(02) SOW.pdf
PDF 114 KB Posted
- Attached to
- Blanchard Springs VIC HVAC compressor replacement Federal contract opportunity
- Solicitation number
- 12444224Q0055
- Issued by
- Department of Agriculture Forest Service
About this file
The document provided is a Statement of Work (SOW) for the replacement of a HVAC compressor at the Blanchard Springs Visitor Information Center located in the Ozark-St. Francis National Forest, Arkansas.
The SOW details the required work, which includes recovering and disposing of any remaining refrigerant, removing the defective compressor, flushing the system, installing a factory replacement compressor and related components, evacuating and leak testing the circuit, and adding a fresh R410a refrigerant charge. The work also includes adjusting the superheat and sub-cooling and logging the operations.
This SOW is in support of a federal contract opportunity, Solicitation Number 12444224Q0055, issued by the Department of Agriculture Forest Service for the Blanchard Springs VIC HVAC compressor replacement. The solicitation provides more detailed instructions regarding the requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HVAC Unit additional pictures.pdf | ||
| Questions and Answers.pdf | ||
| (01) WD Stone County AR.pdf | ||
| SF 1449.pdf | ||
| 12444224Q0055 cont..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
HP1 VIC HVAC
Compressor Replacement
Replacement of Compressor in HP1 HVAC unit at the Blanchard Springs Visitor Information Center.
Listed below will be work performed.
Recover any remaining refrigerant and dispose of per EPA Regulations Demo and remove defective compressor, haul o Flush system with chemical cleaner Demo and remove thermostatic expansion valve and heat pump reversing valve Replace system access port valve stem cores Install compressor with factory replacement Install factory replacement TXV valve and reversing valve Install compressor contactor and bi-flow heat pump refrigerant drier Evacuate and leak test circuit. Weigh in fresh R410a refrigerant charge and start system with approximately 75# refrigerant Adjust superheat and sub-cooling Log operations