1-10500-60-26-2 CONTRACT DOCUMENTS.pdf

PDF 3 MB Posted

Attached to
2026 Roadway Maintenance Program, Contrat No. 10500-60-26-2 State and local contract opportunity
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

Summary of 2026 Roadway Maintenance Program Contract Documents

This is a sealed competitive bid solicitation package issued by Wrightstown Township in Bucks County, Pennsylvania for roadway maintenance services. The project encompasses seal coating, slurry seal application, crack sealing, and pavement marking work across four township roadways: Fox Hill Drive, Martindell Drive, Mud Road, and Thompson Mill Road. The scope includes a single application of Asphalt Seal Coat and Type II Slurry Seal on two roadways totaling 12,225 square yards, a single application of Asphalt Seal Coat on one roadway (9,000 square yards), a double application of Asphalt Seal Coat on one roadway (6,060 square yards), 70 gallons of rubberized crack seal, and removal and replacement of all pavement markings. Sealed electronic bids are due May 5, 2026 at 10:00 A.M. via the PennBID portal at https://pennbid.bonfirehub.com. The contract must be completed within 30 calendar days from the Notice to Proceed. All bidders must be pre-qualified by the Pennsylvania Department of Transportation in accordance with Section 102.01 of PennDOT Specifications Publication 408. A mandatory pre-construction meeting will be conducted by the Engineer prior to issuance of the Notice to Proceed.

Bids must be accompanied by a certified check or bid bond equal to 10 percent of the total bid amount made payable to Wrightstown Township, an executed Non-Collusion Affidavit, and a completed Public Works Employment Verification Form. The successful bidder must furnish separate performance and payment bonds equal to 100 percent of the contract amount and maintain insurance coverage including $1,000,000 general liability and automobile liability per occurrence, plus $2,000,000 excess liability. This project is classified as maintenance and is not subject to the Pennsylvania Prevailing Wage Act but is subject to the Public Works Employment Verification Act (Act 127 of 2012) requiring use of the federal E-Verify system. The contract will be awarded to the lowest responsible bidder at the Township's sole discretion, with the Township reserving the right to reject any or all bids and delete any items. Progress payments will be processed monthly with 10 percent retainage during the first 50 percent of contract completion and 5 percent retainage thereafter. A one-year maintenance bond equal to 100 percent of the final payment contract amount is required, with the maintenance period commencing upon final certification of completion by the Township. Liquidated damages of $250 per calendar day apply for failure to meet the 30-day completion deadline.

View the file

Other files for this state and local contract opportunity

Other files attached to 2026 Roadway Maintenance Program, Contrat No. 10500-60-26-2, newest first.
File Type Posted
1-Contract Documends C0005792.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WRIGHTSTOWN TOWNSHIP

2203 SECOND STREET PIKE

WRIGHTSTOWN, PA 18940

CONTRACT DOCUMENTS

FOR

2026 ROADWAY MAINTENANCE PROGRAM

IN

WRIGHTSTOWN TOWNSHIP,

BUCKS COUNTY, PENNSYLVANIA

APRIL 2026

ARRO CONSULTING, INC.

4259 W. SWAMP ROAD, SUITE 410

DOYLESTOWN, PA 18902

CONTRACT NO. 10500-60-26-2

ARRO REF. #C0005793

ARRO CONSULTING, INC.

INDEX

TITLE SECTION

1. Advertisement for Bids C

2. Location Map C

3. Instructions to Bidders IB

4. Proposal and Contract C

5. Performance Bond C

6. Payment Bond C

7. Affidavit RE (Workmen=s Compensation Act) C

8. Anti-Collusion Affidavit C

9. Statement of Bidder=s Qualifications SBQ

10. Public Works Employment Verification PWEV

11. Construction Specifications CS

ADVERTISEMENT FOR BIDS

WRIGHTSTOWN TOWNSHIP

BUCKS COUNTY, PENNSYLVANIA

Sealed electronic bids will be received by Wrightstown Township until 10:00 A.M., on May 5, 2026 (prevailing time). All documents and solicitation details are exclusively available at https://pennbid.bonfirehub.com. Bidders must register (a free process), then click on the “Portal,” then “Open Public Opportunities” tabs.

2026 ROADWAY MAINTENANCE PROGRAM

CONTRACT NO. C0005793

WRIGHTSTOWN TOWNSHIP

BUCKS COUNTY, PENNSYLVANIA

The Contract will include the single application of Asphalt Seal Coat and single application of Type II Slurry Seal of two roadways (12,225 SY), the single application of Asphalt Seal Coat of one roadway (9,000 SY) and the double application of Asphalt Seal Coat of one roadway (6,060 SY).

The Contract will also include 70 GAL rubberized crack seal and the removal and replacement of all pavement markings.

All bidders on this project must be pre-qualified by the Pennsylvania Department of Transportation in accordance with Section 102.01 of PennDOT Specifications Publication 408, latest edition.

All work and materials shall be in accordance with PennDOT Standards and Specifications.

Proposals must be made upon the forms furnished by the Township, as available on PennBID.

This project is considered maintenance and is not subject to the terms and conditions of the Pennsylvania Prevailing Wage Act, as determined by the Secretary of Labor and Industry and, therefore, is to be bid as such.

The project is subject to the terms of the Public Works Employment Verification Act (Act 127 of 2012). Completed and signed “Public Works Employment Verification Form” is required as a precondition to the award of the Contract and is to be submitted as part of the submission of bid.

Proposals must be accompanied by an electronic copy of a certified check or bid bond in the amount of 10% of the total bid amount for the work detailed in Attachment 1, made payable to Wrightstown Township.

Bids must be accompanied by an executed Non-Collusion Affidavit as set forth in the Contract Documents. Failure to submit an Affidavit with the bid proposal may result in disqualification of the bid.

