02 SOW FIB_SEM.docx
DOCX document 31 KB Posted
- Attached to
- Dual Beam Focused Ion Beam / Scanning Electron Microscope System Federal contract opportunity
- Solicitation number
- 1333ND22QNB640507
About this file
This document is a solicitation for a dual beam focused ion beam/scanning electron microscope system. The National Institute of Standards and Technology (NIST) Applied Chemicals and Materials Division requires one dual beam FIB/SEM instrument to meet minimum specifications including an electron beam resolution of 1nm or better, an ion beam resolution of 3nm or better, a stage capable of tilting over 70 degrees, integrated gas injection and micromanipulation systems, and a one year parts and labor warranty. Quotations are due by September 13, 2022 and the period of performance is six months from award. Price, technical capability, experience, and past performance will be evaluated, with technical capability being most important. Offerors must demonstrate that their equipment meets requirements and provide references. The award will be a fixed price purchase order to the offeror providing the best value to the government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Provisions and Clauses Rev A.doc | DOC document | |
| 02 SOR FIB_SEM Rev A.docx | DOCX document | |
| Combined Synopsis-Solicitation Final amendment 0002.doc | DOC document | |
| Combined Synopsis-Solicitation Final.doc | DOC document | |
| Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF REQUIREMENTS
TITLE: Procurement of a Dual Beam Focused Ion Beam / Scanning Electron Microscope System
I. BACKGROUND INFORMATION
The Applied Chemicals and Materials Division (ACMD) within the Materials Measurement Laboratory is involved in the characterization of metals, semiconductors, and other materials in support of multiple division projects. Materials characterization allows NIST scientists to make direct correlations between material processing, (micro)structure, and properties. This work involves imaging material structures and microstructures in a scanning electron microscope, as well as preparing specimens to be examined via transmission electron microscopy and atom probe tomography. A dual beam focused ion beam scanning electron microscope (dual-beam FIB/SEM) is an instrument which can be used to examine materials at the nanoscale via scanning electron microscopy and can prepare small-scale specimens for examination using other microscopy methods (including transmission electron microscopy, or TEM). Additionally, the dual-beam FIB/SEM system can be used to examine materials in three dimensions using a technique called serial sectioning. A modern dual-beam FIB/SEM also has an integrated micromanipulator (to pick up and manipulate specimens) and gas injection needs (which allow for deposition of protective surface layers).
II. SCOPE OF WORK
The contractor shall deliver and install one dual-beam FIB/SEM instrument with features as defined in the “Hardware Requirements” section. Control and support computers should also be included, as well as all software as defined in the “Hardware Requirements” section. Training will be provided for up to four NIST personnel and the system will be covered under warranty for at least one year to include all parts, labor, and travel.
III. SPECIFICATIONS
The Contractor shall provide one (1) dual-beam FIB/SEM system that meets the following minimum technical requirements. The Contractor shall install the instrument and provide training as described below.
Hardware Requirements:
Electron and Ion Beams:
· Scanning electron microscope column capable of achieving secondary electron resolution of 1.0 nm or better
· Scanning electron microscope column capable of producing a beam current of 200 nA or greater
· A suite of electron detectors that includes (at minimum) an Everhart-Thornley secondary electron detector, an in-lens electron detector, and a retractable segmented backscatter electron detector
· Vendors providing proposals are encouraged to include additional detectors as line-item options so the proposal can be customized to meet budget considerations
· A gallium-based focused ion beam column with a resolution of 3.0 nm or better
· A gallium-based focused ion beam column capable of accelerating voltages from 500 V to 30 kV
· A gallium-based focused ion beam column with a maximum current of no less than 60 nA
Specimen Stage:
· An X/Y-axis range of at least 100 mm
· A Z-axis range of at least 60 mm
· Ability to rotate 360 degrees
· Tilt to greater than 70 degrees
· Can accommodate a specimen greater than 80 mm in height to the eucentric point
· An infrared camera to allow real-time viewing of the specimen chamber
Specimen Chamber
· An oil-free vacuum pumping system
· An infrared camera to allow real-time viewing of the specimen chamber
· Vacuum ports to accommodate typical commercially available energy dispersive spectroscopy and electron backscatter diffraction detectors
· An integrated plasma cleaner
Computers and Software
· Control and support computers with an operating system of Windows 7, 10, or 11.
