This document is a Statement of Work (SOW) for a mowing services contract for the Sam Houston National Forest in Texas. The contract requires the contractor to provide all materials, labor, equipment, and other incidentals necessary to perform grounds maintenance, including mowing, trimming, and debris removal, at five recreation areas within the forest. The work is to be performed on a call-when-needed basis, with an estimated 14 or 10 service visits per area during the mowing season from March 15 to September 30, Monday through Thursday. The contractor must provide and use all necessary personal protective equipment. The government will monitor performance through inspections and can withhold payment or terminate the contract for unacceptable work. The related federal contract opportunity is a Request for Quote (RFQ) solicitation for the mowing services, with a due date for offers. Offerors are encouraged to inspect the sites but can submit a competitive offer without a site visit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12444224Q0035.pdf | ||
| (04) Schedule of Items.xlsx | XLSX spreadsheet | |
| (05) Exhibit A.pdf | ||
| (01) WD-TX.pdf | ||
| (06) Exhibit B.pdf | ||
| (03) Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Project Sam Houston Recreation Area Mowing Contract
General Information
1.0 Scope of Work
The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete grounds maintenance at the Sam Houston RD Recreation Areas:
Cagle Rec Area, Stubblefield Rec Area, Scotts Ridge Rec Area (2 areas), and Double Lake Rec Area in accordance with attached and referenced specifications.
An organized site visit is not scheduled. Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. Contact Sam Houston Ranger District to schedule a site visit. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Nothing restricts the Government from performing any of the work with its own organization and workforce.
Hours of work shall be anytime between the hours of 8:00 am and 4:30 pm Monday through Thursday.
Services to be provided on a CALL WHEN NEEDED BASIS as shown in the specifications below.
If grounds maintenance is not required, a designated Contracting Officer Representative (COR) for the maintenance contract will notify the Contractor by 4:30 pm on Monday of the week that maintenance is not necessary. Mowing will not be performed during inclement weather. The mowing season may be extended in order to complete all specified service quantities, not to exceed the overall contract Period of Performance.
2.0 Background
Sam Houston National Forest District Office: 394 FM 1375 West, New Waverly, Texas
1. Cagle Recreation Area: From New Waverly, at intersection of I-45 and FM 1375, travel west 5 miles to entrance on left.
2. Stubblefield Recreation Area: From New Waverly, at intersection of I-45 and FM 1375 travel west 9 miles; turn right (NW) on
FSR 215 for 3 miles, entrance on right.
3. Scott’s Ridge Boat Launch Area and Scott’s Ridge Day-Use Area: From Willis, at intersection of I-45and FM 1097, travel west
8.5 miles to Scotts Ridge Road, turn right (north). Scott’s Ridge is the end of the road.
4. Double Lake Recreation Area: From New Waverly, at intersection of I-45 and FM 1375 travel east 21 miles on TX-150E; turn right on FM2025 for 0.5 miles, entrance on left.
Line-item Recreation Area Mowed Acres (est.)
Buildings Number Fixtures Picnic/ Camping Sites
Boat Ramps
0001 Cagle Recreation Area
17 Fee Station (1) Bathhouse (4)
N/A 47 1
0002 Stubblefield Recreation Area
Bathhouse (2) Pavilion (1) Pump house (1)
Tables in Pavilion
N/A
0003 Scott’s Ridge Entrance Road & Boat Ramp
3.3 Vault Toilet (1) N/A N/A 1
0004 Scott’s Ridge Swim Area & Access Road (Day Use)
3.5
Vault Toilets (2) Pavilions (2)
0005 Double Lale Recreation Area 21.5 Fee Station (1) Bathhouse (6) Lodge (1) Shelter (2)
N/A 70 N/A
3. Grounds Maintenance – Mowing: The Contractor is cautioned that some of the terrain to be mowed is rough and irregular. The Contractor shall be responsible for replacement of any broken windows or other damage, either of buildings, vehicles, or campers or other features, resulting from contract actions. Any litter, tree limbs, rocks, or other debris shall be picked up and disposed of properly prior to mowing.
Grass Height: All grass will be cut, edged, and trimmed to a height of two inches (2”) when measured on level ground such as grassy beaches. Lawn clippings may be left in place when mowing, but must be removed from sidewalks, individual picnic and camping sites and their spurs, roadways, parking areas, water fountains and picnic shelters, and other areas as directed by the Government.
Trimming: The contractor shall be responsible for performing trimming in conjunction with the cutting/mowing operation. The Contractor shall be responsible for any undue damage resulting from the trimming, such as cutting of tree bark, broken windows, and killing of landscaping vegetation resulting from contract actions. All grass shall be trimmed even with the edges of all curbs, sidewalks, driveways, walls, poles, tree trunks, foundations or other objects contained within or adjacent to the mowed areas.
Trimming operations shall result in a uniform appearance. Trimming debris shall be removed from sidewalks, individual picnic and camping sites and their spurs, roadways, water fountains and picnic shelters.
