01 Painters Course PWS 05 May 2023.pdf

PDF 207 KB Posted

Attached to
Painters Course Federal contract opportunity
Solicitation number
FA822423R0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This performance work statement outlines requirements for a painter training course contract to be awarded by the Department of the Air Force Materiel Command Air Force Sustainment Center. The contractor shall provide a basic and advanced training course to develop proficiency in efficient and durable application of coatings on F-16, A-10, and C-130 aircraft. The basic course will cover topics such as surface preparation, coating application techniques and equipment setup, while the advanced course will focus on application of radar absorbent coatings. The contractor must provide all materials, tools, equipment and labor for training. It is a two year IDIQ contract with one base year and one option year. There may be 12 students per year for the basic course and 32 students per year for the advanced course. The contractor must submit a safety plan and reports on incidents, accidents and student completion.

View the file

Other files for this federal contract opportunity

Other files attached to Painters Course, newest first.
File Type Posted
Solicitation - FA822423R0007.pdf PDF
CDRL 0001 Painters Course.pdf PDF
CDRL 0002 Painters Course.pdf PDF
CDRL 0003 Painters Course.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

PAINTER COURSE TRAINING

309TH AIRCRAFT MAINTENANCE GROUP

Revised 05 May 2023 #10537 Follow-on

TABLE OF CONTENTS

SECTION NUMBER AND TITLE PAGE

1. DESCRIPTION OF SERVICES 3

2. BASIC SERVICES 3

3. SERVICE SUMMARY 6

4. DELIVERABLES 7

5. SAFETY APPENDIX C 7

1. DESCRIPTION OF SERVICES

The Contractor shall provide training for F-16, A-10, and C-130 aircraft painters. The contractor shall provide all management, parts, materials, tools, supplies, equipment and labor necessary for training. This training is used to develop technician proficiency with aircraft polyurethane and Radar Absorbent Material (RAM) coating systems. Training must include a Basic aircraft Painter course and an Advanced Painter course. Ram Training facilities will have the capability to train all personnel on the specifications (tech orders/drawings) provided by the Air Force.

Contractor shall provide a certificate of completion to each student upon the completion of each three day course.

This is expected to be a two (2) year Indefinite Delivery Indefinite Quality (IDIQ) contract with one (1) base year and one (1) option year. There may be 12 students per year for the Basic Painter Course (6 students per month) and 32 students per year (4 students per month) in the Advanced Painter Course. Basic and Advance Painter Course monthly dates TBD at task order level.

A Contracting Officer (COR) will periodically evaluate the contractor’s performance.

2. BASIC SERVICES

2.1 The Basic Aircraft Painters training course plan will include the following:

-Introduction and Technical References -Course Background -Course Overview -Technical Data References -Labs -Masking and De-masking -Necessity of Masking and De-masking -Critical Areas -How Masking Can Become a FOD Issue -Surface Preparation -Necessity of Surface Preparation -Aircraft Washing Procedures -Clean Surface Testing Procedures -Conversion Coating Application Procedures

-Over-coating Procedures -Surface Preparation for Repair -Surface Preparation Process -Labs

-Basic Coating Knowledge -Definition and Importance of Coatings

-Coating Life Cycle -Coating Formulation -Coating Storage and Preparation -Coating Wet Film -Coating Curing

-Coating Dry Film -Preparation of Coatings -Importance of Proper Coating Preparation -Locating Coating Information -Mixing Coatings -Reducing Coating Viscosity -Coating Preparation Procedure -Spray Application Equipment -Spray Systems -Coating Feed Systems -Spray Gun Classes -Spray Gun Equipment Practice -Spray Gun Enhancements -Spray Gun Components -Alternative Coating Equipment -Labs -Spray Equipment Setup -Fluid Nozzle and Air Cap Selection -Fluid Flow Adjustment -Air Pressure Adjustment -Fan Pattern Adjustment -Setup Procedures for Gravity and Siphon Feed -Setup Procedure for Pressure Feed Systems -Spray Application Techniques/Transfer Efficiency -Importance of Proper Spray Technique -Proper Stand-Off Distance -Proper Overlap -Proper Lead and Lag -Banding Technique -Partial Triggering -Plan of Attack for Complex Parts -Final Transfer Efficiency Demonstration -Cleaning and Maintenance of Spray Equipment -Uses and Importance of Appropriate Cleaning Solvents -Application Problems Due to Poor Cleaning and Maintenance -Procedures for Cleaning a Spray System -Spray Gun Disassembly and Reassembly -Labs -Application of Aerospace Primers and Topcoats -Application Preparation -Application of Primer and Topcoat -Testing and Quality Control Measurements and Procedures -Stencil and Decal Application -Stencil Application -Decal Application -Coating Defects, Problems, and Repair

-Coating Film Integrity -Identification of Coating Failures -Identification of Coating Defects

2.2 The Advanced Aircraft Painters training course plan will include the following:

-Introduction and Technical References -Course Background -Course Overview -Technical Data References -Surface Preparation -Necessity of Surface Preparation -Aircraft Washing Procedures -Clean Surface Testing Procedures -Conversion Coating Application Procedures

-Over-coating Procedures -Surface Preparation for Repair -Surface Preparation Process -Labs

