silver, etc.) will be represented in the best pricing offered. If the contractor is not an OEM reseller, the contractor shall clearly identify this on the submitted proposal and list the OEM resell partner’s registered relationship with the OEM. DOs may restrict the use of authorized resellers, specific OEMs, or identify required OEMs. The contractor shall ensure all products are genuine and eligible for any OEM warranties, maintenance agreements and licensing as offered. Genuine products are those products the OEM, by their policy, considers not “secondary”, destroyed, stolen or scrapped.
Delivery/Installation
FOB Destination 101 Daytona Ave Bldg 85
Building 85 LAN Drop Installation
Organization: 96 CTG/ TGS
Address: Bldg. 85
1. Purpose
Install 5-total ScTP CAT 6 NIPR and 3-total OM3 MM duplex cables to conference room 170 and re-terminate 6-each NIPR/POTS cables into newly installed conference desks in rooms 223 and 208.
Specific Task Objectives
1.1. In conference room 170, pretest 10 existing CAT 6 cables before disconnecting from the conference table. Secure the disconnected cables under the raised floor below the table. Install j-hooks under the raised floor approx. 40-feet from the end of the cable basket to the new work area outlet location. Refer to drawing T-001.
1.2. In the hallway between room 169 and comm room 133, install approx. 50 feet of J-hooks above the drop ceiling. Reuse the existing 2-inch core into rooms 133 and 169. The sleeves shall be resealed with firestop after cables are installed.
1.3. Install 5 Plenum ScTP Non-secure Internet Protocol Router (NIPR) white CAT 6 data cabling and jacks from comm room 133 to conference room 170.
Three of the five new and existing cables will be terminated into new conference table. Two of the five will be installed in a new work area outlet location on the wall. Refer to drawing T-001.
1.4. In room 133, reuse rack RR01 modular patch panel E ports 16-20.
1.5. In conference room 170, reuse existing 1-inch innerduct to SIPR room 132.
Install 3-total OM3 MM duplex Plenum duplex fiber optic tight buffered or MIC indoor cable(s) from room 170 to room 132. In room 132, use rack 2 with existing 1RU fiber panel. The fiber panel will be reused as well. Terminations will made with LC splice on connectors on both ends. In room 170, 2 cables will terminate in the conference table and 1 will terminate in a new floor tile outlet box.
1.6. In rooms 223 and 208, perform a pre-test on 1-each POTS and LAN cables currently terminated into existing conference room tables. If cables do not pass current acceptable standards, replace cables with Plenum ScTP Non-secure Internet Protocol Router (NIPR) white CAT 6 cabling back to nearest comm room terminating on available rack mounted patch panel utilizing applicable standards.
Once new conference room tables are installed, re-terminate 1-each POTS and LAN cable onto table mounted Work Area Outlet.
1.7. The provided floor plan(s) illustrates our customers’ preliminary requirement.
(See Attachment 1)
The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.
2. General Technical Requirements
The following design criteria provides additional requirements and guidance for Eglin AFB installations. These specific requirements are to be implemented by means of all applicable publications and documents referenced within this guide:
2.1. Inside Plant:
Common Patch Panel configuration with 110 style terminations. Site survey will be used to determine best arrangement to fit customer needs and system standards. Ladder rack and cable tray will be included in the TR design to properly facilitate cable routing. All cabinets, racks, ladder rack and cable tray will be grounded per Industry Standard, ANSI 607.
2.2. Telecomm Outlets/Jacks:
Single Gang Outlet Box - Flush Mount. (Single Gang Faceplate Mounting Bracket for Low Voltage Applications, 1-1/4" Maximum Wall Thickness, Finish:
Pre-galvanized.)
Single Gang Outlet Box - Surface Mount. (Single gang two-piece screw together outlet box. Box accepts Pan-Way® Screw-On Faceplates or any NEMA standard single gang faceplate. For use with Pan-Way® LD profile raceway.
5.19in L x 3.45in W x 1.75in H (131.9mm x 87.7mm x 44.4mm). Breakouts for 1/2in, 3/4in, or 1in diameter conduit, International White)
Single Gang 4 Port Faceplate. (4 port minimum. Mini Com Classic series single gang downward sloped faceplate that accepts four modular jacks, Off White)
Data Jack. (The Category 6, RJ45, 8-position, 8-wire, UTP Mini-Com® universal jack module has TG-style termination. Off white)
Blank Inserts. (Mini-Com® 1-port blank module, reserves space for future use, White)
Surface Mount Raceway System. Tamper resistant two-piece latching surface raceway. Supplied with pre-punched mounting holes and factory applied adhesive tape. Available in 6', 8', and 10' lengths, Off White. Compatible with surface mount outlet box. Additionally all surface mounted raceway systems shall be screwed to the wall to prevent adhesive from detaching from mounted surface.
