These are architectural and engineering design drawings for a chiller replacement project at the USDA Agricultural Research Service US Salinity Laboratory in Riverside, California. The comprehensive set of 17 design sheets includes detailed plans for demolishing existing mechanical equipment and installing new chillers, including architectural, structural, mechanical, and electrical system modifications. Key elements include removing the existing 200-ton chiller, cooling tower, and associated equipment, and installing two new 132-ton air-cooled chillers with a 700-gallon buffer tank, new pumps, and updated electrical infrastructure.
The drawings specify technical requirements for the replacement, including new concrete foundations, piping diagrams, electrical single-line diagrams, and floor plans showing equipment placement. The project involves comprehensive system upgrades across mechanical rooms, electrical systems, and the mechanical yard, with precise details on equipment connections, power requirements, and installation specifications. The design is marked as a "Final Design Submittal (IFC)" dated February 26, 2025, indicating it is a complete engineering design package prepared for construction implementation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 03-Chiller Replacement_SPECS_IFC Submittal.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e s k D o c s
/U S
D A
T O
-0 R iv e rs id e E le v a to r
C h ill e r
R e p la c e m e n t/
U S
D A
-U S
S L A
.r v t
/1
/2
:5 :2
A
M
G-001
COVER SHEET
Designer
Author
Checker
2-26-2025
Project Number
SHEET LIST
SHEET
COUNT
SHEET
NUMBER Sheet Name
00 GENERAL
1 of 17 G-001 COVER SHEET
2 of 17 G-002 GENERAL NOTES, ABBREVIATIONS
01 ARCHITECTURAL
3 of 17 A-100 LOWER LEVEL FLOOR PLAN
4 of 17 A-400 ENLARGED CHILLER PLANS
02 STRUCTURAL
5 of 17 S-001 GENERAL NOTES AND TYPICAL DETAILS
6 of 17 S-101 CHILLER FOUNDATION PLAN AND SECTION
03 MECHANICAL
7 of 17 M001 MECHANICAL ABBREVIATION
8 of 17 M002 MECHANICAL SCHEDULES
9 of 17 M100 MECHANICAL LOWER LEVEL OVERALL FLOOR PLAN
10 of 17 M101 MECHANICAL MID LEVEL OVERALL FLOOR PLAN
11 of 17 M201 MECHANICAL YARD FLOOR PLAN
12 of 17 M202 MECHANICAL ENLARGED PLAN
13 of 17 M300 MECHANICAL DETAIL
04 ELECTRICAL
14 of 17 E001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
15 of 17 E100 ELECTRICAL DEMOLITION PARTIAL FLOOR PLAN
16 of 17 E101 ELECTRICAL PARTIAL POWER PLAN
17 of 17 E200 SINGLE LINE DIAGRAMS
US SALINITY LABORATORY
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
CHILLER REPLACEMENT AT USSL
VICINITY MAP
SITE LOCATION MAP
PROJECT SITE
PROJECT SITE
CHILLER DEMOLITION
CHILLER REPLACEMENT AT USSL
SCOPE OF WORK
1. REMOVE EXISTING FEEDER TO EXISTING CHILLER TO BE DEMOLISHED.
2. REMOVE EXISTING DISCONNECT SWITCH SERVING EXISTING CHILLER,
PUMPS, & COOLING TOWER TO BE DEMOLISHED.
3. PROVIDE ELECTRICAL CONNECTION TO NEW CHILLERS AND PUMPS.
4. PROVIDE NEW CIRCUIT BREAKERS IN EXISTING MAIN SWITCHBOARD TO
SERVE NEW CHILLERS.
5. PROVIDE COORDINATION STUDY TO NEW CIRCUIT BREAKERS.
6. PROVIDE COORDINATION STUDY TO NEW CIRCUIT BREAKERS.
7. EXTEND EXISTING 120V POWER CONNECTION TO NEW CHILLERS.
DRAWING ABBREVIATIONS
INDEX OF DRAWINGS
NUMBERING SYSTEM:
XX100
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
DISCIPLINE MODIFIER
ANNOTATION CALLOUTS/DRAWING SYMBOLS
GENERAL NOTES
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HTCEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORDCOORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GREXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRKFACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLRFINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED
GOVERNMENT INSTALLED
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTI
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND
RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERINGSTANDARDS
REVISION
TAG
NORTH ARROW w/
TRUE NORTH
INDICATION
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL
(FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
SHEET NUMBER WITHIN SERIES
A201
A204
A301
A401
ROOM
100'
LEVEL 01
100'
A
PLAN NORTH
GENERAL NOTES
DRAWINGS AND DOCUMENT NOTES
1. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS TO
INCLUDE ALL LABOR, MATERIALS AND SERVICES NECESSARY FOR
COMPLETION OF ALL WORK SHOWN, PRESCRIBED, OR REASONABLY
APPLIED BUT NOT LIMITED TO THAT EXPLICITLY INDICATED IN THE
CONTRACT DOCUMENTS.
A. THESE PLANS HAVE BEEN PREPARED USING VISUAL INSPECTION
AND MEASUREMENTS FROM THE ACCESSIBLE AREAS OF THE PROJECT
WORK AREA.
THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS.
B. THE A/E TEAM CANNOT GUARANTEE THE EXACT CONDITION OF ALL
EXISTING WORK.
C. THE GENERAL CONTRACTOR (GC) AND ALL SUBCONTRACTORS
SHALL VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE
PRIOR TO BEGINNING CONSTRUCTION AND SHALL REPORT ANY
DISCREPANCIES OR UNIDENTIFIED CONDITIONS TO THE COR FOR
RESOLUTION BEFORE ANY WORK IS BEGUN.
2. DO NOT SCALE DRAWINGS.
3. DIMENSIONS ON DRAWINGS ARE SHOWN TO THE CENTERLINE OF
COLUMNS AND TO FACE OF STUD AT WALLS AND PARTITIONS UNLESS
NOTED OTHERWISE.
4. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES, STANDARDS,
ORDINANCES AND REGULATIONS AS ADOPTED BY THE GOVERNMENT.
5. DIMENSIONS, DETAIL, NOTES AND /OR SYMBOLS THAT APPLY TO ONE
UNIT, APPLY TO ALL UNITS IN LIKE SITUATIONS UNLESS NOTED
OTHERWISE.
6. UPON AWARD OF THE CONTRACT, THE CONTRACTOR SHALL PROVIDE
A CONSTRUCTION SCHEDULE, WHICH SHALL BE UPDATED AS REQUIRED.
THE CONTRACTOR SHALL COORDINATE AND SUPERVISE THE WORK OF
ALL TRADES AND IS RESPONSIBLE FOR ADHERENCE TO ALL CONTRACT
DOCUMENTS, TIMELY PERFORMANCE OF THE WORK AND MAINTAINING
THE JOB SITE IN A SAFE AND CLEAN MANNER.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEANS, METHODS,
TECHNIQUES AND PROCEDURES EMPLOYED IN PERFORMANCE OF
WORK IN, ON OR AROUND THE JOB SITE. THE CONTRACTOR SHALL
COORDINATE AND VERIFY ALL WORK PERFORMED BY
SUBCONTRACTORS, INCLUDING COORDINATION FOR CONSTRUCTION
MATERIAL AND EQUIPMENT DELIVERY AND LAY-DOWN AREA.
8. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK ON,
OR RELATED TO THIS PROJECT SHALL CONDUCT THEIR OPERATIONS SO
THAT ALL EMPLOYEES ARE PROVIDE A SAFE WORK PLACE AND THE
PUBLIC IS PROTECTED. THE WORKPLACE SHALL COMPLY WITH THE
'OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF THE US
DEPARTMENT OF LABOR AND WITH ANY AND ALL OTHER APPLICABLE
FEDERAL AND/ OR LOCAL SAFETY REGULATIONS. THE CONTRACTOR
AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB
SITE SAFETY CONDITIONS DURING THE COURSE OF DEMOLITION AND
CONSTRUCTION OF THIS PROJECT. THIS REQUIREMENT SHALL APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS
THE GOVERNMENT AND ARCHITECT FROM ANY AND ALL LIABILITY, REAL
OR ALLEGED, IN CONNECTION WITH PERFORMANCE OF WORK ON THIS
PROJECT.