-Basic Coating Knowledge -Definition and Importance of Coatings

-Coating Life Cycle -Coating Formulation -Coating Storage and Preparation -Coating Wet Film -Coating Curing -Coating Dry Film

-Preparation of Coatings -Importance of Proper Coating Preparation -Locating Coating Information -Mixing Coatings -Coating Preparation Procedure -Spray Application Equipment -Spray Systems -Coating Feed Systems -Spray Gun Enhancements -Labs -Spray Equipment Setup -Fluid Nozzle and Air Cap Selection -Fluid Flow Adjustment -Air Pressure Adjustment -Fan Pattern Adjustment -Setup Procedures for Gravity and Siphon Feed -Setup Procedure for Pressure Feed Systems -Spray Application Techniques/Transfer Efficiency -Importance of Proper Spray Technique -Proper Stand-Off Distance

-Proper Overlap -Proper Lead and Lag -Banding Technique -Plan of Attack for Complex Parts -Final Transfer Efficiency Demonstration -Application of Aerospace RAM Coatings -Application Preparation -Importance of Proper Spray Technique -Proper Stand-Off Distance -Proper Overlap -Proper Lead and Lag -Banding Technique -Plan of Attack for Complex Parts -Final Transfer Efficiency Demonstration -Testing and Quality Control Measurements and Procedures -Labs -Coating Defects, Problems, and Repair -Coating Film Integrity -Identification of Coating Failures -Identification of Coating Defects -Repair of Failures/Defects -Labs

2.3 Government Furnished Property (GFP):

- GFP will not be provided under this contract.

- Access to government facilities shall not be granted under this contract.

2.4 Course Schedule and Cancelation policy:

- Government will provide course schedule dates to the contractor. In the case that the government would like to cancel a scheduled course or request a date change, the government will provide a written notice of the request no later than five (5) business days prior to the start of the scheduled course.

- Government POC will be provided to contractor.

3. SERVICE SUMMARY

Performance Objective PWS Para Performance Threshold/CDRL

Training of Government personnel

1 & 2.1

The Contractor shall be responsible for providing training IAW Aerospace Painters training course plan to develop proficiency with efficient and durable application of coatings, Training Completion 1 & 2.1 Training completed within 3 days of class start date.

4. DELIVERABLES

DATA ITEM

TITLE

DELIVERY DATE

A001 Safety Plan IAW DD Form 1423 A002 Incident/Accident IAW DD Form 1423 A003 Attendee Completion Status Report IAW DD Form 1423

5. SAFETY

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. All documents required as a result of OSHA 29 CFR 1910 and 1926 regulations, (i.e. certifications, training, respiratory protection program, workplace hazard assessments), shall be made available to the COR upon request.

The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.

Hazard Assessment. In accordance with 1910.132(d)(2), the contractor shall conduct a certified Hazard assessment on all work areas. A follow-on survey shall be conducted by the contractor when the workload or environment conditions change. If respirators are necessary to protect the health of the employee or whenever respirators are required by the contractor, the contractor employer shall establish and implement a written respiratory protection program according to 29CFR 1910.134.

Contractor personnel must receive Explosive Safety Awareness Training if their duties require entry into the Explosive Clear Zone. This training will be provided by the OO-ALC Safety Office. Contact Eric Covington at 586-0168.

A Risk Assessment will be required prior to any work being accomplished, if munitions will remain in the facility.

http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0

Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well.

This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary.

The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.

SECTION II – SPECIFIC REQUIREMENTS

The contractor’s prepared Safety Plan shall:

Demonstrate a management commitment to employee safety and health

Identify applicable rules and regulations

Identify the roles and responsibilities of Management, Supervisors, Employees and Safety Coordinator

Identify work to be performed and location of expected operations

Provide a description of safety program, safety monitoring responsibilities, organizational structure, and contact information for on-site personnel

Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures

Identify employee safety and health training requirements and the documentation process

Include emergency response plans and procedures that relate to protection of government personnel and property

Include hazard reporting procedures and identify individual(s) responsible for the correcting identified hazards

Identify procedures for accident reporting and investigation

Identify the process for tracking controlled hazards in contractors work area

The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:

PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.

MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4; DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07; and AFI 91-207 AFMC SUP1, The US Air Force Traffic Safety Program, 1 Oct 07. Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition:

AFI 13-213, Airfield Management, applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.

HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29

CFR 1910.141. CLEAN AS YOU GO.

The authorized Government Representative (OO-ALC Safety Office) shall accept/reject the contractor’s procedures within the Health and Safety Plan as meeting the intent of the below referenced standards, with the exception of Mishap Notification / Reporting Procedures, which are outlined in Section I, paragraph B of this Appendix C.

Element/Requirement Referenced Benchmark

Mishap Notification/Reporting Appendix C, Section I

Facility Fire Protection NFPA 13, 70, & 72

NFPA 409/410

AFI 91-203 para., 6.2.9 through

6.2.15, and para., 22.5

Handling, Storage and use of Flammable/ NFPA 30, 33

Hazardous Material Management AFI 32-7086 HAFBSUP 1 (If performance is on Hill AFB)

Storage and Materials Handling DoDI 4140.62

File details come from the government source that posted it. Updated .