Indefinite Delivery Contract FA812122D0020

Award Date 9/28/22
Last Date to Order 9/27/27
Ultimate Awardee
Not listed
Federal Contract Vehicle
Pricing Type
Firm Fixed Price
Legislative Mandate
Service Contract Act
National Interest Action
None
Award Type
Multiple
Primary Consortia Member
Not listed
Similar IDVs
The Department of the Air Force Materiel Command awarded an indefinite delivery contract to Soldream, Inc., a for-profit manufacturer of goods, for the new manufacture of component parts for the F100 aircraft engine. The contract has a potential value of $4,232,370 and a base period through June 1, 2016. Soldream has received prior delivery orders under this contract for the manufacture of F100 engine components such as nozzle segments, synchronizing rings, and augmentor components, with a total...
The Air Force Sustainment Center awarded a multiple-award indefinite delivery contract to Paradigm Manchester Inc. for F100-PW-220 convergent segment assemblies with a potential value of $31.4 million. A firm fixed price delivery order for $199,500 was also awarded for augmentor convergent segment assemblies to be delivered in Manchester, Connecticut by September 2027. The original solicitation sought proposals for an indefinite delivery/indefinite quantity contract to overhaul the F100-PW-220...
The federal contract IDV SPRTA117D0003 was awarded by the Department of the Air Force Materiel Command and the Defense Logistics Agency Aviation to Soldream Inc., a for-profit manufacturer of goods, for the provision of turbine engine components to support aircraft sustainment programs. The $4,996,991.00 single-award IDV has an ultimate completion date of April 13, 2020 and was set aside for small businesses. Under this IDV, Soldream has received delivery orders valued at over $4 million to...
The Department of the Air Force Materiel Command Air Force Sustainment Center awarded Paradigm Manchester Inc., doing business as Paradigm Precision, an indefinite delivery contract with a potential value of $7,524,299 to provide F100-PW-220/229 divergent nozzle segment seal assemblies. Under this contract, a firm fixed price delivery order of $69,100 was issued for the delivery of these assemblies to support Air Force engine sustainment efforts, with work to be completed by September 2027 in...
The U.S. Department of the Air Force Materiel Command has awarded an Indefinite Delivery Contract (IDC) to Hamilton Sundstrand Corporation, doing business as Collins Aerospace, for the repair and overhaul of the F100-PW-229 Augmentor Fuel Controls (AFC) and Augmentor Fuel Pumps (AFP). This contract, valued at up to $24,296,844.00, supports the sustainment of the Pratt & Whitney F100 turbofan engine used on various Air Force fighter aircraft. The contract was awarded through the Oklahoma City...
This indefinite delivery contract was awarded by the Oklahoma City Air Logistics Complex, a field activity of the U.S. Air Force Materiel Command, to Paradigm Manchester Inc. (doing business as Pursuit Aerospace). The $2,675,134.00 single-award contract provides for the overhaul, repair, and manufacturing of F100-PW-220/229 divergent seal assemblies and other F100 turbofan engine components to support the Air Force's tactical fighter fleet and other aircraft. Paradigm Manchester, a subsidiary of...
The U.S. Air Force Sustainment Center, a component of the Air Force Materiel Command, has awarded a $14.3 million single-award indefinite delivery vehicle (IDV) contract to Acmt, Inc., a for-profit manufacturer of aerospace and defense components. The contract is for the remanufacture of F100-PW-220/229 convergent liners, a critical safety item for military aircraft engines, over a five-year period. Several firm fixed-price delivery orders have been issued under this IDV, ranging from $92,340 to...
This is an indefinite delivery contract (IDC) awarded by the Department of the Air Force Materiel Command Air Force Sustainment Center to Pratt & Whitney Military Aftermarket Services, Inc., a division of Raytheon Technologies Corporation. The contract, which does not have any set-aside designations, is focused on the remanufacture, repair, and overhaul of components for the F100 turbofan engine used in F-15 and F-16 fighter aircraft. The task orders issued under this IDC include firm...
The Department of the Air Force Materiel Command Air Force Sustainment Center awarded a single award indefinite delivery contract to Woodward FST Inc., a division of Woodward Governor Company, to provide repair and overhaul services for F100-PW-220 augmentor spray ring manifold assemblies located in Zone IV. The potential value of the contract vehicle is $11.53 million to be delivered over a two-year base period and one-year option. Four firm fixed price delivery orders have been issued...
The key products and services being delivered under this federal contract IDV award are the repair, overhaul, and manufacturing of various F100 turbofan engine components for the U.S. Air Force's tactical fighter fleet. The prime contractor, Paradigm Manchester Inc. (doing business as Pursuit Aerospace), is a subsidiary of General Electric Company and a global manufacturer of complex aircraft engine parts. The indefinite delivery contract, awarded by the Air Force Sustainment Center (a component...
  • FA812122D0020
    Indefinite Delivery Contract
  • 1
    Federal Contract Awards

The Air Force Sustainment Center awarded Soldream, Inc. a multiple-award indefinite delivery contract with a potential value of $22,438,681 to provide F100-PW-220 augmentor convergent segment assemblies. The contract has a base period ending September 2027 with task orders awarded through this period.

Soldream, Inc. was also issued a firm fixed-price delivery order against this contract valued at $154,400 to deliver one F100-PW-220 augmentor convergent segment assembly to the Air Force Sustainment Center by September 2027 in Vernon Rockville, Connecticut. No set-aside was used for this order to support the Air Force's aircraft engine sustainment programs.

The originating opportunity contemplated a requirements contract for the overhaul of the F100-PW-220 convergent segment assembly to support the F100-PW-299/220 engine at Tinker Air Force Base, Oklahoma. Valued between $400,000 to $50 million over five years, the solicitation sought capability for the required overhauls to technical specifications with annual estimates of 400 to 13,250 units.

Generated 1/4/24, 11:28 PM