A. WHEREVER PRACTICAL, THE WORK AREAS SHALL BE FENCED,
BARRICADED OR BLOCKED OFF FROM THE PUBLIC OR OCCUPANTS TO
PREVENT UNAUTHORIZED ENTRY . EXITS SHALL NOT BE BLOCKED TO
PREVENT EVACUATION OF THE BUILDING OCCUPANTS.
B. STORE, POSITION AND USE EQUIPMENT, TOOLS, MATERIALS,
SCRAPS AND TRASH IN A MANNER THAT DOES NOT PRESENT A HAZARD
TO THE PUBLIC OR OCCUPANTS BY ACCIDENTAL SHIFTING, IGNITION OR
OTHER HAZARDOUS ACTIVITY.
C. STORE AND TRANSPORT REFUSE AND DEBRIS IN A MANNER TO
PREVENT UNSAFE OR UNHEALTHY CONDITIONS FOR THE PUBLIC OR
OCCUPANTS. COVER REFUSE CONTAINERS AND REMOVE REFUSE ON A
FREQUENT BASIS ACCEPTABLE TO THE CONTRACTING OFFICER OR
THEIR AUTHORIZED REPRESENTATIVE. USE TARPAULINS OR OTHER
MEANS TO PREVENT LOOSE MATERIALS FROM DROPPING OUT OF
TRUCKS IN TRANSPORTATION.
9. ALL LEGAL EXITS SHALL BE MAINTAINED DURING CONSTRUCTION AND,
IN THEIR FINAL CONSTRUCTION, ALL EXITS SHALL BE OPERABLE AND
HAVE CODE COMPLIANT HARDWARE FROM INSIDE SPACES WITHOUT
THE USE OF A KEY, SPECIAL EFFORT OR KNOWLEDGE. EXITS SHALL BE
PROVIDED WITH ILLUMINATED "EXIT" SIGNS AS REQUIRED BY CODES
AND STANDARDS APPLICABLE TO THIS PROJECT.
10. THE CONTRACTOR SHALL PROVIDE A WASTE MANAGEMENT PLAN TO
COMPLY WITH THE FOLLOWING, OR MEET REQUIREMENTS OF THE AIR
FORCE, WHICHEVER IS MORE STRINGENT
A. RECYCLE OR SALVAGE 50% OF THE NON-HAZARDOUS
CONSTRUCTION AND DEMOLITION WASTE BY DIVERTING MATERIAL
FROM DISPOSAL THROUGH EFFICIENT USE OF RECYCLING, REUSE OR
SALVAGE FOR FUTURE USE OR SALE.
B. DOCUMENTATION SHALL BE PROVIDED WHICH INCLUDES
IDENTIFICATION OF THE WASTE MANAGEMENT AGENCY AND
VERIFICATION THAT THE PERCENTAGE OF THE DEMOLITION AND
CONSTRUCTION WASTE MATERIALS DIVERT FROM LANDFILL COMPLIES
WITH THE XXXX EDITION OF CALGREEN, SECTION 5.408.1.
11.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE GOVERNMENT
SHOULD UNIDENTIFIED FIELD CONDITIONS BE DISCOVERED.
12. THE CONTRACTOR SHALL LIMIT THE NUMBER OF SYSTEMS SHUT
DOWNS TO THE MINIMUM EXTENT POSSIBLE TO COMPLETE THE WORK.
THE CONTRACTING OFFICER MUST BE NOTIFIED 72 HOURS PRIOR TO
ANY SYSTEM SHUT-DOWNS.
13. THE CONTRACTOR IS TO MAINTAIN THE INTEGRITY OF ALL BUILDING
SYSTEMS (STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND
FIRE PROTECTION) THAT ARE UNCOVERED DURING THE DEMOLITION
AND ARE NOT OTHERWISE ADDRESSED IN THE CONSTRUCTION
DOCUMENTS. THE CONTRACTOR SHALL ALSO PATCH OR REPAIR TO
LIKE NEW CONDITION ANY BUILDING ELEMENTS DAMAGED AS A RESULT
OF HIS WORK IN THE PROCESS OF CONSTRUCTION OR DEMOLITION ANT
NO ADDITIONAL COST TO THE GOVERNMENT.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING ALL
FINISHED SURFACES CLEAN AT THE COMPLETION OF THE WORK, AND
SHALL REMOVE ALL EXCESS MATERIAL AND DEBRIS FROM THE JOB SITE
DURING CONSTRUCTION.
15. THE CONTRACTOR SHALL KEEP, ON SITE, A SET OF DRAWINGS AND
SPECIFICATIONS MARKED AS AN UP-TO-DATE RECORD OF
MODIFICATIONS OF THE CONSTRUCTION DOCUMENTS. UPON
COMPLETION OF THE WORK, THE MARKED-UP SET OF 'AS BUILT'
CONDITIONS HALL BE RETURNED TO THE GOVERNMENT COMPLETELY
AND NEATLY POSTED SHOWING ALL ADDITIONS, DELETIONS,
CORRECTIONS AND REVISIONS IN THE ACTUAL CONSTRUCTION OF THE
PROJECT. THESE RECORD DRAWINGS SHALL BE SIGNED BY
SUBCONTRACTORS REPRESENTING ALL MAJOR TRADES FOR THE
PROJECT AS WELL AS THE GENERAL CONTRACTOR.
16. GOVERNMENT REVIEW OR APPROVAL OF SHOP DRAWINGS SHALL
NOT RELIEVE THE GENERAL CONTRACTOR FROM RESPONSIBILITY FOR
DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS UNLESS THE GC HAS
CALLED THE DEVIATION TO THE GOVERNMENT'S ATTENTION (ION
WRITING) AT THE TIME OF SUBMISSION, NOR SHALL THE GC BE
RELIEVED OF RESPONSIBILITY FOR ERRORS OF ANY SORT IN THE SHOP
DRAWINGS.
DEMOLITION NOTES
1. SEE DEMOLITION PLANS FOR ADDITIONAL NOTES AND INFORMATION.
2. MATERIALS, EQUIPMENT OR CONSTRUCTION NOT NOTED IN THE
CONSTRUCTION DOCUMENTS ARE NOT PART OF THIS NEW WORK. IF
DISCOVERED DURING THE COURSE OF THE DEMOLITION, THE
CONTRACTOR SHALL REPORT TO THE CONTRACTING OFFICER FOR
FURTHER INSTRUCTION.
CONTAINING MATERIALS (ACM) ARE PRESENT IN THE PROJECT AREA.
REFER TO EMC LABS REPORT DATED 12/09/2022 FOR IDENTIFICATION OF
PAINTS A
ASBESTOS AND LEAD BASED PAINT NOTES
1. ASBESTOS CONTAINING MATERIALS (ACM) ARE PRESENT IN THE
PROJECT AREA. REFER TO EMC LABS REPORT DATED 12/09/2022 FOR
IDENTIFICATION OF PAINTS AND MATERIALS UTILIZED IN HANGAR B1210.
2. PRIOR TO DEMOLITION AND CONSTRUCTION ACTIVITIES WHICH
WOULD DISTURB THE IDENTIFIED ACM, THE ABATEMENT CONTRACTOR
MUST MAINTAIN CURRENT LICENSES AS REQUIRED BY EAFB
GUIDELINES, THE STATE AND LOCAL JURISDICTIONS FOR THE REMOVAL,
TRANSPORTATION AND DISPOSAL OF ACM OR ANY OTHER REGULATED
MATERIALS AND ACTIVITIES.
3. THE CONTRACTOR SHALL PROVIDE AN ASBESTOS ABATEMENT PLAN
FOR THE CONTRACTING OFFICER TO REVIEW AND APPROVAL. THE
CONTRACTING OFFICER SHALL HAVE NOT LESS THAN 10 DAYS FOR
REVIEW AND APPROVAL. NO DEMOLITION WORK MAY COMMENCE PRIOR
TO APPROVAL OF THE PLAN.
