01 45 00.00 10 QUALITY CONTROL.pdf

PDF 57 KB Posted

Attached to
Tinker AFB Mutiple Award Construction Basic Ordering Agreement (MACB) Federal contract opportunity
Solicitation number
FA813722R0057
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK Ti nker Gener al Speci f i cat i ons 2019

SECTI ON 01 45 00. 00 10

QUALI TY CONTROL

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

ER 1110- 1- 12 ( 2006; Change 1) Engi neer i ng and Desi gn - - Qual i t y Management

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Qual i t y Cont r ol ( QC) Pl an; G

Addi t i onal Requi r ement s f or Desi gn Qual i t y Cont r ol ( DQC) Pl an; G

SD- 05 Desi gn Dat a

Di sci pl i ne- Speci f i c Checkl i st s

Desi gn Qual i t y Cont r ol

SD- 06 Test Repor t s

QC Document at i on

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 GENERAL REQUI REMENTS

Est abl i sh and mai nt ai n an ef f ect i ve qual i t y cont r ol ( QC) syst em t hat compl i es wi t h FAR 52. 246- 12 I nspect i on of Const r uct i on. QC consi st of pl ans, pr ocedur es, and or gani zat i on necessar y t o pr oduce an end pr oduct whi ch compl i es wi t h t he Cont r act r equi r ement s. The QC syst em cover s al l desi gn and/ or const r uct i on oper at i ons, bot h onsi t e and of f s i t e, and be

Apr i l 2019 Page 1 Sect i on 01 45 00. 00 10 keyed t o t he pr oposed desi gn and/ or const r uct i on sequence. The QC Manager , Pr oj ect Manager , Desi gn Qual i t y Manager and Pr oj ect Super i nt endent must wor k t oget her ef f ect i vel y. Al t hough t he QC Manager i s t he pr i mar y i ndi v i dual r esponsi bl e f or qual i t y cont r ol , al l i ndi v i dual s wi l l be hel d r esponsi bl e f or t he qual i t y of wor k on t he j ob.

3. 2 QUALI TY CONTROL ( QC) PLAN

Submi t no l at er t han 15 days af t er r ecei pt of not i ce t o pr oceed, t he Qual i t y Cont r ol ( QC) Pl an pr oposed t o i mpl ement t he r equi r ement s FAR 52. 246- 12 I nspect i on of Const r uct i on. Desi gn and/ or const r uct i on wi l l be per mi t t ed t o begi n onl y af t er accept ance of t he QC Pl an.

3. 2. 1 Cont ent of t he QC Pl an

I ncl ude, as a mi ni mum, t he f ol l owi ng t o cover al l desi gn and/ or const r uct i on- oper at i ons, bot h onsi t e and of f s i t e, i ncl udi ng wor k by subcontractors, desi gner s of r ecor d, consul t ant s, ar chi t ect / engi neer s ( AE) , f abr i cat or s, suppl i er s and pur chasi ng agent s:

a. A descr i pt i on of t he qual i t y cont r ol or gani zat i on, i ncl udi ng a char t showi ng l i nes of aut hor i t y and acknowl edgment t hat t he QC st af f wi l l i mpl ement t he t hr ee phase cont r ol syst em f or al l aspect s of t he wor k specified.

b. The name, qual i f i cat i ons ( i n r esume f or mat ) , dut i es, r esponsi bi l i t i es, and aut hor i t i es of each per son assi gned a QC f unct i on.

c. A copy of t he l et t er t o t he QC Manager s i gned by an aut hor i zed of f i c i al of t he f i r m whi ch descr i bes t he r esponsi bi l i t i es and del egat es suf f i c i ent aut hor i t i es t o adequat el y per f or m t he f unct i ons of t he QC Manager , i ncl udi ng aut hor i t y t o st op wor k whi ch i s not i n compl i ance wi t h t he Cont r act . Let t er s of di r ect i on t o al l ot her var i ous qual i t y cont r ol r epr esent at i ves out l i ni ng dut i es, aut hor i t i es, and r esponsi bi l i t i es wi l l be i ssued by t he QC Manager . Fur ni sh copi es of t hese l et t er s t o t he Cont r act i ng Of f i cer .

d. Pr ocedur es f or schedul i ng, r evi ewi ng, cer t i f y i ng, and managi ng submi t t al s, i ncl udi ng t hose of subcont r act or s, desi gner s of r ecor d, consul t ant s, ar chi t ect engi neer s ( AE) , of f s i t e f abr i cat or s, suppl i er s, and pur chasi ng agent s. These pr ocedur es must be i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES.

e. Cont r ol , ver i f i cat i on, and accept ance t est i ng pr ocedur es f or each speci f i c t est t o i ncl ude t he t est name, speci f i cat i on par agr aph r equi r i ng t est , f eat ur e of wor k t o be t est ed, t est f r equency, and per son r esponsi bl e f or each t est . ( Labor at or y f ac i l i t i es appr oved by t he Cont r act i ng Of f i cer ar e r equi r ed t o be used. ) f . Pr ocedur es f or t r acki ng pr epar at or y, i ni t i al , and f ol l ow- up cont r ol phases and cont r ol , ver i f i cat i on, and accept ance t est s i ncl udi ng documentation.

g. Pr ocedur es f or t r acki ng desi gn and/ or const r uct i on def i c i enci es f r om i dent i f i cat i on t hr ough accept abl e cor r ect i ve act i on. Est abl i sh ver i f i cat i on pr ocedur es t hat i dent i f i ed def i c i enci es have been corrected.

h. Repor t i ng pr ocedur es, i ncl udi ng pr oposed r epor t i ng f or mat s.