The successful bidder will be required to furnish separate bonds with corporate surety issued by companies authorized to do business in the Commonwealth of Pennsylvania on the prescribed forms dated the date of the Contract, or separate Federal or Commonwealth chartered lending institution irrevocable letters of credit in a form accepted and approved by the Township, each equal to one hundred percent (100%) of the Contract amount, to secure (1) the faithful performance and maintenance of the contract; and (b) the prompt payment of materials and labor.

https://pennbid.bonfirehub.com/

The Award of Contract, if a contract is awarded, will be to the lowest responsible bidder, as described in the Instructions to Bidders’ Section of the Contract Documents, but the Township reserves the unqualified right to reject any or all bids and to waive any informalities.

The Township also reserves the right to delete any "item" or portion of an "item" contained in the Contract at its discretion, once bids are received.

Prior to awarding the Contract, bids may be held by the Township for a period not to exceed thirty

(30) days from the date of the bid opening for the purpose of reviewing the bids and investigating the qualifications of bidders. During this period, no bid may be withdrawn.

Wrightstown Township reserves the right to reject any or all proposals.

Stacy Crandell, Township Manager Wrightstown Township

LOCATION MAP

IB-1

INSTRUCTIONS TO BIDDERS

1. PROSPECTIVE BIDDERS ARE ADVISED TO REVIEW THIS CONTRACT IN DETAIL.

2. PREVAILING WAGE DETERMINATION - This project is considered maintenance and is NOT subject to the terms and conditions of the Pennsylvania Prevailing Wage Act as determined by the Secretary of Labor and Industry and, therefore, must be bid as such.

3. All bidders must be pre-qualified by the Pennsylvania Department of Transportation in accordance with Section 102.01 of PennDOT Specifications Publication 408, latest edition.

4 PUBLIC WORKS EMPLOYMENT VERIFICATION - This project is subject to the terms and conditions of the Pennsylvania Public Works Employment Verification Act as set forth in the Contract Documents. All contracts between the Contractor and its subcontractors, and between all subcontractors and their respective sub-subcontractors shall contain information about the requirements of the Public Works Employment Verification Act (Act 127 of 2012).

5. CONSTRUCTION SPECIFICATIONS - This project shall be constructed in accordance with the Specifications noted herein, the requirements of PennDOT Specifications Publication 408, latest edition, and in addition, special project specifications for construction and materials, Pennsylvania Department of Transportation, as amended. These specifications must be strictly adhered to during the entire period of the Contract.

6. EXAMINATION OF CONTRACT DOCUMENTS AND SITE

6.01 Before submitting this bid, each bidder must (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself/herself with local conditions that may in any manner affect his/her performance of the work; and (c) carefully correlate his/her observations with the requirements of the Contract Documents.

6.02 The submission of a bid will constitute an incontrovertible representation by the bidder that he/she has complied with every requirement of these instructions.

7. INTERPRETATIONS - All questions about the meaning or intent of the Contract Documents shall be submitted to the Township via the PennBID website. Replies will be issued by addenda electronically or delivered to all parties recorded by the Township as having received the bidding documents. Questions received less than five working days prior to the date for opening of the bids will not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

8. BID ITEMS - Bidders must bid on all bid items listed in the Schedule of Prices shown on Attachment 1. The Contract will be awarded based on the lowest responsible Bid selected by the Township at their sole discretion in accordance with Instruction No. 17, AAward of Contract.@

9. BID SECURITY - The amount and type of Bid Security is stated in the "Advertisement for Bids."

The required security must be in the form of a certified check or bank cashier=s check made payable to the Township or a bid bond issued by a surety licensed to conduct business in the Commonwealth of Pennsylvania and named in the current list of "Surety Companies Acceptable on Federal Bonds" as published by the Bureau of the Fiscal Service, U. S. Treasury Department. The Bid Security of the successful Bidder will be retained until the bidder has executed the agreement and furnished the required Contract Security, whereupon it will be

IB-2

returned; if the bidder fails to execute and deliver the Contract and furnish the required Insurance Certificate and Contract Security within 15 days of the Contract Award, the Township may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of any Bidder whom the Township believes to have a reasonable chance of receiving the award may be retained by the Township until the earlier of the seventh day after the executed Contract is delivered by the Township to the Contractor and the required Contract Security is furnished or the thirty-first day after the Bid Opening. Bid Security of other Bidders will be returned following formal award of the Contract.

10. CONTRACT TIME - The Contract shall be completed within 30 calendar days from the date of the ANotice to Proceed.@ The undersigned understands and agrees that the Township reserves the right to defer issuance of a ANotice to Proceed@ for a period not to exceed sixty

(60) days from the date of Contract Award should all preparation work required prior to this Contract be incomplete or delayed.

11. SUBCONTRACTORS, ETC. -

11.01 It is the condition of the Contract that the identity of Subcontractors and other persons and organizations be submitted to the Township in advance of the Contract Award.

The apparent low bidder, and any other bidder so requested, will within seven days after the date of the Bid Opening, submit to the Township a list of all subcontractors and other persons and organizations who are to furnish the principal items of material and equipment. Such list shall be accompanied by an experience statement with pertinent information as to similar projects and other evidence of qualification for each subcontractor, person and organization if required by the Township. If the Township, after due investigation, has reasonable objection to any proposed subcontractor, other person or organization, it may, before Contract Award, request the apparent low bidder to submit an acceptable substitute without an increase in the bid price.

11.02 The contractor shall not be required to employ any subcontractor, other person or organization against whom he/she has a reasonable objection.

12. BID FORM

12.01 The bid forms are included in the Contract Documents.

12.02 The bid forms must be completed in accordance with the Electronic Bidding Instructions provided on the PennBid website.

12.03 Final Proposal and Contract Forms by corporations must be executed in the corporate name by the president or vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.

12.04 Final Proposal and Contract Forms by partnerships must be executed in the partnership name and signed by a partner, his/her title must appear under his/her signature and the official address of the partnership must be shown below the signature.

12.05 All names must be typed or printed legibly below the signature.

IB-3

12.06 The bid shall contain an electronic copy of the Bid Bond.

12.07 The bid shall contain an acknowledgment of receipt of all addenda.

13. SUBMISSION OF BIDS - Bids shall be submitted prior to the time indicated in the "Advertisement for Bids" and shall be submitted electronically via the PennBid website.

14. MODIFICATION AND WITHDRAWAL OF BIDS - Bids may be modified or withdrawn in accordance with the Electronic Bidding Instructions provided on the PennBid website at any time prior to the opening of bids.

15. OPENING OF BIDS - The Bid Opening will be held at the time designated in the "Advertisement for Bids." After review, the bids will then be made available on the PennBid website.

16. BIDS TO REMAIN OPEN - All Bids shall remain open for a period not to exceed 30 (thirty) days after the day of the Bid Opening, but the Township may, in its discretion, release any bid and return the Bid Security prior to that date.

17. AWARD OF CONTRACT

17.01 The Township reserves the right to reject any or all Bids and waive any or all informalities, and the right to disregard all nonconforming or conditional Bids or counter proposals.

17.02 In evaluating Bids, the Township shall consider the qualifications of the bidders, whether or not the bids comply with the prescribed requirements, and alternates and unit prices if requested in the bid forms. The Township may consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the work as to which the identity of subcontractors and other persons and organizations must be submitted as specified herein. The Township may conduct such investigations as it deems necessary to establish the responsibility, qualifications, and financial ability of the bidders, proposed subcontractor and other persons and organizations to do the work in accordance with the Contract Documents to the Township's satisfaction within the prescribed time. The Township reserves the right to reject the bid of any bidder who does not pass any such evaluation to the Township's satisfaction.

17.03 If a Contract is awarded, it will be awarded to the lowest responsible bidder based upon the total Contract Price selected at the Township’s discretion. The Township reserves the right to reject any/all Bid Proposals as determined to be in the best interest of the Township, at the sole discretion of the Township.

17.04 If a Contract is awarded, the Township will issue to the apparent successful bidder the Notice to Proceed within ninety (90) days after the Bid Opening, or within sixty (60) days after the date of Contract Award, whichever occurs first.

17.05 Simultaneously with the delivery of the executed counterparts of the Contract to the Township, the Contractor shall deliver to the Township the required Contract Security and insurance certificates.

IB-4

18. CONTRACT CHANGES - Any change or modification made to the Contract once executed must be documented utilizing a Contract Change Order Form. Both parties must execute the Change Order for it to become effective. Any change in the Contract Price due to the Change Order must be duly noted on the Form.

19. INSURANCE REQUIREMENTS - The successful bidder must provide a "Certificate of Insurance" to the Township. The minimum amounts of insurance required are as follows:

a. General Liability - $1,000,000 per occurrence.

b. Automobile Liability - $1,000,000 per occurrence.

c. Excess Liability (umbrella form) $2,000,000

d. Workers= Compensation - Statutory.

e. Employers= Liability - $1,000,000 per occurrence.

Wrightstown Township and ARRO Holdings, LLC, The ARRO Group, Inc. & Subsidiary, ARRO Consulting, Inc., are to be listed as "additional insureds

20. CONTRACT DOCUMENTS - The following must be submitted to ARRO Consulting, Inc., 4259 W. Swamp Road, Suite 410, Doylestown, PA 18902 within two (2) business days from the date of the bid opening:

a. Instructions to Bidders

b. Statement of Bidder's Qualifications (including PennDOT Pre-Qualification Certificate)

c. Completed Proposal and Contract (PennDOT Form MS-944) (As submitted through PennBID).

d. Bid Bond (Original)

e. Executed Anti-Collusion Affidavit

f. Completed Public Works Employment Verification Form

g. Acknowledgment of any Addenda issued as part of this Contract

21. MAINTENANCE BOND - The selected Contractor(s) shall provide a one (1) year Maintenance Bond, in the amount of 100% of the final payment Contract amount. The maintenance period shall start upon final certification of completion by the Township.

MS-944 (4-20) C0005793

TIME

, on the above Letting Date. PROPOSALS MUST BE SUBMITTED VIA

TIME PENNBID ONLY

and specifications on file at as well as the supplements complete all work within calendar days.

3 Accompanying this proposal is a certified check or bid bond in the amount of made payable to the municipality as a proposal guarantee which, it is understood, will be forfeited in case the contractor fails to comply with the requirements of the proposal.

B. PROPOSAL OF:

1 The only person interested in the proposal as principal (s) is (are):

2 None of the above persons are employees of the municipality.

3 This proposal is made without collusion with any other person, firm or corporation.

Wrightstown Township, PA 18940

10:05 AM

The contractor proposes to furnish and deliver all materials ( including Form CS-4171, CERTIFICATE OF COMPLIANCE and/ or CS-4171B DAILY ASPHALT MIXTURE CERTIFICATION ) and to do and perform all work on the following project as more specifically set forth in the Schedule of Prices (Attachment), in accordance with drawings and special requirements contained herein and/ or attached hereto and current PennDOT Specifications (Publication 408), except Volumetric testing of asphalt paving materials is not required (Sec. 413).

INSTRUCTIONS ON PAGE 4

Bids will be opened and read at approximately

May 5, 2026

10:00 AM

Wrightstown Township

MUNICIPALITY (NAME & TYPE)

If designated as the successful bidder, the contractor will begin work on the date specified in the notice to proceed, or as otherwise provided in the special requirements, and will

10% of bid amt.

Wrightstown Township see attachment 1-A

-1-

It is hereby certified as follows:

NAME / ADDRESS OF CONTRACTOR

CONTRACTORS CERTIFICATION

All plans and specifications referred to above and the site of the work have been examined by the contractor. The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit price listed on the Schedule of Prices. (Attachment 1).

Stacy Crandell

TOWNSHIP MANAGER

DATE

on the above Letting Date. 2203 Second Street Pike

THIS PROPOSAL INCLUDES

INSTRUCTIONS TO BIDDERS

ADDRESS

A. DEPOSIT OF PROPOSALS.

Sealed Proposals will be received on or before

All envelopes containing Bid proposals shall be clearly marked “Bid Proposal for letting of

PROPOSAL AND CONTRACT

( WHEN EXECUTED )

C0005793

BY: DATE:

TITLE:

DATE:

TITLE:

TITLE:

BY:

TITLE:

BY:

TITLE:

TITLE:

ATTESTED BY:

MUNICIPALITY

BY:

TO BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED

ACCEPTED ON :

-2-

DATE

Wrightstown Township

The contractor will comply with all requirements of the laws and implementing regulations of the Commonwealth of Pennsylvania and the United States relating to human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed in the performance of the contract the wages to which they may be entitled.

The contractor will provide the municipality with a performance bond, conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions thereof, and a payment bond, conditioned on the prompt payment of all material furnished and labor supplied or performed in the prosecution of the work, in accordance with the Public Works Contractors’ Bond Law of 1967; and an affidavit accepting the provisions of the Workmen’s Compensation Act of 1915, as amended.

CONTRACTOR

WITNESSED OR ATTESTED BY:

SEAL

County:

- 3 -

ATTACHMENT 1

TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 )

Municipality:

LOCATION OF WORK:

TH

IS

P O

R

TI

O N

T O

B E

C O

M

PL

ET

ED

BY

T

H E

M U

N

IC

IP

AL

IT

Y

Unit

SCHEDULE OF PRICES

*Description

Project Number:

N/A

DESCRIPTION OF WORK:

SEE ATTACHMENT 3A

Unit 5 Price

Total

Item 1 No.

Approximate 2 Quantities

ESCALATOR CLAUSE:( if adopted by Municipality.)

SEE ATTACHMENT 3A

* DESCRIPTION:

Must include ADT on wearing surfaces

USE OF CUTBACK ASPHALT IS PROHIBITED

BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT

AS NOTED IN BULLETIN NO. 25.

TOTAL AMOUINT OF BID

3A

ATTACHMENT 1

TO MS-944 (PROPOSAL AND CONTRACT MS-944)

County: Bucks Municipality: Wrightstown Township

Project Number: C0005793

LOCATION OF WORK:

The Contract will include work along the following roadways (or portions): Fox Hill Drive, Martindell Drive, Mud Road and Thompson Mill Road.

DESCRIPTION OF WORK:

The Contract will include the single application of Asphalt Seal Coat and single application of Type II Slurry Seal of two roadways (12,225 SY), the single application of Asphalt Seal Coat of one roadway (9,000 SY) and the double application of Asphalt Seal Coat of one roadway (6,060 SY).

The Contract will also include 70 GAL of rubberized crack seal and the replacement of all pavement markings.

ESCALATOR CLAUSE: (if adopted by Municipality) N/A

SCHEDULE OF PRICES

Item No.

Approximate Quantity Unit *Description Unit Price Total

BASE CONTRACT

1 70 GAL Rubberized Crack Seal 2 1 LS Remove Pavement Markings 3 21,225 SY Asphalt Seal Coat (Single Application) 4 12,225 SY Type II Slurry Seal (Single Application) 5 6,060 SY Asphalt Seal Coat (Double Application) 6 1 EA 2’ x 29’ Stop Bar 7 108 LF 6” White Lane Divider Line 8 2 EA “ONLY” Legend 9 1 EA Left Arrow 10 1 EA Right Arrow 11 125 LF Yellow Gore Markings 12 1 EA 2’ x 10’ Stop Bar (Thompson Mill Road)

TOTAL AMOUNT OF BID

*DESCRIPTION:

Must include ADT on wearing surfaces.

USE OF CUTBACK ASPHALT IS PROHIBITED BETWEEN MAY 1ST AND OCTOBER 31ST,

EXCEPT AS NOTED IN BULLETIN NO. 25.

ARRO CONSULTING, INC. C0005793

WRIGHTSTOWN TOWNSHIP

2026 ROADWAY MAINTENANCE PROGRAM

PROPOSED SCOPE OF WORK – BY ROADWAY

3B-1

DESCRIPTION UNIT QUANTITY

Fox Hill Drive T-401 (9,775 SY)

Rubberized Crack Seal GAL 30

Remove Pavement Markings LS 1

Asphalt Seal Coat (Single Application) SY 9,775

Type II Slurry Seal (Single Application) SY 9,775

Replace Pavement Markings LS 1

Martindell Drive T-402 (2,450 SY)

Rubberized Crack Seal GAL 10

Asphalt Seal Coat (Single Application) SY 2,450

Type II Slurry Seal (Single Application) SY 2,450

Mud Road T-344 (9,000 SY)

Asphalt Seal Coat (Single Application) SY 9,000 Thompson Mill Road T-388 (6,060 SY) Brownsburg Road to Township Line

Remove Pavement Markings LS 1

Rubberized Crack Seal GAL 30

Asphalt Seal Coat (Double Application) SY 6,060

Replace Pavement Markings LS 1

2 If more than one proposal on any project is submitted by an individual, firm or partnership, corporation or association under the same or different names, only one lowest proposal will be considered.

