Performance-based_Work_Statement.pdf
PDF 7 MB Posted
- Attached to
- Water Purifying System Federal contract opportunity
- Solicitation number
- 0040377788
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BRAND_NAME_SALIENT_CHARACTERISTICS.docx | DOCX document | |
| Brand_Name_Specifications.pdf | ||
| Basis_for_Award_-_Best_Value_Trade-off_2-Step.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT
Installation of Type-I Ultrapure water system
Background
The new environmental trace element lab in the Reston National Center requires a consistent source of highly pure water for the preparation and analysis of samples, washing of plastic ware, and conduct of aqueous laboratory-based experiments, etc.
Scope
Services, non-personal, to provide all equipment, labor, travel, and materials including parts necessary for installing the water purification system and verifying its performance post installation.
Work Requirements and Standards
1. Contractor shall plumb the system using building deionized water as source
2. Contractor shall install dispensing unit on counter or on wall next to sink.
3. Contractor shall test the flow and performance of system verifying that it generates:
• Type-I ultrapure water, supplied at a rate specified by product literature (likely max rate of 2L/min)
• 18.2 mega-ohm, 0.055 µS/cm conductivity, and TOC levels not to exceed 5ppb
GENERAL REQUIREMENTS
1. The contractor shall verify that source water meets requirements and that product water produced by system achieves desired levels of purification.
2. The contractor shall complete installation in 1 business day
3. The contractor shall coordinate installation with laboratory manager
4. The contractor shall check in at the Visitor’s Entrance of the USGS National Center to acquire a visitor’s badge and must be accompanied by a designated USGS employee while the contractor is within the building.
Quality Assurance Surveillance Plan
• For the first year of operation, the laboratory managers will periodically run TOC and trace element blanks and confirm that system is producing Type-I ultrapure water with delivery rate of 2 l/min or better (18.2 mega-ohm, 0.055 µS/cm conductivity, and TOC levels not to exceed 5ppb). If system does not continue to meet these standards, contractor will provide additional service to bring system to compliance.