07_QALI_06_09_2020_P1.pdf

PDF 75 KB Posted

Attached to
SELECTOR, MODE Federal contract opportunity
Solicitation number
FA8213-21-R-3018
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines quality assurance requirements for a federal contract to produce explosive devices for military aircraft. The contract was awarded on an unspecified date to produce selector modes, explosive linear actuators, AND gates, and associated data for the B-1B bomber program. Delivery is required by 30 June 2022 to Tinker Air Force Base. The quality assurance letter specifies mandatory, witness, verification, monitor, and notification inspection points to be imposed at the contractor's facility for critical flight items. Inspection requirements include validation of manufacturing plans, attendance at testing, signature requirements, equipment calibration, and notification timelines. The contractor must update their quality assurance planning sheet as required.

View the file

Other files for this federal contract opportunity

Other files attached to SELECTOR, MODE, newest first.
File Type Posted
FA821321R3018_______0001.pdf PDF
01_AIR_SPEC_23_06_20_p3.pdf PDF
02_REPSHIP_20_8_20_p1.pdf PDF
06_Item_Descriptions_10_01_2020_p4.pdf PDF
JQRSANDGateTypII.pdf PDF
JQRSANDGateTypeIII.pdf PDF
03_ADCSOW_1_18_20_p3.pdf PDF
Mode_Selector_08_20_2020_P5.pdf PDF
SPI_012715483_AND_Gates_08_20_20_P5.pdf PDF
Repair_Rework_20_8_20_P1.pdf PDF
JQRS_mode_selector.pdf PDF
CDRLs_6_17_2020_p7.pdf PDF
09_CADPAD_Item_Marking_Instruction_Ver_5_01_19_p10.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 21-50070
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-1B
DODIC: 6039100, 6038100-07, 6038100-08, 6038100-09
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: CED
Text20: 93455
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2020-06-09T19:42:34-0600
SWANSON.DEVIN.D.1385800432
Text49:
Type name_4:
Part Number: SY14, MU99, MU98, MU97
Noun:

File details come from the government source that posted it. Updated .