003251066_IQC_J&A_2_Redacted.pdf

PDF 294 KB Posted

Attached to
C-130 SUPPORT, BEARING, TURBINE ENGINE Federal contract opportunity
Solicitation number
Not on record
Issued by
Defense Logistics Agency Aviation

About this file

REDACTED J&A

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AVN Form S53, OCT 2015 FOR OFFICIAL USE ONLY 1

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

FOR SOLE SOURCE AND LIMITED COMPETITION

1. Agency: _________________________________________ Contracting Activity: _______________________________________ Document Identification Number: _______________________ Solicitation Number: _______________________________________

☐ FAR Part 15 ☐ FAR Part 12 ☐ FAR Part 13.5

2. The action being approved is the acquisition of supplies/services on other than a full and open competition basis.

☐ New Action ☐ Amendment: _______________________________________________________

3. The supplies/services required to meet the using activity’s needs are described as follows:

BRIEF DESCRIPTION NSN/PN QUANTITY ESTIMATED VALUE

*If too numerous, attach list of NSNs and AMSC codes.

This acquisition:

☐ will not include an option.

☐ will include a ______% option for increased quantity. Total estimated dollar value of option quantity is $____________.

☐ will include an option to extend the term of the contract for a period of _______ months, exercisable in increments of _______ months. Total estimated dollar value of all option periods is $ ___________. The maximum dollar value of all option periods is $ __________.

The total estimated dollar value of this acquisition is: (inclusive of any options) $ ____________ The maximum dollar value of this acquisition is: (inclusive of any options) $ ____________

4. The statutory authority permitting other than full and open competition is 10 U.S.C. 2304(c)(1) – Available from only one or limited number of sources.

5. The acquisition is restricted to the only source(s) of supply known to have the capability of furnishing the required supplies/services. Source(s) are:

CAGE COMPANY NAME

The use of authority 10 U.S.C. 2304(c)(1) is based on:

☐ AMC 1. Suitable for competitive acquisition for the second or subsequent time.

☐ AMC 2. Suitable for competitive acquisition for the first time.

☐ AMC 3. Acquire, for the second or subsequent time, directly from the manufacturer.

☐ AMC 4. Acquire, for the first time, directly from the manufacturer.

☐ AMC 5. Acquire directly from the sole source contractor, who is not the manufacturer.

☐ AMSC A. The Government’s right to use data in its possession is questionable. This code is under review and will be updated when the review is complete.

☐ AMSC B. This must be acquired from a manufacturing source(s) specified on a source control drawing.

☐ AMSC C. This part required engineering source approval by the design control activity in order to maintain the quality of the part.

☐ AMSC D. The data needed to acquire this part is not economically available.

☐ AMSC H. The Government does not have sufficient, accurate, or legible data to purchase this part from other than the current source. This code is under review and will be updated when the review is complete.

Type of Contract (may include number of base years)_______________________________________________________

AVN Form S53, OCT 2015 FOR OFFICIAL USE ONLY 2

☐ AMSC K. This part must be produced from class 1 castings under MIL-STD-2175.

☐ AMSC L. The annual buy value of this part falls below the screening threshold established by DoD.

☐ AMSC M. Manufacture of this part requires use of master or coordinated tooling.

☐ AMSC N. Manufacture of this part requires special test and/or inspection facilities to maintain function or system integrity.

☐ AMSC P. The rights to use the data needed to purchase this part from additional source(s) are not owned by the Government and cannot be purchased, developed, or otherwise obtained.

☐ AMSC Q. The Government does not have adequate data, lacks rights to data, or both. It is not economical to buy the data or rights to the data.

☐ AMSC R. The Government does not own the data or rights to the data needed to purchase this part from another source. It is not economical to procure the data or rights to the data.

☐ AMSC S. Acquisition of this item is restricted to Government approved source(s) because the item involves military sensitive technology.

☐ AMSC U. The cost to the Government to breakout this part and acquire it competitively has been determined to exceed the projected savings over the life span of the part.

☐ AMSC V. This part has been designated a high reliability part. Probability of failure would be unacceptable. The engineering activity has determined that data to define and control reliability limits cannot be obtained.

☐ AMSC Y. The design of this part is unstable. Engineering, manufacturing, or performance characteristics indicate that the required design objectives have not been achieved.

☐ AMSC Z. This part is a commercial/no-developmental/off-the-shelf item.

☐ Other:___________________________________________________________________________________

6. Efforts to ensure that offers are solicited from as many sources as practicable are:

☐ The acquisition will be synopsized on or about _________________ and any firm requesting a solicitation copy will be provided one.