GENERAL: The contractor shall remove all tree limbs, branches, cuttings, etc., from the area adjacent to the trash receptacles and deposit in an area designated by the COR. The Contractor shall clean-up work areas, and restore any damaged landscape, government property, or buildings to their original state from damage resulting from contract actions. The Contractor shall supply all materials, labor, and equipment to complete all work specified in this scope of work. The contractor shall notify the government of any maintenance needs or safety concerns encountered during the performance of duties related to this contract.
PERSONAL PROTECTIVE EQUIPMENT - Contractor Responsibility Contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.
Personal protective equipment (PPE), including equipment for eyes, face, head, ears, and extremities must be provided (at no cost to employee), used, and maintained in a sanitary and reliable condition. PPE must be used wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body.
In any area where the worker is exposed to the potential for flying or falling objects, the Contractor shall provide a hard hat to employees. The Contractor shall assure that employees wear the hard hat and all required PPE. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
4. CONTRACTOR/COR REQUIREMENTS
Technical Requirements / Tasks
This contract calls for the contractor to perform the following tasks and subtasks and to perform inspections at the completion of the tasks/subtasks as a minimum and or for intermediate inspections as determined at contract award by the COR/CO.
INVOICING INSTRUCTIONS: The contract will only invoice 1 time per month on the last date of service for that month for all services completed during that month. The contractor must coordinate with the COR to make sure they will be available to approve the invoice in IPP.gov The COR will inspect services for every monthly invoice submitted and will input “Services Inspected DD/MM/YYY” in IPP.gov when they approve each invoice.
Service Delivery Summary (Refer to Sections 3 and 4).
Performance Objective Performance Threshold Debris shall be picked up and disposed of properly prior to mowing 100% adherence to performance requirements is required. Not to exceed three reported occurrences with less than 100% compliance as reported by the COR on the Quality Assurance Report.
All grass cut, edged and trimmed to a height of two inches (2”). Lawn clippings removed from sidewalks, individual picnic and camping sites and their spurs, roadways, parking areas, water fountains and picnic shelters, and other areas as directed by the Government.
100% adherence to performance requirements is required. Not to exceed three reported occurrences with less than 100% compliance as reported by the COR on the Quality Assurance Report.
Trimming performed in conjunction with the cutting/mowing operation. All grass shall be trimmed even with the edges of all curbs, sidewalks, driveways, walls, poles, tree trunks, foundations or other objects contained within or adjacent to the mowed areas. Trimming operations shall result in a uniform appearance. Trimming debris shall be removed from sidewalks, individual picnic and camping sites and their spurs, roadways, water fountains and picnic shelters.
100% adherence to performance requirements is required. Not to exceed three reported occurrences with less than 100% compliance as reported by the COR on the Quality Assurance Report.
Remove all tree limbs, branches, cuttings, etc., from the area adjacent to the trash receptacles and deposit in an area designated by the COR. The Contractor shall clean-up
100% adherence to performance requirements is required. Not to exceed three reported occurrences
Base Year Period of Performance: From the Date of the Award to 05/31/2025 + 4 Option Years that will be from 06/01/YY to 05/31/YY
Line-item Description Recreation Area Season Est.
Qty.
Estimated Frequency
Specific Days
0001 Grounds Maintenance - Mowing Cagle Recreation Area 3/15 – 9/30 14 Every 2 weeks Mon – Th.
0002 Grounds Maintenance- Mowing Stubblefield Recreation Area 3/15 – 9/30 14 Every 2 weeks Mon – Th.
0003 Grounds Maintenance- Mowing Scott’s Ridge Entrance Road &
Boat Ramp
3/15 – 9/30
Every 2 weeks
Mon – Th.
0004 Grounds Maintenance- Mowing Scott’s Ridge Swim Area & Access Road (Day Use)
5/1 – 9/15 10 Every 2 weeks Mon – Th.
0005 Grounds Maintenance- Mowing Double Lake Recreation Area 3/15 – 9/30 14 Every 2 weeks Mon – Th.
work areas, and restore any damaged landscape, government property, or buildings to their original state from damage resulting from contract actions. Notify the government of any maintenance needs or safety concerns encountered during the performance.
with less than 100% compliance as reported by the COR on the Quality Assurance Report.
Personal protective equipment (PPE), including equipment for eyes, face, head, ears and extremities must be provided (at no cost to employee), used, and maintained in a sanitary and reliable condition. PPE must be used wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body.
100% adherence to performance requirements is required. Not to exceed three reported occurrences with less than 100% compliance as reported by the COR on the Quality Assurance Report.
D. METHODS OF SURVEILLANCE
The government, through each COR, shall monitor the contractor's performance through a variety of methods. The methods to be used are:
1. 100% inspection of the contractor's inspection results.
2. Customer surveys.
3. Periodic inspections by COR.
Performance Requirements Summary (Refer to Sections 3 and 4 for Standards).
Required Service Allowable
Deviation Method of Quality Assurance
Disincentive
Debris shall be picked up and disposed of properly prior to mowing 5% from standard Bi-Monthly Inspections/ Quality Assurance Report
Rework at no cost to the Government.