4. THE CONTRACTOR SHALL ABATE AND DISPOSE OF ALL HAZARDOUS
MATERIALS FOUND AND/OR CONSTRUCTION, INCLUDING BUT NOT
LIMITED TO ACM, IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS.
5. THE CONTRACTOR SHALL HIRE AN INDEPENDENT THIRD PARTY AIR
TESTING / MONITOR DURING ACM ABATEMENT WORK TO VERIFY OTHER
PORTIONS OF THE BUILDING ARE NOT SUBJECT TO CONTAMINATION.
THE CONTRACTOR SHALL COORDINATE PERFORMANCE OF WORK WITH
THIRD PARTY AIR TESTING / MONITORING THROUGHOUT THE PROJECT.
6. ACM ABATEMENT SCOPE IS LIMITED TO THE REMOVAL OF ALL
EXISTING MATERIALS THAT ARE, OR WILL BECOME EXPOSED DUE TO
DEMOLITION OR CONSTRUCTION ACTIVITIES AS SHOWN WITHIN THE
PROJECT DOCUMENTS.
7. APPLICABLE LAWS AND REGULATIONS REGARDING THE PRESENCE OF
ASBESTOS SHALL BE FOLLOWED, INCLUDING PROVISIONS REQUIRING
NOTIFICATION TO REGULATORY AGENCIES, BUILDING OCCUPANTS,
RENOVATION CONTRACTORS AND WORKERS.
8. AN IN-PLACE OPERATIONS AND MAINTENANCE PROGRAM SHALL BE
PREPARED BY THE ABATEMENT CONTRACTOR FOR ANY REMAINING
INTACT ACM FOLLOWING BUILDING REMODEL WORK.
9. LEAD BASED PAINT WILL LIKELY BE DISTURBED DURING DEMOLITION
OR RENOVATION AND MUST BE REMOVED IF IT WILL NOT REMAIN INTACT
AND IN GOOD CONDITION THROUGHOUT THE DEMOLITION PROCESS.
THE SURVEY NOTED IN ITEM 1 ABOVE INCLUDES THE SURVEY FOR LEAD-
BASED PAINT. AS AN ALTERNATIVE TO THE INFORMATION IN THE
SURVEY, ALL PAINT MAY BE ASSUMED TO CONTAIN LEAD AND BE
TREATED AS LEAD BASED PAINT. IF ANY LEAD BASED PAINT IS
REMAINING AFTER DEMOLITION/RENOVATION, IT MUST BE INTACT AND IN
GOOD CONDITION, AND A LEAD OPERATIONS AND MAINTENANCE (O&M)
PLAN JUST BE MAINTAINED BY THE GOVERNMENT.
10 THE NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR
POLLUTION (NESHAP), REQUIRES REGULATED ASBESTOS CONTAINING
MATERIAL (RACM) BE IDENTIFIED AND REMOVED PRIOR TO DEMOLITION
OR RENOVATION IF THE RACM IS FRIABLE OR WOULD BECOME FRIABLE
DURING THE DEMOLITION.
11. ALL HAZARDOUS WASTE SHALL BE TRANSPORTED AND COLLECTED,
TEMPORARILY STORED, PACKAGED AND LABELED PER GOVERNMENT
GUIDELINES.
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e s k D o c s
/U S
D A
T O
-0 R iv e rs id e E le v a to r
C h ill e r
R e p la c e m e n t/
U S
D A
-U S
S L A
.r v t
/1
/2
:5 :2
A
M
G-002
GENERAL NOTES, ABBREVIATIONS
Designer
Author
Checker
2-26-2025
Project Number
UP
DN
UP
1 2 3 4 5 6 6.5 7 8 8.5 9 9.5
A
B
C
D
E
F
G
H
J
K
H.7
7.1 8.9 108.1 9.1
M
N
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
GH03
MECHANICAL RM
Room 125 Room
Room
Room
Room
Room
Room
Room
Room
Room 129A
Room
Room
Room
Room
Room
ELEV
Room
GH02
Stair 1
Room 105A
Room 105B
Room
Room
Room 118 Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room
Room 108N
Room 108S
Room
Room
Room 105C
Room
Room
Room
Room
Room
Room
GH05
A-400
A-400
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e s k D o c s
/U S
D A
T O
-0 R iv e rs id e E le v a to r
C h ill e r
R e p la c e m e n t/
U S
D A
-U S
S L A
.r v t
/1
/2
:5 :2
A
M
A-100
LOWER LEVEL FLOOR PLAN
Designer
Author
Checker
2-26-2025
Project Number
1/16" = 1'-0"2
LOWER LEVEL OVERALL FLOOR PLAN
PLAN NORTH
0 16'8' 32'
6 6.5 7
K
7.1
M
10' - 4" 5' - 9"
6 6.5 7
K
7.1
M
A-402 3
2 1
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e s k D o c s
/U S
D A
T O
-0 R iv e rs id e E le v a to r
C h ill e r
R e p la c e m e n t/
U S
D A
-U S
S L A
.r v t
/1
/2
:5 :2
A
M
A-400
ENLARGED CHILLER PLANS
Designer
Author
Checker
2-26-2025
Project Number
1/4" = 1'-0"2
PARTIAL PLAN - CHILLERS
1/4" = 1'-0"1
PARTIAL DEMOLITION PLAN - CHILLERS
KEYED NOTES - DEMO - CHILLERS
Number Text Note
1 DEMO (E) CONCRETE PAD, (E) MECHANICAL EQUIPMENT- SEE
MECHANICAL
2 (E) CONCRETE PAD TO REMAIN, DEMO (E) MECHANICAL
EQUIPMENT - SEE MECHANICAL
3 (E) BOLLARDS TO REMAIN
KEYED NOTES - NEW - CHILLERS
1 (N) CHILLERS - SEE MECHANICAL
2 (N) CONCRETE PAD - SEE STRUCTURAL
3 (E) MECHANICAL EQUIPMENT ON (E) CONCRETE PAD
4 (E) BOLLARDS
PHOTO 1
PHOTO 1
PLAN NORTH
0 2' 4' 8'
PLAN NORTH
0 2' 4' 8'
'd' BAR DIAMETER
'D' = BAR BEND DIAMETER
6d FOR #3 THRU #8 8d FOR #9, #10, AND #11
CAP STIRRUPS MAY BE USED
WHEREVER 135 deg. CLOSED STIRRUPS
ARE SHOWN IN GRADE BEAM ONLY.
MAX.
SLOPE
4d
2 12" MIN.
WIRE REINFORCING TOGETHER
180 DEG. BEND OFFSET 90 DEG. BEND
NOTE:
'd' BAR DIAMETER
135 DEG. BEND
'd' BAR DIAMETER
CAP STIRRUP
NOTE:
EXTEND BAR STRAIGHT
AS FAR AS POSSIBLE
AND BEND
FACE OF SUPPORT
TOP BARS ARE HORIZONTAL BARS SO PLACED THAT MORE THAN 12"
OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR
BAR DEVELOPMENT LENGTH (Ld) SCHEDULE
ACI CLASS A TENSION SPLICE = 1.0 Ld LAP SPLICES FOR ACI CLASS B TENSION SPLICE = 1.3 Ld
BAR SIZE
TOP BARS
#3 #4 #5 #6 #7 #8 #9 #10 #11
OTHER BARS
f'c = 3000 PSI f'c = 4000 PSI
TOP BARS OTHER BARS
4" MIN.
6d
6" MIN CONT.
CLEAN OUT TYP.
FOUNDATION CONCRETE MAY BE PLACED DIRECTLY INTO
EXCAVATION (AS SHOWN) PROVIDED THE TRENCH WALLS ARE
STABLE AS DETERMINED BY THE SOIL ENGINEER.
1.
FOUNDATIONS SHALL BEAR ON ACCEPTABLE SOIL, PER THE
SOIL REPORT, AS DETERMINED BY THE SOIL ENGINEER.
2.