Apr i l 2019 Page 2 Sect i on 01 45 00. 00 10 i . A l i s t of t he def i nabl e f eat ur es of wor k. A def i nabl e f eat ur e of wor k i s a t ask whi ch i s separ at e and di st i nct f r om ot her t asks, has separ at e cont r ol r equi r ement s, and i s i dent i f i ed by di f f er ent t r ades or di sci pl i nes, or i t i s wor k by t he same t r ade i n a di f f er ent envi r onment . Al t hough each sect i on of t he speci f i cat i ons can gener al l y be consi der ed as a def i nabl e f eat ur e of wor k, t her e ar e f r equent l y mor e t han one def i nabl e f eat ur es under a par t i cul ar sect i on. Thi s l i s t wi l l be agr eed upon dur i ng t he coor di nat i on meet i ng.

j . Coor di nat e schedul ed wor k wi t h Speci al I nspect i ons r equi r ed by Sect i on 01 45 35 SPECI AL I NSPECTI ONS, t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons. Wher e t he appl i cabl e Code i ssue by t he I nt er nat i onal Code Counci l ( I CC) cal l s f or i nspect i ons by t he Bui l di ng Of f i c i al , t he Cont r act or must i ncl ude t he i nspect i ons i n t he Qual i t y Cont r ol Pl an and must per f or m t he i nspect i ons r equi r ed by t he appl i cabl e I CC. The Cont r act or must per f or m t hese i nspect i ons usi ng i ndependent qual i f i ed i nspect or s. I ncl ude t he Speci al I nspect i on Pl an r equi r ement s i n t he QC Pl an.

3. 2. 2 Addi t i onal Requi r ement s f or Desi gn Qual i t y Cont r ol ( DQC) Pl an

The f ol l owi ng addi t i onal r equi r ement s appl y t o t he Desi gn Qual i t y Cont r ol ( DQC) pl an:

a. Submi t and mai nt ai n a Desi gn Qual i t y Cont r ol ( DQC) Pl an as an ef f ect i ve qual i t y cont r ol pr ogr am whi ch assur es t hat al l ser vi ces r equi r ed by t hi s cont r act ar e per f or med and pr ovi ded i n a manner t hat meet s pr of essi onal ar chi t ect ur al and engi neer i ng qual i t y st andar ds. As a mi ni mum, al l document s must be t echni cal l y r evi ewed by compet ent , i ndependent r evi ewer s i dent i f i ed i n t he DQC Pl an. Cor r ect er r or s and def i c i enci es i n t he desi gn document s pr i or t o submi t t i ng t hem t o t he Government.

b. I ncl ude i n t he DQC Pl an t he di sci pl i ne- speci f i c checkl i st s t o be used dur i ng t he desi gn and qual i t y cont r ol of each submi t t al . Submi t at each desi gn phase as par t of t he pr oj ect document at i on t hese compl et ed di sci pl i ne- speci f i c checkl i st s. ER 1110- 1- 12 pr ovi des some usef ul i nf or mat i on i n devel opi ng checkl i st s.

c. I mpl ement t he DQC Pl an by a Desi gn Qual i t y Cont r ol Manager who has t he r esponsi bi l i t y of bei ng cogni zant of and assur i ng t hat al l document s on t he pr oj ect have been coor di nat ed. Thi s i ndi v i dual must be a per son who has ver i f i abl e engi neer i ng or ar chi t ect ur al desi gn exper i ence and i s a r egi st er ed pr of essi onal engi neer or ar chi t ect . Not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of t he name of t he i ndi v i dual , and t he name of an al t er nat e per son assi gned t o t he posi t i on.

The Cont r act i ng Of f i cer wi l l not i f y t he Cont r act or i n wr i t i ng of t he accept ance of t he DQC Pl an. Af t er accept ance, any changes pr oposed by t he Cont r act or ar e subj ect t o t he accept ance of t he Cont r act i ng Of f i cer .

3. 2. 3 Accept ance of Pl an

Accept ance of t he Cont r act or ' s pl an i s r equi r ed pr i or t o t he st ar t of desi gn and/ or const r uct i on. Accept ance i s condi t i onal and wi l l be pr edi cat ed on sat i sf act or y per f or mance dur i ng desi gn and/ or const r uct i on.

The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o make changes i n t he Qual i t y Cont r ol ( QC) Pl an and oper at i ons i nc l udi ng r emoval of

Apr i l 2019 Page 3 Sect i on 01 45 00. 00 10 per sonnel , as necessar y, t o obt ai n t he qual i t y speci f i ed.

3. 2. 4 Not i f i cat i on of Changes

Af t er accept ance of t he QC Pl an, not i f y t he Cont r act i ng Of f i cer i n wr i t i ng of any pr oposed change. Pr oposed changes ar e subj ect t o accept ance by t he Cont r act i ng Of f i cer .

