This is a proposal and bidding document issued by the Texas Department of Transportation (TxDOT) for a state construction contract on US Highway 190 in Brazos County, Texas. The project, identified as Control 0117-01-062 and Project F 2026(165), consists of profile markings installation work across multiple roadways including US 190, FM 2818, FM 2223, SH 30 in Brazos County; US 79 and FM 391 in Robertson County; and SH 90, SL 361, FM 1696, and FM 2620 in Grimes County. The work includes placement of reflectorized pavement markings in various configurations (white and yellow, solid and broken patterns in 6-inch and 8-inch widths), prefabricated rumble strips, mobilization, barricades, signs, traffic handling, and truck-mounted attenuators. The project must be completed within 67 working days from authorization. Bidders are required to acknowledge receipt of all addenda issued for the project; failure to do so will result in the bid not being read. A proposal guaranty of $21,000 is required, payable to the Texas Transportation Commission in the form of a cashier's check, teller's check, bank money order, or bid bond.
The contract is a federal-aid highway project subject to Davis-Bacon prevailing wage requirements, E-Verify employment eligibility verification, and comprehensive nondiscrimination provisions. Bidders must submit satisfactory audited financial statements and experience questionnaires at least ten days prior to the letting date. Unit prices must be submitted for all 15 bid items, including mobilization, barricades and traffic handling, stationary and mobile traffic management assistance, reflectorized pavement markings in multiple types and configurations, and prefabricated rumble strips. The project establishes a disadvantaged business enterprises (DBE) goal of 0 percent. Multiple special provisions apply, including restrictions on lane closures during hurricane season and key dates associated with Texas A&M events, limitations on non-surfaced roadway to two miles at any time, and requirements for law enforcement coordination. The contract incorporates the 2024 Standard Specifications and multiple special provisions addressing labor standards, nondiscrimination, environmental controls, and safety requirements. Contractors must comply with federal requirements including Form FHWA 1273 provisions, wage rate determinations, and certification regarding debarment, lobbying activities, and various state and federal compliance certifications.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control 0117-01-062, ETC Project F 2026(165), ETC Highway US 190, ETC County BRAZOS, ETC
ADDENDUM ACKNOWLEDGMENT
Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This page is provided for the purpose of acknowledging an addendum.
FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT
BEING READ.
In order to properly acknowledge an addendum, place a mark in the box next to the respective addendum.
ADDENDUM NO. 1
ADDENDUM NO. 2
ADDENDUM NO. 3
ADDENDUM NO. 4
ADDENDUM NO. 5
In addition, the bidder by affixing their signature to the signature page of the proposal is acknowledging that they have taken the addendum(s) into consideration when preparing their bid and that the information contained in the addendum will be included in the contract, if awarded by the Commission or other designees.
1-1
This page intentionally left blank.
Highway US 190, ETC County BRAZOS, ETC
PROPOSAL TO THE TEXAS
TRANSPORTATION COMMISSION
2024 SPECIFICATIONS
Work Consisting of Profile Markings
BRAZOS COUNTY, TEXAS , ETC
The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated.
This project is to be completed in 67 working days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.
Provide a proposal guaranty in the form of a Cashier’s Check, Teller’s Check (including an Official Check) or Bank Money Order on a State or National Bank or Savings and Loan Association, or State or Federally chartered Credit Union made payable to the Texas Transportation Commission in the following amount:
TWENTY ONE THOUSAND AND 00/100 (Dollars) ( $21,000.00)
A bid bond may be used as the required proposal guaranty. The bond form may be detached from the proposal for completion. The proposal may not be disassembled to remove the bond form. The bond must be in accordance with Item 2 of the specifications.
Any addenda issued amending this proposal and/or the plans that have been acknowledged by the bidder, become part of this proposal.
By signing the proposal the bidder certifies:
1. the only persons or parties interested in this proposal are those named and the bidder has not directly or indirectly participated in collusion, entered into an agreement or otherwise taken any action in restraint of free competitive bidding in connection with the above captioned project.
2. in the event of the award of a contract, the organization represented will secure bonds for the full amount of the contract.
3. the signatory represents and warrants that they are an authorized signatory for the organization for which the bid is submitted and they have full and complete authority to submit this bid on behalf of their firm.
4. that the certifications and representations contained in the proposal are true and accurate and the bidder intends the proposal to be taken as a genuine government record.
• Signed: **
(1) (2) (3) Print Name:
(1) (2) (3) Title:
(1) (2) (3) Company:
(1) (2) (3)
• Signatures to comply with Item 2 of the specifications.
**Note: Complete (1) for single venture, through (2) for joint venture and through (3) for triple venture.
* When the working days field contains an asterisk (*) refer to the Special Provisions and General Notes.
NOTICE TO CONTRACTORS
ANY CONTRACTORS INTENDING TO BID ON ANY WORK TO BE AWARDED
BY THIS DEPARTMENT MUST SUBMIT A SATISFACTORY “AUDITED FINANCIAL
STATEMENT” AND “EXPERIENCE QUESTIONNAIRE” AT LEAST TEN DAYS
PRIOR TO THE LETTING DATE.
