0156V001-10306-SOLE SOURCE NEW SuperFreeze XF-4006AR 5-20_Redacted.pdf
PDF 140 KB Posted
- Attached to
- Pipe Freezer Federal contract opportunity
- Solicitation number
- N3904020Q0252
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0156V002-10307-0156V002 PIPE FREEZER SOLE SOURCE NEW SuperFreeze XF-4006AL 5-20_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)
USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION
UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
Ten closed loop refrigeration system, utilizing R‐507 refrigerant, used for freezing water in 4”NPS pipes for use as maintenance barriers. The estimated cost per unit is for a total cost of . The required delivery date is . This procurement is for the XF‐4006AR units
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
A. _X__ ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. __X_ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
The refrigeration units to be ordered from Spectronics are the only closed loop refrigeration systems manufactured for freezing water in 4”NPS pipes. The 4”NPS refrigeration units from Spectronics are currently undergoing extensive testing at Portsmouth Naval Shipyard (PNSY) and has undergone extensive testing at Pearl Harbor Naval Shipyard (PHNSY) to meet naval nuclear work standards. PNSY plans to utilize the (10) procured units in conjunction with (9) XF‐4006AL units to form a complete system. It is necessary that all of these units are identical in design and operation. They have shown to meet all safety standards for use in industrial environments including at naval shipyards and have been proven to not pose a health or safety risk to personnel operating the equipment. Any change in design, manufacturer, or supplier would require additional formal testing to verify any changes do not negatively affect the operability, reliability, or safety standards determined during PNSY and PHNSY testing.
The Spectronics 4”NPS units are the only closed loop 4” refrigeration units currently on the market. No other manufacturer offers units with similar design, operation or interchangeability. There are currently two patents out by this manufacturer for this refrigeration system: US Patent #5,548,965 and
#6,408,638. There is currently a patent pending for this specific unit design, US Patent Application Serial
No. 14/456,502.
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
OR
Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).
3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.
B. ___ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer. Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.
C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.
Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
4. If appropriate, include any additional pertinent information:
IV. CERTIFICATIONS/APPROVALS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
B. Contracting Officer Approval:
Signature Name (Printed) / Phone # Date