0714-23 - CableFree LTE - SOW - Copy for posting.docx
DOCX document 21 KB Posted
- Attached to
- CABLE FREE LTE Federal contract opportunity
- Solicitation number
- N0017820Q6967
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0714-23 - CableFree LTE - Reqts List.docx | DOCX document | |
| N0017820Q6967 0001 SF18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRSPAN LTE EQUIPMENT INSTALL
STATEMENT OF WORK (SOW)
1.0 BACKGROUNDThe Naval Surface Warfare Center, Dahlgren Division (NSWCDD), Spectrum Supportability Branch, B31 has a requirements for installation and configuration of the Wireless Excellence Emerald eNodeB (eNB) and next generation gNB, Enhanced Packet Core (EPC), 5G Core, and UE attachments as a complete system for 5G LTE testing as part of our AWS-3 spectrum efforts.
2.0 APPLICABLE DOCUMENTS
Original Equipment Manufacturer (OEM) Specifications
3.0 REQUIREMENTS
3.1 The Contractor shall provide configuration services to the entire 5G LTE system ensuring all configurations meet OEM specifications.
3.1.1 Ensuring each eNB/gNB, firmware, and connections to EPC/5G Core are functional and work properly.
3.2 The Contractor shall provide SIMs for configuring government provided unlocked iPhone6s, and unlocked LG-V20 cell phones, and ensuring the phones can be connected to various eNBs/gNBs, and throughput are accomplished.
3.3 The Contractor shall update the 5G Core and provide IP table for all elements of network to include RRH, BBU, AMF, SMF, MME, PGW, SGW, HSS, PCRF, and IMS.
3.4 The Contractor shall be responsible for performing a final inspection of the LTE 5G system, ensuring the various eNB’s/gNBs can provide service flow through two way communications with iPhone 6s, and LG-V20 phones.
3.5 The Contractor shall provide Standard ASPlus maintenance within warranty period of equipment on this order for 12 months after receiving the final unit completely installed, fully operational and meeting specifications
3.6 The Contractor shall provide maintenance of 5G Core software for 3GPP Release 15, and provide and configure 3GPP Release 16, when available, along with hardware support for 12 months.
| 3.7 | The Contractor shall provide each Contractor employee with the personal protective equipment required to do their job safely and in compliance with all applicable regulations. |
| 3.7.1 | All Contractor personnel shall maintain social distancing and wear a facemask at all times while onsite at the NSWCDD base until notified otherwise by the government. |
3.8 The Contractor shall coordinate with the technical point of contact (TPOC) to complete this work.
4.0 TRAVEL
The Contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR). The following travel is anticipated: One (1) personnel to provide technical support to B31 for 5 days when actual field-testing is occurring with remote support for commissioning and configuring.
5.0 TECHNICAL POINT OF CONTACT
To be provided at time of award.