3. 3 COORDI NATI ON MEETI NG

Af t er t he Pr econst r uct i on Conf er ence, Post awar d Conf er ence, bef or e st ar t of desi gn and/ or const r uct i on, and pr i or t o accept ance by t he Gover nment of t he QC Pl an, meet wi t h t he Cont r act i ng Of f i cer and di scuss t he Cont r act or ' s qual i t y cont r ol syst em. Submi t t he QC Pl an a mi ni mum of t en ( 10) cal endar days pr i or t o t he Coor di nat i on Meet i ng. Dur i ng t he meet i ng, a mut ual under st andi ng of t he syst em det ai l s must be devel oped, i ncl udi ng t he f or ms f or r ecor di ng t he QC oper at i ons, desi gn act i v i t i es, cont r ol act i v i t i es, t est i ng, admi ni st r at i on of t he syst em f or bot h onsi t e and of f s i t e wor k, and t he i nt er r el at i onshi p of Cont r act or ' s Management and cont r ol wi t h t he Gover nment ' s Qual i t y Assur ance. Mi nut es of t he meet i ng wi l l be pr epar ed by t he Gover nment , s i gned by bot h t he Cont r act or and t he Cont r act i ng Of f i cer and wi l l become a par t of t he cont r act f i l e. Ther e can be occasi ons when subsequent conf er ences wi l l be cal l ed by ei t her par t y t o r econf i r m mut ual under st andi ngs or addr ess def i c i enci es i n t he QC syst em or pr ocedur es whi ch can r equi r e cor r ect i ve act i on by t he Cont r act or .

3. 4 QC ORGANI ZATI ON

3. 4. 1 Per sonnel Requi r ement s

The r equi r ement s f or t he QC or gani zat i on ar e a QC Manager , a Si t e Saf et y and Heal t h Of f i cer ( SSHO) as det ai l ed i n Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS, a Desi gn Qual i t y Manager , and a suf f i c i ent number of addi t i onal qual i f i ed per sonnel t o ensur e saf et y and Cont r act compl i ance.

The QC Manager may al so ser ve as t he SSHO. The QC Manager r epor t s di r ect l y t o a seni or pr oj ect ( or cor por at e) of f i c i al i ndependent f r om t he Pr oj ect Super i nt endent or Pr oj ect Manager .

The Cont r act or ' s QC st af f mai nt ai ns a pr esence at t he s i t e at al l t i mes dur i ng pr ogr ess of t he wor k and have compl et e aut hor i t y and r esponsi bi l i t y t o t ake any act i on necessar y t o ensur e Cont r act compl i ance. The QC st af f wi l l be subj ect t o accept ance by t he Cont r act i ng Of f i cer .

Pr ompt l y compl et e and f ur ni sh al l l et t er s, mat er i al submi t t al s, shop dr awi ng submi t t al s, schedul es and al l ot her pr oj ect document at i on t o t he QC or gani zat i on. The QC or gani zat i on i s r esponsi bl e t o mai nt ai n t hese document s and r ecor ds at t he s i t e at al l t i mes, except as ot her wi se accept abl e t o t he Cont r act i ng Of f i cer .

3. 4. 2 QC Manager

3. 4. 2. 1 Duties

I dent i f y as QC Manager an i ndi v i dual wi t hi n t he or gani zat i on t hat i s r esponsi bl e f or over al l management of QC and has t he aut hor i t y t o act i n al l QC mat t er s f or t he Cont r act or .

The QC Manager i s r equi r ed t o at t end QC Pl an Meet i ngs, t he Coor di nat i on Meet i ng, conduct t he QC meet i ngs, per f or m t he t hr ee phases of cont r ol

Apr i l 2019 Page 4 Sect i on 01 45 00. 00 10 except f or t hose phases of cont r ol desi gnat ed t o be per f or med by QC Speci al i s t s, per f or m submi t t al r evi ew and appr oval , ensur e t est i ng i s per f or med and pr ovi de QC cer t i f i cat i ons and document at i on r equi r ed i n t hi s Cont r act . The QC Manager i s r esponsi bl e f or managi ng and coor di nat i ng t he t hr ee phases of cont r ol and document at i on per f or med by t he QC Speci al i s t s, t est i ng l abor at or y per sonnel and any ot her i nspect i on and t est i ng per sonnel r equi r ed by t hi s Cont r act .

I n addi t i on t o i mpl ement i ng and managi ng t he QC pr ogr am, t he QC Manager may al so per f or m t he dut i es of Desi gn QC Manager or t he SSHO.

3. 4. 2. 2 Qualifications

The QC Manager i s r equi r ed t o be an i ndi v i dual wi t h a mi ni mum of 5- year s ' combi ned exper i ence i n t he f ol l owi ng posi t i ons: Pr oj ect Super i nt endent , QC Manager , Pr oj ect Manager , Pr oj ect Engi neer or Const r uct i on Manager on s i mi l ar s i ze and t ype const r uct i on cont r act s whi ch i ncl uded t he maj or t r ades t hat ar e par t of t hi s Cont r act . The i ndi v i dual must have at l east 2- year s ' exper i ence as a QC Manager . The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1, and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on, saf et y compl i ance, and sust ai nabi l i t y .