NOTES:
AFTER SET CLEAN TO REMOVE ALL
LAITANCE AND SCUM TO EXPOSED
COARSE AGGREGATE
2" HIGH STARTER WALL FOR
CONCRETE & MASONRY WALLS BELOW
GRADE WHERE APPLICABLE
2x PLANKING
CONT. TYPICAL
FORMWORK NOT
PERMITTED BELOW GRADE
UNLESS FULLY FORMED
CLEAN OUT BOTTOM
OF FOOTING PRIOR TO
FOUNDATION POUR
FOOTING WIDTH
PLUS 2"
STAKES NOT PER-
MITTED WITHIN
FOOTING SECTION
TYPICAL FOOTING TRENCH DETAIL 11"=1'-0"
TYPICAL REINFORCING BENDING & SPLICE DETAIL 51"=1'-0"
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U S D A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
95% SUBMITTAL
S-001
GENERAL NOTES AND
TYPICAL DETAILS
Designer
Author
Checker
1-09-2025
Project Number
REINFORCING
ALL REINFORCING SHALL CONFORM TO ASTM A-615 SPECIFICATIONS, 2-2628(B) GRADE 60 EXCEPT #3 BARS
MAYBE GRADE 40. WELDED BARS SHALL BE ASTM A-706
REINFORCING BARS SHALL BE SPLICED AND BENT IN STRICT ACCORDANCE WITH THE DRAWINGS AND DETAILS AND C.R.S.I. PUBLICATIONS. NO KINKS ALLOWED. ALL BARS SHALL BE CLEAN PRIOR TO CONCRETE
PLACEMENT.
PROVIDE DOWELS OF SAME SIZE AND NUMBER FROM ADJACENT POUR. BOTH VERTICALLY AND
HORIZONTALLY TO MATCH TYPICAL REINFORCING SHOWN. LAPS TO BE IN ACCORDANCE WITH THE
DRAWINGS AND DETAILS. DOWELS SHALL BE CLEANED AFTER POUR.
USE LOW HYDROGEN ELECTRODES, GRADE E-70 OR E-90, FOR WELDING OF REINFORCING BARS.
SHOP DRAWINGS FOR REINFORCING STEEL SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR
APPROVAL PRIOR TO FABRICATIONS.
FIELD WELDING OR BENDING OF REINFORCING IS NOT PERMITTED EXCEPT AS INDICATED ON THE
DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER.
6.
5.
4.
3.
2.
1.
CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS, ROOFS, ETC. THE LOAD SHALL
NOT EXCEED THE DESIGN LIVE LOAD.
NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
SEE MECHANICAL, ELECTRICAL AND/OR ARCHITECTURAL DRAWINGS FOR LOCATION AND SIZE OF PIPE, VENT, DUCT AND OTHER SIMILAR OPENINGS, AND EMBEDDED OR ATTACHED ITEMS.
DO NOT SCALE DRAWINGS.
GENERAL NOTES
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF THE JOB PRIOR TO STARTING CONSTRUCTION AND THE OWNER, ARCHITECT OR ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES OR INCONSISTENCIES. DO NOT SCALE DIMENSIONS. WHERE NO DIMENSIONS ARE PROVIDED, CONSULT WITH OWNER, ARCHITECT OR ENGINEER FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE BUT ARE NOT LIMITED TO BRACING, SHORING, ETC.
OBSERVATION VISITS TO THE SITE BY OWNER, ARCHITECT OR ENGINEER SHALL NOT INCLUDE THE INSPECTION OF
BRACING, SHORING, ETC.
NO OPENINGS, POCKETS, NOTCHES, BLOCKOUTS, ETC., ARE ALLOWED IN STRUCTURAL ELEMENTS UNLESS DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE ARCHITECT OR ENGINEER OF ANY OPENINGS, POCKETS, ETC., SHOWN BY OTHER DRAWINGS BUT NOT SHOWN ON STRUCTURAL DRAWINGS.
ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OR ENGINEER
PRIOR TO PROCEEDING WITH THE WORK.
ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWN EXPENSE AND AT NO EXPENSE TO THE OWNER, ARCHITECT OR
ENGINEER.
ALL WORK SHALL COMPLY WITH THE REQUIREMENT OF INTERNATIONAL BUILDING CODE 2021, AND ALL OTHER
LOCAL OR STATE AGENCIES HAVING JURISDICTION OVER THIS PROJECT.
ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO PROJECT SPECIFICATIONS,
PLANS AND ALL GOVERNING ORDINANCES.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING, SHORING, AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREET AND UTILITIES IN ACCORDANCE WITH ALL
NATIONAL, STATE AND LOCAL SAFETY ORDINANCES.
12.
SEISMIC DESIGN DATA:
SEISMIC IMPORTANCE FACTOR
MAPPED SPECTRAL RESPONSE: S 1
SITE CLASSIFICATION: D
SPECTRAL RESPONSE: DS
SEISMIC DESIGN CATEGORY: D
Ie = 1.0
S = 1.91 S = 0.69
S = 1.35
1.
DESIGN CRITERIA
WIND LOADS:
BASIC WIND SPEED (3-SEC. GUST) = 96 MPH
WIND EXPOSURE = C
3.
RISK CATEGORY II
RISK CATEGORY II
CONCRETE
LIGHTWEIGHT AGGREGATES (CONFORMING TO ASTM C330) SHALL BE APPROVED BY THE ENGINEER, AND
THEIR MAXIMUM SIZE SHALL BE ONE INCH.
HARDROCK AGGREGATES SHALL CONFORM TO ASTM C33. THEIR MAXIMUM SIZE SHALL BE 1-1/2 INCHES
FOR FOOTINGS GRADE BEAMS AND 1 INCH FOR ALL OTHER WORK.
CEMENT SHALL CONFORM TO ASTM C150 TYPE I OR II.
CONCRETE SHALL BE AS FOLLOWS:
CONTINUOUS INSPECTION IS REQUIRED FOR ALL CONCRETE WITH A DESIGN STRENGTHS OVER 2000 PSI.
ONLY ONE GRADE OF CONCRETE SHALL BE POURED ON THE JOB AT ONE TIME.
A STATEMENT OF MIX DESIGN SHALL BE MADE FOR CONCRETE WITH DESIGN STRENGTH OVER 2500 PSI.
COPIES OF THE MIX DESIGN SHALL BE SUBMITTED TO THE OWNER, ARCHITECT, ENGINEER, AND
CONTRACTING OFFICER FOR APPROVAL BEFORE USE.
NOTE: A HIGHER GRADE OF CONCRETE MAY BE SUBSTITUTED FOR THOSE SHOWN ABOVE, BUT WILL BE
SUBJECT TO THE CODE REQUIREMENTS OF THE HIGHER GRADE.
ALL REINFORCING SHOWN CONTINUOUS SHALL BE LAPPED PER ACI 318 CLASS B SPLICE OR 40 DIAMETERS (GRADE 60) AT SPLICES, AND SHALL BE MADE AWAY FROM POINTS OF MAXIMUM STRESS.
MINIMUM LAP SHALL BE 2'-0" LONG.
FORMS FOR CONCRETE STRUCTURAL MEMBERS (SLABS, BEAMS, ETC.) SHALL NOT BE
STRIPPED UNTIL THE CONCRETE HAS REACHED ITS DESIGNED STRENGTH.
ALL CONCRETE IS DESIGNED BY ULTIMATE STRENGTH DESIGN METHOD.
A MIX THAT PRODUCES THE LOWEST SLUMP COMPATIBLE WITH PROPER PLACEMENT SHALL BE
USED (4-1/2" MAXIMUM SLUMP UNLESS OTHERWISE APPROVED BY THE STRUCTURAL ENGINEER.)
CONCRETE GROUT SHALL BE NON SHRINKING WITH SUFFICIENT WATER TO ALLOW POURING.
ULTIMATE COMPRESSIVE STRENGTH (F'C) AT 28 DAYS SHALL BE EQUAL TO 3000 PSI MINIMUM.
