- The U.S. Bureau of Reclamation awarded a $5,918,760 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to the Hidalgo County Irrigation District No. 2 in Texas. The funding will be used to construct infrastructure and efficiency improvements to a feeder canal, discharge pipes, and a pumping plant. Key project activities include building reinforced isolation bays on the headwall and feeder canal, as well as replacing the pump discharge...
- The United Irrigation District, located in Hidalgo County, Texas, was awarded a $1,700,000 Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507). The funding will be used to install seven flow control and metering gates and four flow control gates on the Bryan Canal, which provides water to the cities of Mission and McAllen, Texas, and the Sharyland Water...
- The U.S. Bureau of Reclamation awarded a $300,214.26 Project Grant on January 23, 2024 to the El Paso County Water Improvement District No 1 in Texas under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507). The grant funds will be used to line 3,465 linear feet of the earthen Montoya Main Lateral canal with reinforced shotcrete. This upgrade will reduce water loss due to evaporation and seepage, as well as decrease sediment loading in the canal, improving...
- The El Paso County Water Improvement District No. 1 received a $4,031,382 Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507). The grant will fund the lining of 11,000 feet of the Riverside Canal with steel-panel reinforced concrete, which is expected to result in annual water savings of 1,637 acre-feet by reducing seepage losses. This project aims to improve water...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $3,830,500 Project Grant (CFDA #15.507 - WaterSMART) to the Panoche Water District in Fresno County, California on September 19, 2023. This funding will allow the Panoche Water District to install a 2.9-mile concrete liner on the currently unlined Contour Canal and replace four check structures, three road crossings, and 15 turnouts with pre-cast concrete structures to accommodate necessary trash screens. The project is...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $894,676 Project Grant to the Cameron County Irrigation District #2 in Texas under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507). The funding will be used to convert 4,713 linear feet of unlined open canal in a segment of Lateral C-2 to a buried polyvinyl chloride pipeline. This project is expected to result in annual water savings of 280 acre-feet that is currently...
- The Harlingen Irrigation District Cameron County No. 1 in Texas received a $219,732.76 Project Grant award on July 11, 2023 from the U.S. Department of the Interior Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA #15.507). The grant funding will be used to upgrade the canal flow measurement instrumentation at the Adams Gardens River Pump Station with an acoustic Doppler flowmeter and Supervisory Control and Data Acquisition (SCADA)...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $211,051 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to the La Feria Irrigation District #3 in Cameron County, Texas. The grant funds the installation of a solar-powered Supervisory Control and Data Acquisition (SCADA) telemetry system at 10 spillway sites to monitor water flow, manage discharges, and reduce water lost to operational spills. This technology...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $1,133,442 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to the Cameron County Irrigation District C-15 in Texas. The grant will fund the conversion of 5,207 linear feet of unlined open canal in a segment of Lateral 15 to a buried polyvinyl chloride pipeline. This project is expected to result in annual water savings of 390 acre-feet that would have otherwise...
- The U.S. Department of the Interior's Bureau of Reclamation, under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507), awarded the Firebaugh Canal Water District in San Joaquin County, California a $3,786,000 Project Grant on January 15, 2025. The grant will fund the concreting of 2.08 miles of the 3rd Lift Canal and the construction of a 60-acre-foot midchannel storage reservoir adjacent to the lined section. This project is expected to...
THE DONNA IRRIGATION DISTRICT, LOCATED IN SOUTHERN TEXAS, WILL LINE 12,255 FEET OF THE CURRENTLYCONCRETE LINED EAST MAIN CANAL AND 10,050 LINEAR FEET OF THE CURRENTLY CONCRETE LINED NORTHCROSSOVER MAIN CANAL WITH A GEOSYNTHETIC COMPOSITE CANAL LINER PROTECTED WITH FOUR INCHES OFSHOTCRETE THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 4,620 ACRE FEET BYREDUCING SEEPAGE LOSSES THE DISTRICT WILL ALSO INSTALL 2 SOLAR MONITORING STATIONS AT THE DISTRICT SFIRST LIFT PUMP STATION AND SECOND LIFT PUMP STATION TO PROVIDE A MORE EFFICIENT, REAL TIME,DETECTION OF PROBLEMS TO AID IN MINIMIZING LOSS OF WATER RESOURCES THE CONSERVED WATER WILLREMAIN IN THE FALCON AND AMISTAD RESERVOIRS FOR EVENTUAL ALLOCATION TO OTHER USERS IN THE RIOGRANDE SYSTEM, ALLEVIATING PRESSURE ON THE OVER ALLOCATED WATER RESOURCE SHARED WITH MEXICO
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $0 | 6/30/25 | ||
| Not listed | $0 | 7/18/24 | ||
| Not listed | $2.0m | 9/22/22 |