2.3. Telecommunications Cabling:
Riser CAT 6. (CAT6+ (600MHz), 4-Pair, U/UTP-Unshielded, Riser-CMR, Premise Horizontal Cable, 23 AWG Solid Bare Copper Conductors, Polyolefin Insulation, X Spline, Ripcord, PVC Jacket)
Plenum CAT 6. Copper Cable, Giga SPEED XL 2071E, 23 AWG, 4 Pair, Unshielded, UTP, Solid Bare Copper Conductor, FEP/PVC, CMP, blue jacket )
2.4. Cat 6 Connector Block (Patch Panel):
24/48 Port. Constructed for maximum strength and durability. Supports both T568A and T568B wiring configurations using an easy to read color-coded wiring label. Rack-mount modular panels shall include an integrated cable management requirement for cable routing and strain relief. Provide a complete modular system from patch panel to work area outlet.
Strain Relief Requirements. All Strain relief bars shall consist of a metal bar that mounts to the rear of a standard EIA 19" rack to support a minimum of 24 cables exiting from the back of a patch panel with a 2-inch to 5-inch inward mounted offset. Cables shall be secured with integrated adjustable clips, hook and loop strips or cable ties. Optional quick release brackets shall provide an easy way to remove the strain relief bar without the use of tools.
3.0 Singularly Managed Infrastructure with Enterprise Level Security (SMI-ELS)
3.1 Infrastructure Implementation and Operation
3.2 Network Services and Solutions
3.2.1 Site Preparation and Installation Services
The contractor shall perform site preparation and installation activities to support implementation of required services and solutions under this contract at any AF, DoD or other Federal Agency location.
3.2.2. Requirements Analysis and Conceptual Design
3.2.3 Site Survey
The contractor shall perform site surveys at required locations. The findings of the site survey and any actions required in preparation for system installation shall be documented.
3.2.4 Installation
The contractor shall engineer, install, configure, modify, relocate or remove Communication and Information (C&I) systems for operational use. The systems and equipment installations or modifications must comply with established architectures. The contractor shall perform validation and verification testing on the system, assist users in configuring the system to meet their system requirements and provide all applicable operating manuals/system management guides. Further, the contractor shall provide pre-cutover and post-cutover on-site training IAW with TOs. The government will identify personnel who will receive this training. The training shall provide for in-depth hands-on maintenance, operations and database administration.
3.2.5 Inside Plant
The contractor shall, (as required by each TO), install and configure all the components for inside the plant (e.g., power, groundings, racks, fiber optic distribution panels, equipment, internal cabling, comm. closet, etc.). The contractor shall install and test all cable and components IAW accepted industry standards, unless superseded by a Government approved IS indicated within the TO. Electrical and communications cable, conduits, and circuits shall be installed IAW the National Electric Code (NEC). The contractor shall clearly label each end of every individual cable in accordance with the floor plans or engineering drawings. The contractor shall provide attached labels that are durable and legible. For any deviations to the specific installation specification, the contractor shall submit a proposal to the CO for approval.
3.2.6 Tools and Testing Support
The contractor shall provide all tools, installation materials and test equipment required to perform any required product installation and maintenance as called for by the TO. All tools and test equipment shall remain the property of the contractor. Any damage caused by the contractor to existing site facilities or equipment which might occur during site preparation, installation, testing or cutover of the system will be repaired at the expense of the contractor unless otherwise directed by the government. The site shall be restored to the original condition which existed prior to the event unless otherwise directed. The TO will specify testing and inspection requirements. The contractor shall demonstrate that the system design meets the reliability/availability/maintainability requirements of the TO.
4.0. DELIVERABLES
As-Built Documentation. Contractor format for deliverables is subject to Government acceptance. The installer shall provide accurate As-Built documentation of the entire install (i.e. rack elevations, cable route drawings, etc.)
with type of cable path variations identified clearly. All deliverables shall be produced using recommended software tools/versions as accepted by the Government.
Standard Air Force NIPR/SIPR Data/Voice Wall-Mount Rack Elevation
Standard Air Force NIPR/SIPR Data/Voice Rack Elevation
5.0 Test and Acceptance Documentation.
The Contractor shall submit test reports within 3 duty days prior to final test and acceptance. The test reports shall show the tests performed to verify compliance with the specified performance criteria. Test reports shall include record of the physical parameters verified during testing. The contractor shall correct any errors or performance deficiencies detected by testing. The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.
APPLICABLE DOCUMENTS
All applicable National Electrical Code (NEC) and National Electrical Manufacturers Association (NEMA) dated most recent.
All applicable Unified Facilities Criteria (UFC) dated most recent.
All applicable ANSI /TIA dated most recent.
96th Communications Squadron Cyber Infrastructure Design Guide, to include Applicable Publications referenced in Attachment G, dated most recent.
All DoD and Industry standards/guidelines to provide a complete system, from end to end.