DRY PACK CONCRETE SHALL BE ONE PART PORTLAND CEMENT AND ONE PART SAND WITH
SUFFICIENT WATER TO ALLOW A SMALL AMOUNT OF PASTE TO COME TO THE SURFACE.
ALL SLEEVES NOT SPECIFICALLY SHOWN ON THE DRAWINGS SHALL BE LOCATED BY THE TRADES
INVOLVED AND SHALL BE APPROVED BY THE ENGINEER.
BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO INSURE PROPER PLACEMENT OF ALL
OPENINGS, SLEEVES, CURBS, CONDUITS, BOLTS, INSERTS, ETC., RELATING TO WORK.
16.
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
CONCRETE COVER OVER REINFORCING SHALL BE AS FOLLOWS:
A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3"
B. EXPOSED TO EARTH OR WEATHER
1. CAST-IN-PLACE - NON STRESSED 2"
C. NOT EXPOSED TO EARTH OR WEATHER 2"
1. MAIN BARS IN BEAMS AND COLUMNS 2"
2. TIES AND STIRRUPS 1 1 2"
FOOTINGS HARDROCK 3000 PSI 145 PCF
AGGREGATES STRENGTH
@ 28 DAYS
DRY
WEIGHT
LOCATION
SLAB-0N-GRADE HARDROCK 4000 PSI 145 PCF
EQUIP. PADS HARDROCK 4000 PSI 145 PCF
MAX W/CM
RATIO
0.50 0.50 0.50
1. SPECIAL INSPECTION PER IBC 2021 CHAPTER 17 BY A PERSON WHOSE QUALIFICATIONS ARE ACCEPTABLE TO THE STRUCTURAL ENGINEER OF RECORD AND SHALL BE REQUIRED FOR THE FOLLOWING WORK:
A. CONCRETE STRENGTH GREATER THAN 2500 psi
B. POST INSTALLED ANCHORS WEDGE AND EPOXY ANCHORS.
C. HIGH STRENGTH BOLTS
D. SHOP AND FIELD WELDING
2. INSPECTION REPORTS SHALL BE PROVIDED TO THE CONTRACTING OFFICER, ENGINEER, OR ARCHITECT
OF RECORD WITHIN ONE WEEK OF INSPECTION
3. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO DEMONSTRATES COMPETENCE TO THE SATISFACTION OF THE REGISTERED DESIGN PROFESSIONAL RESPONSIBLE FOR THE DESIGN OF THE
THE STRUCTURE FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR
OPERATION REQUIRING SPECIAL INSPECTION.
4. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR:
THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE WITH:
A. THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. THE INSPECTOR SHALL NOT ALTER, MODIFY, ENLARGE, OR WAIVE ANY OF THE REQUIREMENTS OF THE DOCUMENTS.
B. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE CONTRACTING OFFICER, THE
ROFESSIONAL-OF-RECORD, AND THE CONTRACTOR. ALL DISCREPANCIES SHALL BE BROUGHT TO
THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN, IF UNCORRECTED,
SUBMIT A COMPLETE LIST OF ALL OUTSTANDING DISCREPANCIES ON A WEEKLY BASIS TO THE
CONTRACTING OFFICER, AND THE PROFESSIONAL-OF-RECORD, UNTIL ALL CORRECTIONS HAVE BEEN
COMPLETED.
C. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT STATING WHETHER THE WORK
REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE INSPECTOR'S KNOWLEDGE, IN
CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND THE APPLICABLE
WORKMANSHIP PROVISIONS OF THE BUILDING CODE.
5. WHERE SPECIAL INSPECTION REQUIREMENTS DUPLICATE THE REQUIREMENTS OF OTHER SPECIFIED
TESTING, DUPLICATE INSPECTIONS SHALL NOT BE REQUIRED
SPECIAL INSPECTION PER 2021 IBC
E. CONCRETE MASONRY CONSTRUCTION
LEGEND
(N) NEW
TYP TYPICAL CONDITION
@ AT
W/ WITH
EQUIV EQUIVALENT
Ø DIAMETER
CONC CONCRETE
PLATEPL.
AB ANCHOR BOLT
& AND
DETAIL REFERENCE
EA EACH
SHEET NUMBER
X
S-XXX
DETAIL NUMBER
STD STANDARD
CLR. CLEAR
FINAL DESIGN SUBMITTAL (IFC)
2-26-2025 5 17
'-3
10'-4"
1'- 6"
TY
P
1'-6" TYP
S-101 TYP
6" CONC PAD
#4 @ 14" OC EACH
WAY PLACED 2" FROM
TOP OF SLAB
#4 CONT
TYP
TOOLED
RADIUS
1'- 0"
MI
N.
F G
8"
CHILLER 1 & 2 ANCHOR AND PAD SECTION 2NTS
ANCHOR LOCATION PLAN
MIN 3 ANCHORS
PER LONG SIDE
TYP
2" C
LR
3- 3 4" Ø HILTI KB TZ2
W/ NOMINAL 4 1 2" EMBED
INTO CONCRETE EACH
LONG SIDE
(TOTAL 6 ANCHORS)
ICC - ESR-4266 OR EQUIVALET
SE
E
PL
AN
SEE MECH DWGS
CHILLER
WT = 6331 LBS
9" MIN.
4"
2" C
LR
3" C
LR
1'- 0"
TYP
SEE PLAN
BUFFER TANK PAD AND ANCHORAGE DETAIL 4NTS
BUFFER TANK
WT = 15400 LBS
45°
CONCRETE PAD AND ANCHOR LOCATION PLAN
TYP
5'-6"
5'- 6"
BUFFER TANK ANGLE CONNECTION DETAIL 3NTS
3-SIDES
BUFFER TANK
ANGLE BY TANK
MANUFACTURER
(N) CONC PAD
S2.1
A A
SECTION A-A
8 " Ø HILTI KB TZ
W/ NOMINAL 4 1 2" EMBED
INTO CONCRETE
(TOTAL 6 ANCHORS)
8- 3 4" Ø HILTI KB TZ2
W/ NOMINAL 4 1 2" EMBED
INTO CONCRET
(ICC-ESR-4266) OR
EQUIVALENT
ANGLES BY TANK
MANUFACTURER
TYP
TYP
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
Fi le
P at h:
Pl ot D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U S D A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
95% SUBMITTAL
S-101
CHILLER FOUNDATION PLAN
AND SECTION
Designer
Author
Checker
1-09-2025
Project Number
PLAN CHILLER CONCRETE PAD 11/4"=1'-0"
FINAL DESIGN SUBMITTAL (IFC)
2-26-2025 6 17
DUCT PRESSURE CLASS
INDICATOR (INCHES W.G.)