3. 4. 3 Al t er nat e QC Manager

I dent i f y i n t he pl an an Al t er nat e QC Manager t o ser ve i n t he event of t he QCManager ' s absence. The qual i f i cat i ons f or t he Al t er nat e QC Manager ar e t he same as t he QC Manager .

The Al t er nat e QC Manager may al so per f or m t he dut i es of Desi gn QC Manager or t he SSHO.

3. 4. 4 Assi st ant QC Manager

Pr ovi de an assi st ant ( s) t o t he QC Manager at t he wor k s i t e t o per f or m t he t hr ee phases of cont r ol , per f or m submi t t al r evi ew, ensur e t est i ng i s per f or med, and pr epar e QC cer t i f i cat i ons and document at i on r equi r ed by t hi s Cont r act . The qual i f i cat i on r equi r ement s f or t he Assi st ant QC Manager ar e a mi ni mum of 5 year s combi ned exper i ence i n t he f ol l owi ng posi t i ons:

Pr oj ect Super i nt endent , QC Manager , Pr oj ect Manager , Pr oj ect Engi neer or Const r uct i on Manager on s i mi l ar s i ze and t ype const r uct i on cont r act s whi ch i ncl uded t he maj or t r ades t hat ar e par t of t hi s Cont r act . The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1, and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance.

3. 4. 5 QC Speci al i s t s

I n addi t i on t o QC per sonnel speci f i ed el sewher e i n t he cont r act , t he Cont r act i ng Of f i cer may r equi r e as par t of t he QC or gani zat i on speci al i zed per sonnel t o assi st t he QC Syst em Manager i n t he f ol l owi ng ar eas:

el ect r i cal , mechani cal , c i v i l , s t r uct ur al , ar chi t ect ur al , and/ or mat er i al s t echni c i an. These i ndi v i dual s or speci al i zed t echni cal compani es may be empl oyees of t he pr i me or subcont r act or ; r esponsi bl e t o t he QC Manager ;

shal l be physi cal l y pr esent at t he const r uct i on s i t e dur i ng wor k on t he speci al i zed per sonnel ' s ar eas of r esponsi bi l i t y ; have t he necessar y educat i on or exper i ence i n accor dance wi t h t he exper i ence mat r i x bel ow.

These i ndi v i dual s can per f or m ot her dut i es, but need t o be al l owed suf f i c i ent t i me t o per f or m t he speci al i zed per sonnel ' s assi gned qual i t y cont r ol dut i es as descr i bed i n t he Qual i t y Cont r ol Pl an. A s i ngl e per son can cover mor e t han one ar ea pr ovi ded t hat per son i s qual i f i ed t o per f or m

Apr i l 2019 Page 5 Sect i on 01 45 00. 00 10 qual i t y cont r ol act i v i t i es i n each desi gnat ed ar ea and t hat wor kl oad al l ows.

Exper i ence Mat r i x

Area Qualifications

Civil Gr aduat e Ci vi l Engi neer or Const r uct i on Manager wi t h 2 year s exper i ence i n t he t ype of wor k bei ng per f or med on t hi s pr oj ect or t echni ci an wi t h 5 yr s r el at ed exper i ence

Mechanical Gr aduat e Mechani cal Engi neer wi t h 2 yr s exper i ence or per son wi t h 5 year s of exper i ence super vi s i ng mechani cal f eat ur es of wor k i n t he f i el d wi t h a const r uct i on company

Electrical Gr aduat e El ect r i cal Engi neer wi t h 2 year s r el at ed exper i ence or per son 5 year s of exper i ence super vi si ng el ect r i cal f eat ur es of wor k i n t he f i el d wi t h a const r uct i on company

Structural Gr aduat e Ci vi l Engi neer ( wi t h St r uct ur al Tr ack or Focus) or Const r uct i on Manager wi t h 2 year s exper i ence or per son 5 year s of exper i ence super vi s i ng st r uct ur al f eat ur es of wor k i n t he f i el d wi t h a const r uct i on company

Architectural Gr aduat e Ar chi t ect wi t h 2 year s exper i ence or per son wi t h 5 year s r el at ed exper i ence

Concr et e, Pavement s and Soi l s Mat er i al s Techni ci an wi t h 2 year s exper i ence f or t he appr opr i at e ar ea

Test i ng, Adj ust i ng and Bal anci ng ( TAB) Per sonnel

Speci al i st must be a member of AABC or an exper i enced t echni ci an of t he f i r m cer t i f i ed by t he NEBB

3. 4. 6 Const r uct i on Qual i t y Management Tr ai ni ng

I n addi t i on t o t he above exper i ence and educat i on r equi r ement s, t he QC Manager and Al t er nat e ar e r equi r ed t o have compl et ed t he Const r uct i on Qual i t y Management ( CQM) f or Cont r act or s cour se. I f t he QC Manager does not have a cur r ent cer t i f i cat i on, obt ai n t he CQM f or Cont r act or s cour se cer t i f i cat i on wi t hi n 90 days of awar d. Thi s cour se i s per i odi cal l y of f er ed by t he Naval Faci l i t i es Engi neer i ng Command and t he Ar my Cor ps of Engi neer s. Cont act t he Cont r act i ng Of f i cer f or i nf or mat i on on t he next schedul ed c l ass.