UNIT PRICES MUST BE SUBMITTED IN ACCORDANCE WITH ITEM 2 OF
THE STANDARD SPECIFICATIONS OR SPECIAL PROVISION TO ITEM 2 FOR
EACH ITEM LISTED IN THIS PROPOSAL.
TEXAS DEPARTMENT OF TRANSPORTATION
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS,
That we, (Contractor Name)
Hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Texas Department of Transportation, hereinafter called the Obligee, in the sum of not less than two percent (2%) of the department’s engineer’s estimate, rounded to the nearest one thousand dollars, not to exceed one hundred thousand dollars ($100,000) as a proposal guaranty (amount displayed on the cover of the proposal), the payment of which sum will and truly be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the principal has submitted a bid for the following project identified as:
Control 0117-01-062, ETC
Project F 2026(165), ETC
Highway US 190, ETC
County BRAZOS, ETC
NOW, THEREFORE, if the Obligee shall award the Contract to the Principal and the Principal shall enter into the Contract in writing with the Obligee in accordance with the terms of such bid, then this bond shall be null and void. If in the event of failure of the Principal to execute such Contract in accordance with the terms of such bid, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not as a penalty but as liquidated damages.
Signed this Day of 20
By:
(Contractor/Principal Name)
(Signature and Title of Authorized Signatory for Contractor/Principal)
*By:
(Surety Name)
(Signature of Attorney-in-Fact) Impressed
*Attach Power of attorney (Surety) for Attorney-in-Fact Surety Seal Only
This form may be removed from the proposal
BIDDER’S CHECK RETURN
IMPORTANT
The space provided for the return address must be completed to facilitate the return of your bidder’s check. Care must be taken to provide a legible, accurate, and complete return address, including zip code. A copy of this sheet should be used for each different return address.
NOTE
Successful bidders will receive their guaranty checks with the executed contract.
RETURN BIDDERS CHECK TO (PLEASE PRINT):
Control 0117-01-062, ETC Project F 2026(165), ETC Highway US 190, ETC County BRAZOS, ETC
IMPORTANT
PLEASE RETURN THIS SHEET IN ITS ENTIRETY
Please acknowledge receipt of this check(s) at your earliest convenience by signing below in longhand, in ink, and returning this acknowledgement in the enclosed self-addressed envelope.
Check Received By: Date:
Title:
For (Contractor's Name):
Project: County:
NOTICE TO THE BIDDER
In the space provided below, please enter your total bid amount for this project. Only this figure will be read publicly by the Department at the public bid opening.
It is understood and agreed by the bidder in signing this proposal that the total bid amount entered below is not binding on either the bidder or the Department. It is further agreed that the official total bid amount for this proposal will be determined by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.
Total Bid Amount
Control Project Highway County
ALT ITEM DESC SP Bid Item Description Unit Quantity Bid Price Amount Seq
Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________
Additional Signature for Joint Venture:
Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________
Total Bid Amount _______$2,664.00________
EXAMPLE OF BID PRICES SUBMITTED BY COMPUTER PRINTOUT
0001-03-030
STP 2000(938)HES
SH 20
EL PASO
104 509 REMOV CONC (SDWLK) SY 266.400 $10.000 $2,664.00 1
EXAMPLE EXAMPLE EXAMPLE EXAMPLE
EXAMPLES
BID PRICES SUBMITTED BY HAND WRITTEN FORMAT
Unit price for each plant in place
249 014 FLEX BASE(DEL)(DENSCOT)(TY A GR4 CL2) TON 56,787.00 14
ALT
ITEM-CODE
ITEM
NO
DESC
NO
S.P.
NO.
UNIT BID PRICE ONLY
WRITTEN IN WORDS UNIT
APPROX
QUANTITIES
DEPT
USE
ONLY
190 026 RED OAK 1 1/2” - 1 3/4” GAL BB EA 9.000 1
DLRS
CENTS
DLRS
CENTS
Unit price for each ton of Flexible Base
430 001 001 CL A CONC FOR EXT STR (CULV) CY 45.000 27
Unit price for each cubic yard of Concrete
DLRS
CENTS
610 007 001 RDWY ILL ASSEM(TY ST 50T-8-8)(.4 KW)S EA 13.000 7
Unit price of each Roadway Illumination Assembly
DLRS
CENTS
EXAMPLE EXAMPLE EXAMPLE EXAMPLE
F 2026(165), ETC
Proposal Sheet
BRAZOS, ETC FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
500 7001
MOBILIZATION
LS 1.000 1 DOLLARS
and CENTS
502 7001
BARRICADES, SIGNS AND TRAFFIC
HANDLING
MO 5.000 2 DOLLARS
and CENTS
505 7001
TMA (STATIONARY)
DAY 69.000 3 DOLLARS
and CENTS
505 7003
TMA (MOBILE OPERATION)
DAY 15.000 4 DOLLARS
and CENTS
666 7018
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 2,502.000 5 DOLLARS
and CENTS
666 7024
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 26,995.000 6 DOLLARS
and CENTS
666 7266
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 296,814.000 7 DOLLARS
and CENTS
666 7270
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 130,178.000 8 DOLLARS
and CENTS
666 7274
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 30,327.000 9 DOLLARS
and CENTS
666 7408
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 88,107.000 10 DOLLARS
and CENTS
666 7411
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 580,178.000 11 DOLLARS
and CENTS
666 7420
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 79,178.000 12 DOLLARS
and CENTS
666 7423
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 404,051.000 13 DOLLARS
and CENTS
1-2
F 2026(165), ETC
Proposal Sheet
BRAZOS, ETC FORM 234-B I-61-5M
TxDOT PROJECT
COUNTY
ALT
ITEM-CODE
UNIT BID PRICE ONLY.
