1. Performance Work Statement.docx

DOCX document 26 KB Posted

Attached to
Ft Indiantown Gap Static Display Painting Federal contract opportunity
Solicitation number
W50S9022Q0004
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Ft Indiantown Gap Static Display Painting, newest first.
File Type Posted
W50S9022Q0004.pdf PDF
2. Wage Determination.txt TXT text file
3. Photos.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

Static Display Aircraft Repaint Services

8 August 2022

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, to perform F-102 and EC-130E Static Display Aircraft Repaint Services, to include (but not limited to) repair of external damage, repaint exterior of aircraft and ensure aircraft are adequately protected against animal intrusion.

1.1.1 Objectives: The contractor shall furnish all tools, vehicles, qualified personnel, materials and services necessary to perform F-102 & C-130 static aircraft display repair and painting at Fort Indiantown Gap, Pennsylvania, in accordance with all Federal, State, and, local laws and regulations.

1.2 Background: Both the F-102 and EC-130E aircraft require periodic upkeep and repainting. The F-102 is long overdue to be repainted and is faded and flaking off. The EC-130E repaint that was done several years ago is badly discolored. HQPAANG is looking to have a contract to prepare and repaint both aircraft.

1.3 General Information:

1.3.1 Completion Date: All work shall be completed not later than 31 December 2023.

1.3.2 Place and Performance of Services: Place and Performance of Services: The contractor shall provide services between the hours of 0730-1630 on Monday through Friday until the aircraft are repainted, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at the static display aircraft located on Fisher Ave, Ft. Indiantown Gap. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.3.2.1 Telework: Teleworking is not authorized in the contractors’ performance of this requirement.

1.3.2.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:

1.3.2.2.1 New Year’s Day: January 1st

1.3.2.2.2 Martin Luther King, Jr.’s Birthday

1.3.2.2.3 President’s Day

1.3.2.2.4 Memorial Day

1.3.2.2.5 Juneteenth: June 19th

1.3.2.2.6 Independence Day: July 4th

1.3.2.2.7 Labor Day

1.3.2.2.8 Columbus Day

1.3.2.2.9 Veteran’s Day: November 11th

1.3.2.2.10 Thanksgiving Day

1.3.2.2.11 Christmas Day: December 25th

1.3.2.3 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.3.2. Access:

1.3.2.1 The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Government Point of Contact (POC). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.3.2.2 The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract.

1.3.2.3 The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter shall also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer shall endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.

1.3.2.4 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

1.3.2.5 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

1.3.2.6 Failure to comply with these requirements may result in withholding of final payment.

1.3.3 General Protection/Security Policy and Procedures:

1.3.3.1 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.3.3.2 Identification of Contractor Employees: All contractor personnel are required to identify themselves as contractors to avoid creating an impression that they are Government employees. Contractor personnel shall wear identification badges distinguishing themselves as Contractors. The badges shall have the company name, employee name and the word “contractor” displayed. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

1.3.3.3 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the Government POC or KO within 14 days of an employee’s departure.

1.3.3.4 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.3.3.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call to or from the Government, they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.3.3.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.3.4 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, Government POC, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO shall apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.3.5 Contract Manager (CM): The contactor shall designate a primary and an alternate CM who shall ensure performance under this contract. The name of these individuals shall be designated in writing to the KO. The alternate CM shall act for the contractor when the primary CM is absent. The CMs shall have full authority to act for the contractor on all contractual matters relating to daily operation of this contract. The CM shall work through the Government POC to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

2.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): General: The Government shall provide the material, equipment, services, and/or utilities listed below solely for the purpose of performance under this contract:

2.1 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

3.0 Requirements: The contractor shall:

3.1 Repair / Preparation: Preserve the historical integrity of aerospace vehicles and support equipment being repaired and restored. Do not inflict any damage on the airframe. Only make changes that compromise authenticity if it will enhance the long-term preservation of items displayed outdoors. The Government will use AF Form 3581, Static Display Aerospace Vehicle Maintenance Log to record all preservation and restoration actions. The contractor shall validate and sign.

3.1.1 At a minimum, keep aircraft from deteriorating further. Protect all components from the elements while it awaits restoration. Perform limited disassembly of the aerospace vehicles and selected disassembly of the components. Thoroughly inspect the aircraft and locate, identify, and remove all areas of corrosion. Make sure the aircraft is clean and free from dirt, debris, carbon and contaminants. Apply a corrosion-preventative chemical film prior to reassembly of all components and items. Apply a final chemical coating after reassembly.

