Project Grant R24AP00083

Award Date 3/28/24
Completion Date 12/31/25
Dollars Obligated $630K
Federal Grant Program
15.507
Assistance Type
Project Grant
Place of Performance
Washington, USA
Similar Awards
The U.S. Department of the Interior's Bureau of Reclamation awarded a $1,188,663 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) Federal Grant Program (CFDA 15.507) to Chelan County, Washington to complete the study and design of a comprehensive restoration project for Peshastin Creek. The project will relocate and reconnect the creek channel with its historic floodplain and construct two highway bridges across the rerouted waterway. Key project...
The Chelan County Natural Resources Department in central Washington received a $154,853.11 Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) Federal Grant Program (CFDA 15.507). The grant will fund the implementation of a turf replacement program to incentivize residents to replace turf with drought-tolerant landscaping. This project aims to reduce overall water use across the Wenatchee River...
The Department of the Interior's Bureau of Reclamation awarded Clallam County, WA a $2,434,622 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA No. 15.507) to implement a water conservation and diversion improvement project. The project will pipe 2,900 feet of an open canal, install an automated headgate at the intake, and upgrade a flow control structure to allow for responsive management based on water demand. The project will also...
The Lake Chelan Reclamation District received a $150,633 project grant award from the Department of the Interior Bureau of Reclamation under the WaterSMART (Sustain and Manage America’s Resources for Tomorrow) program (CFDA 15.507). The grant period runs from April 7, 2021 to April 15, 2022. The WaterSMART program aims to leverage federal funding to cost-share with recipients on projects that save water, increase renewable energy use, and accomplish other sustainability goals. This particular...
The Bureau of Reclamation awarded a $765,600 Project Grant under the Aquatic Ecosystem Restoration Program (CFDA 15.580) to the Confederated Tribes and Bands of the Yakama Nation. The grant will fund the development of final construction designs to remove and re-route a 0.65-mile segment of State Route 207 away from the Nason Creek floodway in Chelan County, Washington. This will restore approximately 13 acres of floodplain habitat, including side channels and wetlands, to benefit endangered...
This federal Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation's WaterSMART (Sustain and Manage America's Resources for Tomorrow) program, CFDA No. 15.507, provides $3,017,964.00 to the Kittitas Conservation Trust to implement an in-stream restoration project on River Mile 2-3 of Gold Creek in Kittitas County, Washington. The project aims to restore the geomorphology and increase the habitat complexity of Gold Creek by installing engineered log jam...
The U.S. Department of the Interior's Bureau of Reclamation awarded a $1,191,586 WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) grant to the Quincy Columbia Basin Irrigation District on September 6, 2023. This Project Grant will fund the lining of 2,500 feet of the earthen West Canal with a geomembrane liner covered by concrete to address seepage losses in central Washington. The project is expected to result in annual water savings of 728 acre-feet that...
The Bureau of Reclamation awarded a $4,013,207.73 WaterSMART (CFDA 15.507) grant to the Deschutes Land Trust to restore 124 acres of aquatic, floodplain, and upland habitat at the Ochoco Preserve in Crook County, Oregon. The project aims to create over 2 miles of new main baseflow stream channels, 1.5 miles of side channels, and over 11 acres of wetlands to support reintroduced Spring Chinook salmon and Summer steelhead populations. Additional planned restoration efforts include 37 acres of...
The Kittitas Reclamation District will line 1,902 linear feet of the South Branch Canal in Kittitas County, Washington to conserve water that will be dedicated to instream flows in upper Yakima River tributaries. The conserved water will benefit critical habitat for threatened steelhead and bull trout under a $2.67 million project grant awarded on September 22, 2022 by the Bureau of Reclamation through its WaterSMART Sustain and Manage America's Resources for Tomorrow (WaterSMART) program...
The U.S. Department of the Interior's Bureau of Reclamation awarded a $225,990.68 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) (CFDA 15.507) program to the Columbia Irrigation District in Kennewick, Washington. The grant funding will be used to install a reinforced concrete liner in approximately 1,400 linear feet of the district's Lateral 2 canal. This project will greatly reduce seepage from the canal and protect the banks, thereby reducing the...

The Bureau of Reclamation awarded the Chelan County Natural Resource Department a $629,606.85 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to restore wet meadow hydrology and floodplain connectivity in the 1,300-acre Camas Meadows in Washington state. The project aims to address incision and drainage issues that have degraded this critical natural water storage feature, which is located in the flow-limited Peshastin sub-basin of the Wenatchee watershed. Planned restoration actions include replacing the meadow outlet culvert, regrading channels, installing habitat structures, and replanting native vegetation. These interventions are expected to restore an additional 180 acre-feet of water storage and 0.2 cfs of year-round baseflow, benefiting downstream aquatic habitat and ESA-listed steelhead and spring Chinook populations. The project, which has a completion date of December 31, 2025, is supported by local tribes and water districts as a priority action in the Wenatchee Watershed Plan.

Generated 12/31/24, 12:30 PM