WRITTEN IN WORDS UNIT APPROX
QUANTITIES
DEPT
USE
ONLY
ITEM
NO.
DESC
CODE
S.P.
No.
668 7002
PRFB RUMBLE STRIP (BLK)(1')
(CENTERLINE)
LF 13,070.000 14 DOLLARS
and CENTS
668 7137
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 26,140.000 15 DOLLARS
and CENTS
2-2
CERTIFICATION OF INTEREST IN OTHER BID
PROPOSALS FOR THIS WORK
By signing this proposal, the bidding firm and the signer certify that the following information, as indicated by checking “Yes” or “No” below, is true, accurate, and complete.
A. Quotation(s) have been issued in this firm's name to other firm(s) interested in this work for consideration for performing a portion of this work.
________ YES
________ NO
B. If this proposal is the low bid, the bidder agrees to provide the following information prior to award of the contract.
1. Identify firms which bid as a prime contractor and from which the bidder received quotations for work on this project.
2. Identify all the firms which bid as a prime contractor to which the bidder gave quotations for work on this project.
DISCLOSURE OF LOBBYING ACTIVITIES
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for public burden disclosure.)
1. Type of Federal Action:
a. contract
b. grant
c. cooperative agreement
d. loan
e. loan guarantee
f. loan insurance
2. Status of Federal Action:
a. bid/offer/application
b. initial award
c. post-award
3. Report Type:
a. initial filing
b. grant
For material change only:
year _______ quarter _____ date of last report ___________
4. Name and Address of Reporting Entity:
Prime Subawardee Tier __________, if known:
Congressional District, if known:
5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
Congressional District, if known:
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable: _____________________________
8. Federal Action Number, if known: 9. Award Amount, if known:
10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):
b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
11. Amount of Payment (check all that apply):
$ ___________________________ actual planned
13. Type of Payment (check all that apply):
a. retainer
b. one-time fee
c. commission
d. contingent fee
e. deferred
f. other; specify: _______________________________
12. Form of Payment (check all that apply)
a. cash
b. in-kind; specify: nature ____________________ value ____________________
14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) SF-LLL-A, if necessary)
15. Continuation Sheet(s) SF-LLL-A attached: Yes No
16. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required dis-closure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature: __________________________________________
Print Name: _________________________________________
Title: ______________________________________________
Telephone No: _____________________ Date: ___________
FEDERAL USE ONLY Authorized for Local Reproduction Standard Form - LLL
INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Use the SF-LLL-A Continuation Sheet for additional information if the space on the form is inadequate. Com-plete all items that apply for both the initial filing and material change report. Refer to the implementing guidance pub-lished by the Office of Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity or this covered Federal action.
4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in item 4 checks "Subawardee", then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number, the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.
(b) Enter the full names of the individual(s) performing services, and include full address if different from 10(a).
Enter Last Name, First Name, and Middle Initial (MI).
11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned).
Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.
12. Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.
13. Check the appropriate box(es). Check all boxes that apply. If other, specify nature.
14. Provide a specific and detailed description of the services that the lobbyist has performed, or will be expected to perform, and the date(s) of any services rendered. Include all preparatory and related activity, not just time spent in actual contact with Federal officials. Identify the Federal official(s) or employee(s) contacted or the officer(s), employee(s), or Member(s) of Congress that were contacted.
15. Check whether or not a SF-LLL-A Continuation Sheet(s) is attached.
16. The certifying official shall sign and date the form, print his/her name, title, and telephone number.
Public reporting burdon for this collection of infromation is estimated to average 30 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments reguarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burdon, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.
DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB 0348-0046
CONTINUATION SHEET
Authorized for Local Reproduction
Standard Form - LLL-A
Reporting Entity: ____________________________________ Page ______ of ______
CONTRACTOR’S ASSURANCE
(Subcontracts-Federal Aid Projects)
By signing this proposal, the contractor is giving assurances that each subcontract and further all lower tier subcontracts will incorporate the Standard Specification to Article 9.9, Payment
Provisions for Subcontractors and will also physically attach the following:
Form FHWA 1273
Wage Rates
Special Provision 000-001
Special Provision 000-002
Special Provision 000-007
Required Contract Provisions Federal-Aid Construction
Contracts
All Construction Projects
Nondiscrimination, Sections 3.1-3.6 (include materials and leases of equipment)
Certificate of Nondiscrimination in Employment
Cargo Preference Act Requirements in Federal-Aid
11-25
ENGINEER SEAL
Project F 2026(165), ETC
Highway US 190, ETC County BRAZOS, ETC
The enclosed Texas Department of Transportation Specifications, Special Specifications, Special Provisions, General Notes and Specification Data in this document have been selected by me, or under my responsible supervision as being applicable to this project.
Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act.
The seal appearing on this document was authorized by:
Charles D. Reed P.E.
April 24, 2026
Seal Applies to CSJ(s):
All CSJs within the Contract
111662
Charles D. Reed
Sheet: 4 Highway: US 190, ETC. Control: 0117-01-062, ETC.
County: BRAZOS, ETC.
2026 General Notes Sheet A
GENERAL
Contractor questions on this project are to be addressed to the following individuals:
James Robbins, P.E., A.E., James.Robbins@txdot.gov Bennett Shepherd P.E., A.A.E., John.Shepherd
Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following Address:
https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors
All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A web page.
The Letting Pre-Bid Q&A web page for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.
Send eligible shop plan submittals with PDF attachments directly to the reviewing office. If the shop drawings match a MTD currently approved set of shop drawings, submit that statement in writing with the submittal.
ITEM 7 “LEGAL RELATIONS AND RESPONSIBILITIES”
State contract mowers will mow the right of way during the growing season.
The Contractor will be notified by the Engineer one week in advance of the anticipated time when mowers will be in the limits of the project. Clean the right of way to such a condition that allows the mowing contractors to safely mow.
mailto:James.Robbins@txdot.gov mailto:Matt.Hensarling@txdot.gov https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors
Sheet: 4
County: BRAZOS, ETC.
2026 General Notes Sheet B
In accordance with Item 7.2.5, Contractor equipment equipped with blue warning lights shall be wired so that operation of blue lights is independent of any other lights.
Whenever bridge construction or milling / paving operations reduces the under clearance of a roadway at a bridge underpass, the Contractor shall be required to inform the Engineer a minimum of 2 weeks prior to these operations by email with the specific bridge information including the presumed minimum clearance under the bridge when hanging beams (minus the standard 3 inch buffer), the date(s) which beams are to be hung, the direction(s) of the roadway(s) affected, and the mile point of the bridge where work is being performed. When milling / paving operations increase the elevation of the under passing roadway, the Contractor shall inform the Engineer office a minimum of 7 days prior to performing milling / paving operations.
Contractor shall confirm that the Engineer is made aware, by a minimum of 14 calendar days of any traffic shift or construction activity that would affect travel minimum travel width / height, minimum under clearance requirements, maximum turning length, or maximum weight limits pertaining to Oversized / Overweight (OSOW) transports. Should the Engineer determine that the Contractor's activities requires an OSOW permit restriction, the Contractor is responsible for assuring the permit restriction is accurate and active a minimum of 10 calendar days prior to enacting the traffic shift / activity. Failure to affirm the establishment and accuracy of a required OSOW permit restriction will result in Liquidated Damages until the TCP is removed.
This project is on a hurricane evacuation route. Furnish at the pre-construction meeting a written plan outlining procedures to suspend work, secure the job site and safely handle traffic through and across the project in the event of a hurricane evacuation.
During the hurricane season (June 1 through November 30), do not close any travel lanes except when the Contractor can demonstrate that he can provide labor, equipment, material, work plan, and quality of work to satisfactorily return all lanes to an open, all-weather travel surface within three days of receiving written or verbal notice but no later than 3 days prior
Sheet: 4A
County: BRAZOS, ETC.
2026 General Notes Sheet C to hurricane landfall. Construction of temporary lanes to an all-weather surface will be paid in accordance with Article 9.7, “Payment for Extra Work and Force Account Method”.
In addition to lane closures, cease work 3 days or as directed by the Engineer prior to hurricane landfall on or near the roadway that adversely impacts the flow of traffic and reduces the capacity of the highway during an evacuation. Prohibit the Contractor’s, sub-contractors’ or material suppliers’ vehicles from entering or exiting the stream of traffic including material hauling and delivery, and mobilization or demobilization of equipment. When directed, this prohibition will include a reasonable time period for the evacuees to return to their point of origin.
In the event of the declaration of a hurricane watch, warning, other severe weather warning or national or state emergency that requires the roadways in the vicinity be used as evacuation routes, cease all work that requires the Contractor’s, sub-contractors’ or material suppliers’ vehicles to enter the stream of traffic on these primary or secondary evacuation routes. This work includes material hauling and delivery, and mobilization or demobilization of equipment.
The following roadways are recognized hurricane evacuation routes in the Bryan District:
Primary Evacuation Routes: IH 45, US 77 (S of US 79), US 84 (E of IH 45), US 79, US 287, US 290, SH 6.
Secondary Evacuation Routes: US 190 (E of IH 45), SH 7, SH 21, SH 30 (SH 6 to IH 45), SH 36, SH 105 (E of SH 6).
Other routes may be designated.
Roadway closures during the following key dates and/or special events are prohibited:
Day before and day of Texas A&M home football games Day before and day of:
• SH 6 in Brazos/Grimes/Robertson County
• US 190 in Robertson/Brazos County
Sheet: 4A
County: BRAZOS, ETC.
2026 General Notes Sheet D
• SH 21 in Brazos County
• SH 30 in Brazos County
• SH 40
• SH 47
• FM 2818
• FM 60
• BS 6R (Texas Ave in Bryan/College Station)
• FM 2347
• FM 2154 (north of SH 40)
Day of:
• FM 1179
• FM 158
• SH 308
• Texas A&M graduation
• Texas A&M Family Weekend
The Engineer may decide to restrict construction operations or lane closures on these key dates and/or special events.