Apr i l 2019 Page 6 Sect i on 01 45 00. 00 10

The Const r uct i on Qual i t y Management Tr ai ni ng cer t i f i cat e expi r es af t er 5 year s. I f t he QC Manager ' s cer t i f i cat e has expi r ed, r et ake t he cour se t o r emai n cur r ent .

3. 4. 7 Or gani zat i onal Changes

Mai nt ai n t he QC st af f at f ul l s t r engt h at al l t i mes. When i t i s necessar y t o make changes t o t he QC st af f , r evi se t he QC Pl an t o r ef l ect t he changes and submi t t he changes t o t he Cont r act i ng Of f i cer f or accept ance.

3. 5 SUBMI TTALS AND DELI VERABLES

Submi t t al s, i f needed, have t o compl y wi t h t he r equi r ement s i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES. The QC or gani zat i on i s r esponsi bl e f or cer t i f y i ng t hat al l submi t t al s and del i ver abl es ar e i n compl i ance wi t h t he cont r act r equi r ement s.

3. 6 CONTROL

QC i s t he means by whi ch t he Cont r act or ensur es t hat t he const r uct i on, t o i ncl ude t hat of subcont r act or s and suppl i er s, compl i es wi t h t he r equi r ement s of t he cont r act . At l east t hr ee phases of cont r ol ar e r equi r ed t o be conduct ed by t he QC Manager f or each def i nabl e f eat ur e of t he const r uct i on wor k as f ol l ows:

3. 6. 1 Pr epar at or y Phase

Thi s phase i s per f or med pr i or t o begi nni ng wor k on each def i nabl e f eat ur e of wor k, af t er al l r equi r ed pl ans/ document s/ mat er i al s ar e appr oved/ accept ed, and af t er copi es ar e at t he wor k s i t e. Thi s phase i nc l udes:

a. A r evi ew of each par agr aph of appl i cabl e speci f i cat i ons, r ef er ence codes, and st andar ds. Make avai l abl e dur i ng t he pr epar at or y i nspect i on a copy of t hose sect i ons of r ef er enced codes and st andar ds appl i cabl e t o t hat por t i on of t he wor k t o be accompl i shed i n t he f i el d. Mai nt ai n and make avai l abl e i n t he f i el d f or use by Gover nment per sonnel unt i l f i nal accept ance of t he wor k.

b. Revi ew of t he Cont r act dr awi ngs.

c. Check t o assur e t hat al l mat er i al s and equi pment have been t est ed, submi t t ed, and appr oved.

d. Revi ew of pr ovi s i ons t hat have been made t o pr ovi de r equi r ed cont r ol i nspect i on and t est i ng.

e. Revi ew Speci al I nspect i ons r equi r ed by Sect i on 01 45 35 SPECI AL I NSPECTI ONS, t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons.

f . Exami nat i on of t he wor k ar ea t o assur e t hat al l r equi r ed pr el i mi nar y wor k has been compl et ed and i s i n compl i ance wi t h t he Cont r act .

g. Exami nat i on of r equi r ed mat er i al s, equi pment , and sampl e wor k t o assur e t hat t hey ar e on hand, conf or m t o appr oved shop dr awi ngs or submi t t ed dat a, and ar e pr oper l y st or ed.

h. Revi ew of t he appr opr i at e act i v i t y hazar d anal ysi s t o assur e saf et y r equi r ement s ar e met .

Apr i l 2019 Page 7 Sect i on 01 45 00. 00 10 i . Di scussi on of pr ocedur es f or cont r ol l i ng qual i t y of t he wor k i ncl udi ng r epet i t i ve def i c i enci es. Document const r uct i on t ol er ances and wor kmanshi p st andar ds f or t hat f eat ur e of wor k.

j . Check t o ensur e t hat t he por t i on of t he pl an f or t he wor k t o be per f or med has been accept ed by t he Cont r act i ng Of f i cer .

k. Di scussi on of t he i ni t i al cont r ol phase.

l . The Gover nment needs t o be not i f i ed at l east 48 hour s i n advance of begi nni ng t he pr epar at or y cont r ol phase. I ncl ude a meet i ng conduct ed by t he QC Manager and at t ended by t he super i nt endent , ot her QC per sonnel ( as appl i cabl e) , and t he f or eman r esponsi bl e f or t he def i nabl e f eat ur e. Document t he r esul t s of t he pr epar at or y phase act i ons by separ at e mi nut es pr epar ed by t he QC Manager and at t ach t o t he dai l y QC r epor t . I nst r uct appl i cabl e wor ker s as t o t he accept abl e l evel of wor kmanshi p r equi r ed i n or der t o meet cont r act speci f i cat i ons.

3. 6. 2 I ni t i al Phase

Thi s phase i s accompl i shed at t he begi nni ng of a def i nabl e f eat ur e of wor k. Accompl i sh t he f ol l owi ng:

a. Check wor k t o ensur e t hat i t i s i n f ul l compl i ance wi t h cont r act r equi r ement s. Revi ew mi nut es of t he pr epar at or y meet i ng.

b. Ver i f y adequacy of cont r ol s t o ensur e f ul l cont r act compl i ance. Ver i f y r equi r ed cont r ol i nspect i on and t est i ng ar e i n compl i ance wi t h t he contract.

c. Est abl i sh l evel of wor kmanshi p and ver i f y t hat i t meet s mi ni mum accept abl e wor kmanshi p st andar ds. Compar e wi t h r equi r ed sampl e panel s as appr opr i at e.

d. Resol ve al l di f f er ences.

e. Check saf et y t o i ncl ude compl i ance wi t h and upgr adi ng of t he saf et y pl an and act i v i t y hazar d anal ysi s. Revi ew t he act i v i t y anal ysi s wi t h each wor ker .

f . The Gover nment needs t o be not i f i ed at l east 24 hour s i n advance of begi nni ng t he i ni t i al phase f or def i nabl e f eat ur e of wor k. Pr epar e separ at e mi nut es of t hi s phase by t he QC Manager and at t ach t o t he dai l y QC r epor t . I ndi cat e t he exact l ocat i on of i ni t i al phase f or def i nabl e f eat ur e of wor k f or f ut ur e r ef er ence and compar i son wi t h f ol l ow- up phases.

g. The i ni t i al phase f or each def i nabl e f eat ur e of wor k i s r epeat ed f or each new cr ew t o wor k onsi t e, or any t i me accept abl e speci f i ed qual i t y st andar ds ar e not bei ng met .

h. Coor di nat e schedul ed wor k wi t h Speci al I nspect i ons r equi r ed by Sect i on 01 45 35 SPECI AL I NSPECTI ONS, t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons.

3. 6. 3 Fol l ow- up Phase

Per f or m dai l y checks t o assur e cont r ol act i v i t i es, i ncl udi ng cont r ol

Apr i l 2019 Page 8 Sect i on 01 45 00. 00 10 t est i ng, ar e pr ovi di ng cont i nued compl i ance wi t h cont r act r equi r ement s, unt i l compl et i on of t he par t i cul ar f eat ur e of wor k. Recor d t he checks i n t he QC document at i on. Conduct f i nal f ol l ow- up checks and cor r ect al l def i c i enci es pr i or t o t he st ar t of addi t i onal f eat ur es of wor k whi ch may be af f ect ed by t he def i c i ent wor k. Do not bui l d upon nor conceal non- conf or mi ng wor k. Coor di nat e schedul ed wor k wi t h Speci al I nspect i ons r equi r ed by Sect i on 01 45 35 SPECI AL I NSPECTI ONS, t he St at ement of Speci al I nspect i ons and t he Schedul e of Speci al I nspect i ons.

3. 6. 4 Addi t i onal Pr epar at or y and I ni t i al Phases

Conduct addi t i onal pr epar at or y and i ni t i al phases on t he same def i nabl e f eat ur es of wor k i f : t he qual i t y of on- goi ng wor k i s unaccept abl e; i f t her e ar e changes i n t he appl i cabl e QC st af f , onsi t e pr oduct i on super vi s i on or wor k cr ew; i f wor k on a def i nabl e f eat ur e i s r esumed af t er a subst ant i al per i od of i nact i v i t y; or i f ot her pr obl ems devel op.

3. 7 TESTS

3. 7. 1 Test i ng Pr ocedur e

Per f or m speci f i ed or r equi r ed t est s t o ver i f y t hat cont r ol measur es ar e adequat e t o pr ovi de a pr oduct whi ch conf or ms t o cont r act r equi r ement s.

Upon r equest , f ur ni sh t o t he Gover nment dupl i cat e sampl es of t est speci mens f or possi bl e t est i ng by t he Gover nment . Test i ng i ncl udes oper at i on and accept ance t est s when speci f i ed. Pr ocur e t he ser v i ces of a Cor ps of Engi neer s appr oved t est i ng l abor at or y or est abl i sh an appr oved t est i ng l abor at or y at t he pr oj ect s i t e. Per f or m t he f ol l owi ng act i v i t i es and r ecor d and pr ovi de t he f ol l owi ng dat a:

a. Ver i f y t hat t est i ng pr ocedur es compl y wi t h cont r act r equi r ement s.

b. Ver i f y t hat f aci l i t i es and t est i ng equi pment ar e avai l abl e and compl y wi t h t est i ng st andar ds.

c. Check t est i nst r ument cal i br at i on dat a agai nst cer t i f i ed st andar ds.

d. Ver i f y t hat r ecor di ng f or ms and t est i dent i f i cat i on cont r ol number syst em, i ncl udi ng al l of t he t est document at i on r equi r ement s, have been prepared.

e. Recor d r esul t s of al l t est s t aken, bot h passi ng and f ai l i ng on t he QC r epor t f or t he dat e t aken. Speci f i cat i on par agr aph r ef er ence, l ocat i on wher e t est s wer e t aken, and t he sequent i al cont r ol number i dent i f y i ng t he t est . I f appr oved by t he Cont r act i ng Of f i cer , act ual t est r epor t s ar e submi t t ed l at er wi t h a r ef er ence t o t he t est number and dat e t aken. Pr ovi de an i nf or mat i on copy of t est s per f or med by an of f s i t e or commer ci al t est f aci l i t y di r ect l y t o t he Cont r act i ng Of f i cer . Fai l ur e t o submi t t i mel y t est r epor t s as st at ed r esul t s i n nonpayment f or r el at ed wor k per f or med and di sappr oval of t he t est f aci l i t y f or t hi s Contract.

3. 7. 2 Test i ng Labor at or i es

Al l t est i ng l abor at or i es must be val i dat ed by t he USACE Mat er i al Test i ng Cent er ( MTC) f or t he t est s t o be per f or med. I nf or mat i on on t he USACE MTC wi t h web- l i nks t o bot h a l i s t of val i dat ed t est i ng l abor at or i es and f or t he l abor at or y i nspect i on r equest f or can be f ound at :

Apr i l 2019 Page 9 Sect i on 01 45 00. 00 10 https://www.erdc.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/476661/materials-testing-center/

3. 8 COMPLETI ON I NSPECTI ON

3. 8. 1 Punch- Out I nspect i on

Conduct an i nspect i on of t he wor k by t he QC Manager near t he end of t he wor k, or any i ncr ement of t he wor k est abl i shed by a t i me st at ed i n FAR

52. 211- 10 Commencement , Pr osecut i on, and Compl et i on of Wor k, or by t he speci f i cat i ons. Pr epar e and i ncl ude i n t he QC document at i on a punch l i s t of i t ems whi ch do not conf or m t o t he appr oved dr awi ngs and speci f i cat i ons, as r equi r ed by par agr aph DOCUMENTATI ON. I ncl ude wi t hi n t he l i s t of def i c i enci es t he est i mat ed dat e by whi ch t he def i c i enci es wi l l be cor r ect ed. Conduct second i nspect i on by t he QC Manager or st af f t o ascer t ai n t hat al l def i c i enci es have been cor r ect ed. Once t hi s i s accompl i shed, not i f y t he Gover nment t hat t he f aci l i t y i s r eady f or t he Gover nment Pr e- Fi nal i nspect i on.

3. 8. 2 Pr e- Fi nal I nspect i on

The Gover nment wi l l per f or m t he pr e- f i nal i nspect i on t o ver i f y t hat t he f aci l i t y i s compl et e and r eady t o be occupi ed. A Gover nment Pr e- Fi nal Punch Li st may be devel oped as a r esul t of t hi s i nspect i on. Ensur e t hat al l i t ems on t hi s l i s t have been cor r ect ed bef or e not i f y i ng t he Gover nment , so t hat a Fi nal i nspect i on wi t h t he cust omer can be schedul ed. Cor r ect any i t ems not ed on t he Pr e- Fi nal i nspect i on i n a t i mel y manner . These i nspect i ons and any def i c i ency cor r ect i ons r equi r ed by t hi s par agr aph need t o be accompl i shed wi t hi n t he t i me sl at ed f or compl et i on of t he ent i r e wor k or any par t i cul ar i ncr ement of t he wor k i f t he pr oj ect i s di v i ded i nt o i ncr ement s by separ at e compl et i on dat es.

3. 8. 3 Fi nal Accept ance I nspect i on

The Cont r act or ' s Qual i t y Cont r ol I nspect i on per sonnel , pl us t he super i nt endent or ot her pr i mar y management per son, and t he Cont r act i ng Of f i cer ' s Repr esent at i ve ar e r equi r ed t o be i n at t endance at t he f i nal accept ance i nspect i on. Addi t i onal Gover nment per sonnel i ncl udi ng, but not l i mi t ed t o, t hose f r om Base Ci v i l Engi neer i ng Di r ect or at e and t he Cust omer Repr esent at i ve wi l l al so be i n at t endance. The f i nal accept ance i nspect i on wi l l be f or mal l y schedul ed by t he Cont r act i ng Of f i cer based upon r esul t s of t he Pr e- Fi nal i nspect i on. Not i f y t he Cont r act i ng Of f i cer at l east 14 days pr i or t o t he f i nal accept ance i nspect i on and i ncl ude t he Cont r act or ' s assur ance t hat al l speci f i c i t ems pr evi ousl y i dent i f i ed t o t he Cont r act or as bei ng unaccept abl e, al ong wi t h al l r emai ni ng wor k per f or med under t he Cont r act , wi l l be compl et e and accept abl e by t he dat e schedul ed f or t he f i nal accept ance i nspect i on. Fai l ur e of t he Cont r act or t o have al l cont r act wor k accept abl y compl et e f or t hi s i nspect i on wi l l be cause f or t he Cont r act i ng Of f i cer t o bi l l t he Cont r act or f or t he Gover nment ' s addi t i onal i nspect i on cost i n accor dance FAR 52. 246- 12 I nspect i on of Const r uct i on.

3. 9 QC DOCUMENTATI ON

Mai nt ai n cur r ent and compl et e r ecor ds of on- si t e and of f - s i t e QC pr ogr am oper at i ons and act i v i t i es.

3. 9. 1 Const r uct i on Document at i on

Repor t s ar e r equi r ed f or each day t hat wor k i s per f or med and must be at t ached t o t he Qual i t y Cont r ol Repor t pr epar ed f or t he same day. Mai nt ai n cur r ent and compl et e r ecor ds of on- si t e and of f - s i t e QC pr ogr am oper at i ons

Apr i l 2019 Page 10 Sect i on 01 45 00. 00 10 and act i v i t i es. The f or ms i dent i f i ed under t he par agr aph " SAMPLE FORMS" or appr oved equi val ent s wi l l be used. Repor t s ar e r equi r ed f or each day wor k i s per f or med. Account f or each cal endar day t hr oughout t he l i f e of t he Cont r act . Ever y space on t he f or ms must be f i l l ed i n. Use N/ A i f not hi ng can be r epor t ed i n one of t he spaces. The Pr oj ect Super i nt endent and t he QC Manager must pr epar e and si gn t he Cont r act or Pr oduct i on and CQC Repor t s, r espect i vel y. The r epor t i ng of wor k must be i dent i f i ed by t er mi nol ogy consi st ent wi t h t he const r uct i on schedul e. I n t he " r emar ks" sect i ons of t he r epor t s, ent er per t i nent i nf or mat i on i ncl udi ng di r ect i ons r ecei ved, pr obl ems encount er ed dur i ng const r uct i on, wor k pr ogr ess and del ays, conf l i c t s or er r or s i n t he dr awi ngs or speci f i cat i ons, f i el d changes, saf et y hazar ds encount er ed, i nst r uct i ons gi ven and cor r ect i ve act i ons t aken, del ays encount er ed and a r ecor d of v i s i t or s t o t he wor k s i t e, qual i t y cont r ol pr obl em ar eas, devi at i ons f r om t he QC Pl an, const r uct i on def i c i enci es encount er ed, meet i ngs hel d. For each ent r y i n t he r epor t ( s) , i dent i f y t he Schedul e Act i v i t y No. t hat i s associ at ed wi t h t he ent er ed remark.

Pr ovi de document at i on of desi gn qual i t y cont r ol act i v i t i es. For i ndependent desi gn r evi ews, pr ovi de, as a mi ni mum, i dent i f i cat i on of t he I ndependent Techni cal Revi ew ( I TR) t eam, t he I TR r evi ew comment s, r esponses and t he r ecor d of r esol ut i on of t he comment s.

Submi t r epor t s weekl y on t he f i r s t wor ki ng day of t he f ol l owi ng week, or as di r ect ed by t he CO.

3. 9. 2 Test i ng Pl an and Log

As t est s ar e per f or med, t he QC Manager wi l l r ecor d on t he " Test i ng Pl an and Log" t he dat e t he t est was per f or med and t he dat e t he t est r esul t s wer e f or war ded t o t he Cont r act i ng Of f i cer . At t ach a copy of t he updat ed " Test i ng Pl an and Log" t o t he l ast dai l y QC Repor t of each mont h.

3. 9. 3 Rewor k I t ems Li st

The QC Manager must mai nt ai n a l i s t of wor k t hat does not compl y wi t h t he Cont r act , i dent i f y i ng what i t ems need t o be r ewor ked, t he dat e t he i t em was or i gi nal l y di scover ed, t he dat e t he i t em wi l l be cor r ect ed by, and t he dat e t he i t em was cor r ect ed. Ther e i s no r equi r ement t o r epor t a r ewor k i t em t hat i s cor r ect ed t he same day i t i s di scover ed. At t ach a copy of t he " Rewor k I t ems Li st " t o t he l ast dai l y QC Repor t of each mont h.

3. 9. 4 As- Bui l t Dr awi ngs

The QC Manager i s r equi r ed t o ensur e t he as- bui l t dr awi ngs, r equi r ed by Sect i on 01 78 00 CLOSEOUT SUBMI TTALS ar e kept cur r ent on a dai l y basi s and mar ked t o show devi at i ons whi ch have been made f r om t he Cont r act dr awi ngs.

Ensur e each devi at i on has been i dent i f i ed wi t h t he appr opr i at e modi f y i ng document at i on ( e. g. Modi f i cat i on No. , Request f or I nf or mat i on No. , et c. ) .

The QC Manager must i ni t i al each r evi s i on.

3. 10 SAMPLE FORMS

The f ol l owi ng Sampl e For ms ar e i ncl uded as at t achement s at t he end of t hi s sect i on. El ect r oni c ver si ons of t he cur r ent r epor t f or ms can be obt ai ned f r om t he CO.

Cont r act or Qual i t y Cont r ol Repor t

Apr i l 2019 Page 11 Sect i on 01 45 00. 00 10

Cont r act or Pr oduct i on Repor t Pr epat or y Phase Checkl i st I ni t i al Phase Checkl i st Test i ng PLan and Log Rewor k I t ems Li st

3. 11 NOTI FI CATI ON OF NONCOMPLI ANCE

The Cont r act i ng Of f i cer wi l l not i f y t he Cont r act or of any det ect ed noncompl i ance wi t h t he f or egoi ng r equi r ement s. Take i mmedi at e cor r ect i ve act i on af t er r ecei pt of such not i ce. Such not i ce, when del i ver ed t o t he Cont r act or at t he wor k s i t e, wi l l be deemed suf f i c i ent f or t he pur pose of not i f i cat i on. I f t he Cont r act or f ai l s or r ef uses t o compl y pr ompt l y, t he Cont r act i ng Of f i cer can i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s wi l l be made t he subj ect of c l ai m f or ext ensi on of t i me or f or excess cost s or damages by t he Cont r act or .

- - End of Sect i on - -

Apr i l 2019 Page 12 Sect i on 01 45 00. 00 10

File details come from the government source that posted it. Updated .