☐ A synopsis exception cited in FAR 5.202 applies: (Explain) ________________________________________________

☐ Manufacturers of similar products identified in the market survey will be solicited.

☐ Dealers of the manufacturers will be solicited.

☐ Other: (Explain) ___________________________________________________________________________________

7. I hereby determine that the anticipated cost to the Government will be fair and reasonable. (Explain) _________________________

8. A market survey as defined by FAR 10:

☐ was conducted, and firms indicating an interest in the acquisition will be solicited. Market research efforts, include:

☐ was not conducted due to: ___________________________________________________________________________

9. Additional facts supporting other than full and open competition are:

☐ Based upon the technical certification on file, technical data is not available and cannot be developed to permit full and open competition. The data presently available reflects the minimum needs of the Government.

☐ When FAR 6.302-1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate if the cost to the

Government that would be duplicated and how the estimate was derived. ______________________________________

003251066 IQC J&A 2_Redacted
JA SPE4A716R2033 KO ATKINS_Redacted
FOR SOLE SOURCE AND LIMITED COMPETITION: DEFENSE LOGISTICS AGENCY AVIATION
Contracting Activity: FAQC
Document Identification Number: 1000038332
2 The action being approved is the acquisition of suppliesservices on other than a full and open competition basis:
BRIEF DESCRIPTION 1: SUPPORT, BEARING, TURBINE ENGINE
BRIEF DESCRIPTION 2:
BRIEF DESCRIPTION 3:
NSNPN 1: 2840-00-392-1066
NSNPN 2:
NSNPN 3:
QUANTITY 1: EAD 604
QUANTITY 2:
QUANTITY 3:
ESTIMATED VALUE 2:
ESTIMATED VALUE 3:
Address contract type & number of Base Yrs:
Check Box6: Off
Check Box7: Off
Check Box8: Yes
will not include and option:
undefined:
option for increased quantity Total estimated dollar value of option quantity is: 48
will include an option to extend the term of the contract for a period of: 12
CAGE 1: 52661
CAGE 2: 77445
CAGE 3: 33575
CAGE 4: 1QC67
COMPANY NAME 1: UNITED TECHNOLOGIES CORPORATION
COMPANY NAME 2: UNITED TECHNOLOGIES CORPORATION
COMPANY NAME 3: JF FREDERICKS AERO, LLC
COMPANY NAME 4: TRIUMPH ACTUATION SYSTEMS
Check Box1: Yes
Check Box2: Off
Check Box3: Off
Check Box4: Yes
Check Box5: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Yes
Check Box17: Off
Check Box18: Off
Solicitation Number: SPE4A717R0029
AMSC Z:
6 Efforts to ensure that offers are solicited from as many sources as practicable are: 09/15/2016
undefined_3:
A synopsis exception cited in FAR 5202 applies Explain 1:
A synopsis exception cited in FAR 5202 applies Explain 2:
Dealers of the manufacturers will be solicited: Sources Sought was posted to FBO on July 22, 2015. No vendors replied.
Other Explain 1:
undefined_4: INFORMAL COST DATA WILL BE
7 I hereby determine that the anticipated cost to the Government will be fair and reasonable Explain 1: REQUIRED. A SHOULD COST ANALYSIS WILL BE REQUESTED.
7 I hereby determine that the anticipated cost to the Government will be fair and reasonable Explain 2:
was conducted and firms indicating an interest in the acquisition will be solicited Market research efforts include 1:
was conducted and firms indicating an interest in the acquisition will be solicited Market research efforts include 2:
was conducted and firms indicating an interest in the acquisition will be solicited Market research efforts include 3:
was conducted and firms indicating an interest in the acquisition will be solicited Market research efforts include 4:
undefined_5: THE APPROVED SOURCES(S) ARE INDICATED IN A SOURCE CONTROLLED DRAWING WHICH THE
was not conducted due to 1: GOVERNMENT DOES NOT HAVE THE THE ABILITY TO REVISE OR ALTER. ADDITIONAL RESEARCH WOULD NOT RESULT IN
was not conducted due to 2: ADDITIONAL COMPETITIVE PROPOSALS.
When FAR 63021 is cited for followon acquisitions as described in 63021a2ii an estimate if the cost to the:
Government that would be duplicated and how the estimate was derived:
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Yes
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Yes
Check Box37: Off
Check Box38: Yes
Check Box39: Yes
Check Box40: Off

File details come from the government source that posted it. Updated .