· FIB/SEM control software
· FIB/SEM manual control interface (hand panel)
· FIB/SEM scan controller that allows for patterning of the electron and ion beam to include rectangles, lines, circles, polygons, bitmaps, and arrays.
Gas Injection System(s)
· Gas injection system/needle that allows for the deposition of platinum via the electron or ion beam
· Gas injection system/needle that allows for the deposition of carbon via the electron or ion beam
Micromanipulator
· Computer-controlled micromanipulator that can be controlled in X, Y, Z, and rotation axes
Automation Software
· Software to automatically collect tessellated images over large areas
· Software to allow for automated production of lamella for examination in the transmission electron microscope
· Software to allow for 3D data collection via serial sectioning
· An integrated scripting language to allow for custom automations
Support Equipment
· An air-cooled water chiller
Warranty and Service
· One (1) year parts and labor warranty to be included with the base instrument specification
Installation:
The Contractor shall install the instrument in Building 81, Room 1E105, at NIST Boulder, CO. Installation shall include, at a minimum, uncrating/unpacking of all equipment, set-up and hook-up of all equipment, start-up, demonstration of specifications, and removal of all trash. Instrument will operate to manufacturer’s specifications upon installation. Installation will take place during normal business hours, between 8:30 am and 5:00 pm Eastern Time, Monday through Friday except Federal Holidays, and will be coordinated with the NIST Technical Point of Contact (TPOC). Installation is to occur prior to January 1, 2023.
Extended Warranty:
The Contractor may provide additional quotations to include options for extended warranty/service agreements. This extended warranty/agreement shall cover all parts, labor, and travel. Any extended warranties or service agreements will commence upon the conclusion of the initial warranty defined in “Hardware Requirements” section. Specifically:
· Please include a second quote to include a year of extended warranty/service agreement on top of the warranty included with the base instrument configuration.
· Please include a third quote to include two years of extended warranty/service agreement on top of the included warranty
Training:
Include training at NIST for up to 4 NIST personnel covering normal operation, troubleshooting, and routine maintenance. Training will be provided during normal business hours, between 8:30am and 5:00pm Eastern Time, Monday through Friday, except Federal Holidays, and will be coordinated with the NIST Technical Point of Contact (TPOC) to ensure maximum availability of NIST personnel. Training is to occur within 30 days of installation. The training may be completed on-site at NIST immediately after installation and demonstration of specifications.
IV. PERIOD OF PERFORMANCE
The period of performance shall be six months from award of this requirement.
V. PLACE OF PERFORMANCE
All work shall be completed at the Contractor’s facility. Installation of the instrument and training shall be accomplished at NIST, Boulder, Colorado. Normal duty hours are Monday through Friday, 8:30 a.m. to 5:00 p.m. with the exception of Federal holidays.
VI. GOVERNMENT FURNISHED PROPERTY
No government property will be furnished.
VII. DELIVERABLES
| Description |
| Quantity |
| Due Date |
| Dual beam FIB/SEM instrument and all accessories |
| One (1) |
| Prior to January 1, 2023 |
| Installation of the analytical instrument |
| Once |
| Prior to January 1, 2023 |
| Operations and maintenance manual for the analytical instrument |
| One (1) |
| Prior to January 1, 2023 |
| Training of NIST personnel at NIST, Boulder, CO |
| Amount defined by vendor proposal |
| 90 days after installation |
VIII. ACCEPTANCE CRITERIA
The Contractor shall demonstrate that all performance specifications are met based on the contractor’s standard acceptance testing criteria.
IX. GENERAL INFORMATION
Safety: The Contractor employee shall be responsible for knowing and complying with commercial installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.
Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus.
Identification Badges: Contractor employees shall comply with NIST identification and access requirements. The Contractor shall provide the name and citizenship information of employees for on-site visits to the NIST Technical Point of Contact (TPOC) prior to arrival. The TPOC will submit the name(s) and citizenship information to the NIST Office of Security in order for a given Contractor employee to enter the NIST campus. The Contractor employee is responsible for absences due to missing or expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office.
Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID (which in most cases can be a valid driver's license), proof of insurance and current registration must be presented to the NIST Security Office.
File details come from the government source that posted it. Updated .