6. Contractual Requirements
6.1 Performance Reporting
The contractor’s performance will be monitored by the government and reported in Contractor Performance Assessment Reporting (CPARs). Performance standards shall include the contractor’s ability to:
1. Provide quality products, incidentals and customer support.
2. Meet customer’s agreed-upon timelines for scheduled delivery of items, warranty, and/or incidental services: Emergency/critical, Maintenance/Warranty – 24 x 7 x 365, and remote OCONUS, OCONUS vs.
CONUS response times.
3. Provide satisfactory product repairs or advance replacement, as appropriate.
4. Provide timely and accurate reports.
5. Respond to the customer’s requests for proposals and configuration assistance as identified in each delivery order.
6. Meet subcontracting goals.
6.2 Program Management
The contractor shall identify a Program Manager who shall be the primary representative responsible for all work awarded under this contract, participating in Program Management Reviews and ensuring all standards referenced herein are adhered to.
6.2.1 Services Delivery Summary
The Services Delivery Summary (SDS) will be in accordance with AFI 63-101, Acquisition and Sustainment Life Cycle Management and FAR Subpart 37.6, Performance-Based Acquisition. SLAs will be defined in each TO.
Desired Outcome Performance
Objective Performance Threshold
Overall Outcome
Specific Outcomes
Target Tolerance
Compliance with Infrastructure Solutions support requirements (delivery, quality)
Ensure compliance with Infrastructure Solutions deliverables requirements
Deliver the Infrastructure Solutions w/ predetermined outcomes and on time
Documentation submitted IAW
CDRL A001
verifies the TO was completed on
98% of the
6.2.2 TO Management
The contractor shall establish and provide a qualified workforce capable of performing the required tasks. The workforce may include a project/TO manager who will oversee all aspects of the TO. The contractor shall use key performance parameters to monitor work performance, measure results, ensure delivery of contracted product deliverables and services, support management and decision-making and facilitate communications.
The contractor shall identify risks, resolve problems and verify effectiveness of corrective actions. The contractor shall institute and maintain a process that ensures problems and action items discussed with the government are tracked through resolution and shall provide timely status reporting. Results of contractor actions taken to improve performance should be tracked and lessons learned incorporated into applicable processes. The contractor shall establish and maintain a documented set of disciplined, mature and continuously improving processes for administering all contract and TO efforts with an emphasis on cost-efficiency, schedule, performance, responsiveness and consistently high-quality delivery.
6.2.3 Configuration and Data Management
The contractor shall establish, maintain and administer an integrated data management system for collection, control, publishing and delivery of all program documents. The data management system shall include but not be limited to the following types of documents: CDRLs, White Papers, Status Reports, Audit Reports, Agendas, Presentation Materials, Minutes, Contract Letters and TO Proposals. The contractor shall provide the government with electronic access to this data, including access to printable reports. The contractor shall have an approved property control system IAW FAR 45, DFARS 245 and approved procedures to document and track all GFM and GFE. The contractor shall provide as-built documentation including, but not limited to, drawings and diagrams of the solution provided under each TO identifying specific cards in a chassis/shelf. The as-built documentation shall also include layout drawings, power drawings/specifications, floor plans and engineering specifications generated in support of the installation of the system. Documentation shall also include equipment listing with serial/model numbers and manufacturer specifications.
6.2.4 Records, Files and Documents
All physical records, files, documents and work papers, provided and/or generated by the government and/or generated for the government in performance of this PWS, maintained by the contractor which are to be transferred or released to the government or successor contractor, shall become and remain government property and shall be maintained and disposed of IAW AFMAN 33-363, Management of Records; AFI 33-364, Records Disposition – Procedures and Responsibilities; the Federal Acquisition Regulation, and/or the Defense Federal Acquisition Regulation Supplement, as applicable. Nothing in this section alters the rights of the government or the contractor with respect to patents, data rights, copyrights, or any other intellectual property or proprietary information as set forth in any other part of this PWS or the NetOps and Infrastructure Solutions contract of which this PWS is a part (including all clauses that are or shall be included or incorporated by reference into that contract).
6.3 Security Management
6.3.1 Safeguarding Classified Information
The contractor shall transmit and deliver classified material/reports IAW the National Industrial Security Program Operations Manual (NISPOM) and the National Industrial Security Program Operating Manual (DoD 5220.22-M). These requirements shall be accomplished as specified in the TO. All Classified Contracts must have at a minimum, the Clause 52.204-2 Security Requirement, incorporated into the contract.
Each base will follow its own classified process IAW with the proscribed Federal guidance of the NISPOM and FAR “Subpart 4.4 along with DD Form 254. When transmitting classified information ensure all classified information is properly sanitized and/or degaussed of all sensitive/classified information IAW AFSSI 5020.
6.3.2 Personnel Security
Individuals performing work under these TOs…
This is the start of the file's text. The full file is on GovTribe.