All grass cut, edged and trimmed to a height of two inches (2”). Lawn clippings removed from sidewalks, individual picnic and camping sites and their spurs, roadways, parking areas, water fountains and picnic shelters, and other areas as directed by the Government.
5% from standard Bi-Monthly Inspections/ Quality Assurance Report
Rework at no cost to the Government.
Trimming performed in conjunction with the cutting/mowing operation. All grass shall be trimmed even with the edges of all curbs, sidewalks, driveways, walls, poles, tree trunks, foundations or other objects contained within or adjacent to the mowed areas. Trimming operations shall result in a uniform appearance.
Trimming debris shall be removed from sidewalks, individual picnic and camping sites and their spurs, roadways, water fountains and picnic shelters.
5% from standard Bi-Monthly Inspections/ Quality Assurance Report
Rework at no cost to the Government.
Remove all tree limbs, branches, cuttings, etc., from the area adjacent to the trash receptacles and deposit in an area designated by the COR. The Contractor shall clean-up work areas, and restore any damaged landscape, government property, or buildings to their original state from damage resulting from contract actions.
Notify the government of any maintenance needs or safety concerns encountered during the performance.
5% from standard Bi-Monthly Inspections/ Quality Assurance Report
Rework at no cost to the Government.
Personal protective equipment (PPE), including equipment for eyes, face, head, ears and extremities must be provided (at no cost to employee), used, and maintained in a sanitary and reliable condition. PPE must be used wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body.
5% from standard Bi-Monthly Inspections/ Quality Assurance Report
Rework at no cost to the Government.
Procedures
1. The COR will use one Quality Assurance (QA) Checklist form to document and evaluate the contractor's performance under the contract. The form, when complete, will document what the contractor was supposed to do, what was actually done, and the impact or consequences of what was done.
2. The COR must substantiate all tasks which he judges to be indicative of "unacceptable" performance. Performance at the "acceptable" level is expected and need not be substantiated.
3. If the COR documents unacceptable performance, they will provide the QA Checklist to the contractor. The contractor will be given the opportunity to correct the issue within 3 business days.
4. The contractor is required to respond in writing to any negative QA monitoring form within 3 working days after receipt of the form.
5. In the event the contractor is unable to correct the problem for that service, the COR must report the issue in writing to the CO within 3 business days of the issue not being corrected.
6. Upon receipt of the unacceptable service performance from the COR, the CO will contract the Contractor in writing (email) to notify the contractor of the unacceptable service performance and give them 3 days to remedy that specific problem. If the issue is not resolved within 3 business days, the contractor will not be paid for that specific service. The CO will file a memo for record in the contract file along with the QA Checklist form that documented the unacceptable service along with the email traffic notifying the contractor to correct the issue.
7. The Contracting Officer may choose to terminate the contract for repeated unsatisfactory contractor’s performance by using FAR 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) or FAR 52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984) depending on the circumstances.
Quality Assurance Checklist For Sam Houston Ranger District Recreation Site Grounds Maintenance Contract
Rec Area(s): Place a ✔ in the Checkbox for the Service Line-item inspected
Input the Date the Service was performed
0001-Cagle Recreation Area
0002-Stubblefield Recreation Area
0003-Scott’s Ridge Entrance Road & Boat Ramp
0004-Scott’s Ridge Swim Area & Access Road (Day Use)
0005-Double Lake Recreation Area
Place a ✔ in this Checkbox below for Inspected Services
- Debris shall be picked up and disposed of properly prior to mowing
- All grass cut, edged and trimmed to a height of two inches (2”). Lawn clippings removed from sidewalks, individual picnic and camping sites and their spurs, roadways, parking areas, water fountains and picnic shelters, and other areas as directed by the Government.
- Trimming performed in conjunction with the cutting/mowing operation. All grass shall be trimmed even with the edges of all curbs, sidewalks, driveways, walls, poles, tree trunks, foundations or other objects contained within or adjacent to the mowed areas. Trimming operations shall result in a uniform appearance. Trimming debris shall be removed from sidewalks, individual picnic and camping sites and their spurs, roadways, water fountains and picnic shelters.
- Remove all tree limbs, branches, cuttings, etc., from the area adjacent to the trash receptacles and deposit in an area designated by the COR. The Contractor shall clean-up work areas, and restore any damaged landscape, government property, or buildings to their original state from damage resulting from contract actions. Notify the government of any maintenance needs or safety concerns encountered during the performance.
- Personal protective equipment (PPE), including equipment for eyes, face, head, ears and extremities must be provided (at no cost to employee), used, and maintained in a sanitary and reliable condition. PPE must be used wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body.
Comments: (If a service is unsatisfactory, the Line-item number, the date and time of the service must be listed in the comments below.)
Place a ✔ in the Checkbox for the applicable Overall Rating
SATISFACTORY
UNSATISFACTORY
COR Service Inspection Date:
COR Printed Name:
Contracting Signature: