This federal Project Grant award, funded by the Department of Energy's (DOE) Grid Infrastructure Deployment and Resilience program (CFDA 81.254), provides $103,636,574 to Allete, Inc.'s Minnesota Power division to design and build two high-voltage direct current (HVDC) terminal stations capable of delivering 1500 megawatts (MW). The goal is to ensure the stations are sized and configured for future local and regional grid expansion, as HVDC terminal stations are produced by a limited number of global suppliers. The award period runs from October 1, 2024 to September 30, 2029.
Generated 1/28/25, 10:34 AM