3.1.2 Restore aerospace vehicles to original manufacturer's or operational appearance for the period depicted, and repair all damage. Systems need not be operational. You may leave some interior areas unrestored but they must be as received. The work need not conform to airworthy standards. The contractor shall prepare the surface of each aircraft for painting by removing any loose paint, sanding the surface (as needed), cleaning the surface, and coating the surface with a corrosion preventative prior to application of the final finish coat. Damaged or missing components may be remanufactured to less than original or airworthy standards.

3.1.3 Ensure all fuselage, wing and empennage drain holes are clear of obstructions.

3.1.4 Ensure historical static display aircraft cables remain secured.

3.1.5 Repair historical static display aircraft items including, but not limited to:

windshields, windows, tail, landing, beacon lights to resemble the original item, replace corroded/missing bolts, rivets, and fasteners on exterior of aircraft.

3.1.6 Caulk and/or seal all exterior hatches and windows on aircraft.

3.1.7 Ensure all drainage holes in aircraft are unclogged, and drill new drainage holes if required, and repair any holes in exterior of aircraft with metal patches, and replace duct tape on vents with proper overlay patches.

3.2 Exterior Painting:

3.2.1 The contractor shall perform corrosion control paint preparation functions IAW with standard commercial practices as necessary.

3.2.2 Do not compromise authenticity by adding spurious names, logos, nose art, or other identifying features that violate the historical accuracy of the colors, markings, or insignia (CMIs). Do not compromise CMIs for reasons of personal edification. Do not mix markings from a variety of aircraft, i.e. using the nose art from one aircraft, the serial number of another and unit codes from a third. Ensure historical accuracy in the placement and style of markings being applied, keeping in mind the "window" or "moment" of history you are representing. Fully document the markings being applied to static display aircraft.

3.2.3 The static aircraft topcoat painting is required to match the original color. The contractor shall paint the aircraft with Direct to Metal primers and paints. The use of urethane paint is prohibited due to environmental impact and the inability of urethane paint to provide a long-term uniform pleasing appearance.

3.2.4 The contractor must replicate aircraft markings, i.e. lettering, nose art, Air Force insignias, logos and emblems as applicable, and as near to original scheme as possible. All replications must conform to original configurations and sizes of all markings, etc.

3.2.5 Paint scheme shall match current colors as closely to original scheme as possible using the Federal Standard Colors (FSC) chart

3.2.5.1 C-130:

· Fuselage – see attached photos

· Fuselage underside – gray (FSC) 36173

· Tail – see attached photos

· Landing Gear Struts – gray (FSC) 36173 / silver (FSC) G12E25

· Landing Gear Wheel Wells – gray (FSC) 36173 / silver (FSC) G12E25

· Landing Gear Wheels – white (FSC) 17925

· Propellers –black (FSC) 37038 with black hubs (FSC) 37038

· Radome – – gray (FSC) 36173

· All existing markings as documented

3.2.6 Paint does not require airworthiness. Paint and markings must provide a neat and professional appearance. “Show Quality” paint or excessive gloss is not required. Fogging inside engine nacelles with silver paint is acceptable. Existing decals one inch in size and larger will be preserved or reproduced. Taping over a block and not painting that area is not accessible.

3.2.7 Overspray is unacceptable. Blisters, fish eyes, runs, and snags are unacceptable.

Roughness or dirt inclusions are unacceptable. Contractor must provide a one-year warranty against flaking, peeling, oxidation or dis-coloring.

3.3 Protection of Aircraft against Animal Intrusion. Secure areas of the aircraft subject to animal intrusion (wheel, wells, engines, access panels, etc) against animal intrusion and nesting in accordance with standard commercial practices. The method used to accomplish this must be as invisible as possible so as not to detract from the overall appearance of the aircraft.

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
3.1 Repair exterior of aircraft
The contractor shall make any necessary repairs to the aircraft exterior necessary to enhance long-term preservation of aircraft.
There shall be no instances of visible disrepair after project completion.
Visual Inspection / Government Point of Contact (POC)
3.1.1 Prepare exterior aircraft surface for repaing
The contractor shall remove and properly discard any flaking or loose paint, properly prepare non-failing paint for topcoat and treat all surfaces to prevent corrosion.
There shall be no unprepped or untreated exterior aircraft surfaces prior to aircraft repaint.
Visual Inspection / Government POC
3.2 Repaint exterior of aircraft
The contractor shall repaint the aircraft to match the previous paint color/scheme using appropriate direct to metal paints and primers ensuring historical accuracy.
The quality of repaint will meet all requirements spelled out in section 5.2 of this PWS.
Visual Inspection / Government POC
3.3 Protection of aircraft against animal intrusion
The contractor shall secure areas of the aircraft

subject to animal intrusion (wheel, wells, engines, access panels, etc) against animal intrusion and nesting in accordance with standard commercial practices.

The method used to accomplish this must be as invisible as possible so as not to detract from the overall appearance of the aircraft.

Visual Inspection / Government POC