3 Description of Work- - -

A. If additional space is needed, insert appropriately numbered attachment and note “Continued on attached work sheets."

4 Part A of Page 1 to be completed by municipality. Part B of Page 1 to be completed by contractor.

Schedule of Prices - Column #1 (Item), #2 (Approximate quantities), #3 (Unit, i.e., ton, square yard, linear feet,etc.) and #4 (Description, i.e. , asphalt materials - 9.5 mm S & L, 12.5 mm Wearing,

25.0 mm Base Course, etc.) Must be filled in by the municipality to insure equitable bidding.

Columns #5 (Unit Price), #6 (Total) and total amount of bid, must be filled in by the contractor.

If more space is needed, add note at the bottom of the page; “Continued on Attachment No. 1-A”, and add additional sheet designated as Attachment No. 1-A, 1-B, etc.. Repeat for each additional sheet required.

As required by Publication 408, Section 102.06(e),each bidder must submit a completed Form 7126 - Anti-Collusion Affidavit with its bid proposal.

5 If liquidated damages are to be assessed, add the following sentence to Part A #2. If all work is not completed on time, liquidated damages will be assessed at the rate of $250.00 per additional working day.

(OR “. . . as set forth in the attached schedule.”)

6 Payment and Performance bonds are provided only by the successful bidder. Contracts from $4,000.00 up to $5,000.00 in Second Class Townships - performance bond must be not less than 10% or greater than 100% of amount of contract.

Contracts greater than $1,500.00 up to $10,000.00 in First Class Townships, Boroughs and Third Class Cities - bonds must be between 50 % to 100% of the contract amount. Contracts in excess of $5,000.00 in Second Class Townships and in excess of $10,000.00 in First Class Townships, Boroughs and Third Class Cities - bonds must be in 100% of the amount of the contract. Bond Forms MS-944 Attachments 2 and 3 and Workmen’s Compensation Affidavit - Attachment 4 must be submitted by the successful bidder within 20 days of the contract award. Failure to submit the bonds shall constitute grounds to cancel the contract.

7 *Construction projects, where the estimated cost of the total project exceeds $100,000, are subject to the provisions of the Pennsylvania Prevailing Wage Act 442 and amended by Act 89 of 2013. It is the responsibility of the municipality to request the Prevailing Wage Scale for the area and include it in the proposal. If the Prevailing Wage Act applies, this fact shall be noted in the advertisement.

On projects utilizing Federal Revenue Sharing Funds, if the project cost exceeds $2,000 and is financed with 25% or more Federal Revenue Sharing Funds, the Davis Bacon Act applies. Again, it is the responsibility of the municipality to obtain the Davis Bacon Wage Rates, include them in the proposal and note the fact in the advertisement. If both acts are applicable, The Davis Bacon Act has preference over the Pennsylvania Prevailing Wage Act.

8 An ESCALATOR CLAUSE is optional; if used, it must be included in the proposal prepared by the municipality. An escalator clause may not be inserted by the contractor.

NO ESCALATOR CLAUSE IS INCLUDED IN THIS CONTRACT.

*(1961, Aug. 15, P.L. 987; 43 P.S. 165)

-4-

PROPOSAL AND CONTRACT INSTRUCTIONS- FORM 944 (Rev. 4/2020)

The proposal must be typewritten or printed.

X Traffic Control and Safety Devices to be provided by the Contractor.

X Delivery tickets for all materials.

X CS-4171 Certificate of Compliance and/ or CS-4171B Daily Asphalt Mixture Certification required for all materials.

X three working days prior to start of project.

X * . After 30 days the rate of $ 250.00 per calendar day.

X Roadway to be power broomed by (contractor municipality )prior to start of project.

X Excess material to be removed by (contractor municipality .)

X Municipality to inspect project.

Need Bill of Lading for each shipment of asphalt material per Section 702.1( c ) of Specifications 408.

Tack Coat required per Section 460, or 413 for superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.

Prime Coat required per Section 461 of Specifications 408.

Asphalt Seal on all abutting pavement and curbs required.

Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.

Scratch/ Leveling Courses to be placed at the discretion of appointed inspector(s).

X Municipality reserves the right to limit work completed.

Taper pavement the last 3 feet to curb.

For FOB Source bids, hauling distance will determine selection of bid award.

Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.

X Completion of NON-COLLUSION AFFIDAVIT REQUIRED.

X Incidental Preparation and clean up required. ( Project Construction Materials )

The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.

Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.

X Contractor responsible for defects that occur within one year of applications.

Contractor required to review proposed project with Municipality’s Representative prior to bidding.

Oil Samples required from each distributor truck by contractor (1) one quart : A.M. & P.M. and witnessed by municipality and retained by municipality. (Oil samples must be placed in an approved type container that is compatible with oil sample.)

At least three random stone samples to be taken by contractor on project site witnessed by municipality and retained by municipality.

Complete all testing in accordance with Specification Form 408 Section 413 except for superpave volumetric testing.

Notice to Proceed will be the date of Contract acceptance.

Final Completion Certificate & Notice of Completion required.

Future award of Contract will be based on quality of work as determined by the municipality.

X Contractor, notify all residents of pending work to be performed.

X

X X

My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.

Date

Work to be completed on or before

Wrightstown Township

*30 days from date of "Notice to Proceed."

The Contractor is responsible to ensure that the proper material is provided by supplying a copy of an approved PennDOT

Liquidated damages apply at

Full width pavement with one pass required.

Progress payments made during the term of this Contract shall be subject to retainage in accordance with Instructions to bidders.

Company Municipality

Asphalt Mix Design a minimum of 5 working days prior to the start of work or at the pre-construction meeting. The Contractor will also supply the municipality with a Daily Asphalt Material Certification or a TR-465 or CS-4171 following placing the asphalt material for each day's placement.

Contractor's Representative Municipality's Representative Date

Notify the Municipality

(4-20) SPECIAL PROVISIONS TO CONTRACT MS-944 ( Attachment 1-A ) C0005793

CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR

The Prime Contractor and subcontractors must comply with all of the following provisions that are marked with an "X".

( Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)

Attachment 2

($ ) dollars

WHEREAS, the above bounden Principal has entered into a contract with the above Municipality, bearing even date herewith, for

It is further provided that any alteration which may be made in the terms of the contractor or its specifications with the express authorizing the same to be done on .

BY

TITLE:

TITLE:

TITLE:

TITLE:

- 1 -

CONTRACTOR

SURETY COMPANY

Attest / Witness:

(DATE OF BOND)

approval of the Municipality or the Principal to the other, shall not in any way release the Principal and the Surety or either or any of them, to and made a part thereof, and such alterations as may be made in said Specifications as therein provided, and shall well and truly, and in a manner satisfactory to the municipality fulfill all obligations as therein set forth, then this Obligation shall be void, but otherwise the same the undertaking of certain obligations as therein set forth.

respects comply with and faithfully perform the terms and conditions of said Contract, including the Specifications and conditions referred their heirs, executors, administrators, successors or assigns from their liability hereunder, notice to the surety of any such alteration or

(With Corporate Surety)

Attest / Witness:

IN WITNESS WHEREOF, the said Principal and Surety have duly executed this Bond under Seal, pursuant to due and legal action

NOW, THEREFORE, the condition of this obligation is such that if the above bounden Principal, as Contractor, shall in all lawful money to the United States of America, to be paid to the above Municipality or its assigns, to which payment well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

forebearance being hereby waived.

shall be and remain in full force, virtue and effect.

as Principal and a corporation incorporated under the laws of the State of

(SURETY COMPANY)

(NAME AND ADDRESS OF CONTRACTOR)

PERFORMANCE BONDMS-944-S (7-09)

(NAME OF MUNICIPALITY)

Wrightstown Township in the full and just sum of

(NAME OF STATE)

are held and firmly bound unto

KNOW ALL MEN BY THESE PRESENTS, That we, as Surety

PLACE

SEAL

HERE

PLACE

HERE

MS-944S

KNOW ALL MEN BY THESE PRESENTS, that we a corporation incorporated under the laws of the State of as SURETY, are held and firmly bond unto the , in the full and just sum of

($ )dollars, lawful money of the United States of America, to be paid to the said or its assigns, to which payment well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the above bounden Principal has entered into a contract with the above municipality hereinafter called Obligee, bearing even date herewith, for the improvement of a certain section of highway or bridge in said Municipality consisting of:

for approximately the sum of: ($ ) dollars.

NOW, THEREFORE, the condition of this obligation is such that if the above bounden PRINCIPAL shall and will promptly pay or cause to be paid in full all sums of money which may be due by contract or otherwise, to any individual, firm, partnership, association or corporation, for all material furnished or labor supplied or performed in the prosecution of the work, whether or not the said for material or labor entered into and became component parts of the work and for rental of the equipment used and services rendered by public utilities in, or in connection with the prosecution of such work, then this obligation to be void, otherwise to remain in full force and effect.

The PRINCIPAL and SURETY, hereby, jointly and severally, agree with the Obligee herein that any individual firm, partnership, association or corporation, which has performed labor or furnished material in the prosecution of the work as provided, and any public utility which has not been paid in full therefor, may sue in assumpsit on this Payment Bond in his, their, or its own name and may prosecute the same to final for such sum or sums as may be justly due him, them or it, and have execution thereon. Provided, however, that the Obligee shall not be liable for the payment of any costs of expenses of such suit.

RECOVERY by any individual, firm, partnership, association or corporation hereunder shall be subject to the provisions of the “Public Works Contractors’ Bond Law of 1967", Act No. 385, approved December 20, 1967,P.L. 869, which Act shall be incorporated herein and made a part hereof, as fully and completely as though its provisions were fully and at length herein recited.

It is further provided that any alterations which may be made in the terms of the contract or in the work to be done or materials to be furnished or labor to be supplied or performed under it or the giving by the Obligee of any extension of time for the performance of the contract or any other forebearance on the part of either the Obligee or the Principal to the other, shall not in any way release the PRINCIPAL and the SURETY or SURETIES of any such alteration, extension of forebearance being hereby waived.

IN WITNESS WHEREOF, the said PRINCIPAL and SURETY have duly executed this Bond under seal this ,20 .

WITNESS:

CONTRACTOR

BY:

TITLE:

SURETY COMPANY

TITLE: TITLE:

Wrightstown Township

TITLE:

- 2 -

2026 Roadway Maintenance Program

WITNESS:

day of

PAYMENT BOND Attachment 3 as PRINCIPAL and

Wrightstown Township

PLACE

SEAL

HERE

PLACE

HERE

Attachment 4

State of ) ) ss:

County of ) he has being duly sworn according to law deposes and says that they have it has accepted the provisions of the Workmen’s Compensation Act of 1915 of the Commonwealth of Pennsylvania, with has his its supplements and amendments, and have insured their liability thereunder in accordance with the terms of said its

Act with .

( TYPE OR PRINT)

BY

day of A.D. 20 .

My Commission Expires

- 3 -

CONTRACTOR

SIGNATURE

Sworn to and subscribed before me this

( DATE )

SIGNATURE

(SURETY COMPANY)

AFFIDAVIT RE

ACCEPTING PROVISIONS OF THE WORKMEN’S COMPENSATION ACT

D-7126 ( 7-09 )

County

Municipality

Project Number

State of Fed. Project No.

( If Applicable )

The undersigned deponent deposes and says that he is the of the

BY

Sworn to and subscribed before me the undersigned notary public this day of , .

Notary Public

My Commission expires

(Contractor) competitive bidding in connection with such contract.

into any agreement, participated in any collusion, or otherwise taken any action in restraint of free

Company; that he is authorized to make this

Publication 408, as amended and that the said company has not, either directly or indirectly, entered affidavit on behalf of said company in compliance with section 102.06 (e) of Department Specifications, County of

ANTI-COLLUSION AFFIDAVIT

Bucks

Wrightstown Township

SBQ-1

STATEMENT OF BIDDER’S QUALIFICATIONS

All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate, attached sheets. The Bidder may submit any additional information he/she desires.

1. Name of Bidder.

2. Bidder's permanent main office address.

3. When organized.

4. If a corporation, where incorporated.

5. How many years have you been engaged in the contracting business under your present firm or trade name?

6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion.)

7. General character of work performed by your company.

8. Have you ever failed to complete any work awarded to you? If so, where and why?

9. Have you ever defaulted on a contract? If so, where and why?

10. List three similar type projects recently completed by your company, stating the scope of work, the approximate cost of each, and the month and year completed.

11. List any projects completed within the last two years for which you have not been paid in full.

Present reason for non-payment. Please provide name, address and phone number of agency who refused payment to your firm.

12. List your major equipment to be used for this contract.

13. List the background and experience of the principal members of your organization who will be involved in the completion of this project.

14. Credit available: $

15. Give Bank reference:

16. Will you, upon request, fill out a detailed financial statement, and furnish any other information that may be required by the Township?

17. (A) Have you ever been a party to, or otherwise involved in, any action or legal proceeding involving matters related to race, color, nationality, or religion? If so, give full details.

(B) Have you ever been accused of discrimination based upon race, color, nationality, or religion in any action or legal proceeding including any proceeding related to any Federal Agency? If so, please give full details.

SBQ-2

18. PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PRE-QUALIFICATION.

The pre-qualification of bidders, as specified in Section 102.01 of Pennsylvania Department of Transportation Specifications Publication 408, latest edition, is required on this project. The following information must be provided for the Contractor and subcontractors proposed to perform work on this project.

Contractor’s Name:

Contractor’s Address:

Pre-qualification No.:

Pre-qualification Codes:

(or enclose Pre-qualification Certificate)

Expiration Date:

FID/SSN:

Phone Number:

Subcontractor’s Name:

(If Applicable)

Subcontractor’s Address:

Pre-qualification No.:

Pre-qualification Codes:

(or enclose Pre-qualification Certificate)

Expiration Date:

FID/SSN:

Phone Number:

Subcontractor’s Name:

(If Applicable)

Subcontractor’s Address:

Pre-qualification No.:

Pre-qualification Codes:

(or enclose Pre-qualification Certificate)

Expiration Date:

FID/SSN:

Phone Number:

Subcontractor’s Name:

SBQ-3

(If Applicable)

Subcontractor’s Address:

Pre-qualification No.:

Pre-qualification Codes:

(or enclose Pre-qualification Certificate)

Expiration Date:

FID/SSN:

Phone Number:

19. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Township in verification of the recitals comprising this Statement of Bidder's Qualifications.

Dated at this day of , 20 .

(Name of Bidder)

By:

Title:

State of County of .

, being duly sworn, deposes and says that he is of , and that he answers (Title) (Name of Organization) to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 20 .

Notary Public

My Commission Expires

PUBLIC WORKS EMPLOYMENT VERIFICATION

PWEV-1

PUBLIC WORKS EMPLOYMENT VERIFICATION

1. On January 1, 2013, the Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act, which requires all public work contractors and subcontractors to utilize the Federal Government’s E-Verify system to ensure that all employees performing work on public work projects are authorized to work in the United States.

2. The Pennsylvania Department of General Services defines a “Public Work” to be a construction, reconstruction, demolition, alteration and/or repair work, other than maintenance work, done under contract and paid for in whole or in part out of funds of a public body where the estimated cost of the total project is in excess of twenty-five thousand dollars ($25,000), but shall not include work performed under a manpower or rehabilitation training program.

3. The Department of General Services’ Public Works Employment Verification Compliance Program is responsible for the administration, education and enforcement of the Public Works Employment Verification Act (Act 127 of 2012).

It provides contractors and subcontractors with educational outreach, conducts investigations when complaints are received and random audits to ensure compliance with the requirements of this Act.

4. Any questions pertaining to the Public Works Employment Verification Act (Act 127 of 2012) may be directed to the Public Works Employment Verification Compliance Office at the following:

Mail: Department of General Services Public Works Employment Verification Compliance Office Room 105 Tent Building 18th & Herr Streets Harrisburg, PA 17125

Fax: (717) 214-3669

PWEV-2

PUBLIC WORKS EMPLOYMENT VERIFICATION

INSTRUCTIONS FOR BIDDERS

1. All contractors submitting a bid for the proposed Public Work required under this

Contract are required to verify that all newly hired employees are authorized to work in the United States. Contractors and subcontractors must comply fully with the requirements of the Public Works Employment Verification Act (Act 127 of 2012) and must verify eligibility of all newly hired employees using the U.S.

Department of Homeland Security’s E-Verify internet program at the Department’s website (www.dhs.gov/e-verify).

2. Employment verification shall apply to all employees hired by the Contractor or subcontractor after January 31, 2012. Any employees hired after contract award and during the course of the Public Work contract shall be verified by the contractor or subcontractor within five (5) business days of his/her start date.

3. Prior to contract award, the successful contractor and any proposed subcontractor shall complete and submit to Wrightstown Township the accompanying Public Works Employment Verification Form.

4. All contracts between the Contractor and its subcontractors, and between all subcontractors and their respective sub-subcontractors, shall contain information about the requirements of the Public Works Employment Verification Act (Act 127 of 2012).

http://www.dhs.gov/e-verify

Street Address 2

City State Zip Code

Doing Business As:

(if different from Legal Name)

Commonwealth of Pennsylvania Public Works Employment Verification Form

Complete and return the form to the contracting Public Body prior to the award of the contract.

Company Legal Name: ___________________________________________________________

Mailing Address: ______________________________________________________

Check one: Contractor Subcontractor

Contracting Public Body: _________________________________________________________

Contract/Project Number: ________________________________________________________

Project Description: _____________________________________________________________

Project Location: _______________________________________________________________

Date Enrolled in E-Verify (MM/DD/YYYY): ___________________________________________ As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of today’s date, __________________________, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired are authorized to work in the United States.

It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.

I,____________________________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.

Authorized Representative Signature Date of Signature

Printed Name: _________________________________________________________________

Phone Number: ______________________ Email: ____________________________________

Street Address 1

CONSTRUCTION SPECIFICATIONS

TABLE OF CONTENTS

1. SECTION I - SUPPLEMENTARY CONDITIONS

2. SECTION II - ASPHALT SEAL COAT

3. SECTION III - TYPE II SLURRY SEAL

4. SECTION IV - POLYMER MODIFIED CRACK SEALING

5. SECTION V - PAVEMENT MARKINGS AND LEGENDS REMOVAL

AND REPLACEMENT

6. SECTION VI - MEASUREMENT AND BASIS OF PAYMENT

CS-1-1

SECTION I - SUPPLEMENTARY CONDITIONS

1.01 SCOPE. The following paragraphs outline the minimum acceptable standards to be followed for the 2026 Roadway Maintenance Program located in Wrightstown Township, Bucks County, Pennsylvania. Work shall be done in accordance with the requirements of Wrightstown Township, hereinafter referred to as the Township, these Specifications, and the Specifications of the Pennsylvania Department of Transportation. The work shall be executed in the most workmanlike manner by qualified, careful and experienced workmen.

The Contract will include the single application of Asphalt Seal Coat and single application of Type II Slurry Seal of two roadways (12,225 SY), the single application of Asphalt Seal Coat of one roadway (9,000 SY) and the double application of Asphalt Seal Coat of one roadway (6,060 SY). The Contract will also include 70 GAL rubberized crack seal and the removal and replacement of all pavement markings.

1.02 ENGINEER. The Township shall, in all cases, determine the quality and quantity of the several kinds of work and materials which are to be paid for under this Contract, and he shall determine all questions in relation to lines, levels and dimensions of work and as to the questions of interpretation of these Specifications. The term "ENGINEER" shall mean ARRO Consulting, Inc., 4259 W. Swamp Road, Suite 410, Doylestown, Pennsylvania 18902, or his duly appointed representative.

1.03 CONSTRUCTION OBSERVATION. During construction, the Township or its representative will provide construction observation and will observe all required tests, as well as provide all required construction stakeout. The primary responsibility for compliance with the specifications rests with the Contractor performing the work.

The observation of work performed by the Contractor does not relieve the Contractor of his responsibilities for repairs of defects due to improper installation, carelessness, poor workmanship, etc. The Township's representative, hereinafter referred to as the Resident Project Representative (RPR), does not have the authorization to revoke, alter, relax, release, etc. any regulation of the Contract Documents. The RPR is not a foreman. Any advice from him to the Contractor shall not be binding to the Township and shall not relieve the Contractor of his obligation.

The Contractor must notify the Engineer forty-eight (48) hours prior to the start of work.

1.04 STANDARD SPECIFICATION, ABBREVIATIONS. All standard specifications referred to herein, such as ACI, ASTM, AWWA, and the like, shall have the meaning set forth opposite each below and shall be the latest revision thereof at the time of bidding.

AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute AISC American Institute of Steel Construction ANSI American National Standards Institute ASA American Standards Association ASCE American Society of Civil Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing Materials AWWA American Water Works Association CISPI Cast Iron Soil Pipe Institute

CS-1-2

CRSI Concrete Reinforcing Steel Institute NCSA National Crushed Stone Association

1.05 FEDERAL AND STATE REQUIREMENTS. The Contractor shall at all times observe and comply with all Federal and State laws and regulations, and local bylaws, ordinances and regulations in any manner affecting the conduct of the work or applying to employees on the project, as well as all safety precautions and orders or decrees which have been promulgated or enacted by any legal bodies or tribunals having authority or jurisdiction over the work, materials, equipment, employees or the Contract; such observance and compliance shall be solely and without qualification the responsibility of the Contractor without reliance or superintendence or direction by the Township. The duty of enforcement of all said laws, ordinances, regulations, order or decrees lies with the body or agency promulgating them, not with the Township.

The Contractor must keep a copy of PennDOT Specifications Publication 408 (latest edition) of the Commonwealth of Pennsylvania Department of Transportation (PennDOT) in the field office for the duration of the Contract.

1.06 THE NEW OPEN RECORD LAW. Contractor agrees to comply with all requests for "public records" forwarded by the Township in accordance with Section 506(d)(1) of Act 3 of 2008 entitled "The New Open Record Law". Contractor acknowledges that he/she/it is subject to the New Open Records Law to the extent set forth therein and, if notified by the Township, shall provide copies of public records (as that term is defined by the statute) in the possession of Contractor, without charge to the Township, at the applicable rates…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .