This document outlines first article testing requirements for an A-10 aircraft skin component. The contractor must deliver one first article unit in addition to production quantity for testing and evaluation to verify conformance with drawings, fit, function, and engineering notes. The first article must be manufactured in the same facilities as production units. The contractor must perform testing with a report to be sent to Hill Air Force Base, and the government reserves the right to test as well with a maximum estimated cost of $1,500. Approved first articles will be forwarded to the Air Force supply system while disapproved units will be returned to the contractor. Waiver of first article approval may be allowed if the contractor has produced the same or similar component previously for the Air Force within the past 36 months and it exhibited satisfactory performance.

The related federal contract opportunity is a pre-solicitation notice for replenishment spares for the A-10 aircraft skin component. Responses will be negotiated for a firm-fixed-price contract with the Department of the Air Force at Hill Air Force Base. Interested parties should contact the base once a data package has been requested on SAM.gov for approval to access opportunity details.

View the file

Other files for this federal contract opportunity

Other files attached to A-10 Weapon System; SKIN, AIRCRAFT, newest first.
File Type Posted
003_Transportation Data for Solicitations.pdf PDF
000_FA8212-21-R-0008.pdf PDF
001_CDRLs.pdf PDF
009_Item Description.pdf PDF
005_Existing Packaging SoW.pdf PDF
002_Packing Requirements.pdf PDF
011_Engineering Data Requirements.pdf PDF
006_Justification for Qualification Requirements (Section C).pdf PDF
010_IUID Checklist.pdf PDF
008_Engineering Data List.pdf PDF
004_Special Packaging Instructions.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

24 JAN 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

98747 / 160D611502-8

4. NSN

1560011244882FJ

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM EA

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED X NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are conformance with all drawings, 3D CAD models, form fit and function, and the applicable notes listed in the A-10 General Engineering Notes, Engineering Data List

(EDL).

B. The detailed technical requirements for First Article approval tests are contained in drawings, Engineering Data List (EDL), 3D CAD models, and the applicable notes listed in the A-10 General Engineering Notes. The government reserves the right to test to any specification in the contract.

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

Number of days for government approval / disapproval days.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

FB2029 OO-ALC 809 MXSS/MXDEB

BLDG 849 ATTN: NON-ACCOUNTABLE BAY

HILL AFB, UT 84056-5713

MARK FOR: F/A I & TEST DO NOT POST

(2) Government written notice of approval / disapproval due 90 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 90 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

DODACC:FB2029 OO-ALC 809 MXSS/MXDEB

BLDG 849 ATTN: NON-ACCOUNTABLE BAY

HILL AFB, UT 84056-5713

MARK FOR: F/A I & TEST DO NOT POST

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 90 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$1,500.0000

Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 07 Jun 2021

24 JAN 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

USAF SUPPLY

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by 809 MXSS/MXDEB pending disposition instructions from the contractor.

X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.

b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Bond, Cassidy LNAME: 08 APR 2019DATE:

1. The lead engineer has performed a secondary review of this item and found that a first article test is required for purchase requests less than $25,000.

2. If the manufacturer has never produced this item or hasn't produced it for an extended period of time, in view of the critical nature of the part, a First Article inspection is required.

3. The manufacture will normally be allowed only one attempt to receive full or conditional approval. Failure to receive an approval of a First Article inspection will, at the discretion of the Government, may result in the termination of the contract. It may also result in the subsequent removal of the vendor as an approved source.

4. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

5. Materials utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

6. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 07 Jun 2021

24 JAN 2019(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Moore, Ryan S

416 SCMS / GU M B A

801-777-9920

777-9920

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

First Article Lab

809 MXSS/MXDEB

801-586-4473

586-4473

Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 07 Jun 2021

File details come from the government source that posted it. Updated .