For Work in Proximity to The Railroad
If the project had a Maintenance Consent Letter (MCL) issued for clearance, the contractor at the time the contract is awarded must complete and submit the Contractor Endorsement included with the executed MCL. This form will serve as the contractors right of entry (ROE) onto RR property. The contractor is not responsible for the fee listed on the MCL, TXDOT handles this in coordination with the RR. Additional requirements as outlined on the MCL and in TxDOT Specifications include – insurance, RR flaggers, and RR safety certifications. Further, the contractor shall ensure that adequate insurance is obtained per the Railroad Scope of Work (SOW) and that documentation of such is provided to the email included on the MCL, where the contractor endorsement is submitted. The contractor must also ensure that RR flaggers are set up with RailPros and that all employees working on the RR ROW have the required safety training per UPRR’s requirements.
Sheet: 4B
County: BRAZOS, ETC.
2026 General Notes Sheet E
ITEM 8 “PROSECUTION AND PROGRESS”
No more than 2 miles of non-surfaced roadway will be allowed at any time.
The Engineer may consider extending the 2-mile limit or allow alternating 2-mile sections of concurrent work, only if the Contractor can demonstrate adequate workforce, equipment, material deliveries, work plan, and quality of work sufficient to handle the longer work zones. If the 2 miles of non-surfaced roadway are extended by the Engineer in writing, this will not exempt the Contractor from not exceeding the 5-minute delay and any additional signing/traffic control will be considered subsidiary to Item 502, Barricades, Signs, and Traffic Handling. If, in the opinion of the Engineer, the Contractor fails to adequately progress or protect the work, or minimize disruption to traffic, the 2-mile limit may be reduced, as directed. There will be no additional compensation to the Contractor for the non-surfaced roadway limit being reduced.
By noon of each Wednesday, provide the Engineer a written outline of the daily work schedule for the following week. Include in the outline the times and places for proposed traffic control changes, lane and shoulder closures, and moving operations or other operations that affect traffic on the roadway.
Unless otherwise authorized by the Engineer, prosecute the work on this project as narrated in the TCP Sequence of Work.
prosecute the work on this project in accordance with the following sequence of work:
1) Set advance signing and barricades.
2) Place Rumble Bars
3) Place Profile Markings
4) Place Stripe ?) Final cleanup.
Some of these operations may be performed simultaneously.
Prepare Progress Schedule Bar Chart
Work may commence immediately upon issuance of authorization, and early initiation is both permitted and expected when conditions allow. The 90‑day delayed‑start provision under SP008‑005 is intended solely to accommodate Contractor mobilization and does not constitute a deferral of work activities.
Sheet: 4B
County: BRAZOS, ETC.
2026 General Notes Sheet F
This allowance should not be interpreted as a restriction on beginning work earlier, nor as justification for delaying progress when resources are available.
ITEM 502 “BARRICADES, SIGNS AND TRAFFIC HANDLING”
Where shown on applicable TCP standards, channelizing devices on the centerline are required at all times; including when a pilot vehicle is used to lead traffic. Mount a G20-4 sign a minimum of 4’to the bottom of the sign from the ground at a conspicuous location on the rear of the vehicle. Traffic delays caused by one-lane, two-way traffic control, will not be allowed to exceed 5 minutes unless approved by the Engineer.
One-way traffic control operations are required when placing centerline profile markings, edge line profile markings and rumble bars on all two-lane roadways. Work area is limited to a maximum of 2 miles for this work.
During one-way operations, station flaggers at all county roads and any other locations, such as private businesses, that may have traffic entering the work area.
Removal of ground mounted temporary signs and supports as specified on standard sheet BC (5), shall include the immediate backfilling of support holes with Type B embankment material and the compaction of the backfill material. The signs must also be removed within two weeks once construction ends.
When used, skid mounted and folding Traffic Control Signs shall be covered, folded, or moved away from the clear zone in crash-worthy configuration when not actively in use. Signs/barricades in non-crash-worthy configuration shall be removed from the ROW at the Contractor’s expense.
Relocation of existing signs to temporary mounts during construction is subsidiary to Item 502. Maintain all existing signs during construction that do not conflict with TCP, or as directed by the Engineer.
Sheet: 4C
County: BRAZOS, ETC.
2026 General Notes Sheet G
The Contractor Force Account “Safety Contingency” that has been established for this project is intended to be utilized for work zone enhancements, to improve the effectiveness of the Traffic Control Plan, that could not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor’s Responsible Person based on weekly or more frequent traffic management reviews on the project. The Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.
Law enforcement assistance will be required for this project and is expected to be required for major traffic control changes and lane closures.
Coordinate with local law enforcement and arrange for law enforcement as directed or agreed by the Engineer. Complete the daily tracking form provided by the department and submit invoices that agree with the tracking form for payment at the end of each month approved services were provided.
Patrol vehicles must be clearly marked to correspond with the officer’s agency and equipped with appropriate lights to identify them as law enforcement. For patrol vehicles not owned by a law enforcement agency, markings will be retroreflective and legible from 100 ft. from both sides and the rear of the vehicle. Lights will be high intensity and visible from all angles.
Cancel law enforcement personnel when the event is canceled. Cancellation, minimums or “show up” fees will not be paid when cancellation is made 12 hours prior to beginning of the event. Failure to cancel within 12 hours will not be cause for payment for cancellation, minimums, or "show up" time. Payment of actual “show up” time to the event site due to cancellation will be on a case-by-case basis at a maximum of 2 hours per officer.
Sheet: 4C
County: BRAZOS, ETC.
2026 General Notes Sheet H
ITEM 505 “TRUCK MOUNTED ATTENUATOR (TMA) AND
TRAILER ATTENUATOR (TA)”
In addition to the shadow vehicles with truck mounted attenuator (TMA) that are specified as being required on the traffic control plan (TCP) for this project, provide one (1) shadow vehicle with TMA for TCP (1-1)-18 as detailed on General Note 4 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (1-2)-18 as detailed on General Note 5 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (1-3)-18 as detailed on General Note 6 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (1-4)-18 as detailed on General Note 4 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (1-5)-18 as detailed on General Note 4 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (2-1)-18 as detailed on General Note 4 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (2-2)-18 as detailed on General Note 6 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (2-3)-18 as detailed on General Note 7 of this standard sheet, provide one (1) shadow vehicle with TMA for TCP (2-4)-18 as detailed on General Note 5 of this standard sheet, provide two (2) (shadow and trail) vehicles with TMA for TCP (3-1)-13 as detailed on General Note 3 of this standard sheet, Sheet: 4D
County: BRAZOS, ETC.
2026 General Notes Sheet I provide three (3) (advance warning, shadow, and trail) vehicles with TMA for TCP (3-2)-13 as detailed on General Note 4 of this standard sheet, provide three (3) (advance warning, shadow, and trail) vehicles with TMA for TCP (3-3)-14 as detailed on General Note 3 of this standard sheet, provide two (2) shadow vehicle with TMA for TCP (3-4)-13 as detailed on General Note 2 of this standard sheet, Therefore, nineteen (19) total shadow vehicles with TMA will be required for this type of work. The contractor will be responsible for determining if one or more of these operations will be ongoing at the same time to determine the total number of TMAs needed for the project.
One hundred forty-seven (147) TMA days are provided in the project estimate for stationary operation.
One hundred seventy-two (172) TMA days are provided in the project estimate for mobile operations.
TMA’s shall meet the requirements of the Compliant Work Zone Traffic Control Device List. http://ftp.txdot.gov/pub/txdot-info/cmd/mpl/cwztcd.pdf
Signs and arrow boards required on truck-mounted attenuators and pilot vehicles are subsidiary to Item 505.
ITEM 506 “TEMPORARY EROSION, SEDIMENTATION AND
ENVIRONMENTAL CONTROLS”
It is not anticipated that any erosion control devices will be needed on this project. However, in the event that any devices are needed, payment for the work will be determined in accordance with Article 9.7, “Payment for Extra Work and Force Account Method”.
http://ftp.txdot.gov/pub/txdot-info/cmd/mpl/cwztcd.pdf
Sheet: 4D
County: BRAZOS, ETC.
2026 General Notes Sheet J
ITEM 666 “REFLECTORIZED PAVEMENT MARKINGS”
Unless authorized by the Engineer, the Contractor will not place the pavement markings on the resurfaced roadway until it has cured for 3 days.
All striping limits must be approved by the Engineer before striping operations may begin.
ITEM 672 “RAISED PAVEMENT MARKERS”
Use flexible bituminous adhesive for applications on all pavement types.
Control : 0117-01-062, ETC Project : F 2026(165), ETC
BRAZOS, ETC
US 190, ETCHighway :
County :
TEXAS DEPARTMENT OF TRANSPORTATION
GOVERNING SPECIFICATIONS AND SPECIAL PROVISIONS
ALL SPECIFICATIONS AND SPECIAL PROVISIONS APPLICABLE TO THIS PROJECT ARE
IDENTIFIED AS FOLLOWS:
SPECIAL PROVISIONS :
SPECIAL PROVISIONS WILL GOVERN AND TAKE PRECEDENCE OVER
THE SPECIFICATIONS ENUMERATED HEREON WHEREVER IN
CONFLICT THEREWITH.
SPECIAL SPECIFICATIONS :
STANDARD SPECIFICATIONS:
MOBILIZATIONITEM 500
BARRICADES, SIGNS, AND TRAFFIC HANDLING(503) (505) (510) ITEM 502
TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA)ITEM 505
RETROREFLECTORIZED PAVEMENT MARKINGS(316) (502) (662) (667) (677)
(678)
ITEM 666
PREFABRICATED PAVEMENT MARKINGS AND RUMBLE STRIPS(678) ITEM 668
ITEMS 1-9 INCL., GENERAL REQUIREMENTS AND COVENANTS
ADOPTED BY THE TEXAS DEPARTMENT OF TRANSPORTATION
SEPTEMBER 1, 2024.
STANDARD SPECIFICATIONS ARE INCORPORATED INTO THE
CONTRACT BY REFERENCE.
"NONDISCRIMINATION" (000---001) SPECIAL PROVISION
"CERTIFICATION OF NONDISCRIMINATION IN EMPLOYMENT" (000---
002)
SPECIAL PROVISION
"ON-THE-JOB TRAINING PROGRAM" (000---004) SPECIAL PROVISION
"CARGO PREFERENCE ACT REQUIREMENTS IN FEDERAL AID
CONTRACTS" (000---007)
SPECIAL PROVISION
"CERTIFICATE OF INTERESTED PARTIES (FORM 1295)" (000---017) SPECIAL PROVISION
"SCHEDULE OF LIQUIDATED DAMAGES" (000---031) SPECIAL PROVISION
"NOTICE OF CONTRACTOR PERFORMANCE EVALUATIONS" (000---
125)
SPECIAL PROVISION
(002---003) SPECIAL PROVISION TO ITEM 002
(003---006) SPECIAL PROVISION TO ITEM 003
(006---009) SPECIAL PROVISION TO ITEM 006
(007---001) SPECIAL PROVISION TO ITEM 007
(008---005) SPECIAL PROVISION TO ITEM 008
(009---002) SPECIAL PROVISION TO ITEM 009
REQUIRED CONTRACT PROVISIONS. ALL FEDERAL-AID PROJECTS (REV. 10-23) (FORM
FHWA 1273)
WAGE RATES
1-2
GENERAL :
THE ABOVE-LISTED SPECIFICATIONS ITEMS ARE THOSE UNDER WHICH
PAYMENT IS TO BE MADE. THESE, TOGETHER WITH SUCH OTHER PERTINENT
ITEMS, IF ANY, AS MAY BE REFERRED TO IN THE ABOVE-LISTED
SPECIFICATION ITEMS, AND INCLUDING THE SPECIAL PROVISIONS LISTED
ABOVE, CONSTITUTE THE COMPLETE SPECIFICATIONS FOR THIS PROJECT.
2-2
Highway US 190, ETC County BRAZOS, ETC
DISADVANTAGED BUSINESS ENTERPRISES
REQUIREMENTS
The following goal for disadvantaged business enterprises is established:
DBE
0%
CHILD SUPPORT STATEMENT
Under section 231.006, Family Code, the vendor or applicant certifies that the individual or business entity named in this contract, bid, or application is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate.
CONFLICT OF INTEREST CERTIFICATION
Pursuant to Texas Government Code Section 2261.252(b), the Department is prohibited from entering into contracts in which Department officers and employees have a financial interest.
By signing the Contract, the Contractor certifies that it is not prohibited from entering into a Contract with the Department as a result of a financial interest as defined under Texas Government Code Section 2261.252(b), and that it will exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict of interest with the Department.
The Contractor also certifies that none of the following individuals, nor any of their family members within the second degree of affinity or consanguinity, owns 1% or more interest or has a financial interest as defined under Texas Government Code Section 2261.252(b) in the Contractor:
Any member of the Texas Transportation Commission; and The Department’s Executive Director, General Counsel, Chief of Procurement and Field Support
Operations, Director of Procurement, and Director of Contract Services.
Violation of this certification may result in action by the Department.
E-VERIFY CERTIFICATION
Pursuant to Texas Transportation Code §223.051, all TxDOT contracts for construction, maintenance, or improvement of a highway must include a provision requiring Contractors and subcontractors to use the U.S. Department of Homeland Security’s E-Verify system to determine employment eligibility. By signing the contract, the Contractor certifies that prior to the award of the Contract:
the Contractor has registered with and will, to the extent permitted by law, utilize the United States Department of Homeland Security’s E-Verify system during the term of the Contract to determine the eligibility of all persons hired to perform duties within Texas during the term of the agreement; and the Contractor will require that all subcontractors also register with and, to the extent permitted by law, utilize the United States Department of Homeland Security’s E-Verify system during the term of the subcontract to determine the eligibility of all persons hired to perform duties within Texas during the term of the agreement.
Violation of this requirement constitutes a material breach of the Contract, subjects a subcontractor to removal from the Contract, and subjects the Contractor or subcontractors to possible sanctions in accordance with Title 43, Texas Administrative Code, Chapter 10, Subchapter F, “Sanctions and Suspension for Ethical Violations by Entities Doing Business with the Department.”
_BPSDocName 1-1
Certification Regarding Disclosure of Public Information Pursuant to Subchapter J, Chapter 552, Texas Government Code, contractors executing a contract with a governmental body that results in the expenditure of at least $1 million in public funds must:
1) preserve all contracting information* as provided by the records retention requirements applicable to Texas Department of Transportation (TxDOT) for the duration of the contract,
2) on request of TxDOT, promptly provide any contracting information related to the contract that is in the custody or possession of the entity, and
3) on completion of the contract, either:
A. provide, at no cost to TxDOT, all contracting information related to the contract that is in the custody or possession of the entity, or B. preserve the contracting information related to the contract as provided by the records retention requirements applicable to TxDOT
The requirements of Subchapter J, Chapter 552, Government Code, may apply to this contract, and the contractor or vendor agrees that the contract can be terminated if the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter.
By entering into Contract, the Contractor agrees to:
• provide, or make available, to TxDOT and any authorized governmental investigating or auditing agency all records, including electronic and payment records related to the contract, for the same period provided by the records retention schedule applicable to TxDOT, and
• ensure that all subcontracts include a clause requiring the same.
* As defined in Government Code §552.003, “Contracting information” means the following information maintained by a governmental body or sent between a governmental body and a vendor, contractor, potential vendor, or potential contractor:
1) information in a voucher or contract relating to the receipt or expenditure of public funds by a governmental body;
2) solicitation or bid documents relating to a contract with a governmental body;
3) communications sent between a governmental body and a vendor, contractor, potential vendor, or potential contractor during the solicitation, evaluation, or negotiation of a contract;
4) documents, including bid tabulations, showing the criteria by which a governmental body evaluates each vendor, contractor, potential vendor, or potential contractor responding to a solicitation and, if applicable, an explanation of why the vendor or contractor was selected; and
5) communications and other information sent between a governmental body and a vendor or contractor related to the performance of a final contract with the governmental body or work performed on behalf of the governmental body.
CERTIFICATION TO NOT BOYCOTT ISRAEL
Pursuant to Texas Government Code §2271.002, the Department must include a provision requiring a written verification affirming that the Contractor does not boycott Israel, as defined in Government Code §808.001, and will not boycott Israel during the term of the contract. This provision applies to a contract that:
1) is with a Contractor that is not a sole proprietorship,
2) is with a Contractor with 10 or more full-time employees, and
3) has a value of $100,000 or more.
By signing the contract, the Contractor certifies that it does not boycott Israel and will not boycott Israel during the term of this contract. “Boycott” means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes.
CERTIFICATION TO NOT BOYCOTT ENERGY COMPANIES
Pursuant to Texas Government Code §2274.002, the Department must include a provision requiring a written verification affirming that the Contractor does not boycott energy companies, as defined in Government Code §809.001, and will not boycott energy companies during the term of the contract. This provision applies to a contract that:
1) is with a Contractor that is not a sole proprietorship,
2) is with a Contractor with 10 or more full-time employees, and
3) has a value of $100,000 or more.
By signing the contract, the Contractor certifies that it does not boycott energy companies and will not boycott energy companies during the term of this contract. “Boycott” means taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations with a company because the company: (1) engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law; or (2) does business with a company described by (1).
CERTIFICATION TO NOT DISCRIMINATE AGAINST
FIREARM ENTITIES OR FIREARM TRADE ASSOCIATIONS
Pursuant to Texas Government Code §2274.002, the Department must include a provision requiring a written verification affirming that the Contractor:
1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association, as defined in Government Code §2274.001, and
2) will not discriminate against a firearm entity or firearm trade association during the term of the contract.
This provision applies to a contract that:
1) is with a Contractor that is not a sole proprietorship,
2) is with a Contractor with 10 or more full-time employees, and
3) has a value of $100,000 or more.
By signing the contract, the Contractor certifies that it does not discriminate against a firearm entity or firearm trade association as described and will not do so during the term of this contract. "Discriminate against a firearm entity or firearm trade association" means, with respect to the entity or association, to:
(1) refuse to engage in the trade of any goods or services with the entity or association based solely on its status as a firearm entity or firearm trade association; (2) refrain from continuing an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association; or (3) terminate an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association. "Discriminate against a firearm entity or firearm trade association" does not include: (1) the established policies of a merchant, retail seller, or platform that restrict or prohibit the listing or selling of ammunition, firearms, or firearm accessories; (2) a company’s refusal to engage in the trade of any goods or services, decision to refrain from continuing an existing business relationship, or decision to terminate an existing business relationship to comply with federal, state, or local law, policy, or regulations or a directive by a regulatory agency, or for any traditional business reason that is specific to the customer or potential customer and not based solely on an entity ’s or association’s status as a firearm entity or firearm trade association.
FOREIGN ADVERSARIES REQUIREMENTS
Pursuant to Executive Order No. GA-48 relating to the hardening of state government, TxDOT must require any company that submits a bid or proposal with respect to a contract for goods or services to the Department to certify that the company, and, if applicable, any of its holding companies or subsidiaries, is not:
A. Listed in Section 889 of the 2019 National Defense Authorization Act (NDAA); or
B. Listed in section 1260H of the 2021 NDAA; or
C. Owned by the government of a country on the U.S. Department of Commerce foreign adversaries list under 15 C.F.R. 791.4; or
D. Controlled by any governing or regulatory body located in a country on the U.S. Department of Commerce’s foreign adversaries list under 15 C.F.R. 791.4.
By signing this proposal, the Contractor certifies that neither it nor any affiliated entities are:
• Listed in Section 889 of the 2019 NDAA;
• Listed in Section 1260H of the 2021 NDAA;
• Owned by the government of a country listed under 15 C.F.R. 791.4; or
• Controlled by any governing or regulatory body located in a country listed under 15 C.F.R.
791.4
_BPSDocName 1-1
PROHIBITION ON CERTAIN TELECOMMUNICATIONS
EQUIPMENT OR SERVICES
The Federal Register Notice…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .