05_QALI_C_5_Fire_Cart_JN89.pdf

PDF 888 KB Posted

Attached to
Fire Extinguisher Cartridge Federal contract opportunity
Solicitation number
FA821323R3001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines quality assurance requirements for a federal contract to produce fire cartridges. The contractor must allow inspection at several stages of production including explosive weight verification, leak testing, x-ray examination, lot acceptance testing, preparation for shipment, and final data package review. Inspections will include mandatory stamp verification, witnessing of tests by the government quality engineer, and random sample selection authorization. Additional inspection requirements may be imposed as necessary. The related solicitation provides an opportunity for the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base to procure fire extinguisher cartridges under solicitation number FA821323R3001.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Extinguisher Cartridge, newest first.
File Type Posted
FA821323R3001 0006.pdf PDF
FA821323R3001 0005.pdf PDF
FA821323R3001 0004.pdf PDF
FA8213R3001___0003.pdf PDF
FA821323R3001_______0002.pdf PDF
FA821323R3001_______0001.pdf PDF
08_Repair_and_Rework.pdf PDF
09_Item_Description.pdf PDF
07_CADPAD_Item_Marking.pdf PDF
FA821323R3001.pdf PDF
06_SPI_01-271_7161.pdf PDF
01_AIR_SPEC_FD2020_22_50039.pdf PDF
03_Attach2_Ammo_Data_Cards.pdf PDF
02_RepShip.pdf PDF
10_CDRLs.pdf PDF
04_SOW-Packaging.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 09AUG2021
2021-08-09T14:44:52-0600
KELLY.ZACHARY.ANDREW.1596765501
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 30903955
DODIC: JN89
Text20: 05167
Text19:
Part Number Line 2:
Contract No: 22-50039
Date Contract Awarded:
Final Delivery Date FDD:
Program Name:

File details come from the government source that posted it. Updated .