Purchase Order FA680025P0021
- Not listed
- This is a firm fixed-price purchase order contract awarded by the Oklahoma City Air Logistics Complex (an agency of the U.S. Department of Defense) to HPS Fabrications Inc., a self-certified small disadvantaged and veteran-owned business located in Wyandotte, Michigan. The contract is for the production, inspection, delivery, assembly, and installation of five (5) B-52 bomb bay stands, in accordance with the statement of work. The contract has a ceiling value of $337,500.00 and a completion date...
- The U.S. Air Force Materiel Command has awarded a $2,522,768.11 firm-fixed-price delivery order contract to The Boeing Company for B-52 Advanced Extremely High Frequency (AEHF) engineering services. This award is made under a larger Indefinite Delivery/Indefinite Quantity (IDIQ) contract vehicle and covers recurring and non-recurring engineering, software development, avionics upgrades, structural modifications, and life extension efforts for the B-52 bomber platform. The contract has an...
- <p>This is a delivery order under contract FA853310D0009 awarded by the U.S. Air Force Lifecycle Management Center (AFLCMC) to D A E Industries, Inc., a small business. The contract is for the maintenance stand for the B-52 Stratofortress aircraft's drag chute. The contract has a firm fixed price of $449,828.00 and a completion date of February 29, 2016. The award was made on May 4, 2015 as a set-aside for small businesses.</p>
- This is a firm fixed-price purchase order contract awarded by the Oklahoma City Air Logistics Complex, part of the U.S. Air Force, to Bastian Manufacturing LLC, a small business manufacturer based in Burns, Wyoming. The contract is for the delivery of B-52 stairs and stands, with an ultimate completion date of November 13, 2020 and a ceiling value of $76,450.00. The original solicitation was a pre-solicitation announcement for the purchase of B-52 stands and stairs with installation, with a...
- The Boeing Company's Services Division was awarded a delivery order contract by Air Force Materiel Command on August 30, 2011, to manufacture and deliver four aircraft access doors for the B-52 Stratofortress bomber. This firm fixed-price delivery order, valued at $984,332.15, represents work performed under a larger Indefinite Delivery/Indefinite Quantity contract vehicle, enabling flexible procurement of critical aerospace components for military aircraft sustainment. The contract contained no...
- The Department of the Air Force Materiel Command Lifecycle Management Center at Eglin Air Force Base awarded The Boeing Company's Legacy Wichita Division a $300,763 cost-plus-fixed-fee delivery order contract for B-52 HYPERSONIC CONVENTIONAL STRIKE WEAPON (HCSW) SUPPORT 2. This award, which did not have a set-aside designation, is for engineering services, aircraft maintenance, modifications, repairs, and overhauls in support of the U.S. Air Force's B-52 Stratofortress bomber fleet. The Boeing...
- This is a firm fixed price delivery order awarded to The Boeing Company's Legacy Wichita Division for the B52H 1760 Internal Weapons Bay Upgrade, Increment 1.2 valued at $18,828,135.39. The contract was issued by the Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex for engineering services, modifications, and upgrades to the B-52 Stratofortress bomber. No set-aside designation was used. Boeing has an extensive history of providing engineering, maintenance, and...
- This is a federal contract award to The Boeing Company for B-52 engineering services. The $9,862,180.88 cost-plus-fixed-fee delivery order contract was awarded by the Oklahoma City Air Logistics Complex, which is part of the U.S. Air Force Materiel Command. The contract has an ultimate completion date of December 15, 2027 and covers a range of engineering services for the B-52 Stratofortress bomber aircraft, including recurring and non-recurring engineering, software block sustainment,...
- The Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base awarded a $17,008,887.00 firm-fixed price delivery order contract to The Boeing Company's Legacy Wichita Division for the B-52 Engineering Sustainment Program. The contract provides engineering services, aircraft maintenance, modifications, repairs, and overhauls in support of the U.S. Air Force's B-52 Stratofortress bomber fleet. This includes software upgrades, non-recurring engineering...
- This is a delivery order contract awarded by the U.S. Air Force Sustainment Center (AFSC) to The Boeing Company's Legacy Wichita Division for B-52 engineering services. The $6,605,997.77 cost-plus-fixed-fee contract has a period of performance through June 15, 2024. The contract provides recurring and non-recurring engineering, software block sustainment and support, interim contractor support, and full-scale fatigue testing for the B-52 Stratofortress bomber aircraft. As a major defense...
Fabrication Authorities International, LLC was awarded a $845.5K firm fixed-price purchase order by Air Combat Command to manufacture B-52H phase maintenance stands for engine pods. The contract is set aside for service-disabled veteran-owned small businesses and carries an ultimate completion date of February 2, 2026. The work will be performed in Hillsboro Beach, Florida. The B-52 Stratofortress is a long-range strategic bomber that has served as a cornerstone of the U.S. Air Force's strategic deterrent for decades, with the H-model representing the most extensively modified variant currently in service. Maintenance stands are critical support equipment that enable safe access to and servicing of the aircraft's engines during scheduled maintenance operations. This contract supports Air Combat Command's mission to develop combat airpower and maintain the operational readiness of legacy strategic platforms.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $845.5k | 9/30/25 |