DUCT BRANCH TAKE-OFF -
RECTANGULAR
FIRE DAMPER -
VERTICAL POSITION
(HORIZONTAL AIR FLOW)
SUPPLY AIR W/ FLOW RATE
(SG = GRILLE; CD = CEILING
DIFFUSER; SR = REGISTER)
(200 = CFM QUANTITY)
CD-1
200 CFM
RS
1 2
DUCTWORK SYMBOLSDUCTWORK ACCESSORIES SYMBOLS
SINGLE LINE DOUBLE LINE
SUPPLY AIR W/ FLOW RATE AND
W/ THROW DIRECTION
(SG = GRILLE; CD = CEILING
DIFFUSER; SR = REGISTER)
(200 = CFM QUANTITY)
LD-1
200 CFM
CD-1
200 CFM
SUPPLY AIR W/ FLOW RATE
(LD = LINEAR DIFFUSER)
(200 = CFM QUANTITY)
LD-1
200 CFM
SUPPLY AIR W/ FLOW RATE AND
W/ THROW DIRECTION
(LD = LINEAR DIFFUSER)
(200 = CFM QUANTITY)
SUPPLY AND OUTSIDE AIR DUCT
ELBOW DOWN AND UP
RETURN AIR DUCT ELBOW
DOWN AND UP
EXHAUST AIR DUCT ELBOW
DOWN AND UP
SUPPLY AIR FLOW DIRECTION
EXHAUST OR RETURN AIR FLOW
DIRECTION
FIRE DAMPER -
HORIZONTAL POSITION
(VERTICAL AIR FLOW)
AUTOMATIC AIR DAMPER
BACK DRAFT DAMPER
BDD
MANUAL BALANCING DAMPER
ACCESS DOOR - HORIZONTAL
ACCESS DOOR - VERTICAL
RETURN W/ FLOW RATE
(RG = GRILLE; RR = REGISTER)
(200 = CFM QUANTITY)
RG-1
200 CFM
EXHAUST W/ FLOW RATE
(EG = GRILLE; ER = REGISTER)
(200 = CFM QUANTITY)
EG-1
200 CFM
R / D
DUCT SIZE - RECTANGULAR;
FIRST NUMBER SHOWN IS
DIMENSION OF SIDE SHOWN
(DIMENSIONS ARE CLEAR INTERNAL)
20"x12"
DUCT PITCH IN DIRECTION OF
FLOW (R = RISE; D = DROP)
FLEXIBLE DUCT CONNECTION
DUCT CAP
RS
DUCT BRANCH TAKE-OFF -
ROUND
AND
RS
RG-1
200 CFM
EG-1
200 CFM
CD-1
200 CFM
CD-1
200 CFM
LD-1
200 CFM
LD-1
200 CFM
DUCT SIZE - ROUND;
NUMBER SHOWN IS DIAMETER
DIMENSION OF DUCT (DIMENSIONS
ARE CLEAR INTERNAL)
20"ø
COMBINATION FIRE/SMOKE
DAMPER -
VERTICAL POSITION
(HORIZONTAL AIR FLOW)
COMBINATION FIRE/SMOKE
DAMPER -
HORIZONTAL POSITION
(VERTICAL AIR FLOW)
SINGLE LINE DOUBLE LINE
SMOKE DAMPER -
VERTICAL POSITION
(HORIZONTAL AIR FLOW)
SMOKE DAMPER -
HORIZONTAL POSITION
(VERTICAL AIR FLOW)
TW
F & T
PSD
STANDARD MECHANICAL SYMBOLS
BALL VALVE
BUTTERFLY VALVE
AAV
MAV
R / D
CALIBRATED BALANCING VALVE
CHECK VALVE
STRAINER
UNION
PRESSURE GAGE & COCK
THERMOMETER
PIPE CAP
PIPE ELBOW DOWN
PIPE ELBOW UP
PIPE TEE DOWN
PIPE TEE UP
45 DEGREE DROP
PIPING SYMBOLS
PLUG VALVE
GATE VALVE
GLOBE VALVE
CHECK VALVE W/ BALL DRIP
PITCH OF PIPE (R = RISE; D = DROP)
IN DIRECTION OF FLOW
PRESSURE / TEMPERATURE PORT
STRAINER (BLOW-OFF TYPE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
GATE ANGLE VALVE
GLOBE ANGLE VALVE
BALANCING VALVE
CONCENTRIC REDUCER
ABBREVIATION OF ITEM
ABV.
RELIEF VALVE
PRESSURE REGULATING VALVE
FLEXIBLE CONNECTION
PIPING ACCESSORIES SYMBOLS
METERM
SINGLE LINE DOUBLE LINE
SINGLE LINE DOUBLE LINE
THERMOMETER WELL
TRAP, STEAM W/ TYPE (F & T =
FLOAT & THERMOSTAT;
BT = BUCKET, TT = THERMOSTATIC)
PUMP SUCTION DIFFUSER
PIPING LINETYPES LEGEND
HYDRONIC HOT WATER RETURN
HYDRONIC HOT WATER SUPPLY
PIPING WITH ABBREVIATION
(ABV=TYPE; SEE ABBREVIATIONS)
(ABV)
CHILLED WATER SUPPLY
CHILLED WATER RETURNCHWR
CHWS
PIPING WITH ABBREVIATION
UNDERGROUND (DOUBLE LINE)
(ABV)
HWR
HWS
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
CONDENSATE DRAINCD
STEAMSTM
AND
AND
CONDENSATE RETURNCR
GENERAL SYMBOLS
DUCTWORK LINETYPES LEGEND
AHU-1
DUCTWORK WITH ABBREVIATION
(ABV=TYPE; SEE ABBREVIATIONS)
DRAWING NOTE HEX - NEW WORK
DRAWING NOTE BOX - DEMOLITION
CONNECT TO EXISTING /
POINT OF WORK
CALLOUT OUTLINE
EQUIPMENT MARK AND NUMBER
XX
M-XXX
SHEET NUMBER WHERE SECTION
/ DETAIL IS SHOWN
DETAIL OR SECTION BUBBLE
DETAIL OR SECTION NUMBER
EXHAUST AIREA
OUTSIDE AIR
RETURN AIR
SUPPLY AIR
OA
RA
SA
(ABV)
FLUE VENTV
HUMIDISTAT
HVAC CONTROL SYMBOLS
ROOM THERMOSTAT
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSORCO
H
T
CO2
ANTI-TERRORISM FORCE
PROTECTION SHUT-DOWN BUTTON
COMBINATION HUMIDISTAT & THERMOSTATH/T
NOTES:
A. THIS LEGEND IS COMPOSED OF STANDARD SYMBOLS AND APPLIES
TO THE SET OF DRAWINGS TO THE EXTENT APPLICABLE.
B. SYMBOLS ARE REPRESENTATIONAL AND MAY NOT REFLECT
ACTUAL CONDITIONS.
C. REFER TO HVAC CONTROL SCHEMATIC DRAWINGS FOR
ADDITIONAL CONTROL SYMBOLS & ABBREVIATIONS.
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e sk
D o cs
/U
S D
A T
O -0
R iv e rs id e E le va to r
C h ill e r
R e p la ce m e n t/ U
S D
A -U
S S
L M
.r vt
/1
/2
:1 :5
P
M
M001
MECHANICAL SYMBOLS & ABBREVIATION
Designer
Author
Checker
2-26-2025
7 17
BUFFER TANK SCHEDULE
MARK LOCATION
SYSTEM AND/OR
SERVICE
TYPE
APPROX SYSTEM VOLUME
SYSTEM TEMPERATURE RANGE INITIAL PRESSURE IN
TANK
MAX OPERATING
PRESSURE
FILL PRESSURE AT TANK
MIN VOLUME TANK MIN BLADDER VOLUME PIPE SIZE TO TANK VENT SIZE
MANUFACTURER/MODEL NOMIN MAX RELIEF VALVE AT TANK
GAL [L] °F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm] IN [mm]
BT-1 MECHANICAL YARD CHILLED WATER VERT DIAPHRAGM 700 [ 2600 ] 40 [ 4 ] 60 [ 16 ] 43 [ 300 ] 125 [ 860 ] 80 [ 550 ] 70 [ 480 ] NA #VALUE! NA #VALUE! 6 [ 150 ] 3/4" #VALUE! WESSELS/CBT-700
AIR COOLED CHILLER SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
TYPE
CAPACITY
# OF COMP
COOLING
EFFICIENCY
(EER)
NPLV.IP
MAX IPLV
(kW/TON)
EVAPORATOR CONDENSER ELECTRICAL
MANUFACTURER MODEL NO
FLOW EWT LWT MAX WPD
FOULING
FACTOR
AMBIENT OA
TEMP
COMPRESSOR MOTOR TOTAL
# COMP HP [kW] PHASE VOLT
FANS
MCA MOCP
PHASE VOLT
TONS [kW] GPM [L/s] °F [°C] °F [°C] FT [kPa] °F [°C] AMPS AMPS
CH-1&2 MECHANICA;L YARD WHOLE BUILDING SCROLL 132 [ 460 ] 6 7.26 15.6 17.51 264 [ 17 ] 53 [ 12 ] 43 [ 6 ] 8.43 [ 25 ] 0.0001 95 [ 35 ] 6 35 [ 26 ] 3 460 8 261.4 300 3 460 CARRIER 30RC-1326S015-7-2
PUMP SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR SERVICE TYPE
CIRCULATING FLUID
MIN % EFF
ELECTRICAL MOTOR
FLUID
FLOW HEAD NPSH AVAILABLE TEMPERATURE
SP GR
NOMINAL POWER
PHASE VOLT MAX RPM SPEED CONTROL MANUFACTURER/MODEL NO
GPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [kW]
CHWP1&2 MECHANICAL ROOM 126 USDA Salinity Laboratory CHILLED WATER END-SUCTION CHILLED WATER 530 [ 33 ] 100 [ 1600 ] 9.9 [ 160 ] 55 [ 13 ] 92 80 20 [ 15 ] 3 460 1750 VARIABLE TACO/FI3011D
[ ] [ ] N/A [ ]
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e sk
D o cs
/U
S D
A T
O -0
R iv e rs id e E le va to r
C h ill e r
R e p la ce m e n t/ U
S D
A -U
S S
L M
.r vt
/1
/2
:1 :5
P
M
M002
MECHANICAL SCHEDULES
Designer
Author
Checker
2-26-2025
8 17
UP
1 2 3 4 5 6 6.5 7 8 8.5 9 9.5
A
B
C
D
E
F
G
H
J
K
H.7
7.1 8.9 108.1 9.1
M
N
M201 1 M201
M202
M202
1 2 3 4 5
A
B
C
D
E
F
G
H
MECHANICAL RM
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e sk
D o cs
/U
S D
A T
O -0
R iv e rs id e E le va to r
C h ill e r
R e p la ce m e n t/ U
S D
A -U
S S
L M
.r vt
/1
/2
:1 :5
P
M
M100
MECHANICAL LOWER LEVEL OVERALL FLOOR
PLAN
Designer
Author
Checker
2-26-2025
Project Number 1/16" = 1'-0"1
MECHANICAL LOWER LEVEL OVERALL FLOOR PLAN
9 17
UP
1 2 3 4 5
A
B
C
D
E
F
G
H
M202
M202
(E)AHU-5 (E)AHU-4
(E)AHU-1
BT
CH-2
CH-1
MECHANICAL RM
CONFERENCE RM
Room
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e sk
D o cs
/U
S D
A T
O -0
R iv e rs id e E le va to r
C h ill e r
R e p la ce m e n t/ U
S D
A -U
S S
L M
.r vt
/1
/2
:1 :5
P
M
M101
MECHANICAL MID LEVEL OVERALL FLOOR PLAN
Designer
Author
Checker
2-26-2025
Project Number
1/16" = 1'-0"1
MECHANICAL MID LEVEL OVERALL FLOOR PLAN
10 17
6 6.5 7
K
7.1
M
CH-2
CH-1
BT3
1' - 6"
"ø
C H
W R
"ø
C H
W R
"ø
C H
W S
6"ø CHWR
Room
CT
(E)CH-1
WS-1
ST-1
CAT-1
PCP1
PCP2
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e sk
D o cs
/U
S D
A T
O -0
R iv e rs id e E le va to r
C h ill e r
R e p la ce m e n t/ U
S D
A -U
S S
L M
.r vt
/1
/2
:1 :5
P
M
M201
MECHANICAL YARD FLOOR PLAN
Designer
Author
Checker
2-26-2025
Project Number
1/4" = 1'-0"1
MECHANICAL YARD FLOOR PLAN-NEW
1/4" = 1'-0"2
MECHANICAL FLOOR PLAN-MECHANICAL
YARD - DEMO
DEMOLISION KEYED NOTES
1. REMOVE AND DEMOLISH EXISTING 200-TON CHILLER INCLUDING IING, WIRING, CONTROL
INSTRUMENT AND ALL RELATED ACCESSORIES.
2. POD TO EXISTING 6" CHILLED WATER SUPPLY AND RETURN.
3. REMOVE AND DEMOLISH EXISTING WATER STORAGE TANK WITH ALL ACCESSORIES AND
PIPING.
4. REMOVE AND DEMOLISH WATER SOFTENER SYSTEM.
5. REMOVE AND DEMOLISH ACTIVE CARBONE TANK.
6. REMOVE AND DEMOLISH EXITING COOLING TOWER WITH ALL RELATED ACCESSORIES.
7. REMOVE AND DEMOLISH EXISTING PRE COOLING WATER PUMPS WITH PIPING, WIRING, FITTING
AND ALL RELATED ACCESSORIES.
0 RENOVATION KEYED NOTES
1. PROVIDE NEW 132-TON CHILLER WITH BACNET CONTROL SYSTEM .
2. POINT OF CONNECTION TO EXISTING 6" CHILLED WATER SUPPLY AND RETURN.
3. ROVIDE A NEW 700-GALLON BUFFER TANK ON THE CHILLED WATER RETURN WITH ACCESSORIES.
4. PROVIDE AND INSTALL A 6" BYPASS FOR BUFFER TANK.
5. PROPORTIONAL ISOLATION VALVE TO PREVENT WATER FLOWING THROUGH A DISABLED CHILLER.
6. MANUAL ISOLATION VALVE ON SUPPLY AND RETURN FOR MAINTENANCE.
7. INSTALL FLEXIBLE JOINTS ON THE SUPPLY AND RETURN CONNECTIONS OF THE CHILLER TO ABSORB
VIBRATIONS, ACCOMMODATE THERMAL EXPANSION, AND SIMPLIFY INSTALLATION AND REMOVAL OF
THE CHILLER FOR MAINTENANCE OR REPLACEMENT BY ALLOWING SOME MOVEMENT IN THE
CONNECTIONS.
BYPASS
11 17
(E)CHWP-2
(E)CHWP-1 1
H
(E)AHU3
(E)AHU2
2 3
MECHANICAL RM
4 5
(E) AIR
SEPERATOR
(E)AHU2
(E)AHU3
(N)CHWP-2
(N)CHWP-1
MECHANICAL RM
H
E
F
(E)AHU-4(E)AHU-5
CONTROL
VALVE
CONTROL
VALVE
CONFERENCE RM
B
C
"ø
C H
W R
"ø
C H
W S
CONTROL
VALVE
(E)AHU-1
MECHANICAL RM
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e sk
D o cs
/U
S D
A T
O -0
R iv e rs id e E le va to r
C h ill e r
R e p la ce m e n t/ U
S D
A -U
S S
L M
.r vt
/1
/2
:1 :0
P
M
M202
MECHANICAL ENLARGED PLAN
SZ
SZ
Checker
2-26-2025
Project Number
1/4" = 1'-0"1
MECHANICAL FLOOR PLAN-MECHANICAL ROOM
126-DEMO
1/4" = 1'-0"2
MECHANICAL FLOOR PLAN-MECHANICAL ROOM
126-NEW
DEMOLITION KEYED NOTES
1. REMOVE AND DEMOLISH EXISTING CHILLED WATER PUMPS AND ALL RELATED ACCESSORIES..
2. REMOVE AND DEMOLISH EXISTING CONTROL PANEL FOR CHILLED WATER PUMPS.
3. KEEP AND PROTECT EXISTING VFD FOR NEW CHWS & CHWR.
4. REMOVE AND DEMOLISH EXISTING BYPASS LINE AND 3-WAY VALVE.
5. REMOVE EXISTING 3-WAY VALVE.
6. EXISTING AIR SEPERATOR TO BE REMAIN.
RENOVATION KEYED NOTES
1. PROVIDE NEW CHILLED WATER PUMPS FOR NEW CHILLER WITH ALL ACCESSORIES INCLUDING AIR
SEPARATOR, FLEXIBLE CONNECTOR, GATE VALVE AND PRESSURE GAUGE.
2. PROVIDE A NEW CONTROL PANEL FOR CHILLED WATER PUMPS.
3. REPLACE 3-WAY VALVE WITH A 3", 2-WAY VALVE ON THE CHILLED WATER RETURN PIPE TO REGULATE
FLOW AND MAINTAIN SYSTEM EFFICIENCY.
4. REPLACE 3-WAY VALVE WITH A 6", 2-WAY VALVE ON THE CHILLED WATER RETURN PIPE TO REGULATE
FLOW AND MAINTAIN SYSTEM EFFICIENCY.
5. REPLACE 3-WAY VALVE WITH A 1-1/2", 2-WAY VALVE ON THE CHILLED WATER RETURN PIPE TO
REGULATE FLOW AND MAINTAIN SYSTEM EFFICIENCY.
6. REPLACE 3-WAY VALVE WITH A 2", 2-WAY VALVE ON THE CHILLED WATER RETURN PIPE TO REGULATE
FLOW AND MAINTAIN SYSTEM EFFICIENCY.
7. PROVIDE DIFFERENTIAL PRESSURE (DP) AT THE END OF THE BUILDING'S CHILLED WATER LOOP.
8. THE PUMP SPEEDS ARE MODULATED TO MAINTAIN THE DIFFERENTIAL SET POINT.
9. INSTALL A NEW 6" BYPASS WITH MANUAL VALVE TO ISOLATE THE SYSTEM FROM CHILLERS AND
BUFFER TANK DURING COMMISSIONING OR MAINTENANCE.
10. PROVIDE AND INSTALL A 3" BYPASS LINE IN THE CHILLED WATER SYSTEM WITH AN AUTOMATIC MODULATING VALVE TO MAINTAIN THE MINIMUM REQUIRED FLOW RATE FOR CHILLER PROTECTION
AND PERFORMANCE.
1/8" = 1'-0"3
MECHANICAL FLOOR PLAN-CONFERENCE ROOM 24
1/4" = 1'-0"4
MECHANICAL FLOOR PLAN-MECHANICAL ROOM 18
(E)VFD(N)CONTROL
PANEL
DP 7
12 17
HWS
HWR
BALL VALVE (TYP)2-WAY AUTOMATIC
CONTROL VALVE
STRAINER WITH BALL
VALVE, CAP, AND
CHAIN
AUTOMATIC BALANCING VALVE (GRISWOLD OR APPROVED
EQUAL). CONTRACTOR SHALL PROVIDE A VALVE TAG WITH
NUMBER AND FLOW PER SPECIFICATIONS.
TEST PLUG (TYP.)
AIR
FLO
W
6" MIN.
3/4" DRAIN
CAP
NOTES:
1. LOCATE PIPE UNIONS AND ARRANGE PIPING TO FACILITATE COIL REMOVAL.
2. ON LINES 2" AND SMALLER, LOCATE THERMOMETER WELLS IN PIPE ELBOW.
3. FOR PIPE SIZES REFER TO PLANS AND SCHEDULES.
CONCENTRIC
REDUCER (AS
NEEDED)
UNION (TYP.)
ANGLE
18 GAUGE
GALVANIZED
SHEET METAL
SADDLE
INSULATION
LENGTH THREE
TIMES
PIPE SIZE MIN. 9"
3/8"
DIA.
MIN.
ROD
CLEVIS
STYLE
HANGE
R
TACK WELD
PIPE
SADDLE
TO HANGER
INSULATION
INSULATION
ANGLE
OR
UNISTRU
T
18 GAUGE
GALVANIZED
SHEET METAL
SADDLE
1/2"
DIA.
MIN.
ROD
PIPE
PIPE
CLAM
P
INSULATION
PIPE
TACK WELD
PIPE
SADDLE
TO HANGER
SINGLE PIPE
TWO OR MORE PIPES
TYPE OF PIPE SIZE MAX. SPACING
STEEL 1-1/2" AND SMALLER
2" AND LARGER
7 FT
10 FT
BRASS
OR
COPPER
3/4" AND SMALLER
1" TO 1-1/4"
5 FT
6 FT
1-1/2" TO 3"
4" AND LARGER
8 FT
10 FT
PIPE SUPPORT SPACING SCHEDULE
STEEL ROD SIZING SCHEDULE
PIPE, IPS ROD
1/2 IN2-1/2 IN
1/2 IN3 IN
4 IN 5/8 IN
6 IN 3/4 IN
3/8 INTO 2 IN
ET
FS
FS
BT-1
AS
PP
PP
PP
PP
AHU-2
AHU-3
CH-1
CH-2
VFD
VFD
AIR SEPARATOR
STRAINER
PRESSURE
REGULATOR
AIR VENT
PRESSURE TAP,
TYP.
CHILLED WATER PUMP
AIR VENT
BUFFER TANK
THERMOMETER,
TYP.
STRAINER
STRAINER
PRESSURE
TAP, TYP.EQUIPMENT
WITHIN CHILLER
(TYP. 2)
AIR COOLED
CHILLER
TO CHEMICAL FEED
CHWS
EXPANSION TANK
MANUAL AIR VENT AT HIGH POINTS
2-WAY PRESSURE
INDISPENSABLE CONTROL
VALVE, TYP.
PETE'S PLUG, TYP.
AIR HANDLING UNIT
COOLING COILS
CHWR
EQUIPMENT
WITHIN CHILLER
(TYP. 2)
C H
W S
C H
W R
TO OTHER AIR HANDLERS
AHU-1,4,5
MANUAL AIR VENT AT HIGH POINTS
2-WAY PRESSURE
INDISPENSABLE CONTROL
VALVE, TYP.
PETE'S PLUG, TYP.
AIR HANDLING UNIT
COOLING COILS
CHWR
CHWS
CHWS
CHWS
CHWR
BYPASS
BYPASS
-CONTROL
VALVE.
BYPASS
EQUIPMENT WITHIN
MECHANICAL ROOM 126
AIR COOLED
CHILLER
CHWS
CHWR
CHWS
C H
W S
C H
W S
C H
W R
BACKFLOW PREVENTER
3/4"
SHEET IDUSDA AGRICULTURAL RESEARCH SERVICE
USDA/ARS, PA
DRAWN BY:
PROJ. MANAGER:
CHECKED BY:
ISSUE DATE:CONTRACT NO.:
PPM
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
DATEMARK DESCRIPTION
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
Q
2221 23
BY
800 BUCHANNAN STREET
ALBANY, CA
US SALINITY LABORATORY
U
S
D
A
USDAA-E FIRM
REVISIONS
Agricultural Research Service
UNIVERSITY OF CALIFORNIA, RIVERSIDE, CA
SHT OF
PROJECT NO:
EPM
SAFETY & HEALTH
REAL PROPERTY
ELEVATOR MODERNIZATION AND CHILLER REPLACEMENT AT USSL
FINAL DESIGN SUBMITTAL (IFC)
A u to d e sk
D o cs
/U
S D
A T
O -0
R iv e rs id e E le va to r
C h ill e r
R e p la ce m e n t/ U
S D
A -U
S S
L M
.r vt
/1
/2
:1 :0
P
M
M300
MECHANICAL DETAIL
Designer
Author
Checker
2-26-2025
Project Number
1" = 1'-0"2 Cooling Coil
1" = 1'-0"3 Pipe Hanger
1" = 1'-0"1
CHILLER SYSTEM PIPING DIAGRAM
13 17
SINGLE LINE LEGEND:
EC-1
A
EC-1
WP
a,b,c
IG
A,A1
F
APPEAR AS PART OF THESE DRAWINGS IF NOT REQUIRED.
SYMBOLS INDICATED ABOVE MAY NOT NECESSARILY
100A
3P
NOTE:
HOMERUN TO RESPECTIVE PANEL OR TERMINAL
CABINET - UNDERGROUND
SECTION DESIGNATION; TOP LETTER INDICATES SECTION,
HOMERUN TO RESPECTIVE PANEL OR TERMINAL CABINET -
OVERHEAD
BOTTOM LETTER/NUMBER INDICATES SHEET
DETAIL DESIGNATION; TOP NUMBER INDICATES DETAIL,
CONDUIT RISER - DOWN
CONDUIT RISER - UP
MOTOR, N.I.E.S. CONNECT AS REQUIRED, NUMBER INDICATES HP
MAIN SWITCHBOARD OR MOTOR CONTROL CENTER, SEE ONE LINE
DIAGRAM
TRANSFORMER, MOUNTING AS NOTED
PANELBOARD - SURFACE MOUNTED - SEE…